TOPIC: Local Street Preventative Maintenance FY 20-21
AGENDA TITLE
Award a Construction Contract to Hardy and Harper, Inc. in the Amount of $1,532,000 for
the Local Street Preventative Maintenance FY 20-21 Project with an Estimated Project
Delivery Cost of $2,120,419 (Project No. 21-6907) (Non -General Fund)
RECOMMENDED ACTION
1. Award a construction contract to Hardy and Harper, Inc., the lowest responsible
bidder, in accordance with the base bid in the amount of $1,532,000, for construction
of the Local Street Preventative Maintenance FY 20-21, for the term beginning June
1, 2021 and ending upon project completion, and authorize the City Manager to
execute the contract subject to nonsubstantive changes approved by the City
Manager and the City Attorney.
2. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$2,120,419, which includes $1,532,000 for the construction contract, $230,119 for
contract administration, inspection and testing, and a $358,300 project contingency
for unanticipated or unforeseen work.
DISCUSSION
The City's Pavement Management Program has been developed to identify the
preventive maintenance requirements for the City's street network. The local street
segments (Exhibit 1) recommended for the Fiscal Year 2020-21 Local Street Preventative
Maintenance Capital Improvement Project have been identified as high priorities for slurry
seal. The recommended work consists of preparing the roadway by performing minor
pavement repairs, including the following localized replacement of asphalt concrete
pavement, followed by slurry seal resurfacing, crack seal, striping, and signage. The
improvements also include replacement of damaged concrete curbs, gutters, sidewalks,
and curb ramps. Once completed, this project will improve the City's overall pavement
condition, enhance the visual appeal of the street, upgrade ride quality, and support
compliance with Americans with Disability Act (ADA) standards.
Award Construction Contract to Hardy and Harper, Inc.
June 1, 2021
Page 2
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of
939 regional vendors via PlanetBids, many of which are Santa Ana based. Twenty-eight
vendors requested bidding documents, and a total of five bids were received. Bids were
not received from any Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on April 1, and 9, of 2021. The project was also advertised in PlanetBids from
March 30, 2021 through April 21, 2021. Bids were received electronically via PlanetBids
on April 21, 2021.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Hardy and Harper, Inc.
Lake Forest
$1,532,000
2
R.J. Noble Company
Orange
$1,579,789
3
All American Asphalt
Corona
$1,581,560
4
Excel Paving Co
Long Beach
$1,677,582
5
EBS General Engineering Inc.
Corona
$1,831,532
A total of five bids were received, and all were deemed responsive. Hardy and Harper,
Inc. submitted the lowest responsive base bid in the amount of $1,532,000 (Exhibit 2). As
specified in the bid documents, the lowest bid shall be determined on the basis of the
Base Bid. Based on the bid analysis and a contractor's reference check, staff
recommends awarding the construction contract to Hardy and Harper, Inc., in the amount
of the base bid totaling $1,532,000 (Exhibit 3).
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen conditions.
Construction administration and inspection includes construction management;
implementation of the City's Community Workforce Agreement requirements, inspection
of the Contractor's work to ensure contract compliance, workmanship, quality, and
materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the
table below, the estimated total construction delivery cost of the project is $2,120,419.
Award Construction Contract to Hardy and Harper, Inc.
June 1, 2021
Page 3
Project Item
Total
Construction Contract
$1,532,000
Construction Administration, Inspection, Testing
$230,119
Contingencies
$358,300
TOTAL CONSTRUCTION DELIVERY COST
$2,120,419
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2021-38 was filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $2,120,419, which includes construction, contract administration, inspection,
testing, design engineering, and an authorized contingency of $358,300.
The following table summarizes the funds budgeted for expenditure to deliver
construction of this project. All Funds are available for expenditure in Fiscal Year 2020-
21.
Fiscal
Accounting Unit -
Fund
Accounting Unit -
Y
Year
Account No.
Description
Account No.
Amount
(Project No.)
Description
EXISTING BUDGET
Measure M-
Measure M2 Local
2020-21
03217662-66220
Street
Fairshare,
$2,120,419
(21-6907)
Construction
Improvements Other
Than Building
Total
$2,120,419
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
i0:I:n:3ifi
SANTAANA Project No. 21-6907.
