HomeMy WebLinkAboutItem 25 - Construction Engineering Services for San Lorenzo Lift StationPublic Works Agency
www.santa-ana.org/public-works
Item # 25
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 16, 2023
TOPIC: Construction Engineering Services for San Lorenzo Lift Station
AGENDA TITLE
Approve an Appropriation Adjustment and Approve an Agreement with Butier
Engineering, Inc. for a Total Amount Not to Exceed $500,000 for Construction
Engineering Services for San Lorenzo Sewage Lift Station (Non -General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment recognizing prior -year fund balance of
$500,000 in the Sewer Connection Fee Fund, Sewer Connection Projects, Prior
Year Carry Forward revenue account, and appropriating the same amount into
the Sewer Connection Projects, Improvements Other Than Building expenditure
account. (requires five affirmative votes)
2. Authorize the City Manager to execute an agreement with Butier Engineering,
Inc. for construction engineering services, for a total agreement amount of
$500,000 subject to non -substantive changes approved by the City Manager and
the City Attorney.
3. Approve an amendment to the Fiscal Year 2022-23 Capital Improvement
Program for $500,000 in construction funds for the San Lorenzo Sewer Lift
Station Project (06-3510).
DISCUSSION
On October 1, 2019, the City Council authorized the City Manager to execute an
agreement with Butier Engineering, Inc. (Butier Engineering) to provide construction
engineering services for the San Lorenzo Sewer Lift Station project (Exhibit 1). Due to
issues encountered during the construction of the project, the defaulting of the original
contractor, and COVID-1 9-related delays, the $550,000 originally allocated for this
agreement was depleted. On August 17, 2021, the City Council approved an
amendment to the agreement to add $500,000 for construction engineering services
(Exhibit 2).
The original agreement and amendment has since expired and construction engineering
services for San Lorenzo Lift Station project through RFP No. 18-049 (Exhibit 3) are still
Amend Agreement for Construction Engineering Services
May 16, 2023
Page 2
required through the remainder of the construction project. The new agreement with
Butier Engineering details the services they will provide at the same fee detailed in the
original agreement and fee proposal. (Exhibit 4).
FISCAL IMPACT
Approval of the requested appropriation adjustment will recognize $500,000 in prior -
year fund balance in the Sewer Connection Fee Fund, Sewer Connection Projects, Prior
Year Carry Forward revenue account (No. 05517002-50001), and appropriating the
same amount into the Sewer Connection Projects, Improvements Other Than Building
expenditure account (No. 05517660-66220).
Approval of the amendment to the FY 2022-23 Capital Improvement Program (Exhibit 5)
will officially incorporate these funds in the amount of $500,000 to the program.
The following table summarizes the funds budgeted for expenditure on construction
engineering services to deliver construction of this project. The current fiscal year
funding is available in the FY 2022-23 budget. Any remaining balance not expended at
the end of the fiscal year will be presented to City Council for approval of carryovers to
FY 2023-24.
Fiscal
Year
Accounting Unit
- Account NO.
(Project No.)
Fund
Description
Accounting Unit,
Account No.
Description
Amount
Capital Recovery
05417647-66220
Sanitary
Charges,
2022-23
(06-3510)
Sewer
Improvements
$500,000
Capital
Other Than
Building
Total
$500,000
EXHIBIT(S)
1. Staff Report October 1, 2019
2. Staff Report August 17, 2021
3. RFP No. 18-049
4. Agreement with Butier Engineering
5. FY 2022-23 Capital Improvement Program Sheet
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
REQUESTFOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
OCTOBER 1, 2019
APPROVE AN APPROPRIATION
ADJUSTMENTAND AWARD A
CONSTRUCTION CONTRACT TO
ROCKFORCE CONSTRUCTION, LLC, IN
AMOUNT OF $7,606,500 AND APPROVE AN
AGREEMENT WITH BUTIER ENGINEERING,
INC., TO PROVIDE CONSTRUCTION
ENGINEERING SERVICES FOR THE SAN
LORENZO SEWER LIFT STATION PROJECT
IN AMOUNT NOT TO EXCEED $550,000 —
ESTIMATED TOTAL DELIVERY COST:
$10,058,125
(PROJECT NO 06-3510)
{STRATEGIC PLAN NOS. 6, 1 C & 1G)
Is/ Kristine Ridge
CITY MANAGER
RECOMMENDED ACTION
EXHIBIT 1
CLERK OF COUNCIL USE ONLY:
APPROVED
El As Recommended
El As Amended
F� Ordinance on 1 It Reading
F� Ordinance on 2"d Reading
El Implementing Resolution
El Set Public Hearing For_
CONTINUED TO
FILE NUMBER
1. Approve an appropriation adjustment to spend $1,416,100 from prior year fund balance in
the Sewer Connection Fee fund, Improvements Other Than Building expenditure account.
2. Award a contract to Rockforce Construction, LLC, the lowest responsible bidder, in
accordance with the base bid in the amount of $7,606,500, for construction of the San
Lorenzo Sewer Lift Station Project, for the term beginning upon execution of the contract and
ending upon project completion, and authorize the City Manager to execute the contract
subject to non -substantive changes approved by the City Manager and the City Attorney.
3. Authorize the City Manager to execute an agreement with Butier Engineering, Inc., to provide
Construction Engineering Services for the San Lorenzo Sewer Lift Station project, for the
three-year term beginning October 1, 2019, and expiring on September 30, 2022, with
provisions for two one-year extensions exercisable by the City Manager and City Attorney, in
the total amount not to exceed $550,000, which includes a $479,572 project fee and a
contingency of $70,428, subject to non -substantive changes approved by the City Manager
and City Attorney.
4. Approve the Project Cost Analysis for a total estimated delivery cost of $10,058,125, which
includes the contract base bid, Construction Engineering Services agreement, administration,
20A-1
Award Construction and Construction Engineering Contracts
for the San Lorenzo Sewer Lift Station Project
October 1, 2019
Page 2
inspection and testing, and an authorized contingency of $1,140,975, to be paid with Sewer
Connection Projects funding.
DISCUSSION
The City of Santa Ana Segerstrom Sewer Lift Station, located on the east side of Bristol Street,
about 300 feet north of Segerstrom Avenue, has been in service since 1965. This City -owned
facility is providing a service to a tributary area of approximately 380 acres and pumping
approximately 1.2 million gallons of sewage every day. Currently, this 55-year-old station has
surcharge problems with upstream sewer mains and requires frequent maintenance and repair.
In addition, City maintenance crews and vehicles must divert traffic out of the northbound traffic
lanes on Bristol Street to access the facility. Maintenance efficiencies can be improved by
relocating the facility and replacing the failing pumps and equipment.
The proposed new San Lorenzo Sewer Lift Station will be located at the southwest corner of the
intersection of San Lorenzo Avenue and Baker Street (Exhibit 1). The scope of work includes
approximately 880 linear feet of 15-inch and 12-inch gravity sewer mains and 600 linear feet of
parallel 10-inch force mains, sewer manholes, sewer gate valves, 3 vertical dry pit sewage
pumps, motors with variable frequency drives, in -line grinders, flow meter, underground concrete
dry well and wet well, piping, fittings, and appurtenances. Moreover, this project will construct a
new concrete masonry unit block building with a Heating, Cooling & Ventilation (HVAC) system,
ducting, rails, hoist system, gravity scrubber system, electrical and instrumentation; plus site
grading, landscaping, and irrigation improvements. Once completed, the improvements will
improve system efficiency, reliability, and enhance safety.
Proiect Construction: Public Outreach and Contractor Particir)ation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised
in the Orange County Register newspaper on April 5 and 9, 2019, and bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on July 9, 2019.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates and
submit bids electronically.
A total of 137 vendors, including 7 located in the City of Santa Ana, were notified of the project
via PlanetBids. 108 vendors requested bidding documents and 5 bids were received, including 1
bid from a Santa Ana contractor.
20A-2
Award Construction and Construction Engineering Contracts
for the San Lorenzo Sewer Lift Station Project
October 1, 2019
Page 3
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Rockforce Construction, LLC.
Lake Forest
$7,606,500
2
MMC, Inc
La Palma
$7,854,000
3
Steve P. Rados, Inc.
Santa Ana
$9,761,700
4
PCL Construction, Inc.
Long Beach
$10,7127501
5
Lonerock, Inc.
Irvine,
$10,714,824
All 5 bids received were deemed responsive. Rockforce Construction, LLC. submitted the lowest
responsive bid in the amount of $7,606,500 (Exhibit 2). Based on the bid analysis and a
contractor's reference check, staff recommends awarding the construction contract to Rockforce
Construction, LLC, in the amount bid (Exhibit 3).
Construction Engineerin-q Services
Currently, the Construction Services department is assisting with the construction management
for the Orange County Streetcar project and providing field inspections, as well as ongoing
coordination with other capital improvement projects. Therefore, the Construction Services
department will utilize a consultant to oversee the San Lorenzo Sewer Lift Station project. The
Public Works Agency issued a request for proposals (RFP) on the City's Website and notified
qualified consulting firms to provide Construction Engineering Services for this project. Seven
proposals were received and evaluated by a review committee from the Public Work Agency.
Each firm was rated according to its organization, credentials, resumes, references, and fees to
provide the required services, the list of the firms and their respective scores are listed on the
following table.
FIRM LOCATION SCORE
Butier Engineering, Inc.
Tustin
88
MWH Constructors
Pasadena
85
Interwest Consulting Group
Huntington Beach
84
Lee & Ro, Inc.
City of Industry
81
NV5
Irvine
79
Willdan Group
Anaheim
79
GK & Associates
Diamond Bar
71
Butier Engineering, Inc., is the top ranking consultant for this project. Their cost proposal was
negotiated to ensure the City would receive the highest quality and value. Staff recommends that
Butier Engineering, Inc. be retained and a contract awarded for construction engineering services
20A-3
Award Construction and Construction Engineering Contracts
for the San Lorenzo Sewer Lift Station Project
October 1, 2019
Page 4
in the amount not to exceed $550,000, which includes a $479,572 project fee and a contingency
of $70,428, for the term of the agreement (Exhibit 4).
Promect Delivery
In order to deliver a complete project, in addition to the construction contract awarded to the
lowest responsible bidder, the estimated total construction delivery cost of the project includes
construction administration, inspection and testing, along with an allowance for contingencies to
account for unexpected or unforeseen conditions. Construction administration and inspection
includes construction management, implementation of the City's Community Workforce
Agreement requirements, inspection of the contractor's work to ensure contract compliance,
workmanship and quality, and material testing. As indicated in the Cost Analysis (Exhibit 5) and
as summarized in the table below, the estimated total construction delivery cost of the project is
$10,058,125.
Construction Contract
$7,606,500
Construction Engineering Services Agreement
$550,000
Inspection and Testing
$608,520
Construction Administration
$152,130
Contingencies
$1,140,975
ESTIMATED CONSTRUCTION DELIVERY COST
$10,058,125
Project funds will cover all staffing costs associated with the delivery of this capital project. No
additional funding will be used.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy C (invest resources and technology to extend the service life of existing
infrastructure to protect the City's investment and support a high quality of life standard) and
Strategy G (develop and implement the City's Capital Improvement Program in coordination with
the Community Investment Plan).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are
exempt from further review. Categorical Exemption Environmental Review No. ER-2011-04 was
filed for the project.
20A-4
Award Construction and Construction Engineering Contracts
for the San Lorenzo Sewer Lift Station Project
October 1, 2019
Page 5
FISCAL IMPACT
As indicated in the Cost Analysis (Exhibit 5), the estimated total construction delivery cost of the
project is $10,058,125, which includes the construction contract, contract administration,
inspection, testing, and project contingency.
Approval of the requested Appropriation Adjustment will authorize expense of $1,416,100 from
the prior year fund balance in the Sewer Connection Fee Fund - Improvements Other Than
Building expenditure account (No. 05517660-66220). The estimated fund balance at June 30,
2019 is $12,866,589, which is sufficient for the proposed appropriation adjustment.
The following table summarizes the budget to deliver construction of this project:
Accounting Unit —
Accounting Unit —
Fiscal Year
Account No.
Fund Description
Account No.
Amount
(Pr ject No.)
Description
Sewer Connection
FY 2019-20
05517660-66220
Sewer Connection
Projects —
$10,058,125
Oct. - June
(Proj. 06-3510)
Fee
Improvements Other
Than Building
Total
$10,058,
All Funds are scheduled for expenditure in Fiscal Year 2019-20.
Fuad S. Sweiss, PE, PLS
Executive Director
Public Works Agency
FSSfTC/MO
Exhibits: 1. Location Map
2. Bid Proposal
3. Construction Contract
4. Consultant Agreement
5. Cost Analysis
FI-11 W N! XT91VA = I I] R'" 11011 ; 1110 1 ow-W-11T41610111 0 116-1
Kathryn Downs, CPA
Executive Director
Finance and Management Services Agency
20A-5
EXHIBIT 2
Public Works Agency
https://www.santa-ana.org/pw
Item # 24
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
August 17, 2021
TOPIC: San Lorenzo Sewer Lift Station
AGENDA TITLE
Approve Appropriation Adjustment and Amendment to Agreement with Butier
Engineering, Inc. for Construction Engineering Services to Increase the Agreement
Amount by $379,714 and the Contingency by $56,957, for a Total Amount Not to Exceed
$986,671 (Non -General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment recognizing prior -year fund balance of $681,343
in the Sewer Connection Fee Fund, Sewer Connection Projects, Prior Year Carry -
Forward revenue account, and appropriating the same amount into the Sewer
Connection Projects, Improvements Other Than Building expenditure account.
2. Authorize the City Manager to execute an agreement amendment for construction
engineering services with Butier Engineering, Inc. for construction engineering
services to increase the agreement amount by $379,714 and the contingency by
$56,957 for a total agreement amount of $986,671, subject to nonsubstantive changes
approved by the City Manager and the City Attorney.
3. Approve an amendment to the Fiscal Year 2021-22 Capital Improvement Program for
$681,343 in construction funds, for the San Lorenzo Sewer Lift Station Project (06-
3510).
DISCUSSION
On October 1, 2019 City Council authorized the City Manager to execute an agreement
with Butier Engineering, Inc. to provide construction engineering services for the San
Lorenzo Sewer Lift Station project. Due to issues encountered during the construction of
the project and COVID-19-related delays, the $550,000 originally allocated for this
agreement was depleted.
Staff requests approval of an amendment to increase the agreement amount by $379,714
and the contingency by $56,957, for a total of $436,671 for construction engineering
services. An additional $244,672 will be appropriated to this project to allow for continued
San Lorenzo Sewer Lift Station
August 17, 2021
Page 2
oversight and consistency in delivering the project. These services augment City staff
efforts to ensure the timely delivery of the project.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Approval of the requested Appropriation Adjustment will recognize $681,343 in prior year
funds balance in the Sewer Connection Fee Fund, Sewer Connection Projects, Prior Year
Carry Forward revenue account (No. 05517002-50001), and appropriating the same
amount into the Sewer Connection Projects, Improvements Other Than Building
expenditure account (No. 05517660-66220).
Approval of the amendment to the FY 2021-22 Capital Improvement Program (Exhibit 2)
will officially incorporate these funds in the amount of $681,343 to the program.
The following table summarizes the funds budgeted for expenditure on construction
engineering services to deliver construction of this project.
Fiscal
Accounting Unit -
Fund
Accounting Unit -
Year
Account No '
Description
Account No.
Amount
(Project No.)
Description
Prior Authorized Funds
Sewer
Sewer Connection
2019-20
05517660-66220
Connection
Projects,
$550,000
(06-3510)
Fee
Improvements
Other Than Building
Additional Funds Requested
Sewer
Sewer Connection
2021-22
05517660-66220
Connection
Projects,
$681,343
(06-3510)
Fee
Improvements
Other Than Building
Total
$1,231,343
EXHIBIT(S)
1. Amendment to Agreement with Butier Engineering
2. FY 2021-22 Capital Improvement Program Sheet
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
EXHIBIT 3
REQUEST FOR PROPOSALS (RFP)
FOR
CONSTRUCTION ENGINEERING SERVICES
FOR
THE SAN LORENZO SEWAGE LIFT STATION
REP NO.: 18-049
CITY OF SANTA ANA
Santa Ana Public Works Agency
20 Civic Center Plaza
Santa Ana, CA 92701
Tyrone Chesanek, P.E.
Project Manager
(714) 647-5045 Office
tchesanek(&,santa-ana.or
for Release:
KEY RFP DATES (Subiect to change at discretion of City):
Issue Date:
Letter of Intent:
Deadline for Requests for Information:
Proposal Due Date:
Interview (If Required)
Projected Award Date:
Thursday, June 14, 2018
Tuesday, June 26, 2018
Tuesday, July 3, 2018
Tuesday, July 10, 2018; 2:00 p.m.
Week of July 3 0, 2 018
Tuesday, August 21, 2018
Edwin "Willian-C Galvez, P.E.
Acting Executive Director
Public Works Agency
J 4
NOTICE INVITING PROPOSALS
NOTICE IS HEREBY GIVEN that proposals will be received from qualified firms for
construction engineering services for the San Lorenzo Sewage Lift Station project.
Responses to this Request for Proposals (RFP) will be accepted until Tuesday, July 10, 2018;
2:00 p.m. Proposals received after this date/time will not be considered. It is the responsibility of
the proposer to ensure that any proposals submitted have sufficient time to be received by the
City of Santa Ana prior to this proposal due date and time.
Proposals shall be enclosed in a sealed envelope and marked clearly with following information,
formatted as follows:
"SEALED PROPOSAL FOR
RFP NO. 18-049
CONSTRUCTION ENGINEERING SERVICES FOR
THE SAN LORENZO SEWAGE LIFT STATION
IN THE CITY OF SANTA ANA
DO NOT OPEN WITH REGULAR MAIL."
City of Santa Ana
Attn.: Tyrone Chesanek
Public Works Agency;
20 Civic Center Plaza; 3rd Floor Reception, Ross Annex
Santa Ana, CA 92701
Proposals shall be mailed, hand delivered, or sent by courier service.
Proposals shall NOT be sent via telegraphic, electronic or facsimile.
All notifications, updates and addenda will be posted on the City's REP Bid page at www.santa-
ana.org/bids-rfps. Proposers shall be responsible for monitoring the site to obtain information
regarding this solicitation. Failure to respond to required updates may result in a determination
of a nonresponsive proposal.
LETTER OF INTENT - Interested firms shall submit a Letter of Intent of their pending proposal
to the noted Project Manager by the required date as shown on the cover page of this RFP.
Letters shall be forwarded via certified mail or email and shall include the following information:
1. Use formal company letterhead.
2. Indication of company interest in the RFP.
3. Acknowledgement of candidate's responsibility to monitor the City's website for any
amendments or modifications to the RFP.
4. Provision of correct, complete contact information.
City of Santa Ana RFP 18-049
Page ii
TABLE OF CONTENTS
1. INTRODUCTION / PROJECT DESCRIPTION
11. INSTRUCTIONS TO PROPOSERS
A. CITY RESPONSIBILITIES
B. PROPOSER RESPONSIBILITIES
C. REQUEST FOR INFORMATION OR CLARIFICATION
D. ADDENDA
E. LICENSES & PERMITS
F. INSURANCE
G. INFORMATION PACKET
H. PRE -PROPOSAL MEETING
1. CITY RIGHT TO REJECT
J. BID PROTESTS
111. SUBMITTAL REQUIREMENTS
A. GENERAL
B. PROPOSAL CONTENTS
1. STATEMENT OF QUALIFICATIONS
2. SCOPE OF SERVICES AND SCHEDULE
3. FEE PROPOSAL
4. CERTIFICATIONS
IFV. PROPOSAL REVIEW (CONSULTANT SELECTION
A. EVALUATION AND RATING
B. SELECTION
3
5
V. CONTRACT AWARD 7
A. REQUEST FOR COUNCIL ACTION
B. EXECUTION OF AGREEMENT
VI. IMPLEMENTATION 7
A. KICK-OFF MEETING
B. NOTICE TO PROCEED
VII. PUBLIC RECORDS
VIII. APPENDIX
7
ATTACHMENT 1: SCOPE OF WORK
ATTACHMENT 2: AGREEMENT
ATTACHMENT 3: CERTIFICATIONS
City of Santa Ana RFP 18-049
Page iii
1. INTRODUCTION / PROJECT DESCRIPTION
Nature of Work:
The City of Santa Ana is seeking a qualified professional consulting firm to provide
construction engineering services for the San Lorenzo Sewage Lift Station project. The
consultant shall provide three individuals to act as a Project Manager, an Inspector and a
Contract Administrator.
