HomeMy WebLinkAboutItem 11 - Saddleback View Neighborhood Street Lighting Project Public Works Agency www.santa-ana.org/public-works Item # 11 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report March 7, 2023 TOPIC: Saddleback View Neighborhood Street Lighting Project AGENDA TITLE Approve an Amendment to the FY 2022-23 Capital Improvement Program for $752,471.25 and Award a Construction Contract to International Line Builders, Inc. in the Amount of $601,977.00 for the Saddleback View Neighborhood Street Lighting Project, with an Estimated Project Delivery Cost of $752,471.25 (Project No. 22-6017) (General Fund) RECOMMENDED ACTION 1. Approve an amendment to the FY 2022-23 Capital Improvement Program to include $752,471.25 in construction funds for the Saddleback View Neighborhood Street Lighting Project (Project No. 22-6017). 2. Award a construction contract to International Line Builders, Inc., the lowest responsible bidder, in accordance with the base bid in the amount of $601,977.00, for construction of the Saddleback View Neighborhood Street Lighting Project, for the term beginning March 7, 2023, and ending upon project completion, and authorize the City Manager to execute the contract subject to non-substantive changes approved by the City Manager and the City Attorney. 3. Approve the Project Cost Analysis for a total estimated construction delivery cost of $752,471.25, which includes $601,977.00 for the construction contract, $90,296.55 for contract administration, inspection and testing, and a $60,197.70 project contingency for unanticipated or unforeseen work. DISCUSSION The City has identified the need to undertake lighting improvements within the Saddleback View Neighborhood along McClay Street, Linwood Avenue, 4th Street, Palm Street, and Mabury Street (Exhibit 1). The scope of work includes installation of new street light poles, LED lights, underground conduits and wiring, and new electrical meter pedestals. Once completed, the newly installed street lighting will provide a safer and welcoming environment for pedestrians and motorists in Saddleback View Neighborhood. Public Outreach and Contractor Participation To provide an opportunity for local vendors to submit bids, the City notified a total of 365 regional vendors via PlanetBids, many of which are Santa Ana based. Six vendors Award Construction Contract with International Line Builders, Inc. March 7, 2023 Page 2 3 2 7 3 requested bidding documents and a total of six bids were received. Bids were not received from any Santa Ana contractors. As legally required, a Notice Inviting Bids was advertised in the Orange County Register newspaper on December 14, 2022 and December 21, 2022. The project was also advertised in PlanetBids from December 14, 2022 through January 4, 2023. Bids were received electronically via PlanetBids on January 4, 2023. Bid Results Summary RANK BIDDER’S NAME LOCATION BASE BID 1 International Line Builders, Inc.Corona, CA $601,977.00 2 MSL Electric, Inc.Anaheim, CA $713,800.00 3 Inter-Pacific, Inc.Tustin, CA $749,885.02 4 Servitek Electric, Inc.Walnut, CA $755,643.00 5 Elecnor Belco Electric, Inc.Chino, CA $788,450.00 6 California Professional Engineering, Inc.La Puente, CA $849,410.00 A total of six bids were received, and all were deemed responsive. International Line Builders, Inc. submitted the lowest responsive base bid in the amount of $601,977.00 (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the basis of the Base Bid. Based on the bid analysis and a contractor’s reference check, staff recommends awarding the construction contract to International Line Builders, Inc., in the amount of the base bid totaling $601,977.00 (Exhibit 3). International Line Builders, Inc. has successfully completed various projects for the City of Santa Ana throughout the last several years. The most recent projects are 1st Street at Jackson Street & 5th Street at Euclid Street Traffic Signal Modification, Euclid Street at Hazard Avenue Traffic Signal Modification, and Citywide Traffic Signal Vehicle Head Upgrades. Project Delivery To deliver a complete project, in addition to the construction contract, the estimated total project delivery cost includes construction administration, inspection, and testing, along with an allowance for contingencies to account for unexpected or unforeseen