Uai
Local Street Preventative Maintenance
PUBLIC WORKS AGENCY I FY 21-22
City of Santa Ma page 1 of 7
Local Street Pr—e®ative Malntef+acce FY 2020-21 (Proled 21-MOI), brdrfing an 0414114021 2:00 PM fPOTq
Pnnfed 04l2212021
EXHIBIT 2
Bid Results
Bidder Details
Vendor Name
Hardy & Harper, Inc.
Address
32 Rancho Circle
Lake Forest, California 92603
United States
Respondee
Ashlie Blanchard
Respondee Title
Bid Coordinator
Phone
714444-1851
Email
ablanchard@hardyandharper.com
Vendor Type
CADIR
License #
215952
CADIR
Bid Detail
Bid Format
Electronic
Submitted
04/21/2021 1:49 PM (PDT)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
251064
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title File Name Fite Type
CITY OF SANTAANA BID BOND - 04202021.pdf CITY OF SANTAANA BID BOND - 04202021.pdf General
Attachments
SANTAANA-GENERAL ATTACHMENTSO4212021.pdf SANTAANA-GENERAL ATTACHMENTSO4212021.pdf General
Attachments
CITY OF SANTAANA OWNERSHIP AFFIDAVIT - CITY OF SANTAANA OWNERSHIP AFFIDAVIT - General
04202021.pdf 04202021.pdf Attachments
CITY OF SANTAANA NONCOLLUSION - 04202021.pdf CITY OF SANTAANA NONCOLLUSION - 04202021.pdf General
Attachments
Page 2 of 3
City of Santa Ana
Local Street Preventative Mamtanance FY 2920-21 (Project 21-69071, bidding on 0412112021 2!00 PM (PDT) Printed 04122/2021
Line Items
Discount Terms No Discount
item Item Type
Item Desatppon
UOM
OTY
LIM Ph-
Cne Twat Response Comment
e Code
$1532,000 Mao
Bass Bid It.— fa I - 111)
CY
430
S35-000a
$15,050.0000 Yes
I
Uncl—flied Eaca'.ation'
SF
386NO
$0-100o
S73.511.0000 Yes
2
Cud Mil! 07
TN
5250
S70-0000
S367500.0000 Yes
3
Asphan Comets IAC Pavement!'
4
Rudhetr2Ad FmutsianAWragate SlunY iRFAS1 TyP9 It'
TN
950
S577,am
W8,150.000o Yes
LF
460
$41.0000
S1a.eM0000 Yes
5
PCC Cure & Gutter IA-2-6 I'
SF
4000
SS 25M
S21,0M 0000 Yes
6
FCC Curb Ramp'
SF
35M
53.70W
S112000000 Yes
7
PCC SA—dik-
SF
7BOo
524.OD90
$W8 200.0000 Yes
6
PCC Cross Golfer'
EA
25
$450.9W0
S11250 0000 Yes
9
Tree Rook Shave-
10
Adjust Manhow Frame 8 C—r to Fan hed Grads
FA
20
S950.0000
Sio.000.0000 Yes
11
Adjust Water Val— From 9 Cover to Fmished Crade
EA
20
Sg75A0W
S119.5015 00no Yes
LS
1
S156.779.000
S166770OwO Yes
12
Crack Sealing
13
Protection of Surlaee UTAIV Frames and Covers
LS
1
53.560.0w0
S3.500.O0w Yes
14
Remaye erlWay btnping, pavement legends, and malketa
1.5
1
S20,t100.0WU
$20,000-OOW Yes
16
Install TrAc Loops Type E and D Bike Mps
EA
B
$5w 0000
53.GW.wOO YOU
1.5
r
530.DDO o0W
$30 GM DODO Yos
16
Srgnmg A 5tnpug
17
Project Ad—Usamen190n
FA
2
$750 OWO
$15W 0000 Yes
l5
1
S15,0MODUO
$15.00g.GOOD Yes
I6
Consfruciian Perms
Asterisk Ncles IP9r
Section 3.2 0l Standard Spacirc tmnsi - NOT part o1 Total aid Calculation
$0A000
' = The quantity Ier (lbs bid Item ¢ show for lad waaparisan only. This hid nem shag not be suhled to the'25%' hmd as doped M
3a0ion 3-2 0! the Standard 3peci6ratroaS This tad item $her —1 he subject to the -254o gmg as staled in S-Jra, 3-2 of the Slandard
ea
0
50 am
SO.0000 Yes
10
$peca6catlond- The actual amount for this item will be dlclatod by the actual auamitry used. and the AgoncY eeaurves IM aghl W
,naease or dedeaso" 4uanhfy W IM gem accordingly.