Plans and Specifications for the San Lorenzo Sewage Lift Station project are available for
review by the proposer at the office of the Public Works Agency, Construction Engineering
Section of the City of Santa Ana, located at 20 Civic Center Plaza, Ross Street Annex, Third
floor. A detailed Scope of Work is included in the Appendix of this RFP as Attachment 1.
Number of Proposals and Signature:
Five (5) hard copies and one (1) digital file on labeled USB Flash Drive (or equivalent) of
your proposal shall be signed by a company official with the power to bind the company and
submitted to the City of Santa Ana. One (1) copy of your Fee Proposal shall be submitted.
The Statement of Qualifications shall be limited to a maximum of (10) double -sided pages
(excluding front and back covers, section dividers and attachments such as resumes, forms).
Font size shall be minimum I I -point Arial. Proposal exhibits shall be maximum I I" x 1719.
Proposal Evaluation and Rating:
The criteria for evaluating the proposals submitted will take the following items into
consideration:
• Finn/Team Experience
25%
• Understanding of Need
25%
• Relevant Project Experience
30%
• Schedule
10%
• References
10%
The City has established a proposal review committee to evaluate proposers based on the
response to the RFP, which includes adherence to outlined directions and forniat, and the
City evaluation criteria set forth above. A final score will be calculated for each submitted
proposal and used to rank the proposers.
Prevailing Wages:
In accordance with the California State Labor Code, prevailing wage rates apply. Copies of
the prevailing rate of per them wages are on file with the Public Works Agency and shall be
made available to any interested party on request.
Term of Contract Agreemen :
The City desires to enter into a contract with the selected finn(s) for a period to be negotiated
with the successful proposer based on the proposed schedule in the successful proposal and
the needs of the City. This term will be specified in the Standard Consultant Agreement, as
contained in the Appendix of this RFP as Attachment 2.
City of Santa Ana RFP 18-049
Page 1
City of Santa Ana RFP 18-049
Page 2
-Wr
:A
II. INSTRUCTIONS TO PROPOSERS
A. CITY RESPONSIBILITIES
The City will provide information in its possession relevant to preparation of required
information in RFP. The City will provide only the staff assistance and documentation
specifically referred to herein.
B. PROPOSER RESPONSIBILITIES
Point of Contact: The selected proposer will assume responsibilities for all services in its
proposal. The selected proposer shall identify a sole point of contact with the greatest
knowledge in regard to the required service operations and contractual matters, including
payment of any and all charges resulting from the Agreement.
Evidence of Financial Cqpacity: Proposer may be requested to submit its most recent audited
financial statement, evidencing proposer's financial capacity to fully perform the required
services, including provision of equipment and personnel expenses over a ninety (90) day
period. If said financial statement does not reflect full ninety (90) day operational capacity,
proposer may include a letter of credit as evidence of supplemental capacity.
C. REQUEST FOR INFORMATION OR CLARIFICATION
All questions or requested clarifications shall be made in writing via e-mail to the Project
Manager (contact information as noted on the cover page to this RFP) no fewer than five (5)
calendar days prior to the date and time set for opening of proposals. No verbal requests or
responses will be accepted. Significant interpretations or clarifications will be addressed via
addenda to this RFP.
D.ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an addendum
or amendment. Notification of such addendum or amendment shall be posted on City's
website, santa-ana.org/bids-rfps as set forth in the Notice Inviting Proposals. Addenda shall
become part of the agreement documents.
E. LICENSES & PERMITS
The selected proposer shall be required to obtain a City of Santa Ana Business license within
ten (10) business days of selection and must provide a copy to the City projects manager or
designee prior to commencing any work in Santa Ana.
Additionally, Proposer will be responsible for obtaining any licenses/permits required by the
Scope of Work.
F. INSURANCE
The Selected Proposer shall provide the required evidence of insurance coverage as set forth in
the Scope of Work within ten (10) business days after receipt of notice that the contract has been
awarded. Failure to provide the required insurance certificates shall be cause for the annulment
of the award.
City of Santa Ana RFP
Page 3
-Wr
:A
G. PAYMENT INFORMATION PACKET
The selected proposer shall return a completed payment information packet within ten (10)
business days after the successful proposer has received notice that the contract has been
awarded. The packet is available on the City's website: santa-ana.org/bids-rf
ps.
H. PRE -PROPOSAL MEETING
Should a pre -proposal be scheduled, the date, time and location is identified on the cover
page of this RFP. The meeting will include discussion of the project scope and a question -
and -answer session. It is highly recommended that the Proposer's key team members attend
this meeting. Significant interpretations or clarifications will be addressed via addenda to this
RFP, as described above in "Section D: Addenda."
1. CITY RIGHT TO REJECT
The City reserves the right to reject any or all proposals submitted and no representation is
made hereby that any contract will be awarded pursuant to this RFP or otherwise.
The City reserves the right to accept or reject the combined or separate components of this
proposal in part or in its entirety or to waive any minor inconsistency, informality or
technical defect in the proposal.
The City reserves the right to reject, replace and approve any and all subcontractors. All
subcontractor(s) shall be identified in the response to the RFP. Subcontractors shall be the
responsibility of the successful proposer and the City shall assume no liability of such
subcontractors.
J. BID PROTESTS
Proposers with concerns or rebuttal of any staff determination of non -responsiveness or non -
responsibility may submit, in writing within five (5) business days, to the Project Manager,
any concerns regarding the RFP process or staff determination. Such writing shall be
considered by the City Manager or his designated representative, and may be acted upon
within five (5) business days. If no action is taken within such time, there shall be no change
to the staff determination. The exercise by Proposer of its right to submit written concerns
shall be a condition precedent to seeking judicial review of any award of a contract
hereunder.
City of Santa Ana RFP
Page 4
-Wr
:A
111. SUBMITTAL REQUIREMENTS
A. GENERAL
1. The number of Proposal Copies and signature is specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION.
Il. Deadline:
Proposals are due to the City of Santa Ana at the date, time, and location specified in the
Notice Inviting Proposals.
B. PROPOSAL CONTENTS
The proposal format and page limitation, if any, is specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION.
1. STATEMENT OF QUALIFICATIONS
a. Cover Letter — Proposals shall include a letter signed by a principal or authorized
representative who can make legally binding commitments for the entity.
b. Contract Agreement Statement: Proposal shall include a statement outlining your
concurrence or concerns with any and all provisions as contained in the Agreement
attached herein as Attachment 2 in the Appendix.
Firm and Team Experience: Proposal shall include a profile of the firm's experience.
Include resumes of project team/sub-consultants that will be providing services which
outline their technical and design experience. At a minimum, this should include the
project manager/principal agent, associates in charge when project manager/principal
agent is unavailable, key personnel, firm size, and an organization chart identifying
only those who will perform work for the proposed project and the percentage of each
individual's time devoted to this project. The project manager/principal agent shall
be the primary contact person to represent your firm and will be the person to conduct
the presentation, if invited for an interview.
d. Understanding of Nee : Proposal shall include an outline which demonstrates the
firm's understanding of the work. This outline should include anticipated approach,
tasks necessary for successful completion, deliverables, and suggestions or special
concerns that the City should be made aware of. Identify any assumptions and/or
exclusions used in preparation of the scope of work and associated fee estimate.
e. Relevant Project Experience: Proposal shall include a list of projects which your firm
or personnel have completed within the last 5 years, including significant work with
public agencies. Project information should include project description, year
completed, client name, along with a person to contact and their telephone number.
City of Santa Ana RFP
Page 5
-Wr
:A
f, References: Proposal shall include a listing of relevant projects with references for
three public entities for which Proposer has performed similar work within the past
five (5) years.
2. SCOPE OF SERVICES AND SCHEDULE:
Proposal shall include a Scope of Services and Schedule which details the work
phases to be completed, the tasks to be accomplished, the deliverables to be provided,
and the schedule / timeline to complete the project, based upon the requested Scope
of Work detailed in Attachment I of this RFP.
3. FEE PROPOSAL:
The fee proposal shall be submitted concurrently with the technical proposal, but in a
separately sealed envelope, clearly labeled as "Fee Proposal." This shall include the
firm's Standard Hourly Fee Schedule, a table outlining the tasks and team hourly
effort for each of the major tasks, and a Project Fee Schedule as outlined in the Scope
of Work.
The fee proposal will not be opened until the proposals have been evaluated by the
proposal selection committee. The City will select the consultant based on
qualifications, and then negotiate a contract price based on available funding.
4. CERTIFICATIONS:
The following forms shall be signed and included as part of the proposal submittal
package:
• Attachment 3-1: Non -Collusion Affidavit
• Attachment 3-2: Non -Lobbying Certification
• Attachment 3-3: Non -Discrimination Certification
IV. PROPOSAL REVIEW (CONSULTANT SELECTION)
A. EVALUATION AND RATING
The criteria for evaluating the proposals are specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION.
B. SELECTION
The committee may interview the top ranking proposers. The City will recommend
award of the contract to the proposer who will provide the best value to the City. City
reserves the right to begin negotiations and enter into a contract without interview or
further discussions.
V. CONTRACT AWARD
A. REQUEST FOR COUNCIL ACTION
City of Santa Ana RFP
Page 6
-Wr
:A
Following evaluation and rating by the proposal review committee, the Project Manager
will recommend award of a contract to the proposer providing the best value to the City.
B. EXECUTION OF AGREEMENT
The Scope of Services, Schedule, and Fees submitted in the proposal will be the basis of
any negotiation of final terms which will lead to a completed agreement ready for
execution based on the standard Agreement attached herein as Attachment 2 in the
Appendix.
VI. IMPLEMENTATION
A. KICK-OFF MEETING
A kick-off meeting will be held after award of contract. Consultant and its team will
meet with City of Santa Ana staff to conduct introductions, discuss scope of services, and
implementation process.
B. NOTICE TO PROCEED
Following the kick-off meeting, a formal Notice to Proceed (NTP) may be issued after
the agreement is fully executed, and all required bonds, insurance documents and
contents of the Information Packet have been received and approved.
For "On -Call" contracts, Consultant will be notified by individual City Project Managers
on a case -by -case basis to request project/task specific proposals. Written NTPs will be
then issued accordingly.
VIL PUBLIC RECORDS
All data, documents and other products used, developed, or produced during response
preparation of the REP will become property of the City. All responses to the RFP shall
become property of the City. Proposer information identified as proprietary information
shall be maintained confidential, to the extent allowed under the California Public
Records Act.
Proposals will become public record after award of contract. Proposer information
identified as proprietary information shall be maintained confidential, to the extent
allowed under the California Public Records Act.
City of Santa Ana RFP
Page 7
Appendix
ATTACHMENT 1
SCOPE OF WORK
CITY OF SANTA ANA
REQUEST FOR PROPOSALS
FOR
CONSTRUCTION ENGINEERING SERVICES FOR
SAN LORENZO SEWAGE LIFT STATION
RFP NO.: 17-115
Introduction and Backizround:
The City desires to engage a professional consultant to perform construction engineering
services for the San Lorenzo Sewage Lift Station project. The consultant shall provide three
individuals to act as Project Manager (PM), Inspector, and a Contract Administrator (CA), and
serve as an extension of City staff to assist in the overall delivery of this project, including pre -
construction tasks, managing construction and ensuring that the work is completed in
accordance with the contract documents, and project closeout and warranty phase. The
consultant team will report directly to the City's Construction Manager or his authorized
representative. City staff may assist in managing construction and will oversee the work of the
Project Manager, Inspector, and Contract Administrator.
The estimated construction cost for the San Lorenzo Sewage Lift Station project is $6 million.
The City anticipates advertising construction bids in the early fall 2018, and starting
construction by late 2018. Total construction duration for the project is anticipated to be 14
months.
Description of Work:
The required services by the Project Manager, the Inspector and the Contract Administrator may
include the following:
1. The PM shall be a registered engineer in the State of California and shall
represent the City Construction Manager in the field. The CM shall possess a
minimum of (5) years' experience in sewer lift station construction management.
The Inspector and the Contracts Administrator should have relevant experience
in sewer lift station construction management and certifications that affirm the
experience.
2. Prior to the start of the project, the PM shall be responsible for conducting a bid
analysis to determine who the lowest responsible bidder for the project will be.
Shall obtain certificates of insurance, performance bond and "New Vendor
Packet" requirements have been satisfied. This includes verifying that all sub-
contractors have a valid City Business License. Once determined, a staff report
will need to be generated to recommend the award of a Construction Contract.
City of Santa Ana RFP 18-049
Page Al-1
3. The PM shall be responsible for review of completeness and quantity of all
required shop drawings, product data, samples and other submittals
("Submittals"). Shall transmit the Submittals to City staffing for review and
approval, and shall establish and implement procedures for expediting the
processing and approval of Submittals.
4. Attend pre -construction meeting and schedule and conduct weekly construction
and progress meetings to discuss such matters as procedures, progress, problems
and scheduling. Will prepare and promptly distribute minutes.
5. Shall be responsible for ensuring that all building permits and special permits, if
required are obtained and that all applicable fees have been paid, and shall obtain
approvals from authorities having jurisdiction over the Project.
6. Shall review construction schedule, including activity sequences and duration,
schedule of submittals and schedule of delivery for products with long lead-time.
Update the project schedule as required showing current conditions and revisions
required by actual progress.
7. Shall conduct comprehensive evaluation of change order requests, provide
independent estimates, render recommendations and assist in claim resolution.
Shall regularly monitor and report on the status of the Project Construction
Budget on a monthly basis, indicating actual costs for completed activities and
work in progress, and indicating estimates for uncompleted work. Report should
identify variances between actual and budgeted or estimated costs, and shall
advise the City whenever it appears that the Actual Construction Cost has
exceeded, or will exceed, the Project Construction Budget for the entire Project
or any Project Component.
8. Monitor the contractor's safety program. Take necessary steps to ensure the job
site conditions are in compliance with OSHA regulations.
9. Maintain cost accounting records on authorized work perfon-ned under unit costs
and additional work performed on the basis of actual costs of labor and materials,
or other work requiring accounting records.
10. May develop and implement procedures for the review and processing of
applications by contractor for progress and final payments. Make
recommendations for certification to the City for payment.
11. Determine that the work of contractor is being performed in accordance with the
contract documents. Make recommendations to the City regarding special
inspection or testing of work not in compliance with the provisions of the
contract documents. Subject to review by the City, reject work which does not
conform to the requirements of contract documents.
12. The individuals, Project Manager, Inspector and Contract Administrator, shall
City of Santa Ana RFP 18-049
Page Al -2
not be responsible for construction means, methods, techniques, sequences and
procedures employed by the contractor in the performance of the contract, and
shall not be responsible for the failure of the contractor to carry out work in
accordance with the contract documents. However, any errors, omissions, or
discrepancies found in the Contract Documents shall be called to the attention of
the City's Construction Manager and clarified prior to construction starts.
13. Consult with the City when the contractor requests interpretations of the meaning
and intent of the drawings and specifications, and assist in achieving the
resolution of problems which may arise.
14. Record the progress of the project. Submit written daily and progress reports to
the City. Keep daily logs containing a record of weather, contractor's work on the
site, number of workers and equipment, work accomplished, problems
encountered, and other relevant data. Make the log available to the City. Prepare
and send Weekly Statement of Working Days to the contractor. Monitor
contractor's compliance with labor code requirements.
15. Maintain, at the job site, records of contract documents including drawings,
addenda, change orders, and other modifications of plans and specifications
marked to show all changes made during construction. Maintain as -built records
of underground utilities, including locations and depths of trenches. At the
completion of the project, deliver to the City all contract documents including as -
built records.
16. Evaluate the completion of the work of the contractor and make
recommendations to the City when work is ready for final inspection. Assist the
City in conducting final inspections.
17. Facilitate and coordinate inspection by representatives of other agencies.
18. Schedule and coordinate special inspection and material testing with the County
of Orange or other consultants.
19. Shall monitor and enforce prevailing wage forms and requirements for
conformance to the prevailing wage rates on a weekly basis. Shall verify that all
Trade personnel listed in the daily log are also listed in the certified payroll and
shall conduct weekly employee interviews, one for each trade, and submit
verification with the monthly progress payments.
20. Shall monitor and enforce the City's Community Workforce Agreement (CWA)
forms and requirements to ensure compliance. Verification should be provided
with the monthly progress payments.
21. The PM shall be responsible for all project closeout items, such as: As -Built
plans and related documentation, punch list completion, commissioning,
warranty requests during the one-year period. Shall schedule and oversee the
City of Santa Ana RFP 18-049
Page Al -3
warranty repair. Should include site visits as requested by the City to look at
defects or imperfection to determine if it is a warranty issue.
The city reserves the right to add or reduce some of the above tasks and duties as it sees
fit. The consultant, serving as staff extension, shall remain sufficiently flexible to meet
the needs of the City and of the project.
City Responsibilities:
I Provide a testing laboratory for special inspection and material testing and other
quality assurance program as required by the contract documents.
2. Process progress payments upon receipt of approved payment requests from the
resident engineer/inspector.
3. Furnish copies of construction documents, including plans and specifications.
4. Communicate with other consultant to review shop drawings and submittals,
respond to requests for information and revise plans if needed.
5. Provide a field office for the Project Manager, the Inspector and the Contract
Administrator.
6. Coordinate with the CM and serve as liaison with other City departments
Fee Proposal:
In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be
structured as follows:
The cost proposal must include the projected staff hours, hourly rates, unit prices and
reimbursable expenses for the project, as follows:
[1] Itemized estimated breakdown for services for construction engineering services for the
duration of construction. The breakdown should include pre -construction services,
construction services, and warranty period services.
a. Personnel costs - Itemized to show the following:
1. Personnel by classification/responsibilities.
2. Hourly rate for each classification.
3. Estimated hours for each personnel category.
4. Subtotal cost for each category.
5. Total estimated personnel cost.
City of Santa Ana RFP 18-049
Page Al -4
6. Include percent breakdown availability for each of the classifications
The estimated construction duration stated above is for the purpose of cost estimate only.
The length of time requiring Consultant's services will be dependent on the construction
progress. For services under this category, the Consultant shall be paid according to hourly
rates set forth herewith and the actual hours of service.
b. Estimated reimbursable Expenses:
1. Costs of supplies and materials (itemized).
2. Travel - Transportation and per them or subsistence listed separately, if any.
3. Any other direct charges.
4. Total estimated reimbursable expenses.
For services under this category, the Consultant shall be paid according to the rates set forth
herewith and the actual reimbursable expenses.
c. Subtotal of a and b.
[11] Contingency services for each month after the original construction contract time:
Services under this category will be provided when requested by the City, and the Consultant
shall be paid according to hourly rates set forth herewith and the actual hours of service.
For the purpose of comparison, each proposer shall use the same number of hours: 500 hours for
the Project Manager, the Inspector and the Contract Administrator. The subtotal of this category
shall be calculated as follows:
Proposed
Hourly Rate Hours Total
Project Manager
$
/Hr.
500 $
Inspector
$
/Hr.
500 $
Contract Administrator
$
/Hr.
500 $
City of Santa Ana RFP 18-049
Page Al -5
Appendix
ATTACHMENT 2
STANDARD AGREEMENT
City of Santa Ana RFP 18-029
CONSULTANT AGREEMENT
CITY OF SANTA ANA
THIS AGREEMENT is made and entered into this [##] day of [Monthl, 20[##] by and between
[Consultant Company Name] ("Consultant"), and the City of Santa Ana, a charter city and municipal
corporation organized and existing under the Constitution and laws of the State of California, ("City").
RECITALS
A. On [Month] [##], 20r##I, the City issued Request for Proposal No. r##-###] ("RFP"), by
which it sought a consultant to rbriefly describe the expertise sought].
