HomeMy WebLinkAboutItem 56 - 2022-23 Fiscal Year SB 1 Local Streets and Roads Projects Public Works Agency
www.santa-ana.org/pw
Item # 56
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
June 21, 2022
TOPIC: 2022-23 Fiscal Year SB 1 Local Streets and Roads Projects
AGENDA TITLE
Adopt a Resolution for Fiscal Year 2022-23 SB 1 Local Streets and Roads Projects in an
Amount Estimated at $7,553,444 for Capital Improvement Projects (Non-General Fund)
RECOMMENDED ACTION
Adopt a resolution affirming the Fiscal Year 2022-2023 SB 1 Projects List and anticipated
funding in the amount of $7,553,444, which is required to be submitted to the California
Transportation Commission (CTC) for budgeting the Fiscal Year 2022-23 Capital
Improvement Program (CIP), as necessary for City eligibility to receive Road
Maintenance and Rehabilitation Account Funding.
DISCUSSION
Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes
of 2017), was passed by the Legislature and signed into law by the Governor in April 2017
to address basic road maintenance, rehabilitation, and critical safety needs on both the
state highway and the local streets systems.
The funding guidelines specify that before local agencies can receive their apportionment
of Road Maintenance and Rehabilitation Account (RMRA) funds in a given fiscal year,
they must adopt a resolution with a list of proposed projects (Exhibit 1). The City will
receive an estimated $7,553,444 in FY 2022-23 from RMRA funds and must submit a
resolution with the project list to the CTC by July 1, 2022 to maintain eligibility.
Each RMRA-funded project must be specifically differentiated from the Highway Users
Tax Account funding, and project nominations must include a project description, specific
location, proposed schedule for completion, and the estimated useful life.
The proposed projects are being incorporated into the FY 2022-23 Capital Improvement
Program (CIP) Budget, and staff has prepared FY 2022-23 CIP Project Sheets (Exhibit
2) for each of the projects.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the action.
Adopt a Resolution for 2022-23 Fiscal Year SB1 Local Streets and Roads Projects
June 21, 2022
Page 2
2
7
5
1
FISCAL IMPACT
Pursuant to the California Transportation Commission’s Annual Reporting Guidelines for
Local Streets and Roads Funding, staff has identified five CIP projects to be funded with
anticipated FY 2022-23 RMRA revenues in the table shown below. The proposed FY
2022-23 CIP was prepared using the California Department of Finance RMRA January
2022 estimate of $7,553,444 and budgeted in the HUTA Gas Tax-RMRA, Select Street
Construction, Improvements Other Than Buildings account (Accounting Unit No.
05917660-66220).
Fiscal Year 2022/23 - SB1 Road Repair and Accountability Act Project List
PROJECT LOCATION DESCRIPTION COST
McFadden Avenue Harbor Boulevard to
Grand Avenue Road Rehabilitation $3,615,000
Standard Avenue Warner Avenue to First
Street Road Rehabilitation $1,900,000
1st Street Grand Avenue to Tustin
Avenue Road Rehabilitation $888,444
1st Street Flower Street to
Standard Avenue Road Rehabilitation $1,150,000
Grand Total: $7,553,444
EXHIBIT(S)
1. Resolution and Proposed List of Projects for FY 2022-23
2. FY 2022-23 RMRA CIP Project Sheets
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Kristine Ridge, City Manager
Resolution No. 2022-XXX
Page 1 of 5
RESOLUTION NO. 2022-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA ADOPTING A LIST OF PROJECTS TO BE
FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS
FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds, determines and
declares as follows:
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017, was
passed by the Legislature and signed into law by the Governor in April 2017 in order to
address the significant multi-modal transportation funding shortfalls statewide.
B. SB 1 includes accountability and transparency provisions that will ensure
the residents of the City of Santa Ana are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year.
C. The City of Santa Ana must establish a list of all projects to receive funding
from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which
must include a description and the location of each proposed project, a proposed
schedule for the project’s completion, and the estimated useful life of the improvement.
D. The City will receive an estimated $7,553,444 in RMRA funding in Fiscal
Year 2022-23 from SB 1.
E. This is the fourth year in which the City of Santa Ana is receiving SB 1
funding and will enable the City to continue essential road maintenance and rehabilitation
projects, safety improvements, repairing and replacing aging bridges, and increasing
access and mobility options for the traveling public that would not have otherwise been
possible without SB 1.
F. The City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects
that also meet the priorities of the community for transportation investment.
G. The funding from SB 1 will help the City maintain and rehabilitate local
streets and roads and provide resources for similar projects in the future.
H. The 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City’s streets and roads are in an good condition and this revenue will help
Resolution No. 2022-XXX
Page 2 of 5
us enhance the overall quality of our road system and over the next decade will help to
maintain streets and roads condition.
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance, safety, and investing in complete streets
will have significant benefits statewide.
Section 2. The City of Santa Ana adopts the following list of projects planned
to be funded with Road Maintenance and Rehabilitation Account (RMRA) revenues for
Fiscal Year 2022-23.