20
t d This bid item is considored a SDoc alry item par Section 2.32 og me Standard 9p941BCaiien8.
ea
0
S0 0000
50.0000 Yae
PlannTR.:ts -^_
City of Santa Ana
LucaF Streel Prevenli Marnlenance FY 2020 21 tProlect 21-6967). Wdmy nn Q4l21i2021 2 00 PM IPUT)
Page 3 a1 3
Prinled 04122l2021
Line Item Subtotals
Section TrOe
Base Bid Items (p1 - 181
Asti Moles (Per Section 3.2 of Standard Specllicalions) - NOT part of Total Bid Calculation
Une Total
$1,532.Ooo 0000
$0 0000
Grand Total $1,532,000.0000
CITY OF SANTA ANA
COMMUNITY WORKFORCE
AGREEMENT COMPLIANCE
REQUIRED
CONTRACT DOCUMENTS
FOR
PROJECT NO. 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE
FY 20-21
PREPARED UNDER THE SUPERVISIONS OF:
7 ;
a
r
r{CE NO.4a603E
EXP, 6/30/22
���� 3I2512g21
Kenny Nguyen DATE
20 CIVIC CENTER PLAZA M-22
CITY HALL - ROSS ANNEX
SANTA ANA, CA 92701
SANTA ANA
�IPWA�
PUBLIC WORKS AGENCY
Prospective bidders may obtain Bid Documents, Project Specifications and Plans via PlanetBids:
htt s:Llwww. lanetbids.com/pottallportal.ct Com an ID=20137
CITY OF SANTA ANA
TABLE OF CONTENTS
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
SECTION f ITEM PAGE
_ADVERTISEMENT
NoticeInviting Bids..................................................................................................................... iv
Mapof City Hall...... ........................ ............................................................................................ vii
INSTRUCTIONS TO BIDDERS
Instructions to Bidders for Proposal Submission ..................
PROPOSAL
N2Proposal................................................................................................................................. P-1
Bidder's Statement.... ... ...........................................................................................................I P-3
Contractor's Licensing and Registration Statement.................................................................... P-4
Prevailing Wage Compliance and Monitoring Statement........................................................... P-5
OwnershipAffidavit ................................................................................... ............................... P-6
BidBond..................................................................................................................................... P-7
Listof Sub-Contractors.............................................................................................................. P-8
References................................................................................................................................... P-9
AdditionalReferences................................................................................................................ P-10
Non -Collusion Affidavit........................................................................................................... P-11
Non -Discrimination Certificate................................................................................................. P-12
Statement Regarding Apprenticeship Requirements.................................................................P-14
Statement Regarding "Anti -Kickback" Requirements.............................................................. P-15
Public Contract Code Section 10162 Questionnaire.................................................................. P-16
Statement Regarding Community Workforce Agreement (CWA) Requirements .................... P-17
SPECIFICATIONS
Part 1- General Provisions
Section1 General..........................................................................................................................I
Section2 Scope of the Work....., ...............................................................................................4
Section 3 Control of the Work......................................................................................................6
Section4 Control of Materials..................................................................................................... I I
Section 5 Legal Relations and Responsibilities........................................................................11
Section 6 Prosecutionand Progress of the Work.........................................................................14
Section 7 - Measurement and Payment..........................................................................................15
Section 8 Facilities for City Personnel............................................................................ Not Used
Section 9 - Claims Resolution Procedures...................................................................................16
Part 4 - Existing Improvements
Section402 Utilities..................................................................................................................21
Part 6 - Temporary Traffic Control
Section600 - Access....................................................................................................................22
Section 601 - Temporary Traffic Control for Construction and Maintenance Work
Zones..................................................................................................................................23
rev. 021011202 1 i
CITY OF SANTA ANA
TABLE OF CONTENTS
PROJECT NO_: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FX 20-21
SECTION / ITEM PAGE
1,00
Special Provisions - Construction
1,01
Rock Products....................................................................................................................24
1.02
Relative Compaction Tests................................................................................................24
1.03
Clearing and Grubbing,..................................................................................................24
1.04
Unclassified Excavation..................................................................................................24
1.05
Subgrade Preparation................................................................................