B. Consultant submitted a responsive proposal that was selected by the City. Consultant
represents that it is able and willing to provide the services described in the scope of work
that was included in the RFP.
C
In undertaking the performance of this Agreement,
knowledgeable in its field and that any services
Agreement will be performed in compliance t
1
wAi
expected from a professional consulting firm in
NOW THEREFORE, in consideration of the mutual
and conditions hereinafter set forth, the parties agree a:
1.
SCOPE OF SERVICES
Consultant shall perforni during the
all labor, materials, tools, equipment, ajjji6
complete the services described aZM
incorporated by reference.
2.
3.
COMPENSATION
0
Consultant represents that it is
5rmed by Consultant under this
standards as may reasonably be
and subject to the terms
ent, the tasks and obligations including
RUPT,
tom-ary work required to fully and adequately
of Services - Exhibit A, attached hereto and
City agre4go pay, anVonWtant agrees to accept as total payment for its services for
City, the rdl%knd chargs identified in Compensation - Exhibit B. The total amount to
be expended 3ftr tWAgreement shall not exceed [One Million Two Hundred Thirty -
Four Thousand Five Hundred Sixty -Seven Dollars and Eighty -Nine Cents
($1,234,567.89)] durring the term of this Agreement, including and extension periods
exercised under Section 3.
b. Payment by City shall be made within 45 days (forty-five) days following receipt of
proper invoice evidencing work performed, subject to City accounting procedures.
Payment need not be made for work which fails to meet the standards of performance set
forth in the Recitals which may reasonably be expected by City.
fix-51mu
This Agreement shall commence on [Month ##, 20##] -OR- [the date first written above] and
terminate on.[Monthl [##], 20r##], unless terminated earlier in accordance with Section 16, below. The
term of this Agreement may be extended for [number #-year] period upon a writing executed by the City
Manager and City Attorney.
rev. 09/20/2017 Page I of 8
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and
1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing
Wage Laws"), which require the payment of prevailing wage rates and the performance of other
requirements on "public works" and "maintenance" projects. If the services being performed are part of
an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and
the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage
Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreen
contractor and not an employee of the City. This Agreement is
create an employer -employee relationship, a joint venture rel4
discretion or control over the professional manner in whi4c*o
the subject matter of this Agreement; however, the s
provided in a manner consistent with all applicable s ar
Consultant shall pay all salaries and wages, employer's
and similar taxes relating to employees and shaldIbLesponsi
�N
6. OWNERSHIP OF MATERIALS
ie�e construed to be an independent
ended nor shall it be construed to
Irns or to allow the City to exercise
n rls
sultan forms the services which are
0 t
0
pro
be pro ed by Consultant shall be
d regulations governing such services.
security taxes, unemployment insurance
for all applicable withholding taxes.
This Agreement creates a n
sfFxclV aiVerpetual license for City to copy, use, modify,
g
ah
1
reuse, or sublicense any and a c ight, s Vhd other intellectual property embodied in plans,
specifications, studies, drawings, es , an er documents or works of authorship fixed in any
tangible medium of express* di ut not limited to, physical drawings or data magnetically or
otherwise recorded on c uter di tes, ich are prepared or caused to be prepared by Consultant
under this Agreement ( umen s ata"). Consultant shall require all subcontractors to agree in
writing that City is grant non- lusive and perpetual license for any Documents & Data the
subcontractor prepares under eement. Consultant represents and warrants that Consultant has
the legal right to license any an Documents & Data. Consultant makes no such representation and
warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not
be limited in any way in its use of the Documents and Data at any time, provided that any such use not
within the purposes intended by this Agreement shall be at City's sole risk.
7. INSURANCE
Prior to undertaking performance of work under this Agreement, Consultant shall maintain and
shall require its subcontractors, if any, to obtain and maintain insurance as described below:
a. Commercial General Liability Insurance. Consultant shall maintain commercial general
liability insurance naming the City, its officers, employees, agents, volunteers and
representatives as additional insured(s) and shall include, but not be limited to protection
against claims arising from bodily and personal injury, including death resulting
therefrom and damage to property, resulting from any act or occurrence arising out of
Consultant's operations in the performance of this Agreement, including, without
Page 2 of 8
limitation, acts involving vehicles. The amounts of insurance shall be not less than the
following: single limit coverage applying to bodily and personal injury, including death
resulting therefrom, and property damage, in the total amount of $1,000,000 per
occurrence, with $2,000,000 in the aggregate. Such insurance shall (a) name the City, its
officers, employees, agents, and representatives as additional insured(s); (b) be primary
and not contributory with respect to insurance or self-insurance programs maintained by
the City; and (c) contain standard separation of insureds provisions.
b. Business automobile liability insurance, or equivalent form, with a combined single limit
of not less than $1,000,000 per occurrence. Such insurance shall include coverage for
owned, hired and non -owned automobiles.
C. Worker's Compensation Insurance. In accordance with the provisions of Section 3700 of
the Labor Code, Consultant, if Consultant has any e1joyees, is required to be insured
)r to
against liability for worker's compensation ( c , ertake self-insurance. Prior to
commencing the performance of the work und Agreement, Consultant agrees to
obtain and maintain any employer's liabili ins ce with limits not less than
$1,000,000 per accident.
d. If Consultant is or employs a license 0 fe nal such as an architect or engineer:
is,
, io
Professional liability (errors and om s Osurance, with a combined single limit of
not less than $ 1,000,000 per claivAlbigi $2,0 0 in the aggregate.
e. The following requirements apply
to this section: AUL
(i) Consultant
the entire v
to be provided by Consultant pursuant
PParance required above in fiall force and effect for
s Agreement.
(ii) Cegrates 'AWsu e shall be furnished to the City upon execution of this
Aftment and'%all be approved by the City.
(iii) Certif0% policies shall state that the policies shall not be canceled or
reduced 11ROverage or changed in any other material aspect without thirty (30)
days prior written notice to the City.
(iv) Consultant shall supply City with a fully executed additional insured
endorsement.
f. If Consultant fails or refuses to produce or maintain the insurance required by this section
or fails or refuses to furnish the City with required proof that insurance has been procured
and is in force and paid for, the City shall have the right, at the City's election, to
forthwith terminate this Agreement. Such termination shall not affect Consultant's right
to be paid for its time and materials expended prior to notification of termination.
Consultant waives the right to receive compensation and agrees to indemnify the City for
any work performed prior to approval of insurance by the City.
Page 3 of 8
8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents,
employees, contractors, special counsel, and representatives from liability: (1) for personal injury,
damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal
injury, including death, and claims for property damage, which may arise from the negligent operations
of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which
relates to the services described in section I of this Agreement; and (2) from any claim that personal
injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms
of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all
claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to
have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or
effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and
pay all costs for the defense of the City, including fees and costs for c* al counsel to be selected by the
City, regarding any action by a third party challenging the valid �it, �Kis Agreement, or asserting that
personal injury, damages, just compensation, restitution, judic* quitable relief due to personal or
ion i quitabl'
'ju� 0 is A'
property rights arises by reason of the terms of, or effects ar' fro is Agreement. City may make
all reasonable decisions with respect to its representation �* any legal eeding. Notwithstanding the
.1
foregoing, to the extent Consultant's services are s t to ivil Co ection 2782.8, the above
i
indemnity shall be limited, to the extent required by C Section 2782.8, to claims that arise out
j I
of, pertain to, or relate to the negligence, recklessness, or I misconduct of the Consultant.
9. INTELLECTUAL PROPERTY IND
Consultant shall defend and City, its officers, agents, representatives, and
employees against any and all liab* mc ��Jngs, for infringement of any United States' letters
t
patent, trademark, or copyright i ding costs, contained in the work product or
ity purs t 1
documents provided by Consultant to ty pursuant to this Agreement.
10. RECORDS
Consultant shall ke cords d invoices in connection with the work to be performed under
�z
this Agreement. ConsullatNnt aintain complete and accurate records with respect to the costs
I vs
incurred under this Agreement an /any services, expenditures, and disbursements charged to the City for
a minimum period of three (3) years, or for any longer period required by law, from the date of final
payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable.
Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of
such records and any other documents created pursuant to this Agreement during regular business hours.
Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this
Agreement for a period of three (3) years from the date of final payment to Consultant under this
Agreement.
11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is
reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or
disclose such information except in the performance of this Agreement, and further agrees to exercise
the same degree of care it uses to protect its own information of like importance, but in no event less
than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential
Page 4 of 8
information includes not only written information, but also information transferred orally, visually,
electronically, or by other means. Confidential information disclosed to either party by any subsidiary
and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and
nondisclosure shall not apply to any information that (a) has been disclosed in publicly available
sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in
rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be
disclosed by operation of law; or (e) is independently developed by the Consultant without reference to
information disclosed by the City.
12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or
indirect, which would conflict in any manner with performance of services. Conflict may be further
specified in Certifications - Exhibit C, attached hereto and orated in this Agreement by
reference. �v
13. DISCRIMINATION
Consultant shall not discriminate because of r,
sexual orientation, age, national origin, ancestry, or. �14
law, in the recruitment, selection, training, utilization,
related activities. Consultant affirms that it is a ual
applicable federal, state and local laws and r
Exhibit C, attached hereto and incorporated in tbh
14. EXCLUSIVITY AND
creedlWligion, sex, marital status,
defined and prohibited by applicable
)n, termination or other employment
y employer and shall comply with all
further specified in Certifications -
reference.
This Agreement represents in and exclusive statement between the City and
Consultant, and supersedes Z04 er agreements, oral or written, between the parties. In the
fr
v 0
event of a conflict betwe e te f Ag;reement and any attachments hereto, the terms of this
1 0'
Agreement shall prevai . is Agree nt may not be modified except by written instrument signed by
the City and by an auth d repr :ntative of Consultant. The parties agree that any ternis or
conditions of any purchase o ther instrument that are inconsistent with, or in addition to, the
1 r of, ot
terms and conditions here f, )snot bind or obligate Consultant or the City. Each party to this
Agreement acknowledges that no representations, inducements, promises or agreements, orally or
otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied
herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant,
Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written
consent of the City and any such assigninent, transfer, delegation or subcontract without the City's prior
written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit
the City's ability to have any of the services which are the subject to this Agreement performed by City
personnel or by other consultants retained by City.
Page 5 of 8
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant
compensation for all services performed by Consultant prior to receipt of such notice of termination,
subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver
to the City all work product(s) completed as of such date ' and in such case such work
product shall be the property of the City unless prohibited by law, and Consultant
consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance
specified in the Recitals of this Agreement.
17. WAIVER
No waiver of breach, failure of any conditio or a i-ght or ?1%gdy contained in or granted by
ig
w a igned by the party waiving
the provisions of this Agreement shall be effective les s in writing
the breach, failure, right or remedy. No waiver of y ch, re or right, or remedy shall be deemed
a waiver of any other breach, failure, right or reme<dy,er or not similar, nor shall any waiver
1
constitute a continuing waiver unless the writing&gspecifie
18. JURISDICTION - VENUE
This Agreement has been
interpretation, performance, and
determined and governed by the I
County, California, shall b
in connection with or by r��Ono
19. PROFESSI
id d ered n the State of California and the validity,
11% i
t of *y of the clauses of this Agreement shall be
.AWCalifornia. Both parties further agree that Orange
action or proceeding that may be brought or arise out of,
Consultant shall, througlv.me term of this Agreement, maintain all necessary licenses, permits,
approvals, waivers, and exemptions necessary for the provision of the services hereunder and required
by the laws and regulations of the United States, the State of California, the City of Santa Ana and all
other governmental agencies. Consultant shall notify the City immediately and in writing of its inability
to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be
cause for termination of this Agreement.
20. MISCELLANEOUS PROVISIONS
a. Additional provisions, if any, are identified in Additional Provisions - Exhibit D,
attached hereto and incorporated into this Agreement by reference.
b. Each undersigned represents and warrants that its signature herein below has the power,
authority and right to bind their respective parties to each of the terms of this Agreement,
and shall indemnify City fully, including reasonable costs and attorney's fees, for any
Page 6 of 8
injuries or damages to City in the event that such authority or power is not, in fact, held
by the signatory or is withdrawn.
All Exhibits referenced herein and attached hereto shall be incorporated as if fully set
forth in the body of this Agreement.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall
be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or
certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner
provided in this Section, to the following persons:
To CITY:
Clerk of the Ci
City of Santa �
20 Civic Cent(
P.O. Box 1988
Santa Ana, CA
Fax: (714) 647
With courtesy copies to:
Executive Dir(
City of Santa 1
20 Civic Centc
P.O. Box 1988
Santa Ana, CA
Fax: (714) 647
To CONSULTANT:
First Last
I itie
Consultant Comp�Lny Name
Address
City, State Zip
Fax: (###) ###-####
ley
ita Ana
enter Plaza (M-29)
988
CA 92702
647-6515
A party may change its address by giving notice in writing to the other party. Thereafter, any
communication shall be addressed and transmitted to the new address. If sent by mail, communication
shall be effective or deemed to have been given three (3) days after it has been deposited in the United
States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent
by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the
time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set
forth above. For purposes of calculating these time frames, weekends, federal, state, County or City
holidays shall be excluded.
Page 7 of 8
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first
above written.
ATTEST:
MARIA D. HUIZAR
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
0
CITY OF SANTA ANA
RAUL GODINEZ II
City Manager
CONSULT,Z,
[Consultai ny Name]
z " N
Page 8 of 8
EXHIBIT A
SCOPE OF SERVICES
EXHIBIT B
COMPENSATION
Fee Proposal including hourly rates
EXHIBIT C
CERTIFICATIONS
EXHIBIT D
ADDITIONAL PROVISIONS
Appendix
ATTACHMENT 3
CERTIFICATIONS
City of Santa Ana RFP 18-029
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited
any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that
anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly,
sought by agreement, communication, or conference with anyone to fix the bid price of the
BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDER, or to secure any advantage against the public body awarding the
contract of anyone interested in the proposed contract; that all statements contained in the bid are
true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price
or any breakdown thereof, or the contents thereof, or divulged information or data relative
thereto, or paid, and will not pay, any fee to any corporation, partnership, company association,
organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham
bid.
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are
cautioned that making a false certification may subject the certifier to criminal
prosecution.
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of _, 20_, by
, proved to me on the basis of satisfactory evidence to be the
person(s) who appeared before me
Notary Public Signature Notary Public Seal
City of Santa Ana RFP 18-029
NON -LOBBYING CERTIFICATION
The prospective participant certifies, by signing and submitting this bid or proposal, to
the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of
the undersigned, to any person for influencing or attempting to influence an
officer or employee of any Federal agency, a Member of Congress, an officer or
employee of Congress, or an employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the
making of any Federal loan, the entering into of any cooperative agreement, and
the extension, continuation, renewal, amendment, or modification of any Federal
contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid
to any person for influencing or attempting to influence an officer or employee of
any Federal agency, a Member of Congress, an officer or employee of Congress,
or an employee of a Member of Congress in connection with this Federal
contract, grant, loan, or cooperative agreement, the undersigned shall complete
and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in
conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed
when this transaction was made or entered into. Submission of this certification is a
prerequisite for making or entering into this transaction imposed by Section 1352, Title
31, U.S. Code. Any person who fails to file the required certification shall be subject to
a civil penalty of not less than $10,000 and not more than $100,000 for each such
failure.
The prospective participant also agrees by submitting his or her bid or proposal that he
or she shall require that the language of this certification be included in all lower tier
subcontracts, which exceed $100,000 and that all such subrecipients shall certify and
disclose accordingly.
Signed-
Title -
Firm:
Date -
City of Santa Ana RFP 18-029
CITY OF SANTA ANA
RFP NO.: 18-029
STRUCTURAL ENGINEERING SERVICES
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
I . The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as
otherwise provided by law.
Page 1 of 2
CITY OF SANTA ANA
RFP NO.: 18-029
STRUCTURAL ENGINEERING SERVICES
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be
binding upon each subcontract or purchase order as the administering agency may direct as
means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to protect
the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed:
Title:
Finn:
Date:
Page 2 of 2
EXHIBIT 4
AGREEMENT TO PROVIDE CONSTRUCTION ENGINEERING SERVICES
FOR THE SAN LORENZO SEWAGE LIFT STATION PROJECT
THIS AGREEMENT is made and entered into on this 16 th day of May, 2023 by and between
Butier Engineering, Inc. ("Contractor"), and the City of Santa Ana, a charter city and municipal
corporation organized and existing under the Constitution and laws of the State of California
("City").
RECITALS
A. On June 14, 2018, the City issued a Request for Proposal No. 18-049 ("RFP"), by which it
sought a contractor to provide construction engineering services for the San Lorenzo
Sewage Lift State Project. On October 1, 2019, the City entered into Agreement #A-2019-
17 1, as amended, with the Contractor to provide said services. The term of the Agreement
ran until September 30, 2022 and was not extended per the terms of Agreement #A-2019-
171.
B. Due to the expiration of services, City staff determined that a new agreement was required.
In accordance with the City's Purchasing Rules and Guidelines, City staff received
approval from the City's Purchasing Manager to proceed with a new Agreement under the
2018 RFP process above which allowed for the prior engagement with the Contractor.
C. The City desires to continue services provided under the prior Agreement and Contractor
represents that it is able and willing to provide such services to the City.
D. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform the services that were described in the Scope of Work which was
included in the RFP and is attached here to as Exhibit A, and as further delineated in Contractor's
proposal, which is attached as Exhibit B and incorporated in full.
2. COMPENSATION
a. City agrees to pay, and Contractor agrees to accept as total payment for its services for
City, the rates and charges identified in Exhibit C. The total amount to be expended
during the term of this Agreement, including any extension periods, shall not exceed
$500,000.
b. City agrees to compensate Contractor for any services provided to the City since
October 1, 2022 to the effective date, above. Contractor agrees to provide any and all
outstanding invoices for work rendered during this period no later than 90 days after
the effective date, above. No additional invoices for this period between October 1,
2022, and the effective date, will be accepted by the City.
c. Payment by City shall be made within forty-five (45) days following receipt of proper
invoice evidencing work performed, subject to City accounting procedures. Payment
need not be made for work which fails to meet the standards of performance set forth
in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on the date first written above for a one (1) year term
with the option for the City to grant up to two (2) one (1) year renewals, exercisable by a writing
by the City Manager and the City Attorney, unless terminated earlier in accordance with Section
16, below.
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq.,
and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq.,
("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the
performance of other requirements on "public works" and "maintenance" projects. If the services
being performed are part of an applicable "public works" or "maintenance" project, as defined by
the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to
fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the
City, its elected officials, officers, employees and agents free and harmless from any claim or
liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent Contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer -employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Contractor
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Contractor shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Contractor shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or
caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Contractor represents and warrants that Contractor has the legal right to license any and all
Documents & Data. Contractor makes no such representation and warranty in regard to
Documents & Data which were provided to Contractor by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
7. INSURANCE
Contractor shall procure and maintain for the duration of the contract insurance against
claims for injuries to persons or damages to property which may arise from or in connection with
the performance of the work hereunder and the results of that work by the Contractor, his agents,
representatives, employees or subcontractors.
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 0 1 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal & advertising injury with limits no less than $2,000,000
per occurrence. If a general aggregate limit applies, either the general aggregate limit shall
apply separately to this project/location (ISO CG 25 03 05 09 or 25 04 05 09) or the general
aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if
Contractor has no owned autos, covering hired, (Code 8) and non -owned autos (Code 9), with
limit no less than $1,000,000 per accident for bodily iiijury and property damage.
3. Workers' Compensation: as required by the State of California, with Statutory Limits, and
Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily
injury or disease.
If the contractor maintains broader coverage and/or higher limits than the minimums shown above,
the City requires and shall be entitled to the broader coverage and/or higher limits maintained by
the contractor.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its officers, officials, employees, and volunteers are to be covered as additional
insureds on the CGL policy with respect to liability arising out of work or operations performed
by or on behalf of the Contractor including materials, parts or equipment furnished in connection
with such work or operations. General liability coverage can be provided in the form of an
endorsement to the Contractor's insurance (at least as broad as ISO Form CG 20 10 1185 or both
CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
Primaty Coverage
For any claims related to this contract, the Contractor's insurance coverage shall be primary
insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers,
officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its
officers, officials, employees, or volunteers shall be excess of the Contractor's insurance and shall
not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except
with notice to the City.