Project
Name
Location
Description Proposed
Project
Completion
date
Estimated
Useful Life
Road Projects:
McFadden
Avenue
Harbor Boulevard to Grand
Avenue
Road
Rehabilitation
12/31/24 20 YR
Standard
Avenue
Warner Avenue to First Street Road
Rehabilitation
12/31/24 20 YR
1st Street Grand Avenue to First Avenue Road
Rehabilitation
12/31/24 20 YR
1st Street Flower Street to Standard Avenue Road
Rehabilitation
12/31/24 20 YR
Section 3. The following previously proposed and adopted projects may also
utilize previous Fiscal Year Road Maintenance and Rehabilitation Account revenues in
their delivery. With the relisting of these projects in the adopted fiscal year resolution, the
City is reaffirming to the public and the State our intent to fund these projects with Road
Maintenance and Rehabilitation Account revenues:
Projects Continued from FY 21-22:
Project
Name
Locati
on
Description Proposed
Project
Completion
date
Estimated
Useful Life
Road Projects:
Main Street MACARTHUR BLVD TO DYER
RD
Preventative
Maintenance/Slurry
7/01/23 10 YR
Westminster
Avenue
NEWHOPE ST TO HARBOR
BLVD
Road
Rehabilitation
7/01/23 20 YR
Bristol Street SANTA CLARA ST TO
MEMORY LN
Road
Rehabilitation
12/31/24 20 YR
Resolution No. 2022-XXX
Page 3 of 5
Grand Avenue WARNER AVE TO EDINGER
AVE
Road
Rehabilitation
12/31/24 20 YR
Projects Continued from FY 20-21:
Projects Continued from FY 19-20:
Project Name
Location
Description Proposed
Project
Completion
Estimated
Useful Life
Road Projects:
17th Street Fairview Street to Bristol Street Road Rehabilitation 02/06/23 20 YR
17th Street Bristol Street to Flower Street Road Rehabilitation 02/06/23 20 YR
Alton Main Street to Standard Avenue Road Rehabilitation 06/22/23 20 YR
Fairview Avenue City Limit to Segerstrom Avenue Road Rehabilitation 03/11/23 20 YR
MacArthur
Boulevard
Fairview Street to Raitt Street Road Rehabilitation 02/17/23 20 YR
Project Name
Location
Description Proposed
Project
Completion
Estimated
Useful Life
Road Projects:
Euclid Street McFadden Avenue to 1st Street Road Rehabilitation 07/07/22 20 YR
Euclid Street 1st Street to Hazard Avenue Road Rehabilitation 07/07/22 20 YR
MacArthur
Boulevard
Flower Street to Main Street Road Rehabilitation 07/17/23 20 YR
Euclid Street City Limit to McFadden Avenue Road Rehabilitation 12/31/23 20 YR
Main Street Warner Avenue to Edinger Avenue Road Rehabilitation 12/31/23 20 YR
Resolution No. 2022-XXX
Page 4 of 5
Projects Continued from FY 18-19:
Section 4. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote adopting
this Resolution.
ADOPTED this 7th day of June, 2022.
_
Vicente Sarmiento
Mayor
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
John M. Funk
Sr. Assistant City Attorney
Project Name
Location
Description Proposed
Project
Completion
Estimated
Useful Life
Road Projects:
Raitt Street McFadden Avenue to Civic Center
Drive
Road Rehabilitation 02/02/25 20 YR
Main Street Dyer Road to Warner Avenue Road Rehabilitation 09/20/23 20 YR
Main Street 1st Street to Civic Center Drive Preventative
Maintenance / Slurry
12/31/24 10 YR
McFadden Avenue Fairview Street to Raitt Street Road Rehabilitation 02/27/23 20 YR
Resolution No. 2022-XXX
Page 5 of 5
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers _
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Daisy Gomez, Clerk of the Council, do hereby certify the attached Resolution No. 2022 -
_____ to be the original resolution adopted by the City Council of the City of Santa Ana on
June 7th, 2022.
Date:
Clerk of the Council
City of Santa Ana
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of McFadden Avenue pavement rehabilitation
is identified as a high priority in the PMP.
PROJECT TITLE:
McFadden Avenue Rehabilitation
from Harbor Boulevard to Fairview
Ave
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer 14-Apr-2022
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 836,750 ------
Engineering 67,000 ------
TOTAL 903,750 ------
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
RMRA SB1 903,750 ------
TOTAL 903,750 ------
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of 17th Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
McFadden Avenue Rehabilitation
from Raitt to Grand
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer 14-Apr-2022
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 2,510,250 ------
Engineering 201,000 ------
TOTAL 2,711,250 ------
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
RMRA SB1 2,711,250 ------
TOTAL 2,711,250 ------
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Standard Avenue pavement rehabilitation
is identified as a high priority in the PMP.
PROJECT TITLE:
Standard Avenue Rehabilitation from
1st Street to Warner Avenue
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Gilbert Castillo, Senior Engineer 14-Apr-2022
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 1,900,000 ------
TOTAL 1,900,000 ------
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
RMRA SB1 1,900,000 ------
TOTAL 1,900,000 ------
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of 1st Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
1st Street Rehabilitation from Grand
Avenue to Tustin Avenue
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Gilbert Castillo, Senior Engineer 14-Apr-2022
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 888,440 ------
TOTAL 888,440 ------
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
RMRA SB1 888,440 ------
TOTAL 888,440 ------
CITY OF SANTA ANA FY 22/23CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Design and construction of pedestrian safety improvements
including sidewalk widening, protected pedestrian crossings and
ADA upgrades. Reconstruction/resurfacing of existing pavement
and replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
This project is designed to increase pedestrian safety and mobility
along the corridor. The City's Pavement Management Program (PMP)
has been developed to prioritize and recommend the most cost-
effective roadway repairs, and maximize the return from available
funding for street pavement. This segment of 1st Street pavement
rehabilitation is identified as a high priority in the PMP.
PROJECT TITLE:
1st Street Pedestrian Improvements
and Rehabilitation from Flower to
Standard Avenue
PROJECT CATEGORY:
Street Improvements
Curb, Gutter, Sidewalk
Improvements
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 14-Apr-2022
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 1,150,000 ------
TOTAL 1,150,000 ------
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
RMRA SB1 1,150,000 ------
TOTAL 1,150,000 ------