.......................24
1.06
Cold Milling... ....................................................................................,
.....................I....1.25
1.07
Slurry Sea] Surfacing.........................................................................................................25
1,08
Asphalt Concrete...............................................................................................................27
1.09
Pavement Fabric..............................................................................................................29
1.10
Asphalt Rubber Hot Mix (ARHM)................................................
................................29
1.11
Crack Repair and Patching.............................................................................................30
1.12
Portland Cement Concrete (PCC)......................................................................................
30
1.13
Concrete Curbs, Gutters, Walks, Ramps, Driveway Approaches, Alley
Aprons, and Cross Gutters..............................................................................................31
1.14
Portland Cement Concrete (PCC) Grinding.....................................................................32
1,15
Portland Cement Concrete (PCC) Pavement Construction...............................................32
1.16
Landscaping and Irrigation Repair.....................................................................................33
1.17
Root Shaving..................................................................................................................33
1.18
Adjustment of Surface Utilities to Grade...........................................................................34
1.19
Pulverize & Cement -Treat Existing Asphalt Concrete, Base,
and Subgrade ....... Not Used
1,20
Remove Excess Pulverized Material....................................................................
Not Used
1.21
Cold In -Place Recycling (CIR) / Cold Central Plant Recycling (CCPR) ............. Not Used
1.22
Cold In -Place Recycling Expanded Asphalt Mix (CIR> AM)
.............................. Not Used
1.23
Asphalt -Rubber Cape Seal.................................................................................
Not Used
2.00
Special Provisions - Traffic Signing & Striping
2.01
Scope of Work...................................................................................................................36
2.02
Striping (Traffic Stripes and Pavement Markings)..........................
...............................36
2.03
Signs (Roadside Signs) and Markers..........................................
.....................................39
.3.00
Special Provisions - Traffic Control
3.01
General.............................................................................................................................43
3.02
Project Phasing and Lane Requirements........................................................................44
3.03
Advanced Warning Signs..................................................................................................45
3.04
Traffic Control Plan Preparation and Submittal................................................................46
3.05
Payment....................................................................................
.........................................46
4.00 Special Provisions - Traffic Signal Systems ........................................................ Not Used
5.00 Special Provisions - ftrigation, Landscaping, & Maintenance Period .............. Not Used
6.00 Special Provisions -Sanitary Sewer Improvements ........................................... Not Used
ii
CITY OF SANTA ANA
TABLE OF CONTENTS
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
SECTION / ITEM PAGE
7.00 Special Provisions - Water Main Improvements ................................................ Not Used
8.00 Special Provisions - Storm Drain Construction.................................................. Not Used
9.00 Special Provisions - Electrical System................................................................ Not Used
10.00 Special Provisions - Bridge Construction............................................................ Not Used
11.00 Special Provisions - Miscellaneous Construction ................................................ Not Used
APPENDIX
A Definition of Bid Items
B Construction Contract Agreement
C Bonds
D Certificate of Insurance
E Construction Signage and Notices
F Standard Plans
G Appendix G --- FCC LIST
H Appendix H - LOCATION MAP AND SIGNING AND STRIPING
I Appendix I - COMMUNITY WORKFORCE AGREEMENT
iii
CITE' OF SANTA ANA
ADVERTISEMENT
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via
PlanetBids on or before 2:00 pm, April 21,.2021. No late bids will be accepted. No other
method of bid submittal will be accepted for:
PROJECT NO.: PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
All Plans and Specifications are available on PlanetBids.
For further information on how to register as a vendor refer to:
htt s:lfwww.santa-ana.or financc/ urchasin-division/vendor-re istration
Do not call Purchasing Division regarding Public Works Agency projects.
Scope of Work; includes slurry seal, cold mill; removal & replacement of asphalt concrete
pavement, curb ramp, cross gutter; repair sidewalk, curb and gutter; and signing and striping.
Pre -Bid Job Meeting: There will be no pre job walk.
Contractor's License Re uirements: From the time of City Council contract award until work
completion, the Contractor shall possess a valid California Class "A" Contractor's license. All
sub -contractors shall be properly licensed for their respective trades.
