HomeMy WebLinkAboutItem 18 - Riverview Neighborhood Street Lighting ProjectPublic Works Agency
www.santa-ana.org/public-works
Item # 18
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 16, 2023
TOPIC: Riverview Neighborhood Street Lighting Project
AGENDA TITLE
Approve an Amendment to the FY 2022-23 Capital Improvement Program for $483,584
and Award a Construction Contract to California Professional Engineering, Inc. in the
Amount of $358,210 for the Riverview Neighborhood Street Lighting Project, with an
Estimated Project Delivery Cost of $483,584 (Project No. 23-6030) (General Fund)
RECOMMENDED ACTION
1. Approve an amendment to the FY 2022-23 Capital Improvement Program to include
$483,584 in construction funds for the Riverview Neighborhood Street Lighting
Project (Project No. 23-6030).
2. Award a construction contract to California Professional Engineering, Inc, the lowest
responsible bidder in accordance with the base bid in the amount of $358,210, for
the construction of the Riverview Neighborhood Street Lighting Project for a term
beginning May 16, 2023 and ending upon project completion, and authorize the City
Manager to execute the contract subject to non -substantive changes approved by
the City Manager and the City Attorney.
3. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$483,584, which includes $258,210 for the construction contract, $53,732 for
contract administration, inspection and testing, and a $71,642 contingency for
unanticipated or unforeseen work.
4. Determine these actions are exempt from further review pursuant to the California
Environmental Quality Act as Categorical Exemption Environmental Review No.
ER-2023-181475 was filed for the project.
DISCUSSION
The City has identified the need for lighting improvements in the Riverview
neighborhood (Exhibit 1). The scope of work includes installation of new street light
poles, LED lights, underground conduits and wiring, and new electrical meter pedestals.
Once completed, the newly installed street lighting will provide better right-of-way
illumination and a welcoming environment for pedestrians and motorists in the
Riverview Neighborhood.
Riverview Neighborhood Street Lighting Project
May 16, 2023
Page 2
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of 367
regional vendors via PlanetBids, many of which are Santa Ana based. Six vendors
requested bidding documents and a total of 15 bids were received. Bids were not
received from any Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on March 1, 2023 and March 8, 2023. The project was also advertised in
PlanetBids from March 1, 2023 through March 22, 2023. Bids were received
electronically via PlanetBids on March 22, 2023.
Bid Results Summary
Rank
Bidder's Name
Location
Base Bid
1
California Professional
Engineering, Inc.
La Puente, CA
$358,210
2
Global Diversified Voltage
Services Inc.
Van Nuys, CA
$398,825
3
KIP Electric Co Inc.
Buena Park, CA
$413,199
4
VT Electric Inc.
Ontario, CA
$429,553
5
Servitek Electric, Inc.
Walnut, CA
$432,650
6
Baker Electric Inc.
Escondido, CA
$445,636
7
Traffic Loops Crackfilling, Inc.
Anaheim, CA
$449,300
8
International Line Builders, Inc.
Corona, CA
$511,105
9
Embee Power Inc.
Irvine, CA
$539,747
10
DBX, Inc.
Temecula, CA
$546,800
11
MSL Electric, Inc.
Anaheim, CA
$553,150
12
Elecnor Belco Electric, Inc.
Chino, CA
$598,726
13
Select Electric, Inc.
Vista, CA
$640,696
14
Ha Construction
La Mesa, CA
$699,000
15
My Electrician Inc.
Menifee, CA
$990,000
A total of 15 bids were received and all were deemed responsive. California
Professional Engineering, Inc. submitted the lowest responsive base bid in the amount
of $358,210 (Exhibit 2). As specified in the bid documents, the lowest bid shall be
Riverview Neighborhood Street Lighting Project
May 16, 2023
Page 3
determined on the basis of the Base Bid. Based on the bid analysis and a contractor's
reference check, staff recommends awarding the construction contract to California
Professional Engineering, Inc. in the amount of the base bid totaling $358,210 (Exhibit
3).
California Professional Engineering, Inc. has successfully completed various projects for
the City of Santa Ana throughout the last several years. The most recent projects are
Pacific Electric Bike Trial, Sandpointe Paseo Lighting, and Thornton Park Lighting.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen
conditions. Construction administration and inspection includes the following:
construction management; inspection of the Contractor's work to ensure contract
compliance, workmanship, and quality; and materials testing. As indicated in the Cost
Analysis (Exhibit 4) and as summarized in the table below, the estimated total
construction delivery cost of the project is $483,584.