conditions. Construction administration and inspection includes construction management; inspection of the Contractor’s work to ensure contract compliance, workmanship, and quality; and materials testing. As indicated in the Cost Analysis Award Construction Contract with International Line Builders, Inc. March 7, 2023 Page 3 3 2 7 3 (Exhibit 4) and as summarized in the table below, the estimated total construction delivery cost of the project is $752,471.25. Project Item Total Construction Contract $601,977.00 Construction Administration, Inspection, Testing $90,296.55 Contingencies $60,197.70 TOTAL CONSTRUCTION DELIVERY COST $752,471.25 Approval of this item will amend the FY 2022-23 Capital Improvement Program to include the Saddleback View Neighborhood Street Lighting Project (Exhibit 5). ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER- 2023-1 was filed for the project. FISCAL IMPACT As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is $752,471.25, which includes construction, contract administration, inspection, testing, and an authorized contingency. The following table summarizes the funds budgeted and available in current FY 22-23 for expenditure to deliver construction of this project. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers to FY 23-24. Fiscal Year Accounting Unit - Account No. (Project No.) Fund Description Accounting Unit - Account No. Description Amount 2022-23 01117630- 66220 (22-6017) General Fund - PWA Street Lighting PW-ST Light Maintenance Service Enhancement - Improvements Other Than Buildings $752,471.25 Total $752,471.25 EXHIBIT(S) 1. Location Map 2. Bid Proposal Award Construction Contract with International Line Builders, Inc. March 7, 2023 Page 4 3 2 7 3 3. Construction Contract 4. Cost Analysis 5. CIP Project Sheet Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Kristine Ridge, City Manager PWA SANTA ANA PUBLIC WORKS AGENCY Project No. 22-6017: Saddleback View Neighborhood Street Lighting Exhibit 1 Exhibit 2 Exhibit 2 Exhibit 3 CITY OF SANTA ANA CONSTRUCTION CONTRACT PROJECT 22-6017 SADDLEBACK VIEW NEIGHBORHOOD STREET LIGHTING PROJECT This CONSTRUCTION CONTRACT is made and entered into this 7th day of March, 2023 by and between the City of Santa Ana, California, acharter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and International Line Builders, Inc. (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Saddleback View Neighborhood Street Lighting Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: Notice Inviting Bids Information to Bidders Bid Proposal Bid Bond Contract Form Contract Bonds General Provisions Special Provisions Technical Provisions and Project Plans Community Workforce Agreement Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed Six Hundred and One Thousand, Nine Hundred and Seventy Seven Dollars andZero Cents ($601,977.00), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reseryes the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. a a a a a a a a a t t Page I of3 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. lf applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre-hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: http://www.santa-ana.orq/pwa/documents/CWABdf 7. CONTRACTOR shall, after award of this Contract, fumish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance ofthe work (Performance Bond), and one in the amount ofOne Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Palment Bond). This Conract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, fumish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition ofproject acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($ 10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater ofOne Hundred Thousand Dollars ($100,000) or Ten Percent (10%) ofthe final contract price. 