Public Works Construction Permit: The Contractor will be required to obtain a Public Works
Construction Permit (refer to Section 2-2a, Construction Permit, of these Special Provisions).
The required deposit for this permit shall be as described in the Bid Proposal.
Bid Proposal_ Guaranty:
o A scanned cop of the Bid Proposal Guaranty shall be uploaded to PlanetBids along with
project bid. Bid Proposal Guaranty shall be in the form of a cashier's or certified check
payable to the City of ,Santa Ana, or Bid Bond issued by a corporate surety, in an amount
not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will
enter into the proposed contract if the same is awarded. The signature of the bidder on the
bid bond must be notarized.
o In addition to electronic Bid submittals, Bidders shall deliver an original hard copy of the
Bid Proposal Guaranty. For further instructions regarding original Bid Proposal Guaranty
submittal, refer to PlanetBids.
Failure to provide required documents with Bid may cause the bid to he deemed non-
responsive.
iv
CITY OF SA)_ TA ANA
ADVERTISEMENT
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
COMMUNITY WORKFORCE AGREEMENT
For projects with bids greater than $250,000 for prime multi -trade construction contracts
(including all subcontractors) or over $100,000 for specialty contracts (contracts either limited to
a single trade or craft or limited to a singular scope of work), the CONTRACTOR shall adhere to
the CITY'S Community Workforce Agreement (CWA). This project is considered a prime
multi -trade construction contract. The CWA is a pre -hire collective bargaining agreement,
which establishes the labor relations policies and procedures for CONTRACTOR to follow in
the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully
described in the CWA. The CWA is incorporated by reference in the Construction Contract. A
copy of the CWA may be found on the City's website at:
http://www.santa-,qaa.org/pwa/documen!L/CWA.tp)df.
This project is subject to compliance monitoring and enforcement by the State of California
Department of Industrial Relations, per Section 1771.4.a.1. BIDDERS are required to inform
themselves fully of the conditions relating to construction and labor under which the work will
be performed. Any contract entered into pursuant to this notice will incorporate the provisions of
the California State Labor Code.
In accordance with the California State Labor Code, prevailing wage rates apply. Copies of the
prevailing rate of per diem wages are on file with the Public Works Agency and shall be made
available to any interested party on request.
A Contractor and any subcontractor must be registered with the Department of Industrial
Relations prior to submitting a bid or otherwise have the ability to be registered prior to contract
award per Section 10164 or 20103.5 of the California Business and Professions Code. "A
contractor and any subcontractor shall not be qualified to bid on, be listed in a bid proposal,
subject to the requirements of Section 4104 of the California Public Contract Code, or engage in
the performance of any contract for public work, as defined in this chapter, unless currently
registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation
of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1
of the California Business and Professions Code or by Section 10164 or 201015 of the
California Public Contract Code, provided the contractor is registered to perform public work
pursuant to Section 1725.5 at the time the contract is awarded. Information about registration
can be found on the Department of Industrial Relations website at
htti2://www.dir.ca,govipublie-works/publicworks,litml
A bid will not be considered nor any contract or subcontract entered into without proof of the
contractor and subcontractor's current registration to perform public work as defined in the
Section of the California Public Contract Code stated above,
v
CITY OF SANTA ANA
ADVERTISEMENT
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE, MAfNTENANCE FY 20-21
APPROVAL:
I.� Date;. F f Z6-
By: �- ` —
Nabil SaUa, P.E.
xecutive Director, Public Works Agency
of
CITY OF SANTA ANA
ADVERTISEMENT
PROJECT NO.: 21-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 20-21
MAP OF CITY HALL
Fr2 m S Fwv St►uth
Exit Broadway, go South
on Broadway, turn Right
on Santa Ana Blvd.
Civic Center Plaza
PWblic.,Works Agency_
Ross Annex
20 Civic Center Plaza
Santa Ana, CA 92701
Directions
= Norlh
Exit Grand Ave, turn Left
on Gmnd Ave, turn Right
on Santa Ana Blvd.
From 22 fl'wv El t.
To I-3 South, exit
Broadway go South on
Broadway, turn Right on
Santo Ana Blvd
From 22 Fwv MI
Exit Main St„ turn Left on
La Veta, turn Left on Main
St., turn Right on Santa
Ana Blvd.
vll