Waiver of Subrogation
Contractor hereby grants to City a waiver of any right to subrogation which any insurer of said
Contractor may acquire against the City by virtue of the payment of any loss under such insurance.
Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of
subrogation, but this provision applies regardless of whether or not the City has received a waiver
of subrogation endorsement from the insurer.
Self -Insured Retentions
Self -insured retentions must be declared to and approved by the City. The City may require the
Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses
and related investigations, claim administration, and defense expenses within the retention. The
policy language shall provide, or be endorsed to provide, that the self -insured retention may be
satisfied by either the named insured or City.
Acceptability of Insurers
insurance is to be placed with insurers authorized to conduct business in the state with a current
A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.
Claims Made Policies
If any of the required policies provide claims -made coverage:
1. The Retroactive Date must be shown, and must be before the date of the contract or the
beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be providedfor at leastfive (5)
years after completion of the contract of work.
3. If coverage is canceled or non -renewed, and not replaced with another claims-madepolicyform
with a Retroactive Date prior to the contract effective date, the Contractor must purchase
"extended reporting" coverage for a minimum offive (5) years after completion of work.
4
Verification of Coverage
Contractor shall furnish the City with original certificates and amendatory endorsements or copies
of the applicable policy language effecting coverage required by this clause. All certificates and
endorsements are to be received and approved by the City before work commences. However,
failure to obtain the required documents prior to the work beginning shall not waive the
Contractor's obligation to provide them. The City reserves the right to require complete, certified
copies of all required insurance policies, including endorsements required by these specifications,
at any time,
Special Risks or Circumstances
City reserves the right to modify these requirements, *including limits, based on the nature of the
risk, prior experience, insurer, coverage, or other special circumstances.
8. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1) for personal
injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Contractor, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section I of this Agreement; and (2)
from any claim that personal injury, damages, just compensation, restitution, judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution, judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing,
to the extent Contractor's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of,
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent, trademark, or copyright infringement, including costs, contained in the work product
or documents provided by Contractor to the City pursuant to this Agreement.
10. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed
under this Agreement. Contractor shall maintain complete and accurate records with respect to
the costs incurred under this Agreement and any services, expenditures, and disbursements
charged to the City for a minimum period of three (3) years, or for any longer period required by
law, from the date of final payment to Contractor under this Agreement. All such records and
invoices shall be clearly identifiable. Contractor shall allow a representative of the City to
examine, audit, and make transcripts or copies of such records and any other documents created
pursuant to this Agreement during regular business hours. Contractor shall allow inspection of all
work, data, documents, proceedings, and activities related to this Agreement for a period of three
(3) years from the date of final payment to Contractor under this Agreement.
11. CONFIDENTIALITY
If Contractor receives fi7orn the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance, but in no event less than reasonable care. "Confidential Information7' shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the
Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Contractor without reference to information disclosed by the
City.
12. CONFLICT OF INTEREST CLAUSE
Contractor covenants that it presently has no interests and shall not have interests, direct or
indirect, which would conflict in any manner with performance of services specified under this
Agreement.
13. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
me
14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Contractor. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Contractors retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor
compensation for all services performed by Contractor prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Contractor consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
7
18. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
20. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-2 1)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
Butier Engineering, Inc.
Attn: Mark M. Butier, VP/CFO
17822 E. 17th Street, Ste. 404
Tustin, CA 92780
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
21. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. The Agreement is the final and complete agreement and any prior or
contemporaneous agreements for similar services between the parties is superseded
by this Agreement. This shall not apply where the Parties are currently engaged
and Contractor is providing services not contemplated by this Agreement.
C. All Exhibits referenced herein and attached hereto shall be incorporated a� if fully
set forth in the body of this Agreement.
[Signature page to follow]
E
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST:
Jennifer L. Hall
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
Bv:
Jose Montoya
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Nabil Saba, PE
Executive Director
Public Works Agency
10
CITY OF SANTA ANA
Kristine Ridge
City Manager
CONTRACTOR:
Mark M. Butier
Vice President / Chief Fina�lfficer
EXHIBIT A
SCOPE OF SERVICES
Appendix
ATTACHMENT I
SCOPE OF WORK
CITY OF SANTA ANA
REQUEST FOR PROPOSALS
FOR
CONSTRUCTION ENGINEERING SERVICES FOR
SAN LORENZO SEWAGE LIFT STATION
RFP NO.: 17-115
Introduction and Background:
The City desires to engage a professional consultant to perform construction engineering
services for the San Lorenzo Sewage Lift Station project. The consultant shall provide three
individuals to act as Project Manager (PM), Inspector, and a Contract Administrator (CA), and
serve as an extension of City staff to assist in the overall delivery of this project, including pre -
construction tasks, managing construction and ensuring that the work is completed in
accordance with the contract documents, and project closeout and warranty phase. The
consultant team will report directly to the City's Construction Manager or his authorized
representative. City staff may assist in managing construction and will oversee the work of the
Project Manager, Inspector, and Contract Administrator.
The estimated construction cost for the San Lorenzo Sewage Lift Station project is $6 million.
The City anticipates advertising construction bids in the early fall 2018, and starting
construction by late 2018. Total construction duration for the project is anticipated to be 14
months.
Description of Work:
The required services by the Project Manager, the Inspector and the Contract Administrator may
include the following:
1. The PM shall be a registered engineer in the State of California and shall
represent the City Construction Manager in the field. The CM shall possess a
minimum of (5) years' experience in sewer lift station construction management.
The Inspector and the Contracts Administrator should have relevant experience
in sewer lift station construction management and certifications that affirm the
experience.
2. Prior to the start of the project, the PM shall be responsible for conducting a bid
analysis to determine who the lowest responsible bidder for the project will be.
Shall obtain certificates of insurance, performance bond and "New Vendor
Packet" requirements have been satisfied. This includes verifying that all sub-
contractors have a valid City Business License. Once determined, a staff report
will need to be generated to recommend the award of a Construction Contract.
City of Santa Ana RFP 18-049
Page Al-1
3. The PM shall be responsible for review of completeness and quantity of all
required shop drawings, product data, samples and other submittals
("Submittals"). Shall transmit the Submittals to City staffing for review and
approval, and shall establish and implement procedures for expediting the
processing and approval of Submittals.
4. Attend pre -construction meeting and schedule and conduct weekly construction
and progress meetings to discuss such matters as procedures, progress, problems
and scheduling. Will prepare and promptly distribute minutes.
5. Shall be responsible for ensuring that all building permits and special permits, if
required are obtained and that all applicable fees have been paid, and shall obtain
approvals from authorities having jurisdiction over the Project.
6. Shall review construction schedule, including activity sequences and duration,
schedule of submittals and schedule of delivery for products with long lead-time.
Update the project schedule as required showing current conditions and revisions
required by actual progress.
7. Shall conduct comprehensive evaluation of change order requests, provide
independent estimates, render recommendations and assist in claim resolution.
Shall regularly monitor and report on the status of the Project Construction
Budget on a monthly basis, indicating actual costs for completed activities and
work in progress, and indicating estimates for uncompleted work. Report should
identify variances between actual and budgeted or estimated costs, and shall
advise the City whenever it appears that the Actual Construction Cost has
exceeded, or will exceed, the Project Construction Budget for the entire Project
or any Project Component.
8, Monitor the contractor's safety program. Take necessary steps to ensure the job
site conditions are in compliance with OSHA regulations.
9. Maintain cost accounting records on authorized work performed under unit costs
and additional work performed on the basis of actual costs of labor and materials,
or other work requiring accounting records.
10. May develop and implement procedures for the review and processing of
applications by contractor for progress and final payments. Make
recommendations for certification to the City for payment.
11. Determine that the work of contractor is being performed in accordance with the
contract documents. Make recommendations to the City regarding special
inspection or testing of work not in compliance with the provisions of the
contract documents. Subject to review by the City, reject work which does not
conform to the requirements of contract documents.
12. The individuals, Project Manager, Inspector and Contract Administrator, shall
City of Santa Ana RFP 18-049
Page A1-2
not be responsible for construction means, methods, techniques, sequences and
procedures employed by the contractor in the performance of the contract, and
shall not be responsible for the failure of the contractor to carry out work in
accordance with the contract documents. However, any errors, omissions, or
discrepancies found in the Contract Documents shall be called to the attention of
the City's Construction Manager and clarified prior to construction starts.
13. Consult with the City when the contractor requests interpretations of the meaning
and intent of the drawings and specifications, and assist in achieving the
resolution of problems which may arise.
14. Record the progress of the project. Submit written daily and progress reports to
the City. Keep daily logs containing a record of weather, contractor's work on the
site, number of workers and equipment, work accomplished, problems
encountered, and other relevant data. Make the log available to the City. Prepare
and send Weekly Statement of Working Days to the contractor. Monitor
contractor's compliance with labor code requirements.
15. Maintain, at the job site, records of contract documents including drawings,
addenda, change orders, and other modifications of plans and specifications
marked to show all changes made during construction. Maintain as -built records
of underground utilities, including locations and depths of trenches. At the
completion of the project, deliver to the City all contract documents including as -
built records.
16. Evaluate the completion of the work of the contractor and make
recommendations to the City when work is ready for final inspection. Assist the
City in conducting final inspections.
17. Facilitate and coordinate inspection by representatives of other agencies.
18. Schedule and coordinate special inspection and material testing with the County
of Orange or other consultants.
19. Shall monitor and enforce prevailing wage forms and requirements for
conformance to the prevailing wage rates on a weekly basis. Shall verify that all
Trade personnel listed in the daily log are also listed in the certified payroll and
shall conduct weekly employee interviews, one for each trade, and submit
verification with the monthly progress payments.
20. Shall monitor and enforce the City's Community Workforce Agreement (CWA)
forms and requirements to ensure compliance. Verification should be provided
with the monthly progress payments.
21. The PM shall be responsible for all project closeout items, such as: As -Built
plans and related documentation, punch list completion, commissioning,
warranty requests during the one-year period. Shall schedule and oversee the
City of Santa Ana RFP 18-049
Page AI-3
warranty repair. Should include site visits as requested by the City to look at
defects or imperfection to determine if it is a warranty issue.
The city reserves the right to add or reduce some of the above tasks and duties as it sees
fit. The consultant, serving as staff extension, shall remain sufficiently flexible to meet
the needs of the City and of the project.
City Responsibilities:
I Provide a testing laboratory for special inspection and material testing and other
quality assurance program as required by the contract documents.
2. Process progress payments upon receipt of approved payment requests from the
resident engineer/inspector.
3. Furnish copies of construction documents, including plans and specifications.
4. Communicate with other consultant to review shop drawings and submittals,
respond to requests for information and revise plans if needed.
5. Provide a field office for the Project Manager, the Inspector and the Contract
Administrator.
6. Coordinate with the CM and serve as liaison with other City departments
Fee Proposal:
In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be
structured as follows:
The cost proposal must include the projected staff hours, hourly rates, unit prices and
reimbursable expenses for the project, as follows:
[1] Itemized estimated breakdown for services for construction engineering services for the
duration of construction. The breakdown should include pre -construction services,
construction services, and warranty period services.
a. Personnel costs - Itemized to show the following:
1. Personnel by classification/responsibilities.
2. Hourly rate for each classification.
3. Estimated hours for each personnel category.
4. Subtotal cost for each category.
5. Total estimated personnel cost.
City of Santa Ana RFP 18-049
Page A14
6. Include percent breakdown availability for each of the classifications
The estimated construction duration stated above is for the purpose of cost estimate only.
The length of time requiring Consultant's services will be dependent on the construction
progress. For services under this category, the Consultant shall be paid according to hourly
rates set forth herewith and the actual hours of service.
b. Estimated reimbursable Expenses:
1. Costs of supplies and materials (itemized).
2. Travel - Transportation and per them or subsistence listed separately, if any.
3. Any other direct charges.
4. Total estimated reimbursable expenses.
For services under this category, the Consultant shall be paid according to the rates set forth
herewith and the actual reimbursable expenses.
c. Subtotal of a and b.
[111 Contingency services for each month after the original construction contract time:
Services under this category will be provided when requested by the City, and the Consultant
shall be paid according to hourly rates set forth herewith and the actual hours of service.
For the purpose of comparison, each proposer shall use the same number of hours: 500 hours for
the Project Manager, the Inspector and the Contract Administrator. The subtotal of this category
shall be calculated as follows:
Proposed
Hourly Rate Hours Total
Project Manager $ /Hr. 500
Inspector /Hr. 500 $
Contract Administrator /Hr. 500 $
City of Santa Ana RFP 18-049
Page A1-5
1 *14 111 1.11 a -,�
PROPOSAL
1p
RFP No. 18-049
Construction Engineering Services for the July 31, 2018
San Lorenzo Sewage Lift Station
win
:1 4
%
Proposal to Provide
Construction Engineering Services
for the San Lorenzo Sewage Lift Station
RFP No. 18-049
Due: July 31, 2018
BUTIER
SECTION A
Cover Letter
SECTION 8
Firm & Team Experience
SEC71ON C
Understandlog of Need
SE"ON D
Relevant Peolect Experience
SECTION E
References
SEMON F
Scope of Services and Schedule
SECTION G
Certifications
I
04
2
Section A. Cover Letter
July 26, 2018
City of Santa Ana
Attn: Tyrone Chesanek
Public Works Agency
20 Civic Center Plaza
31 Floor Reception, Ross Annex
Santa Ana, CA 92701
Subject: RFP No. 18-049—Construction Engineering Services for the San Lorenzo Sewage
Lift Station Project
Dear Mr. Chesanek:
Butler Engineering, Inc. (Butler) is pleased to present five (5) hard copies of its proposal accompanied
by one (1) digital file on a labeled USB Flesh Drive for the above stated subject. Per the RFP
instructions, we have also provided one (1) harcicopy of our Fee Proposal in a separate envelope.
Our submittal is fully responsive to the RFP and Addendum Nos. 1 and 2. The Butler Team offers
several distinguishing qualifications and a proven record of performance to the City of Santa Ana. To
address the dernands of the San Lorenzo Sewage Lift Station Project, we have assembled a team that
has provided services on some of the largest water/wastewater capital improvement projects in
Southern California,
Contract Agreement Statement
We have reviewed the Contract Agreement and concur with any and all provisions as contained in
the Agreement attached in the RFP as Attachment 2 in the Appendix,
Established Relationship with City of Santa Ana
Butier is currently providing CM and inspection services for OCWD's Mid -Basin Injection Project. The
project, which is located within the City of Santa Ana'a 87-acre Centennial Park, includes the
construction of four (4) groundwater injection wells. Our team is coordinating closely with the City and
Santa Ana Unified School District, In addition, Butler performed numerous coordination meetings with
the City's Public Works, Building, and Parks & Recreation Departments during the construction of
OCWD's Groundwater Storage Program. The Program included eight (8) wells within the OC
groundwater Iiiasin, two of which were lorated In the City of Santa Ana.
Team Member Firm
Butier and ON -SITE Technical Services, Inc. have a 14-year working relationship oil major water
capital improvement projects for Orange County Water District (OCWD), Metropolitan Water District
(MWO), West Basin Municipal Water District (WBMWD), and San Diego County Water AUthority
(SDCWA). Butler and ON -SITE have completed 15 major projects and numerous operation
upgrades for SDCWA and WBMWD. The most recent pump station project that was psi -formed as a
team was OCWD's $20.5 million Burris Pump Station Project —Phase 2, ON-SITE's domestic and
international expertise in the inspection and testing of equipment is unmatched. They conduct quality
assurance inspection services on structural steel, pump stations, recycled water facilities, pipelines,
and engineered equipment manufactured at various domestic and international facilities on a daily
basis.
City of Santa And, Public Works Agency
Constrtiction Engineering Services for the
Son Lorenzo Sewage Lift Station, RFP No. 16-049
Unique Team Features
• Professional Relationship with the Design Team--Burtier has developed a strong working
history with the Designer of Record. BLAler and Tetra Tech—spocifically, Mr. Tom Epperson —
have nearly 25 years of project history, Our firm has provided CM and inspection services on
several large, multi -phase projects designed by Tetra Tech, including the City of Tustin's
Rawlings Reservoir Replacement and City of Anaheim's Nohl Canyon Water Storage Tank
projects. In addition, our firms recently worked together on OCWD's Burris Pump Station
Project —Phase 11. Our long-standing relationship with Tetra Tech and Mr. Epperson will
make the development of our management approach more efficient and cost effective.
• IT Infrastructure and Project Documentation—Butier will provide a sophisticated IT
Infrastructure, This web -based platform allows project information to be disseminated via the
internet using Procore as a cloud -based construction project management software. The
program affords the project team with 24/7 visibility into project status and a centralized,
comprehensive platfon-n to manage all vital project data. The platform will allow us to create
"dashboards" specific to the user. This will allow the City to quickly access the project record for
key metrics and provide near real time updates of project progress,
• Extensive Experience in the Analysis and Defense of Contractor Claims—Butier's senior
staff has been responsible for the administration and defense of complex construction claims,
The firm's focus in water gives LIS a Sp0CifiC Case history that aligns CM practices with the type of
issues encountered on projects of this size and complexity.
• Local Market Knowledge —The Butler team will provide unmatched cost control and estimating
services, The firm's strong relationship with the Southern California construction community
allows us to provide market price cost estimates. We also have the ability to survey local
contractors on the current market environment- This provides our clients with an assessment of
the best time to release a project for bidding.
The construction management team will be managed out of Butler's corporate office located at
17822 E. 1711 Street, Suite 404; Tustin. CA. We appreciate the opportunity to meet the City's project
challenges with our most experienced personnel. and are confident that we have assembled a team
that will serve the best interests of all project participants. If you have any questions regarding our
proposal, please direct them to me for clarification at (714) 832-7222,
Respectfully Yours,
BUTIER Engineering, Inc.
Construction Managers, Consulting En, Iders-
Mar M. Butler, Jr.,
Vice President/CFO
GUTIER A. COVER LETTER
Section B. Flym and Team Experience
13utiler Engineering, Inc.
BLIti2r Engineering Inc.'s focus as a firm is to
provide third -patty construction management
services, a commitment we made to our
clients 42 years ago. Butler is a Southern
California -based firm that services public
agencies, special districts, and the private
sector in the delivery of heavy civil
infrastructure. Our project expertise is in pump
stations, small and large diameter pipelines,
flow control facilities, water production walls,
water/wastewater treatment facilities,
reservoirs, and water quality laboratories.
Representative clients include, but are not
limited to, the following:
- Chino Basin DesalterAtithorRy
Cities of Tustin, Anaheim, San Juan
Capistrano, Newport Beach, Huntington
Beach, Carlsbad, Escondido, and Vista
County of Orange
East Orange County Municipal Water District
Irvine Ranch Water District
Mesa Water District
Metropolitan Water District of S. California
* Orange County Sanitation District
* Orange County Water District
* San Bernardino Valley MWD
* San Diego County Water Authority
* Santa Mai-parita. Water District
* South Coast Water District
* South Orange County Wastewater Authority
* Water Replenishment District of S. California
* West Basin Municipal Water District
Key Personnel
Butier Engineering, Inc.'s team consists of 35
skilled project managers, schedulers,
estimators, arid inspectors who have
successfully managed water/wastewater
treatment, storage, and transmission projects
throughout Southern California. The
Construction Management Team is a key link
to a successful project, By having the Butier
Team serve the City as a single-sourco of
responsibility, the CM and Inspection activities
will be well coordinated and delivered
efficiently, In addition to Our licensed
professional engineers, our f leld engineering
staff possess certifications from the following
organizations:
• American Concrete Institute (Field Testing
Technicians)
• Arnevican Welding Society (Certified Welding
Inspectors)
• International Code Council (Reinforced
Concrete, Prestressed Concrete, Structural
Masonry, Soils, Spray -Applied Fireproofing,
Structural Steel And Bolting, Structural
Weldinq, Electrical)
• NACE International (Level 1, 2 and 3 Certified
Coating Inspectors)
• Post Tension Institute (Field Technicians)
Approach to Managing Personnoll
We propose to approach this project with a
spirit of partnership. This enables us to
combine the knowledge, ideas, and talents of
your staff with our construction administration
experience, Our core team will be
supplemented by as -needed technical and
administrative resources provided by Butler.