9. CONTRACTOR shall, after award of this Contract, fumish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemniff, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "lndemnitees"), through legal counsel acceptable to C[Y, fiom and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attomey's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, ofany ofthe obligations under the Contract Documents; (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any penonal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. Page 2 of 3 (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subconkact documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. CITY OF SANTA ANA Clerk of the Council APPROVED AS TO FORM: SONIA R- CARVALHO City Attomey KRISTINE RIDGE City Manager CONTRACTOR: International Line Builders, Inc. NAME: Matthew Edwards TITLE: Vice President By:hK-tu.T,*l- JOHN FUNK Chief Assistant City Attomey RECOMMENDED FOR APPROVAL: NABIL SABA. PE Executive Director Public Works Agency ATTEST: Page 3 of 3 EXHIBIT A CITY OF SAI\TA ANA PROPOSAL PROJECTNO.: 22-6017 SADDLEBACK VIEW NEIGHBORHOOD STREET LIGHTING BID PROPOSAL TO: CITY C]OUNCIL OF THE CIry OF SANTA ANA FROM: International Line Builders, lnc. dba ILB Electric REQUIREMENT: The undersigned bidder declares lhat they have carefully exanrined the location ofthe proposed work, that thcy have examincd the Contract Documents in its entirety and hereby proposes to fumish all material and do all the work required to complete the said work in accordance with said plans (if any) and thc specifications for the unit price(s) or lump sum(s) sct fonh in the following schedule: S oo oo $D,54D co $a1g4t ca s4.5a! oo e36pz8.rr su.5 ot> Item Description Qty Unit Price Amount I Install Street l-ight Polc ll EA sU,r4e oo st5r,5Jb o0 2 lnstall Electrical Maer Pcdcstal 2 EA $ 9,f,34.rp $lt,lruSoc 3 r lnstall 3#E AWG Conductor Wires 5500 LF s lt.th $3U7.6,16 0o 4 t lnstall 2" PVC Condui(LF s54 'rc 5 t lnstall 3" PVC Conduit 50 LF $ l05.oo $6,?6C CO 6 . Install No ll li2 Pull Bor l0 EA sl,osa (, 1 Install No.5 Pull Box EA sl9q4 co I Remove and Replace Concrcte Pad t00 SF s t15.3f, 9 Pothole Sreer Light Polc Lmation 1,3 EA sl,€ar.oo t0 Polhole Iltililies Nol Sho\\'n on Plan 5 EA $t4.oo Construction Pcrmit I LS $t ,aco oo P-l ofP-16 Unil 5400 8 s6,200 EXHIBIT A CITY OF SAI\TA ANA PROPOSAL PROJECTNO.: 22{017 SADDLEBACK VIEW NEIGHBORHOOD STREET LIGHTING TOTAL BASE BID $u0l,rl11.oo The lowest responsible bidder shall be selected based or th€ total base bid. The City reserves the right to award the Base Bid, and any. all. or none of the add-altemate bid items (if any). The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 ofthe Standard Specifications. The actual amount for this item will be dictated by the acrual quantity used. and the Agerrcy reserves the right to increasc or dccrease the quantity ofthis itcm accordingly. t This bid item is considered a Specialty Item per Section 3-2 ofthe Standard Specifications TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES The undersigned biddcr hereby proposes to complete the Work for the total base bid amount shown above, within sixtv (60) workinc davs after the commencement date slaled in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,500 per calendar day. Name of Firm lnternational Line Builders, lnc. dba ILB Electric7HtruSignarure of BIDDER Title Vice President - u/*)*!x,t €du-,tarr),! (lfan individual, so state. Ifa firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. Ifa corporation. state legal name of corporalion. and names of President, Secraary, Treasurer and Manager. thereof. ) P-2 ofP-16 EXHIBIT 4 Construction Contract 601,977.00$ Contract Administration, Inspection and Testing 90,296.55$ Contingencies 60,197.70$ TOTAL ESTIMATED CONSTRUCTION COSTS 752,471.25$ CONSTRUCTION OF PROJECT NO. 22-6017: Saddleback View Neighborhood Street Lighting Project COST ANALYSIS CITY OF SANTA ANA FY 22/23CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: This project includes installation of new street light poles including foundation, luminaire arm, LED luminaire, wiring, electrical meter pedestal and any other work required to provide the intended operation. PROJECT NEED: Saddleback View Neighborhood has areas without street lighting. New Street Lights will increase driver and pedestrian visibility, enhance road safety, and promote security. PROJECT TITLE: Saddleback View Neighborhood Street Lighting PROJECT CATEGORY: Traffic Improvements Traffic Safety / Mobility LOCATION MAP AGENCY:DIVISION:CONTACT:DATE: Public Works Traffic Engineering Cesar Rodriguez, Senior Civil Engineer 02-Feb-2023 PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Construction 692,274 ------ Contingency 60,198 ------ TOTAL 752,471 ------ SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 GENERAL FUND 752,471 ------ TOTAL 752,471 ------