Project Item
Total
Construction Contract
$358,210
Construction Administration, Inspection, Testing
$53,732
Contingencies
$71,642
TOTAL CONSTRUCTION DELIVERY COST
$483,584
Approval of this item will amend the FY 2022-23 Capital Improvement Program to
include the Riverview Neighborhood Street Lighting Project (Exhibit 5).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2023-181475 was filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $483,584, which includes construction, contract administration, inspection,
testing, and an authorized contingency.
The following table summarizes the funds budgeted and available in current FY 22-23
for expenditure to deliver construction of this project. Any remaining balances not
expended at the end of the fiscal year will be presented to City Council for approval of
carryovers to FY 2023-24.
Riverview Neighborhood Street Lighting Project
May 16, 2023
Page 4
Accounting
Accounting Unit -
Fiscal
Unit - Account
Fund
Account No.
Amount
Year
No.
Description
Description
Project No.
PW-ST Light
01117630-
Maintenance Service
2022-23
66220
General Fund
Enhancement -
$483,584
(22-6017)
Improvements Other
Than Buildings
Total
$483,584
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
5. CIP Project Sheet
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
Exhibit 1
SANTAANA Project No. 23-6030.
P�i Riverview Neighborhood Street Lighting Project
PUBLIC WORKS AGENCY
Exhibit 2
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6030
RIVERVIEW NEIGHBORHOOD STREET LIGHTING
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: California Professional Engineering, Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sunn(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Install Street Light Pole
15
EA
S 70t? C'>
$
2
Install Electrical Meter Pedestal
I
EA
S
17- FOP
$
3
* Install 3#8 AWG Conductor
4300
LF
S
S
Wires
.
4
* Install 2" PVC Conduit
4200
LF
S
l
S
Go 1 f�a
5
* Install 3" PVC Conduit
30
LF
S
S
6
* Install No. 3 112 Pull Box
6
EA
$
S
f �
7 ;—?
7
Install No. 5 Pull Box
1
EA
S
S
i2,00
8
* Remove and Replace Concrete
20
SF
$
$
Pad
;-I:�-
, 7 f n/0
9
Pothole Street Light Pale Location
15
EA
$
S
l0
Pothole Utilities Not Shown on Plan
5
EA
S
S
_
11
Construction Permit
I
EA
$6,000
$ WOO
P-1 of P-16
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6030
RIVERVIEW NEIGHBORHOOD STREET LIGHTING
TOTAL BASE BID S
10
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within sixty (60) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $3,500 per calendar day.
Name of Firm California Pr*ssiopAl Engineering, Inc.
Signature of BIDDER
Title Van Nguyen President, Secretary
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-2 of P-16
EXHIBIT 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 23-6030
RIVERVIEW NEIGHBORHOOD STREET LIGHTING PROJECT
This CONSTRUCTION CONTRACT is made and entered into this 161 day of May, 2023 by and between
the City of Santa Ana, California, a charter city and municipal corporation organized and existing under
the Constitution and laws of the State of California (hereinafter "CITY"), and California Professional
Engineering, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
I. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Riverview Neighborhood Street Lighting Project (hereinafter
referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract
Documents prepared by the City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Three Hundred Fifty -Eight Thousand Two
Hundred Ten Dollars and No Cents ($358.210.00), as set forth and identified in the BID PROPOSAL,
which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev, 09/01/2017 Page I of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: http://www.santa-ana.ora/pwa/documents/CWA.12df
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Doi tars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Doi lars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
JENNIFER L. HALL
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: 4� m
JOSE MONTOYA
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
California Professi
NAME: Van Nguy
TITLE: President
Engineering, Inc.
Page 3 of 3
EXHIBIT 4
COST ANALYSIS
CONSTRUCTION OF PROJECT NO. 23-6030 Riverview Neighborhood Street Lighting
Construction Contract
$
358,210.00
Contract Administration, Inspection and Testing
$
53,732.00
Contin encies
$
71,642.00
TOTAL ESTIMATED CONSTRUCTION COSTS
1 $
483,584.00
EXHIBIT 5
PROJECT TITLE:
Riverview Neighborhood Street
Lighting Project
PROJECT CATEGORY:
Utility/Drainage/Lighting
Improvements
LOCATION MAP A
N
- -
- Szntiago.Creek
AGENCY:
Public Works
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET 41
PROJECT DESCRIPTION:
Scope of work includes installation of new street light poles, LED
lights, underground conduits and wiring, and new electrical meter
pedestals.
F
ROJECT NEED:
e City has identified the need for lighting improvements within the
verview Neighborhood.
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 483,584 - - - - - -
TOTAL 483,584 -
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
GENERAL FUNDS 483,584 - - - - - -
TOTAL 483,584 - - - - -
DIVISION:
Traffic Engineering
CONTACT:
Cesar Rodriguez, Senior Civil Engineer
39