Butier's CM and inspection responsibilities are
handled by the project team member best
experienced to provide the needed service.
Butier does not assign inspection staff to
perform project document controls; rather,
inspectors focus on implementing the QA/QC
program and reports required to document
daily activity. Likewise, all project
documentation and controls are the
responsibility of the Contract Administrator, All
projects have a Project Manager assigned to
monitor project field staff performance.
Following this formula is critical for the
Owner's defense in the event of project
claims. It is also more cost efficient by
matching staff skills to project needs.
The Project Director has full access to teams
of civil, mechanical, electrical, and structural
engineers, specialty consultants, and
inspectors through existing relationships and
teaming arrangements with local firms, The
CM Team is always vigilant during
preconstruction, construction, and close-out to
meticulously document project activities and
minimize contractor claims.
Z9
'00 ci
i75
L (D
S
co
Ld
'd
IL
Ul
E
z
ru
rd
6W'
BUTIER
EDUCATION
MBA, FlnanGe, University of
California, Irvine, Graduate
School of Management,
1998
Graduate Studies. Civil
Engineering, Califomla State
University at Long Beach
B.A., Economics, University
of Southern California, !987
B.A., Social Sciences,
University of Southern
California, 1987
LICENSES I
CERTIFICATIONS
General Engineering
Contractor, State of
California, Class A 716863
Registered Constriction
Inspector, ACIA: Division I
Engineering 5572
YEARS WITN FIRM
31yea(s
AVAILABILITY
As-Noeded
Mark M. Butler, Jr.
Project Director
Professional Summary
Mr, Butler serves as Vice -President and Chief Financial Officer for Butler
Engineering. His primary d uties include functioning as the primary point of
contact between Butler and its clients; contract management, sub -consultant
contract mmagement. maintenance of Butler's project Information system;
development of the firm's field procedural manuals: and staff resource
management, Mr. Butler works closely with the field construction manageme nt
,staff to ensure all contract scope requirements are being fully Implemented, Mr.
Butier also serves as the Firm's contact between the field construction
management staff/client and the pro*t public outreach effort, when necessary.
He has been responsible for generating, distributing, and presenting to
numerous public boards and community associations dealing with the impact of
construction activity on the local community.
Project Experience
Project Director, Mid -Basin Injection: Centennial Park Project; Santa
Ana, CA; Orange County Water District (Est. Completion: 201 8)—The
Mid -Basin Injection project consists of the constrUCtiOn of the following: four
groundwater injection wells in below grade vaults; a monitoring well at the
Heritage Museum site; a purified recycled water injection supply pipeline
approximately 5,000 feet long that connects to the District's existing
Groundwater Replenishment System (GWRS) pipeline and crosses the Santa
Ana River; a backflush discharge pipeline approximately 4,000 feet long that
discharges to the Greenville -Banning Channel and Centennial Park Lake;
installation of submersible pumps within the four injection wells; replacement
of approximately 9.6 acres of paving within the Park; demolishing an existing
City of Santa Ana restroom facility; and constructing two new buildings with
shared City and District uses. Butier is coordinating closely with the City of
Santa Ari Santa Ana UnIf led School District, Heritage Museum, and
state and federal agencies,
Project Director, Edinger Avenue Wsll—Phase 11 Equipping Project; City
of Tustin, Public; Works (Estimated Completion: 2016; Value:
$4,103,650)—Butier is providing construction management and inspection
services for the Edinger Avenue Well - Phase 11 Equipping Project.
Construction of the buil0ing and equipping of the pump includes installation of
a 225 LF of 12-inch diameter CML ductile iron pipe discharge water line
connection to 'I 2-inch ductile iron watermain; installation of 162 LF of 1 �.inch
diameter C-905 drain line; connection to the existing storm drain,' placement
of new onsite sewer manhole; installation of 76 LF of 8-inch diameter SDR 26
sewer lateral: and connection to existing OCSID sewer manhole. The scope of
work also includes the erection ol 2,376 SF of CMU block wall with a metal
roof building to enclose the well pump, electrical equipment and chlorine
room, The project is part of the City of Tustin's Water Services Division,
which is responsible for the production and safe delivery of domestic water to
more than 14,100 service connections through approximately 172 miles of
water mains, Butler staff coordinated with several agencies inrInding the City
of Tustin, City of Santa Ana, and Caltrans,
BUTIER Mark M. Butler, Jr.
Cewistfavloa Uma4vrs, Cuivini);j EASOnno's I Project Director
Owner's Representative, Agua Hedionda Sewer Lift Station and
VistalCarlsbad Interceptor Sewer Replacement; Vista, CA; Cities of
Vista and Carlsbad (Completion: 2018; Value $64.2 million)—Butier is
performing as the Owner's Representative for the construction of the sewer
lift station and interceptor sewer reaches. The project begins at the north
shore of the Agua Hedionda Lagoon in Carlsbad and extends a distance of
2.3 miles to the Encina Water Pollution Control Facility, Major project
components include the following: 1) Removal and replacement of the
existing wood trestle sewer support bridge across the lagoon with a new steel
support bridge. The existing 42-inch diameter sewer pipe along the bridge will
be replaced with a new 54-inch pipe; 2) Removal and replacement of the
existing Ague Hedloncla lift station. The new structure will house replacement
motors and pumps, as well as new system enhancements including an
emergency generator and bypass motors and pumps, an electrical control
building, and odor control facilities; and 3) Construction of a new 30-inch
diameter force main and a now 54-inch diameter gravity sewer line to
increase system capacity and reliability, The force main will provide 4,000
linear feet of high density polyethylene pipe parallel to an existing line and will
connect into 7,000 linear feet of new 54-inch diameter gravity sewer to be
constructed in Avenida Encinas from Cannon Road to the Encina Water
Pollution Control Facility.
Project Director, Orange County Groundwater Storage Program; Orange
County, CA (Orange County Water District) —The Orange County
Groundwater Storage Program consisted of equipping eight (8) municipal
water production wells in the cities of Santa Ana, Anaheim, Garden
Grove, Westminster, Cypress, Placentia, and Buena Park. The scope of work
for the wells included site work� installation of deep well turbine pump and
motors, electrical and instrumentation work, disinfection facilities, discharge
piping and valving, and off -site piping and valving; construction of concrete
block buildings, paving. drainage, fencing. and landscaping; and startup,
testing, and training. Mr. White coordinated with building officials, City
engineers, and public works departments to learn the organization's
operation, disrover the hierarchy, and present solutions tailored to each of
the agency's needs.
Project Director, Burris Pump Station Project —Phase 2; Anaheim, CA;
Orange County Water District (Completion; 2016; Value: $20,585,400)—
Mr. Butier oversaw the construction management and inspection services
team for the Burris Purnp Station Project — Phase 2. Phase 1 included the
construction of a portion of the building site and an earthen berm. The berm
allows the basin to remain in operation during final construction of the we'
L
well and pump station. Phase 2 consisted of the construction of a new 10,000
SF storm water pump station that uses four conventional vertical turbine
pumps installed in a circular wet welt. The pump stallion also consists of new
mechanical, electrical, and control systerns. An intake pipe W2S installed on
the slope of the embankment, connecting the new purops to the intake invert.
OLMER
Cmmbumloa Main�rjora, COPWIN110 tifti-1606
EDUCATION
B.S., Construction
Engineering, Arizona State
University, 1977
Graduate Studies, ArIzona
State University
Y9Aft9 WITH FIRM
37 years
AVAILABILM
20%
Casey HarTls
Principal-Irl-Chargel Senior Schedulerl Ualms
Professional Summary
Mr. Harris has over 40 years of varied experience as a project/construction
manager, resident engineer, and senior scheduler. As the on-site/owner
representative for major municipal, public agency, and special district capital
improvement projects, Mr. Harris has successfully managed the construction of
muffl-million dollar water and wastewater treatment facilities, plpelines, airports,
solid waste landfills, water quality laboratories. and ports. Collectively, this
project expedence represents over $700 million in construction costs.
Mr. Harris is an expert CPM scheduler, has established and implemented
effective change order control systems, negotiated change orders w1h
design/build contractors, performed routine shop drawing reviews, anO
resolved contractor claims. As a Senior Scheduler, Mr. Harris con4kicts pre -
construction scheduling meetings with the owner and contractor to discuss the
scheduling specification requirements and forrinat, The meeting facilitates
timely submittal, review, and approval of the contractor's baseline schedule
and helps to reduce the number of resubmittals. Mr. Harris evaluates and
monitors the contractor's baseline schedule, weekly look -ahead scheOules,
and provides monthly schedule updates, time impact analyses (TIAs),
schedule revisions, and as-buift schedule submittals. He is also responsible for
updating the overall project schedule to reflect actual progress and changes.
He Identifies slippage of contract activities on the critical path, as well as time
sequence problems, early on so that the construction management team may
take corrective action.
Project Experience
Senior Scheduler, Mid -Basin Injection; Centennial Park Project; Santa
Ana, CA; Orange County Water District (Completion: 2018; Value: $23.2
million) —The Mid -Basin Injection project consists of the construction of the
following: four groundwater injection wells in below grade vaults; a monitoring
well at the Heritage Museum site; a purified recycled water injection supply
pipeline approximately 5,000 feet long that connects to the District's existing
Groundwater Replenishment System (GWRS) pipeline and Grosses the Santa
Ana River; a backflush discharge pipeline approximately 4,000 feet long that
discharges to the Greenville -Banning Channel and Centennial Park Lake;
irstallation of submersible pumps within the four injection wells; replacement
of approximately 9,6 acres of paving within the Park; demolishing an existing
City of Santa Ana restroom facility; and constructing two new buildings with
shared City and District uses. Mr. Burce is coordinating closely with the City
of Santa Ana, Santa Ana Unified School District, Heritage Museum, and state
and federal agencies.
Constructabillity Review and Senior Scheduler, Burris Pump Station
Project —Phase 2; Anaheirin, CA (Orange County Water District) —Mr.
Harris performed civil/structural design review for the Burris Pump Station
Project —Phase 2 as a part of Butier's oonstruction management agreement
with OCWD. The scope of services included report and data review and
Phase 2 Design Review at the 75% design stage. Mr. Harris also provided
schedule review sorvices under the construction phase of the Burris Pump
BUTIER
coml,"110" M4,"Mets. cenralld,q Cnow"m
Casey Harris
Principal -In. -Charge / Senior Schedulerl Claims
Station Project. Phase 2 consisted of the constructor of a new 10,000 SF storm
water pump station that uses four conventional vertical turbine pumps Installed in
a circular wet well. The pump station also consists of new mechanical, electrical,
and control systems. An intake pipe was Installed on the slope of the
embankment, connecting the new pumps to the Intake Invert.
Senior Scheduller, Chino 11 Desaller Concentrate Reduction Facility;
Jurupa Valley, CA; Chino Basin Desalter Authority (Completion: 2016—
Value: $46.6 mililon)—Senior Scheduler for the CRF groundwater treatment
facility. Both !on exchange (IX) and RO treatment trains are used to treat
brackish groundwater from eight wells that also have elevated nitrate
concentrations. The project scope included construction of new softening,
clarification, filtration, and secondary RO (SRO) treatment and solids
dewatering and storage; Installation of a new decarbonator; installation of a
new transfer pump with motor with associated VFD and motor controls and
discharge piping and valves', installation of new cartridge filters; modification
of the existing sulfuric acid chemical system; modification of the existing
threshold Inhibitor chemical system; and site modifications, Including fencing
and gates, yard piping, and storm drain replacement.
Senior Scheduler, Carlsbad 50 MGD Seawater Reverse Osmosis
Desalination Plant and 10-Mile Conveyance Pipeline; Carlsbad, CA;
Poseidon Water (Completion: 1212015; Value: $697 million) —Mr. Harris
provided scheduling services for the new construction of a 50 MGD seawater
reverse osmosis deselination plant at the EncIna Power Station located in
Carlsbad, CA. The scope also included the construction of a 2.5 million gallon
product water storage tank; product pump station; and conveyance pipeline to
daliver the drinking water produced by the Project to water utilities and
municipalities in San Diego County. The 10-mile. 54-inch diameter pipeline was
constructed under Interstate 5 Highway and a railroad using a jack and bore
tunnel method, Butier staff coordinated closely with the City of Carlsbad,
SDCWA, SDG&E, Poseidon and the Coastal Commission during the
construction of the tunnel option across Macario Canyon. The pipeline
alignment includes over 6,000 feet of tunnels performed by four dIfferent
tunneling subcontractors. One of the tunnels is over 1,700 linear feet, 30 feet
below sea level, and required a vertical shaft over 80 feet In height,
Senior Scheduller/Risk Analysis, Groundwater Reliability Improvement
Program (GRIP) Advanced Water Treatment Facility Project, Water
Replenishment District of Southern California (Value: $100 million) —Mr.
Harris is providing scheduling and risk analysis services as a part of GHD's
Owner's Agent/Owner's Engineer team for the GRIP Advianced Water
Treatment Facility Project. As a part of the GRIP Program, an advmnced
water treatment facility is being constructed to purify 10,000 acre feet (3.25
billion gallons) of tertiary treated (recycled) water annually, The GRIP AWTF
is being built on a 5.2 acre property in the City of Pico Rivera, adjacent to the
San Gabriel River. The GRIP AWTF will include the following treatment
processes: autornatic strainer; microfiltration (MF) and reverse osmosis (RO)
followed by Ultraviolet advanc9d oxidation (UVAO),, cartridge fitrntion:
decarbonation; and pH adjustment/corrosivity stabilization.
BUTIER
om"OV411" Not"#14. cbnollf.a Uqpnh;�n
EDUCATION
M.B.A. and M,S., Finance,
University of Denver,
Colorado, 2010
B,S., Civil Engineering,
University of Nebraska,
Lincoln, 2003
LICENSES /
CERTIFICATIONS
Registered Professional
Engineer (Civil), State of
California, No. 71736
SOFTWARE
PROFICIENCY
AjtoCAD Land Desktop
Development
Agtek 3-D Modeling
HEC-HMS
Storm CAD
Flowmaster
A.E.S. (Californie Hydrology
Program)
WSPG (California Hydraulic
Modeling Program)
YEARS WITH FIRM
6 years
AVAILABILITY
50%
Kyle Morgheim, P.E.
Project Manager
Professional Summary
Mr. Kyle Morgheirn is a professional engineer %Mth over 15 years of
comprehensive experience in civil engineering and project and construction
management, including resource allocation and cost I schedule management
of major projects. He has extensive experience In providing PM and CM
services for water / wastewater treatment facilities, pump stations, reservoirs,
pipelines, transportation, and land development projects from design through
construction phases.
Mr. Morgheirn has strong decision -making, leadership, communication, and
technical skills. He Is extremely focused on identifying potential problem
areas, minimizing issues, and formulating and executing competent solutions.
His project management responsibilities typically include coordinating with
agencies and stakeholders; scheduling: preparing and reviewing cost
estimates-, managing the construction project field office and personnel; full
contract administration; leading project meetings; responding to contractor
correspondence: negotiating and recommending monthly progress payments;
maintaining a daily diary of events; preparing monthly project status reports;
and monitoring as -built drawings.
Project Experience
Assistant Resident Engineer, Rawlings Reservoir Repair and
Replacement; Tustin, CA; City of Tustin (Completion: 2013; Value: $12.5
million)—Thp, City's former 4 MG hopper bottom reservoir was taken out of
service due to its age and deteriorating condition. After its decommissioning,
the City proceeded with the design of two 3.0 MG prestressed circular
concrete tanks to replace the reservoir. Prior to bidding, Butier assisted the
City with solving construction access and temporary shoring issues. The
project originally required the construction of a tie -back retaining wall, which
would have extended the project into an adjacent property. At the City's
direction, Butier performed a constructability review and proposed using a
cantilevered shoring system, which would keep the project within (he City's
property line. In addition, Butier assisted the City in obtaining a temporary
construction easement from the adjacent landowner to the north. Use of this
undeveloped property provided the Project team with an access road down to
the bottom of the tank elevation, as well as layclown and stockpiling areas,
Resident Engineer, Chino Desalter Phase 3 Expansion Project; Norco,
CA (Chino Basin Desalter Authority) —The Chino Desalter Phase 3
Expansion Project included the drilling of six (5) additional wells, new raw
water and product water pipelines, and expansion of the Chino Desalter's
treatment facilities. The scope of the Expansion increased Oesalter
groundwater pumping from the lower Chino Baqln to 40,000 acre-feet per
year (AF/yr) and provides at least 10 MGD of additional product water
capacity. The treatment processes include reverse osmosis (RO), ion
excharge (IC), and air stripping.
BUTIER
Kyle Morpelm, P.E.
Project Manager
Resident Engineer, Milliken 101D Zone Pump Station; Chino, CA; Chino
Basin Desalter Authority (Completion: 2014; Value- $1.3 million) —The
,scope of work includes the following potable water improvements: construction
of a ventilated CMU Pump Station, 198 LF of 116-Inch discharge pip)nq and
intarconnecton to an existing 30-inch transmission line, and 24-inch suction
piping and interconnection to an existing 24-inch transmission line; installation of
3 vertical turbine pumps and associated piping, fittings, valves, appurtenances,
electrical instrumentation, and controls; and site Improvements, including grading
and paving and restoration of existing improvements.
Technical Advisor, Moffett Drive and Park Avenue Roadway Extension
Project; City of Tustin, Public Works (Completion, 2016; Value: $14.5
million) —Mr. Morgheirn provided construction management services for the
Moffett Drive anii Park Avenue Extension Roadway Project, The project included
the removal and compaction of 250,000 CY of removal and compaction of soil;
275,000 SP of subgracle preparation and street fine grading; and 4,000 LF of
reinforced concrete box storm drain. The project also includes the construction of
street improvements, paving, utility installation, sioning, traffic installation,
landscaping, and irrigation. Approximately 15,000 CY of concrete was used to
construct the reinforced concrete box storm drain, which includes lateral storm
drains with catch basins. Major dewatering efforts and shoring under the
Jamboree Bridge at Moffett Drive presented significant challenges that Butier
coordinated with success,
Technical Advisor, Peter's Canyon Channel and Moffett Drive Bridge
Construction and Street Improvements Project; City of Tustin, Public
Works (EstImated Completion: 2018)—Mr- Morgheim is providing
construction management services for the Peters Canyon Channel and
Moffett Drive Bridge Construction and Street Improvements Project. The
scope of work consists of removing the existing bridge and constructing a
single sparl cast -in -place concrete box girder bridge approximately 108 feet in
length and 73.25 feet in width. The work also includes an architectural steel
arch on each side of the bridge. In addition to the construction of briqiqe, the
work shall include, but not limited to construction of barriers, sidewalks, wing -
walls, foundation, railings, structure excavation, backfill, drainage, and bridge
lighting. The channtfl work includes Oemol(tion, widening, and relining
approximately 5,000 feet of the existing channel within the Cities of Tustin
and Irvine. The channel scope of work also includes construction of new
storm drain lines, extension of existing storm drain lines, and road
undercrossings,
Technical Support, Armstrong Avenue & Warner Avenue Extension
Phase 2 Street Improvements, City of Tustin (Completion 2015; Value
$13.2 milllon)—Mr. Morlheim provided technical support services for the
Armstrong/Warner Ave. Extension Phase 2 project. The vope of work
included roadway improvements, traffic signals, landscape, dry utility,
waterline, and reclaimed water and sewer line construction on the following
streets: Armstrong Avenue Extension from Warner Avenue to Barranca
Parkway and Warner Avenue Extension frorn Red Hill Avenue to Tustin
Ranch Road.
BUTIER
C.In6twerfoo C,�nfm'rkq� V�yi."
EDUCATION
M.S., Construction
Management, University of
Southern California, Los
Angeles, California, 2003
B,S,, Civil ErigIneering,
Callfoorila State Polytechnic
University - Pomona,
California, 1995
LICENSES /
CERTIFICATIONS
ProfeEk-ional Civil Engineer:
California (CE59405)
AFFILIA71ONS
P!oject Management Institute
Building Industry Association,
Orange County Chapter
Urban Land Institute
YEARS WITH FIRM
3 years
AVAILABILITY
As -Needed
Vladimir Burce, P.E.
TeChnical Advisor
Professional Summary
Mr. Bume Is a registered civil engineer with over 23 years of professional
experience in project and construction management, including planning,
clasIgn, resourGe allocabon, and costischedule management of major projects.
He has extensive exper�ence in providing PIV and CM services for
water/wastewater treatment facilities, wells, pump stations, storm water
detenflon / retention systems, transportation, parking structures. industrial,
Pducational, residentfal, and lana development projects during the design and
construction phases,
Mr. Burce has diverse project experience in public works and real estate
development, 71his background provides h1m vAth an In-depth understanding
of clvll engineering disciplines. His professional responsibilities have ranged
from feasibility study, geotechnical, civil design, complex drainage design and
regulatory requirements, technical specifications development and preparation
of bid documents, design/constructablilty review, schedule preparatton. field
implementation and supervi!5ion, and construction managernent.
Relevant Experience
Resident Engineer, Mid -Basin Injection: Centennial Park Project. Sarita
An a, C A; Orange County Wate r District (Complet! on: 2018; Val ue: $2 3.2
m i I I i on) --The Mid -Basin I njection project co nsists of the construction of the
folfowlng� four groundwater injection wells In below grada vaults, a monitoring
woll at the Horitage Museum site; a purified recycled water injection supp�j
pipeline approximately 5.000 feet long that ronnects to the District's existing
Groundwater Replenishment System (GINRS) pipeline arid crosses the Sanla
Ana River; a backflush dischargo pipeline approximately 4,000 feet long that
disoharges to the GreenvIlle-Banning Channel and Centennial Park Lake;
installation of submersible purnips wHhin the four InjoGtIon wells; replacement
of approx(mately 9.6 acres of paving within the Park: demolishing an existing
City of Sonta Ana restroom fac[llty� and constructing two new buildings with
shared City and District uses, Mr. Burce is coordinating ulogely with the C�Ly
of Santa Ana, Santa Aria Unif ied School District, Heritage Museum, and state
and faderAl agencies,
Res I dent Eng i neer, C h ino I I We] I Fi e Id E qu ip ping of R aw Water We I I s
Nos. 11 - 10 and 11 - 11; East val e a ni Ontari o, C A; (Chi no Basin Desa Iter
Authority (Completion: 2017; Value: $3.8 rrilillon)-4Ar- Burce provided
rosident enginearinp, servicas for Well Nos. 11-10 and 11-11, Well ll-,110 is
located on CDA property In the Clty of Eastvale within Riverside County. Well
11-11 (Lot r'X) is located on CDA property in the City of Ontario within San
Bernardino County. The scope of work included equipping of two water wells
including, but not limited to, the following: construction of 16'8" W x 41'4"L x
16*H reinforced masonry block building, installation of 3,301) gprn vertical
turbine stainless steel pumping unill and 600 lip premium efficiency motor,
16-Inch diameter epoxy lined steel discharge he.ader pipa. 12-inch diameter
pump to waste piping, 16-inch diameter flow meter, site pressire pip'ing and
tubing, valves, tips and corp stops, pressure gages, 116-inch diarneter Cq05
PVC underground discharge pipeline, and connection to existing 24-inch
BUTIER
Vladimir Burce, P.E.
Technfcal Advisor
diameter discharge pipeline: and on- and off-sile: alectrica;, Including power,
control, lighting, underground electrical duct, Instrumentation equipment and
panels, switchgear, VFD and motor control center equipment, and installation
of SCADA equipment, The project Included close coordination with the City of
Ontario, City of Eastvale, County of San Bernardino County Flood Control
District. Southern California Edison, and local businesses and residents.
Resident Engineer, Chino Desaiter Reliability Project; Chino, CA; Chino
Basin Desaiter Authority (Completion- October 2017; Value: $3.8
million)—Butior provided CM and inspection services for the Chino I Reliability
Project located at the ex�sting Chino I Desafter. The project scope included the
following: new building built on to the existing Chino I Desafter faclifty: new RO
train tied into the existing (eed water, permeate, ooncentrate, and CIP piping
manifolds, modification of the existing sulfuric acid chemical system by
replacing two existing metering purnps and furnishing and Installing two
metering pumps; trench overflow constructed and connected below the air gap
that conveys water to the brine line; slurry seal all existing and new asphalt
surfaces; coating of the exterior of the existing process building to match the
new process building exterior coating system; and coating of all existing
trenches.
Construction Manager, Chino 11 Desalter Concentrate Reduction
Facility; Jurupa Valley, CA; Chino Basin Desalter Authority
(Completion- 2016—Val ue: $46.6 ml 11 lon�—B utiler provided CM and
inspection services for the CRF groundwater treatment facility- Both [on
excharge (IX) and RO treatment trains are used to treat brackish
groundwater from eight wells that also have elevated nitrate concentrations.
The project scope included construction of new softening, clarification,
filtration, and secondary RO (SRO) treatment and solids dewatering and
storage; installation of a new decarbonator; installation of a new transfer
pump with motor with associated VFD and motor controls and discharge
piping and valves,- installation of new cartridge filters; modification of the
existing sulfuric acid chemical system; modification of the existing threshoid
inhibitor chemical system; and site modifications, including fencing and gates.
yard piping, and storm drain replacement.
BUTIER
C�mefk,"Iqr eirmom, wnsJoUro r'.0M",q
EDUCATION
Constructbn Apprentioeship.
11
Rio Hondo College: Whittier,
CA, 1981
Constructior Management,
Pasadena College;
Pasadena, CA, 1978
LICENSES /
CERTIFICATIONS
ICC Reinforced Concrete
Special Inspector
No.6057063
Exp. 0113112019
Amertcan Concrete Institute
Fluid Testing Technician -
Grade I Carfification
Exp. 11 /1 W201 9
YEARS WITH FIRM
18 years
AVAILABILITY
100%
Bart Crawford
Lead Inspector
Prof*ssional Summary
Mr. Bart Crawford came to Butler from the Metropolitan Water District, Los
Angeles, where he spent over five years as an inspector. His heavy
construction experience and knowledge of methods and equipment have
facilitated an expertise in concrete and steel structures, various types of form
work, bridge construction, controlled blasting, pre -stress, earth work, roadway
improvements, rack bollIng, reinforcing steel, tunneling, metal decking,
architectural/intedor finish. As an inspector for Butler, Mr, Crawford works
primarily on water capital improvement projects, including water and
wastewater treatment plants, pipelines, pump stations, and reservoirs. His
inspection duties typically include utility/agency coordination, submittals, RFI
and field memo responses, interpretation of drawings and general
correspondence with design engineer. His background includes 18 years of
union carpentry.
Mr. Crawford provides both pipeline encasement construction and pipeline
inspection experience to water projects. Pipeline work has involved piping for
filtration plants, domestic water 11nes and reservoirs, Pipe material has
included CML&Q and ductile iron, Experience has also Included flow Measure
and flow metering for 144" and 66" lines, and tunneling.
Project Experience
Lead Inspector, Groundwater Reliability Improvement Project (GRIP)
Advanced Water Treatment Facility Project; Water Replenishment
District of Southern California (Value: $100 million) —Mr. Crawford is
providing field inspection services as a part of GHD's Owner's Agent/Owner's
Engineer team for the GRIP Advarced Water Treatment Facility Project. As a
part of the GRIP Program, an advanced water treatment facility is being
constructed to purify 10,000 acre feet (3,25 billion gallons) of tertiary treated
(recycled) water annually. The GRIP AWTF is being built on a 5.2 acre
property in the City of Pico Rivera, adjacent to the San Gabriel River. The
GRIP AWTF will Include the following treatment processes: automatic
strainer; microfiltration (MF) and reverse osmosis (RO) followed by ultraviolet
advanced oxidation (UVAO),, cartridge filtration; decarbonation; and pH
adjushTmnt/corrosivity stabilization.
Lead Inspector, Chino Creek Well Field Equipping -Wells 11-16,11-17, and 111-
18; Chino, CA; Chino Basin Desalter Authority (Completion: 2013;
Value: $1.5 ml Illon)—Provided Inspection services for the Equipping of
Chino Creek Well Field Wells 1-16,1-17 & 1-18 project. The groundwater wells
were equipped as part of the CDA Phase 3 Expansion Project, In addition to
well equipping, the project included the installation of 625 LF of Wdiarneter
HDPE corrugated storm drain pipe and the grading and paving of the well
sites- Coordination with other projects was required, including connection of
well discharge lines to the Chino Creek Well Field Raw Water Pipeline. The
project also involved coordination with the City of Chino to secure the
required permits,
HUTIER
n. M, N'l ff'?Rh'C'.rA
Bart Crawford
Lead Inspector
Lead Inspector, Edward C. Little Water Recycling Facility Phase V
Design -Build Expansion; El Segundo, CA (West Basin Municipal Water
Distrlct�—Provided inspection services for the Phase V Design -Build projecl.
West Basin expanded Title 22, Barrier Water and Low Pressure Boller Feed
water treatment processes. The Phasp V project involved expanding the Title
22 pretreatment capacity by 10 MGD to achieve a total treatment capacity of
40 MGD. along with expanding the Bafrier Water production from 12.5 MGD
to 17.5 MGD and the Low Pressure Boiler Feed water production frurn 11.7 to
2.2 MGD to serve Singlo-Pass RO water to NRG's El Segundo Power Plant.
The Phose V project addressed nUM01'OUS capacity expansion and tre.itrnem
process upgrades, The project included Ozone-Microfiltration Pretreatment
Process; West Coast Barrier; El Segundo Power -Low Pressure Boller Feed
Water; Title 22 Faclllty-High Rate Clarifier Expansion; Title 22 Pump Station;
Chemical Facilities; and miscellaneous Civil work.
Lead Inspector, Chino ll Desalter Concentrate Reduction Facility;
Jurupa Valley, CA: Chino Basin Desafter Authority (Value; $46.6 million;
Com plail an: 201 5�—Mr. Crawford was the Lea d I nspector for the CRF
groundwater treatment facility. which is one of Lwo plants managed by the
Chino Basin Desalter Authority. Both [on exchange (IX') and reverse osmosis
(RO) treatment trains arp used to treat brackish groundwater from eight wells
that also have elevated nitrate conr;entrations. The projeM scopf) included
construction of new *oflemng, clarification, filtration, and secondary RO
(SRO) treatment and solids dewatering and storage; installaflon of a now
decarbonalor, installation of a new transfer purnp with motor with associated
VFD and motor controls and discharge piping arid valves; instaflation of new
cartridge filters; modifiration of the existing sulfuric acld chemical system:
modification of the existing threshold inhibitor dierrilral system: and site
modifications, including now fencing and pates, yard piping, and storryi drain
replacement,
Resident Engineer, Chino Desafter Reliability Project; Chino, CA; Chino
Basin Desialter Authority (Completion: October 2017; Value: $3.8
million)—Butier provided CM and inspectlon servic" foi thH Chino I Reliability
Project located at the existing Chino I Desalter. The project scope includ ed tho
following., now building built on 10 the existing Chino I Degallarfadlity' now RID
tran lied into the existing feed water, permeate, concentrate, and CIP piping
manifolds; niodiflcation of the existing sulfuricacid charnical systein by
replacing two existing metering PUMPS and furnishing and installing two
metering purnps; trench overflow constructed and connected beluw the air gap
that convoys water to the brine line; slun y sea I all existing and now asphalt
Rurraces: coating of the exterior of the existing procass builOng to inatch the
new process building exterior coating system; and coating of all existing
trenches.
BUTIER
1�W,&-M,10,1996. Camuiihip Eqinftls
EDUCATION
B.S., Engineering
Technology—Construcilon,
California State Polytechnic
University, Porrona, 2000
AREAS OF
EXPERTISE
CPM Project Scheduling
Cost Control
Quality Control
Construction & Specialty
Trade EsUmatlng
Cost Valuation
Value Engineering
Construction Inspertions
Surveying
Structural Design
Change Order Negotiation
Cost Segregation Studies
Project Organization
Engineering Management
Owner Presentations
Project Review
YEARS WITH FIRM
4 yes ra
AVAILABILITY
20%
Bryan Wilson
Contract Administrator
Professional Summary
Mr. Wilson has over 18 years of construction estimating, cost review,
inspection, and enginearing rnana�ement experience. He has analyzed and
reviewed cost estimates for hundreds of projects ranging from underground
pipelines to high-rise office buildings. These projects involved the training and
management of engineers and estimators to determine and track construction
costs and activities. Mr. Wilson's detailed estimating experience covers all
aspects of building and heavy/civil design and construction, including
earthwork, structural, mechanical, electrical, and plumbing components, He
has conducted nurnerous physical inspections in order to verify the accuracy
and scope of quontitios and cost estimates derived from corstruetton
blueprints. He also has oxperience in organizing and trucking requests for
information (RFI), projert scheduling, negotiating construiction change orders,
and value engineering analyses.
Mr. Wilson's range of professional experience includes working for and with
construction management firms, general contractors, architecture and
engineering firms, and public accounting and consulting firms. He has aiso
provided asset valuation and classification consulting services to real estate
appraisers and construction companies. He has prepared construction cost
estimate studies for federal tax depreciation classification and successfully
defended these studies when audited by the Internal Revenue Service.
Project Experience
Field Engineer/Document Control Specialist, Mid -Basin Injection -
Centennial Park Project; Santa Ana, CA; Orange County Water District
(Completion: 2018; Value: $23.2 millIllon)—Mr. Wilson is performing as the
Document Control Specialist for the Mid -Basin Injection project, which
consists of the construction of the following: four groundwater injection wells
In below grade vaults, Including all related appurtenances within Centennial
Plark; a monitoring well at the Heritage Museum site; a purified recycled water
injection supply pipeline approximately 5,000 feet long that connects to the
District's existing Groundwater Replenishment System (GWRS) pipeline and
crosses the Santa Ana River: a backf1ush discharge pipeline approximately
4,000 feet long that discharges to the Greenville -Banning Channel and
Centennial Park Lake; installation of submersible pumps within the four
injection wells; replacement of approximately 9.6 acres of paving within the
Park; demolishing an existing City of Santa Ana restroorn faoilfty; and
constructing two now buildinga with shared City and District uses. Mr. Burce
is coordinating closely with the City of Santa Ana, Santa Ana Unif ied School
District, Heritage Museum, and state and federal agencies.
Field Engineer/Assistant Resident Engineer, Santa Ana River Enhanced
Recharge Phase 1A Sedimentation Basin and Pipeline; San Bernardino
Valley Municipal Water District (Est, Completion: 2018; Value: $14
million)---Butier (Prime) and GHD (Sub) are providing design, engineering,
and CM services for the SARER Phase 1A project, which is located in an
undeveloped area near the upper reaches of the Santa Ana River, A new
diversion strL[Cture and inlet channel is being constructed to divert water to
BUTIER
Bfyan Wilson
Contract Administrator
the new sedimentation basis and the Water Conservation District Canal. The
new sedimentation basin will be 200-foot wide and 600-foot long and
approximately 10 feet deep, The new pipeline will consist orf approximately
1,900 linear feet of 96-Inch diameter CMLC welded steel pipe and 1,300
linear feet of 78-inch diameter CMLC welded steel pipe connecting the new
sedimentation basin and the existing 78-inch diameter SBVMWD Foothill
Pipeline.
Field Engineer/Document Control Specialist, Vista Verde Reservoir
Replacement Project —Phase 11; Vista, CA4 City of Escondido
(Completion: 2018, Value $9.5 million) —Mr. Wilson Is providing field
engineedng and document control servilces, for the replacement of the Vista
Verde Reservoir, The existing 750,000-gallon steel reservoir, which suffered
from internal corrosion, is being replaced with two 1 million -gallon Type I pre-
stressed concrete reservoirs that will be partially buried. The extra capacity
for water storage will allow additional development in ths area. The scope of
work also includes now interconnecting piping, valve structure, grading,
paving, site improvements, landscaping, eleclNcal, instrumentation, and
Incidentals for a complete and usable facility. The pipeline portion of the
project will extend from the existing pump station along Vista Verde Way, up
to the Vista Verde Way cul-de-sac (approximately 6,000 Linear Feet), It
includes inlet, outlet and drain line up the hill to the vault structure.
Field Engineer/Document Controls, Wineville Extension Recycled Water
Pipelline—Segment A; Inland Empire Utilities Agency (Completion:
September 2015; Value: $110,6139,00%—Butiler provided construction
management, contract administration, and inspection services for the
construction of the Wineville Extension Recycled Water Pipeline, Segment A is
located in the Cities of Ontario and Fontana and within the San Bernardino
Flood Control District property, It begins along East Airport Drive beside the
east side of the Day Creek Channel continuing to Jurupa Avenue, south along
Wineville Avenue to Francis Street, cast along Francis Street and Marlay
Avenue just east of Mulberry Avenue. The construdon consisted of the
following: 5,464-LF of 24-inch pipe; 13,500-LF of 313-inch pipe; isolating valves;
alr release and vacuum valve assemblies; and blow -off assemblies, Mr. Wilson
managed all financial aspects of project construction, Includlng payment
application review and processing, change order drafting and approval
recommendation construction cost estimating, and overall project budget
implementation and tracking. Additionally, Mr. Wilson conducted weekly
project meetings, reviewed and processed submittals and RF1s, performed
field inspections, and coordinated the resolution of construction and contractual
issues.
"li i'A"
AJ
d
%y IA
I
R 04
Section C. Understanding of Need
PROJECT UNDERSTANDING
Based on our review of the project request for
proposal and the associated plans and
specifications, we understand that the San
Lorenzo Sewage Lift Station Project will consist
of construction of the following:
• Lift station —below ground dry and wet wells
• Aboveground CMU block building
Three (3) 15 hp dry pit sewage pumps
Piping, Wings, valves, flow meter, In-Ine
grinders, rail and hoist system
HVAC, ventilation and ducting
Electrical and instrumentation
a Site grading and improvements
0 560 (LF) of 15" gravity sewer pipe
0 190 (LF) of 12" gravity sewer pipe
a 545 (LF) of 10" force main
a Sewer manholes and appurtenances
a Abandonment of existing Segerstrom Lift
Station
The anticipated start of construction is late fall
2018 with a duration of 14 months. The
estimated cost of construction is $6 milliom
PROJECT APPROACH
The B;utier Team will use a project control
system consisting of the following four
elements that will provide quality
assurance/quallty control procedures and
guidelines in the execution of the San Lorenzo
Sewage Lift Station Project.
The CM Team's ability to monitor and manage
the Contractor's performance will be critical to
minimizing problems during construction and
potential claims. Contractor schedule
requirements will include substantial
completion deadlines and interim and final
completion dates. The construction progress
will be evaluated based on approved,
resource -loaded CPM schedules
(Primavera 1126). The Contractor wil I be
required to submit GPM schedules to the City
for acceptance in addition to timely, detailed
status information as the work progresses.
The Butier Team will evaluate the Contractor's
actual performance by comparing actual
qualities completed versus planned,
Anticipated work to be accomplished will be
reviewed based on a two -week "look ahead"
schedule updated weekly by the Contractor,
Available information must be evaluated for
schedule exceptions, available contractual
options, and corrective actions required by the
Contractor.
The CM Team will address schedule
variances with the Contractor at weekly
progress meetings. The CM Team will
evaluate each variance, its -cause and
possible corrective actions, and require the
Contractor to provide an action plan to correct
unsatisfactory variances. If a satisfactory
resolution is not achieved and the Contractor
falls significantly behind schedule, the CM
Team will require the Contractor to submit a
recovery plan. The plan should address
mitigation efforts such as additional crews,
additional shifts, or developing work -around
schedules that move the delayed activity off the
critical path so that its completion will not affect
critical milestones.
12 Ouality AsstjrXirx .' Quality CoMrol
The B utier Team will develop a QA1QC Plan for
the San Lorenzo Sewage Lift Station Projed.
The plan will reflect a set of objectives defined
by City staff and assigned CM and field
Inspection personnel. The QAIQC Plan will be
organized accordingly:
• Organization and Responsibility;
• Execution and Schedule;
• Procedural Requirements:
• Requirements for Consultants; and
• Project Quality Management Audits
These sections define requirements and
procedures for checking, reviewing. distributing,
tracking, and controlling documents for QA/QC.
The project specific QKQC Plan will be
submitted and reviewed by the C4ty prior to
submittal of other project doliverables. The
individuals perfon-ning QAIQC reviews will be
clearly indicated In the project organization
chart. Dellverables, will contain a statement that
the Information containad in the submittal has
been quality control checked in accordance with
the QA1QC Plan.
Quallty Assurance is the confirmation
process that all procedures directing [he work
have been developed and followed and any
corrective actions required have been
Implememed. Procedures or actions to be
CDnfirmed include:
Construction management plan;
Training of staff in QAIQC requirements;
Submittal process plan;
Document control plan;
Identification of City approvals at
appropriate milestones;
Control of testing to determine validity and
accuracy of data collected in the field;
Calibration and testing of equipment;
Identification of the need for corrective
action; and
Audit to verify compliance with the QA/QC
Plan.
Quality Control is the actual checking and
validation of the inputs and outputs of the
work, Activities to be verified for the work
include the following:
• Review by quality control team;
• Identification and compliance with
applicable codes, ordinances, permits,
environmental requirements, etc,;
• Review input data and check calculations;
City of Santa Ann, Public Works Agency
Construction Engineering Services for the
San Lorenzo Sewage Lift Station, PFP No. 16-049
6 Review drawings, specifications, technical
reports, memos, meeting minutes;
0 Perform constructability, operabIlity,
maintainability, and usability reviews; and
0 Review design for compliance with safety
standards.
The Principal -In -Charge and Project Manager
will prepare a specific CM Communications
Manual for the San Lorenzo Sewage Lift
Station Project to be approved by the City,
The manual Will include project
correspondence and other forms of
communication in accordance with the Cii:y's
document formatting standards. The manual
will integrate the interdependent roles of the
City, Construction Manager, Design Engineer,
and the Contractor, through pre -construction,
mobilization. construction, and acceptance of
the phases of the work. The Communication
Manual will Include the following:
Project Organization: Individual
assignments, responsibilities, phone
numbers, lines of communication, and
methods for interfaGing with the City,
project stakeholders, and the Contractor,
Organization chart showing relationships
between the parties.
0 Project Control: Description of cost,
,schedule and document control systems.
0 Communication Management:
Procedures for documenting
communications and correspondence;
distribution and/or routing lists; and
examples of all forms that the Contractor
will be required to use.
a Meeting/Notice Procedures:
Schedules, notices, agendas, reporting
procedures, documentation requirement,%,
and timely acceptance processes,
QAIQC: Procedures, laboratory testing,
field-testing, coordination checks, and
BUTIER
C. UNDERSTANDING OF NEWED
construction Inspection activities for all
project features, equipment and materials.
Document Control: Discussion of
Butler's cloud -based project management
document control system used to input
and track various reports and
correspondence between key parties,
Contract Administration: Description of
control systems and procedures for
performing and
docornenting
subm[ttal reviews,
RFIs, change
orders, claims
management,
contract closeout
activities, and
other contract
administration
procedures.
Records: The
CM will maintain
records of
inspections,
reports, and test
results received
from the
Contractor,
Design Engineer,
rnanUfaCtUrers,
and others,
f,%. f IF.,
The Butler Team recommends utilizing
Procore cloud -based construction
project management solution —to organize,
manage and control project dOCUmentation.
The advantages of Procore include unlimited
users and storage, 2417 visibility Into project
status, and a centralized, comprehensive
platform to manage vital project data, All
parties involved have access to the system.
Each user can access the program via a
web browser on their computer or mobile
device using secure log -in information.
Procore is utilized to store, review, track, and
manage all project docurrents including
City of Santo Ann, Public Works Agency
Construclion Engineeting SeNices for tha
Son Loronzo Saw6ige Lift Station, RFF No. 18-049
construction drawings and specifications,
RIFIs, submittals, transmittals, meeting
agenda& and minutes, emalls and
correspondence, progress photos, budgets,
schedule of values, payment applications,
change orders, daily inspection reports, final
punch lists, and point of contact information,
Additionally, Procore can be configured to
display the latest Primavera P6
construction
project schedule
and weather
information, both
current and forecast,
Automated emalls
can be generated by
the software program
to remind personnel
of required
documentation
reviews and other
project related tasks
that need attention,
Project
documentation is
'—fl I A 4 A
"YVM� Y WF, a 0
and available always
to all involved
personnel, with prior
revisions stored for
reference, At the co nclusion of the project,
project -related documentation is converted to
PDF format and distributed to the appropriate
parties.
SPECIIAL CONCERNS I SUGGESTIONS
Butler has vetted special concerns that the
My should be made aware of. Table 1,
located on the following pages, provides a
summary of these concerns and suggestions,
C. UNDERSTANDING OF NEED
Table 1. Special Concerns/ Suggestions
Schedule Control
Objective: Implement
proposed project according to
its schedule and any
constraints.
Quality Control
Obj6cfive: Follow QC
guidelines to minimize rework
that could result in schedule
defoys.
Cost Control
Objective: Wilize and follow
cost control management
strafegies to keep pmject
within budget.
Stakeholder Coordination
Objective: Be responsive to
project stokehoider
caordinatio� requirements to
achieve a high confidence /eve/
for project success.
Team Cohesiveness
Objective: Maintain a
streamlined, team that works
"If together durfng CM and
inspection activities,
Cons1ructability
Objective. Engage an
experienced CM team to
pedorm constructability
reviews at critical design
milestones.
City of Santa Ana, Public Works Agency
Construction Engineering Services for the
San Lorenzo Sewage Lilt Station, RFP No. 18-049
C Review Program Schedule during
pre -construction phase
2 Conduct Schedule Workshops
regarding project constraints with
stakeholders
El Follow proven Buller QAIQC plan
with experienced Inspection staff.
El Document work activities and
distribute to CM members daily,
0 Ensure contractor redlines; are up
to date on a weekly basis.
Ei Provide CMIField Engineering
budget linked to resource -loaded
construction baseline schedule.
Ei Quanthy and negotiate PCOs to
ensure contingent costs are
reported to management.
El Provide proactive alternatives to
construction sequencing,
Li Utilize document control tools for
team 2417 team access.
0 Participate in any partnering
workshops proposed by City.
L] Hold issue specific team meetings
I workshops.
El Provide a locally -based team that
has waited well together an
similar projects,
Li Build from recent CM and
inspection activities for other
similar projects,
o Provide local team that is familiar
with local issues and contractors,
Ei Provide an Independent team to
perform reviews.
[i Provide input and respect
Englineer's design approach.
Li Confirm project sequencing
requirements are addressed in
Contract Documents.
[I Confirm proper interface between
construction projects,
Identification of key schedule
constraints early on to mitigate
potential delays.
Minimized cost overruns due to
unforeseen construction Issues,
Ei Meet schedule with fully -
functional facility
* Concise 2-week look -ahead,
* Streamlined sequencing &
coordination
[i- Minimize inspection costs
El Provide City staff with current
summarized data weekly. Create
Management "dashboard" for
interface with field CM team.
0 Maintain a 'no su rpdses* result
when planning progress
payments or approval of PCOn.
El Provide a monthly report detailing
progress & delineate project risk.
71 Facilitated, yet secure, document
filing system for detailed project
progress,
Ef Streamlined communications and
accountability for prcject success.
0 Established plan for maintaining
Stakeholder Involvement,
Adaptive CM and inspection team
that Is in close proximity to project
site
* Proven integration of our
combined Team's CM and
Inspection expertise.
* Team with knowledge of current
bidding climate,
El Confidence in constructability
reviews to Identify am bigulties
and conflicts,
Ei Lower bid prices, reduced change
ordersiclaims and fewer delays.
LJ Mitigate/ellminate Impact to
stakeholders on concurrent
constructlon activities.
.... ......
BUTIER C. UNDERSTANDING OF NEED
I .. . , -1 - . ,
(9)
Safety
El
0
0
City of Sainta Ann, Public Works Agency
Construction EngInearing, Services for the
San LOrenzo Sewage Lift Stat0n, Rr-P No. fB-049
Attend Contractors weekly safety
meeting. Follow and respect
Contractor's safety program.
Observe for testIng of the quality
of air in confined spaces and the
provision of a fresh air source.
inspect HVAC duct connections,
pipe joints, door/hatch seals,
penetration seals and equipment
seals for tightness and longevity.
Ensure HVAC system is installed
where the fresh air scource Is
unobstructed and unadulterated.
inspect to see that all electrical
equipment is properly grounded,
all switches are the non -spark type
and hazardous areas are
equipped with explosion proof
fixtures, switches, b0X06r outlets -
Verify all light sources are installed
in a location to provide required
lumens for operation personnel.
Ei Illness and injury free
construction site.
0 Maintain a safe working
environment In confined space
Ei Prevent leakage of odors and
explosive gasses. Provide for a
hazard free environment.
F,J Provide a safe environment for
operation and maintenance of the
pump station.
C1 Facility Is provided with
unobstructed lighting for safety
and ease of operation and
maintenance.
Environmentai Impacts
C1 Enforce hours of work, noise
D
Minimize environmental impacts
levels, and clean work areas.
to the local community.
0 Require whisper quiet equipment
0
Minimize community complaints
for 24-hour dewatering operations
and possible complications from
and emergency numbers for
spills or interruption of dewatering
Contractor to address
operation.
abnormalifies.
Structural Failures
0 Inspect all structural components
Ll
Prevent minor structural failures
such as concrete, pump base
that can cause pumps and other
plates and other equipment
equipment to run inefriclently
supports for level and plumb.
causing noise vibration and wear
Drive & Pump Shaft
0 Require proper alignment using
[I
Will provide full warranty
millwirfght(s) for drive and pump
performance,
shaft alignment.
0 Provide a pump Installation within'
the manufacturer's requirement,
Longevity of Materials
0 Insist the Contractor follow the
El
Increase longevity of the Pump
requirement for corrosion resistant
Station and pipeline,
materials during construction.
Compliance
0 Enforce Beat Management
n
Maintain compliance with all
Practices (BMP) for site drainage
regulatory agencies.
and eliminate runoff.
Traffic Control
D Monitor and enforce traffic control
[I
Maintain maximum traffic flow
plans for Sergerstrom Avenue,
and workeessafety,
Pump Station and Pipeline
r3 Check Pump Station and Pipeline
Ei
Provide working hydraulic profile
Alignment
alignment and depth during
as designed for properly
construction,
functioning facilities.
WU--TfUR
C. UNDKIIIIIISTANDING 00 NEED
, Oil
I LLMWY'64MW�
L
Section D. Relevant Project Experience
Mid -Basin Injection Wells—
Centennial Park Project;
Santa Ana, CA
Orange County
Water D !strict
Ban Smith, P.E.
Project Manager
Tel: (714) 378-3211
bsmith@ocwd.com
Value: $23.2 million
Completion: 2019
Proposed Key Personnel
Mark Butler, Casey Harris,
Vladimir Bume, P,E., and
3ryan Wilson
Eding -of Avenue WeII-
Phase 11 Equipping;
Tustin, CA
City of Tustin, Public Wo.rks
Ken Nishikawa, Deputy
Director of Public
Works/Engi nee ring
Tel: (714) 573-3389
knish[kawa@tustinca.org
Value: $4,103,650
Completion: 2016
Proposed Key Personnel
Mark Butler and
Kyle Morgheim, P.E.
Butler Engineering, Inc. Is providing
constructability review, project coordination,
resident engineering, and construction inspection
services for the Mid -Basin Injection Wells Project
located within the City of Santa Ana's 87-acre
Centennial Park. The wells will be used to directly
inject product water from the District's
Groundwater Replenishment System (GWRS)
We% +hn rin�i �1 4 + ;; i 41,
V v b v-G1 wl cl4u 'PI " V
central portion of the Orange County groundwater basin. The project requires
close coordination with the City of Santa Ana, Santa Ana Unified School District,
Heritage Museum, and state and federal agencies. The project consists of
construction of the following:
Four (4) groundwater injection wells in below grade vaults (1,200 feet deep)
and all related appurtenances
SR-1 3 monitoring well at the Heritage Museum site
5,500 LF of purified recycled water injection supply pipeline that connects to
the DWrict's existing GWRS pipeline and crosses the Santa Ana River
4,200 LF of backfush discharge pipeline that discharges to the Greenville -
Banning Channel and Centennial Park Lake
Two now buildings with shared City of Santa Aria and District uses
Installation of subrner8ible PLIMPS within the four injection wells
Replacement of 9.6 acres of paving with the Park
Demolishing an existing City of Santa Ana restroom facility
Butler provided project / construction
management and Inspectlon services for the
Edinger Avenue Well - Phase I I Equipping
Project. Construction of the building and
equipping of the pump included the folloMng:
installation of a 225 LF of 12-inch diameter CML
ductile iron pipe discharge water line: connection
to 12-inch ductile iron watermain; installation of
162 LF of 18-inch diameter C-905 drain line; connectlon to the existing storm
drain: placement of new onsite sewer manhole; installation of 76 LF of 8-inch
diameter SDfR 26 sewer lateral; connection to existing OCSD sewer manhole; and
erection of 2,376 SF of CMU block wall with a metal roof building to enclose the
well pump, electrical equipment and chlorine room.
The project is part of the City of Tustin's Water Services Division, Mich is
responsible for the production and safe delivery of domestic water to more than
14,100 service connections through approx1mately 172 miles of water mains,
Butler staff coordinated with several agencies including the City of Tustin, City of
Santa Ana, and Caltrans,
D. RELEVANT PROJECT EXPERIINCE
(9)
Station and Vista /
Carlsbad Interceptor Sewer
Replacement; Vista and
Carlsbad, CA
City of Vista
Greg Mayer, P.E-.
City Engineer
Tel: (760) 726-1340 x11206
gmayer@cl,vista.ca.us
Value: $64.2 million
Completion; 2018
Proposed Key Personnel
Mark Butler
City of Santa An*, Public Works Apney
Construction Enginaefing SeMcoa for the
San Lorenzo Sewage Uft Station, RFP No, 18-049
Butler Engineering, Inc. performed as
the Owner's Representative for the
constructlon of the sewer lift station and
Interceptor sewer reaches. This is a joint
sewer project with the City of Vista and
the City of Carlsbad to replace existing
facilities, Increase sewer capacity and
Improve reliability within the lower
portion of the sewer system. The project
belngs at the north shore of the Agua
Hedionda Lagoon in Carlsbad and
extends a distance of 2.3 miles to the
Encina Water Pollution Control Facility.
Major project components include the
following:
Removal and replacement of the
existing wood trestle sewer support
bridge across the lagoon with a new
steel support bridge. The new bridge
will provide vehicle access to sewer
facilities. The existing 42-inch
diameter sewer pipe along the
bridge will be replaced with a new
54-inch pipe,
Removal and replacement of the
existing Agua Hedionda lift station.
The new structure will house
replacement motors and pumps, as
well as new system enhancements
including an enle en- annrmfnr
I ZI Y W
and bypass motors and pumps, an electrical control building, and odor
control facilities.
Construction of a new 30-inch diameter force main and a new 54-inch
diameter gravity sewer line to increase system capacity and reliability. The
force main will provide 4,000 linear feet of high density polyethylene pipe
parallel to an existing line and will connect into 7,000 linear feet of new 64-
inch diameter gravity sewer to be constructed In Avenida Encinas from
Cannon Road to the Encina Water Pollution Control Facility.
BUTIER D. RELEVANT PROJEOT EXPERIER-CE
1 !L
p W%l
ft L was ,--I�A
ir
low
P
Section E. References
Mid -Basin Injection Wells —
Centennial Park Project
Santa Ana, CA
Value: $23.2 million
Completion: 2019
Edinger Avenue Well —
Phase 11 Equipping
Tustin, CA
Value: $4,11 million
Complebon: 2016
Agua Hedionda Sewer Lift
Station and Vista I Carlsbad
Interceptor Sewer
Replacement
Vista and Carlsbad, CA
Value; $64,2 million
Completion: 2018
Burris Pump Station
Project —Phase 2
Anaheim, CA
Value: $20.5 million
Completon: 2016
Chino If Well Field Equipping
of Raw Water Well Nos. 11-10
and 11-11
Eastvale and Ontario, CA
Value: $3.8 million
Completion: 2017
Orange County Water District
City of Tustin, Public Works
City of Visa
Orange County Water District
Chino Basin Deselter Authority
Ban Smith, P.E,
Project Manager
Tel: (714) 378-3211
t)srnillhCQocwd.com
Ken Nishikawa
Deputy Director of Public
Works/Engineedng
Tel: (714) 573-3389
'btLIS[InGH
hdshik�,ivvaLC _.Or�j
Greg Mayer, P.E,
City Engineer
Tel: (760) 726-1340 x1206
clmayeraci'visjta.QQ�ws
Ryan Bouley
Project Manager
Tel: (714) 378-8207
rbouloyRocwd.com
Curtis Paxton
General Manager/CEO
Tel: (909) 218-3729
maxton0chimiesaltor.orn
r
, Z
NIffil; J,-
I
�1�
?VY111%
VA',
I.d
1721
.—BUTIER.
wGUar:1
Section F. Scope of Services & Schedule
SCOPE OF WORK
The Butler Team will consist of a Project
Manager (PM), Inspector, and a Contract
Administrator (CA). They will serve as an
extension of City staff to assist in the overall
delivery of the San Lorenzo Sewage Lift
Station Project, including pre -construction
tasks, managing construction, and ensure that
the work is completed in accordance with the
contract documents, and project closeout and
warranty phase. The Butier Team will report
directly to the City's Construction Manager,
The proposed scope of work includes Butler's
understanding of the construction
management arid field work needs of the City
as related to this contract. We have provided
sufficient detail to demonstrate that we grasp
the magnitude of the project, and are
experienced In providing the necessary
service&
L Review of Contract Documents
The PM will perform a thorough review of the
contract documents. The review will include '
but not be limited to, the appropriateness of the
number of working days allowed. the
appropriateness of the amount of liquidated
damages and timely coordination with other
agencies. If any ambiguities, errors, omissions,
or conflicts exist, the PIVI will advise the City's
Construction Manager on the need for
document content revision, as appropriate.
2. Bid Review
Prior to the start of the project, the PM will
review the submitted bids for responsiveness
and completeness, including verifying
licensing, insurance arid bonding, and will
assist in performing reference checking, This
will also include verifying that ail subcontracWt-s
have a valid City Business License. The PM
will evaluate bids to ensure they are balanced
and not front-end 'loaded." Upon completion of
the bid reviews, Butler will assist the City In
determining the apparent responsible and
responsive low bidder for the project. The PIVI
will prepare a formal memorandum detailing
the bid proposal review and the
recommendation for award.
3. lUck-OffiPre-Construcillon Meeting
The Butier Team will organize, schedule,
attend and facilitate all project -related
meetings. The PM will organize a kick-off
MOetihg with City personnel to discuss the
scope of work, project team, and project
schedule and to receive any additional
background information. In addition, the PIVI
will schedule and facilitate meetings with the
project stakeholders and City staff to discuss
the following: contract administration
guidelines; contractual roles; and
reinforcement of specific requIrements for
safety, access, and coordination issues for the
work. The PM will provide a meeting agenda
three (3) days in advance of the meeting and
transmit meeting minutes to all attendees
within three (3) business days.
4. Construction Schedule I Sudget
The PM will utilize Oracle Primavera 1116
Professional Project Management to
perform detailed monitoring of the Contractor's
master schedule for the duration of the Project.
The PM will sstablish a cost control system for
monitoring and updating project costs and
budget. He will utilize Primavera P6 to prepare
an independent construction cost estimate and
construction schedule based on a standard
five-day workweek. The cost -loaded CPM
schedule will provide the PM with the basis for
cash flow projections. The budget Will be
reviewed with the design tearn and consultants
and submitted to the City for acceptance. The
PM will revise the budget as directed by the
City,
1. Construction Progress Reports
The PM will prepare monthly progress reports
that will include the following items: summary of
the prior month's main accomplishments and
current construction activities; reconciliation of
contract time, work progress, and manpower
usage by the Contractor; project costs to date;
overall contractor's conformance to qL81ity
en, lkll
requirements; Identification of major issues
addressed or arising from the project requiring
resolution; summary of progress payments,
certified payrolls, change order disputes,
submittals, RFls and responses, and notices of
noncompliance; and daily photographs of
representative project activities.
2. Weekly Progress Meetings
The PM will schedule and lead weekly
meetings with the Contractor, City's
Construction Manager, and other
representatives to resolve all project matters
and assess responsibilities for response to
respWive participants. The PM will Implement
action monitoring to ensure compliance and
timely response, The CA will distribute the
minutes to the attendees within two working
days and include the minutes in the monthly
progress reports.
3. Shop Drawings and Submittals
The Butier Team will be responsible for
processing and monitoring the status of
submittals, In meeting the City's internal
timefrarnes, submittals will be processed on a
one -week turnaround basis or sooner,
Submittal tracking will be introduced into the
electronic document control system and status
of submittals will be known at all times, Thils
systerri will be coordinated with the Contractor
per contract document requirements. The RM
will review the completeness and quantity of
all required shop drawings, product data,
samples and other submittals received during
the construction phase and transmit to City
staffing for review and approval.
4. Requests for Information
The PM will coordinate the RFI review
process and route all RIFIs to the appropriate
reviewer. The documentation will be logged,
tracked, maintained, and organized in the
electronic document control system in PDF
format. All responses will be monitored with
suspense action dates and follow-up
procedures implemented to ensure limety
action by all parties to project issues Including
input from City staff.
City of Santa Ana, Public Works Agency
Consirudian Engineering Smlceq for the
San Lorenzo Sewage Lift 81490on, RFP No. 16-049
5. Permits
The Butler Team will ensure that all building
permits and special permits are obtained and
that all applicable fees have been paid, and
will obtain approvals from authorities having
jurisdiction. over the Project,
6. Change Order Requests
The City or Contractor may initiate a change
or request for changes, or modifications may
arise due to differing site conditions. The PM
will track, document and negotiate all changes
for added costs or credits with the Contractor,
The PM will evaluate all schedule impacts in
addition to advising the District of equitable
cost and time adjustments for proposed or
authorized changes including credits that are
due.
The PM will coordinate change order
procedures for preparation of documents to be
executed by the Contractor and the District.
The RE and claims support will evaluate
Contractor claims seeking add)tlonal costs or
time for contract modifications.
The PM will assess if the claim has merit and
make recommendations, Unresolved claims
will be administered through the remedies
clauses of the construction contract under the
direction of the District.
7. Contractor's Safety Program
The Contractor will be required to prepare and
submit a safety program to the PM for review.
The PM will take the necessary steps to ensure
the job site conditions are in compliance with
OSHA regulations. The PM will notify the
Contractor of any safety problems and direct
the Contractorto suspend work if Imminent
hazard is not immediately remedied or a
dangerous condition persists.
S. Cost Accounting Records
The Butler Team will maintain cost accounting
records on authorized work performed under
unit costs and additional work performed on
the basis of actual costs of labor and
materials, or other work required accounting
records.
F. SCOPE OF SERVICES & SCHEDULE
dowml�&
11AA
®r
9. Progress and Final Paymonts
The PM will receive, check, and verify all
Contractor monthly progress payment
requests and other project -related invoices
based upon the cost -loaded schedule. The
progress payment worksheet will be based on
an approved schedule of values. Progress pay
requests will be checked against the approved
schedule of assigned values and actual in -
place quantities verified at the end of the pay
period, The pay request format will be
established by the project team to expedite
checking, processing, and subsequent
updating of project budgets and cost
projections and forwarded to the City's
Construction Manager for approval and
payment to the Contractor,
10. Prevailing Wage& CWA Forms
The Butier Team will monitor prevailing wage
forms and requirements for conformation to
the prevailing wage rates on a weekly basis,
The Butier Team will verify that all Trade
personnel listed in the daily log are also listed
in the certified payroll. The Butier Team will
also monitor the City's Community Workforce
Agreement (CWA) forms and requirements to
ensure compliance. Verification of prevailing
wage,and CWA will be provided with the
monthly progress payments.
111-Complianco vvith Contract Documents
The Butier Team will monitor construction
activities to ensure the work adheres to the
contract documents and regulatory agencies.
The PM v011 lead resolution of day-to-day
construction issues raised and coordinate with
the inspectors, Design Engineer, and
Contractor as required. The PM will make
recommendations to the City regarding special
inspection or testing of work not in compliance
with the contract documents,
12. Maintain "As -Built' Records
The Butler Team will review the Contractor's
as-buift records on a monthly basis to ensure
that timely recording is being accomplished,
The PM will ensure that the City's as-builts
identify RFls, shop drawing revisions, change
order modifications, etc, and that they are
ClIty of Santa Ana, Public Works Agency
Construction EngMewIng Services tar the
San Lorenzo Sewage Lift Station, RFP No, 18-049
updated weekly. The as-builts will be submitted
to the City and the Design Engineer at (he
completion of the project. The PM will
coordinate the submittal of completed record
drawings to the City's Construction Manager.
The PM will hold monthly record drawing
review meetings with the City's CM and the
Contractor prior to submittal of monthly
progress payments, Butier will be utilizing Blue
Beam.
13. Construction Inspoction
Butier will assign a Lead Inspector to ensure
that the Contractor's work is in compliance
with the contract documents, industry
standards, applicable codes, environmental
and local regulations, and construction
permits, In addition, the Lead Inspector will be
responsible for the following:
Daily Inspection Reports: The Lead
Inspector will maintain daily inspection
reports, which will be submitted to the City
on a weekly basis. The reports will
document construction activities, including
the date, day of week, and weather
conditions; hours of work; personnel on
site; equipment being used; Idle or
Inoperable equipment; details of each
activity: controversial mattersldlsputes;
deficiencies and violations; instructions
issued to the construction contractor;
safety concerns; description of accidents;
major material and equipment deliverie5 to
the site; names of visitors to the site; and
delays and extra work.
* Schedule Review: Reviewing the
Contra ctors' two week 'look ahead"
schedules and coordinate staffing needs
with Butier's PNI.
* RFb: Discuss responses to RFIs with
Butler's PM as required and coordinate the
replies to the Contractor; review of the
subrnittals� provide non-conformance
reports; and provide documentation of
construction activities, duration of
activities, manpower and equipment
allocation.
GUYIER F. SCOPE OF SERVICES A SCHEDULE
... . � I ...,
Photographic Recolds: Provide weekly
photograph ic/dig ital records of the project
during construction. Log construction
digital photographs on a daily basis. A
digital photographic library will be
maintained of significant construction
activities, The photographs will be labeled
with the date, location, and narrative
information, Additional digital photographs
will be taken of change order and claim
items, and any "cial or unique
conditions as they arise. The photographic
library will be turned over to the City at the
completion of the construction contract.
14. Special Inspection I Materials Testing
The PM and Lead Inspector will facilitate and
coordinate inspection by representatives of
other agencies and schedu[e and coordinate
special inspection and materials testing.
1. Detailed Project Punch List*
The Butler Team will prepare a project punch
list at substantial completion and coordinate
the correction of deficiencies by the
Contractor. Upon correction of deficiencies,
the PM will coordinate and conduct a final
walk-through prior to the acceptance of work
with the Design Engineer, CIty's Construction
Manager, and other staff as directed,
2. Final Payment Requests
The PM will verify that the Contractor has
made all payments to the subcontractors and
vendors and that any stop notices or liens
have been released. The PM will obtain a
Conditional Waiver of Lien from the Contractor
prior to recommending final payment,
3. Verify Contractor's Project Record
Drawings
The PM will review the Contractor's project
record drawings for completeness.
4. Compile and Submit 0 & M Manuals
The PM will compile and submit operation and
maintenance manuals, instruction manuals,
parts lists, spare parts, and warranties for
equipment procured. The PV will collect
Cft of Santa Ana, Public Works Agsncy
ConskociYon Engineedng Services fbr the
San Lorenzo Sewege Lift StaWn, RFP No. 18-049
relevant data and information from the
Contractor and material/equipment supplies
and assist the Design Engineer in developing
a comprehensive O&M Manual.
S. Finell Report
The PM will prepare and submit a final
progress report to the City no later then 60
calendar days followlng the filing of the Notice
of Completion. The report will incJude a
complete overview of the contract,
Contractor's performance, accomplishments,
preliminary and final project costs, cash flows,
schedules, and recommendations for
alleviating problems experienced on the
project.
6. Turn Over All Documents and Kos
The Butier Team will furnish all original project
documents and final reports to the City's CM
within 60 calendar days following filing of the
Notice of Completion. The documents will be
delivered to the City in a form and fashion
acceptable to the City. The files wil I also be
scanned and provided to the City in electronic
format on CD-ROM (two copies) labeled with
the project name.
F. SCOPE OF SERVICES & SCHEDULE
a 'It I
VT
zr
1- 5 11 - !, I !, i I I -- v -9 1 1 0, 1 1 g *-, I , ,
Ro
T3 m
ID 0 z
N- -nL 4DL-- — 1 he �t 14 1
R
M,
Al
jr,
13UTIER
, --T- - I
NQN- OLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section I t2 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited
any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agmed with any BIDDER or anyone else to put in a sham bid, or that
anyone shall refrain from bidding; that the BIDDER has not in any mann r, directly or indirectly,
sought by agreement, communication, or conference with anyone to fix the bid price of the
BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDM or to secure any advantage against the public body awarding the
conUwt of anyone interested in the proposed contract; that all statements contained in the bid are
true, and, ftather, that the BIDDER has not, directly or indirectly, submitted his or her bid price
or any breakdown thereof, or the contents thereof, or divulged information or data relative
thereto, or paid, and will not pay, any fee to any corporation, partnership, company association,
organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham
bi&
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are
cautioned that making a false certification may subject the certifier to criminal
prosecution.
Signed
State of California
County of Oratige
Subscribed and sworn to (or af[irmed) before me on this -, 20, by
, proved to me on the basis Tii �Jsractoryv ;�"n-encep be the
person(s) who appeared before me 7 : a;ee�6.c&
Notary Public Signature Notary Public Sea]
City R Santa 70na �RFP 18-029
2C
A Notary Public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document,
STATE OF CALIFORNIA
COUNTY OF ORANGE
SU13SCRIBED AND SWORN TO (or affirmed) before me, on this 24 "d day of June, 2018 by
Mark M. Butier, proved to me on the basis of sotisfactory evidence to be fix persons who
appemd before me,
CYNTHIA L GILLESPnli
2096843
NOW V Public - Callfarnla i?�nthia L, Offople, Notary �Public
Orangs coun(y
!�'CO%M4W�08 Feb 6 2019
NON -LOBBYING CERTIFICATION
The prospective participant certifies, by signing and submitting this bid or proposal, to
the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of
the undersigned, to any person for influencing or attempting to influence an
officer or employee of any Federal agency, a Member of Congress, an officer or
GMPIOY89 Of Congress, or an employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the
making of any Federal loan, the entering into of any cooperative agreement, and
the extension, continuation, renewal, amendment, or modification of any Federal
contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid
to any person for influencing or attempting to Influence an officer or employee of
any Federal agency, a Member of Congress, an officer or employee of Congress,
or an employee of a Member of Congress in connection with this Federal
contract, grant, loan, or cooperative agreement, the undersigned shall complete
and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in
conformance with its instructions,
This certification is a material representation of fact upon which reliance was placed
when this transaction was made or entered into. Submission of this certification is a
prerequisite for making or entering Into this transaction imposed by Section 1352, Title
31, U.S. Code. Any person who fails to file the required certification shall be subject to
a civil penalty of not less than $10,000 and not more than $100,000 for each such
failure.
The prospective participant also agrees by submitting his or her bid or proposal that he
or she shall require that the language of this certification be included in all lower tier
subcontracts, which exceed $100,000 and that all such subreciplents shall certify and
disclose accordingly.
Signed:
Title: Vice President/CFO
Firm: Butler Engineering, Inc.
Date: 07/26/2018
City of Sa�—ta 'Ana RFP 18-029
CM OF SANTA ANA
RFP NO,: 18-029
STRUCTURAL ENGINEERING SERVICES
NON-DISCRMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that appEcants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following, employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship, The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrin-tination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or Nvorkers' representatives of the ContractWs
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment,
4. Ile Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, mid relevant orders of the Secretary of Labor,
5. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/tier books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared inehgible
for Rather Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order I t 246 of September 24, t 965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as
otherwise provided by law.
Page I of 2
CITY OF SANTA ANA
RFP NO.: 19-029
STRUCTUILU ENGINEERING SERVICES
7, The Contractor shall include the pottion of the sentence �nmediately preceding parqp1ph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or urders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be
binding upon each subcontract or purchase order as the administering agency may direct as
means of �mrbroing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to protect
the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sox of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed:
Tidc-. Vice President/4CF0
Fimi: Butler Engineering, Inc.
Date. 0712612018
Page 2 of 2
- �2. - . - fi �. �! - .- .
two
�V4
FSL
EXHIBIT C
COMPENSATION
Fee Proposal including hourly rates if applicable
17822 E. 171h Street
Suite 404
Tustin, CA 92780
Tel (714) 832-7222
Fax (714) 832-7211
July 26, 2018
City of Santa Ana
Attn: Tyrone Chesanek
Public Works Agency
20 Civic Center Plaza
31d Floor Reception, Ross Annex
Santa Ana, CA 92701
Subject: Fee Proposall—RFP No. 18-049: Construction Engineering Services
for the San Lorenzo Sewage Lift Station Project
Dear Mr. Chesanek:
The Butier Team is pleased to submit one (1) hardcopy of our fee proposal in a
sealed envelope to provide construction engineering services for the above
referenced project. Our proposal is fully responsive to the City of Santa Ana's (City)
Request for Proposal issued on June 14, 2018, THE PROPOSED BUDGETS ARE
SUBJECT TO FINAL SCOPE NEGOTIATIONS.
CLARIFICATIONS/SUGGESTIONS
The proposed level of effort is based on the project schedule provided in the RFP.
The objective of our staffing plan is to take full advantage of our local project
resources. The final staffing plan will be based on the approved schedules
furnished by the construction contractor.
Rates for the Construction Management Team
Vehicle mileage, computers, computer software, printers, reproduction, cell phone
service, broadband service, office supplies, technical reference materials, training,
and personal protective equipment (PPE) including hard hats, safety boots, work
gloves, safety glasses and other PPE as required shall be billed at the attached
rates per labor hour charged to the project. Rates will be maintained for the
contact period.
Excluded from Rates
Trailer rental costs, installation of utilities, cost of utilities, cost of sanitary services,
broadband / high speed connections, janitorial, and furniture.
Legal
All sub -consultants will be bound to the final terms and conditions of the prime
agreement.
Field Office
We have assumed the contractor will provide the necessary office space to house
the field CM team. Team meetings can be conducted in Butier's home office in
Tustin as an option,
BUTIER
17822 E. 171h Street
Suite 404
Tustin, CA 92780
Tel (714) 832-7222
Fax (714) 832-7211
We look forward to the opportunity to work with the City on this important
procurement. If you have any questions regarding the attached proposal, please
contact me at (714) 832-7222.
Sincerely,
BUTIER Engineering, Inc.
Construction Managers, Consultin gineers
Mark M. Butier, Jr.
Vice President/CFO
P1tj--Rf1]-*1qk
1 0 0 0
0 0 0 0 0 0 0 0 a 0 0 0
0 0
0
0 0 0 0 0
0 C�
a
0
0
8
8
�D w 0 0
Nowd00000�boo C)
m U) w N LD N 1* rq �* N w N 0
6(::)g
00 0
oowoor�
in
t*-
oo
oo
oo
r,
C� rl� rl�
It ll�, "R l7i �R L'i rrt L'i Iri cl� �R r1i l7i
rl�
Lfi
1-i
pl�
ll�
ai
1� r4 rsJ
0 r�4 0 (3) � 00 CY) (=) C3 CT) M N r-
IT 00
0
r14
Ln
�4
�4
0)
Ln �4 r, r4 rIj rNl H rq 0 H r�4
-4
�4
r1l
P,
-1—i
In
I ,-�
I V�
4^
1 ,A
I -Ln I
0 o co
o o o
0
0
'T
C4
0
to
tD %D rn
0 �� '�I-
10
.0
r,
ID
%0
r-4
(n
fn
1-4
14
0
-cr 00 co 00
'T 0 00 0 0 0 rq 0 a
00
rq �T rq
rNi
rN
rq
r4 co �o Ln �o kD :T
CO 1-1 14
Iq �4
vi
co
0
tf�
w co �r -r
M Ln 0 (N
C4 T rN Ln
C'4 'T
N
N
00
'r
M
r4
00 Ln rj r-4 CD
C)
W -1 ID w w m kD
�D
-4
ID 10
%D
C)
14
ID
N
N
Z;
Lo Ln Ln LI)
Ln
Ln
bl)
CL
u
E
c
aj
0
0
u
ao
C:
03
LL
>
a
75
0 c
CL
m
0
a)
CL 2 (U
> CL w E
0
0
c
w < C:
cr 0 _0
c
m
co
(V
u
a
o a; <( E w 2
w In
-C
c
m
0
C:: 'a 2
C C -C >.
tw
aj
c
oj
w
to
ai
m
0
co
U no < c
c >.
0-4
ro 0 ru 2 -0 m
CLO
ai
m
c
M
7f�
0
E
w
aj
< oj
c 0 C:
U
0
w
ei CL
:D 0
tj c
ai
CL
a)
>
c
— c
> 1: 0
c
u
0
.0
E E E u aj
m
-;6
m
?:
E
E 0
_0
E 0 -0 E 0 [2 'w
E tt u c
'
< al
E
m
c > o. 0 o 1� 0 a)
-2 :3 0
�5
-0 CL
w
w
c
E
CL
b. 0
m - v Q:: E a)
w 7 -0 v c-
ai .7 W ',v
t�
ai
E
c
m
w
(U , 0) u
t4 E - --
-r- = -
D
(Li
Qj
M
>
Uj
<U rM aj C
'n OL
5� Ln 0 C,
u
o
-0
LLJ
If
-0
w
Q,
w aj 0 Li
-2
E 0
0
0
C
0
9L C aj
u .0 o
m m
a o
u
o
u
c
10
m 0,
f w
c
C
c
A
.,u
—M ki m
m
m
0
m
C::
:L'
M
:3
0)
6-1
c a,
<
E u E
:t�
-0
41
0 C:
y CL
o m o LX c
U
9
u 0
V, w CO z u
M
-C
u
c
:3
(D 0 z
m
I I I I 1
L/)
LLJ
121
1
U'j I
m T Ln W r- 00 CT) 0 (N
�Dj r,
oo
a)
N
r14
FP PROJECT TITLE:
ROJ '
Segerstrom (San Lorenzo) Sewer
Lift Station Reconstruction
PROJECT CATEGORY:
ty
1 -/19 ID
UtilitylDrainagelLighting
Improvements
Munici pal Facilities
LOCATION MAP
N
CITY OF SANTA ANA FY22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruct existing sewer lift station.
EXHIBIT 5
PROJECT NEED:
The existing wet well is too shallow, resulting in surcharging of
incoming sewer mains. This project is required to prevent sewer mains
from plugging and to prevent spills. I
PROJECT COSTS FY 22/23 FY 23/24 IFY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 489,343 - - - - - -
TOTAL 489,343 - - - - - -
SOURCE OF FUNDS IFY 22/23 IFY 23/24 IFY 24/25 IFY 25/26 IFY 26/27 IFY 27/28 IFY 28/29
SEWER CONNECTION 489,343 - - - - - -
PROJECTS
TOTAL 489,343
AGENCY: DIVISION: CONTACT: DATE:
Public Works Water Resources Armando Femandez, Senior Civil Engineer 16-May-2023