HomeMy WebLinkAboutPresentation - #18Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 1
Cabrillo Town Center
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 2
Appeal of Planning Commission Decision
Application: Appeal Nos. 2023-02 and 2023-03, appealing the decision of the
Planning Commission to approve Site Plan Review (SPR) No. 2023-01 and
Tentative Tract Map (TTM) No. 2023-03 (County Map No. 19243)
Address & Council Ward: 1901 E. Fourth Street, Ward 3
Description: Appeal Application Nos. 2023-02 and 2023-03, appealing the
decision of the Planning Commission to approve SPR No. 2023-01 and TTM
No. 2023-03 (County Map No. 19243) to facilitate the construction of a
mixed-use development known as Cabrillo Town Center at 1901 East Fourth
Street.
Recommendation: It is recommended that the City Council adopt a
resolution denying Appeal Application Nos. 2023-02 and 2023-03 and
upholding the Planning Commission’s approval of two resolutions to approve
SPR No. 2023-01 and TTM No. 2023-03 (County Map No. 19243) for the
Cabrillo Town Center Project.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 3
Planning Commission Action & Background
•On April 24, 2023, the Planning Commission voted unanimously (6-0-
0-1 with Ramos absent) to adopt a resolution approving SPR No.
2023-01 and TTM No. 2023-03.
•The Commission modified the conditions of approval to require the
applicant to coordinate with the Public Works Agency (PWA) to
develop a traffic-calming strategy along Cabrillo Park Drive.
•On May 1, 2023, Lozeau Drury, LLP, on behalf of the Supporters
Alliance for Environmental Responsibility (“SAFER”), submitted an
appeal application appealing the Planning Commission’s approval.
•On May 3, 2023, Mitchell M. Tsai, on behalf of the Southwest
Mountains States Carpenters (“SWMSRCC”), also submitted an appeal
application appealing the Planning Commission’s approval.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 4
Location and Zoning
Fourth StreetCabrillo Park DriveParkcourt Place
•General Plan: District
Center –Medium High (DC-3)
•Zoning: Professional (P) &
Village Center District of the
Metro East Mixed-Use
Overlay Zone (MEMU)
•Surrounding Land Uses:
–North: Cabrillo Park
–West:Vacant Site (future
Central Pointe Mixed-Use
Development)
–South: Medical Offices
–East : Professional & Medical
Offices
•Lot Size: 8.9 acres
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 5
Project Description
•Demolition of four existing office buildings totaling
approximately 87,082 sq. ft.
•Construction of a mixed-use development with nine buildings
on two parcels consisting of:
507 residential units
o 449 rental apartments
o 19 live/work lofts
o 58 townhome units
Total of 26,800 SF of commercial space
3.4 acres of onsite open space & amenities
1,025 parking spaces (a ratio of 2.02 spaces per unit)
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 6
Overall Site Plan
Parcel 1 Parcel 2
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 7
Rendering: 4th Street & Cabrillo Park Drive View
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 8
Rendering: Cabrillo Park Drive & Parkcourt Place View
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 9
Rendering: Parkcourt Place Entry View
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 10
Project Analysis
•The project is designed as an integrated development with two parcels that provide
diverse housing options for people looking to buy or rent.
•The project will contribute to the production of affordable housing in Santa Ana through
in-lieu housing funds (approximately $8 million).
•The commercial areas have been designed to accommodate a range of uses common
within mixed-use structures, such as cafes, small retail, and neighborhood service uses.
•The town center plaza has been designed to provide a passive recreation area to be
enjoyed by the residents, commercial patrons, and visitors of the development.
•The project features durable and high-quality architectural materials and provides a
range of amenities and open space.
•The project will provide 47,810 square feet of publicly accessible open space, in the
form of the Town Center Plaza, Shopkeeper’s Plaza, and along Cabrillo Park Drive,
Parkcourt Place, and the new proposed Paseo along the eastern property line.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 11
Site Plan Review Analysis
•The development is consistent with the objectives and development
standards of the Metro East Mixed Used (MEMU) Overlay Zone.
•The project will contribute toward a growing mixed-use community in
the MEMU area and will introduce a new roadway that can be
extended east to complete a street grid as the area transitions.
•The development has been designed to be compatible with adjacent
development (i.e. scale, height, and site configuration and design
principles of the MEMU).
•The land use uses, site design, and operation of the development have
been planned in a manner that will result in a compatible and
harmonious operations as specified in the MEMU.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 12
Tentative Tract Map Analysis
•The subdivision will enable the 58 townhome units to be sold, creating
new homeownership opportunities.
•The development is consistent with the General Plan land use
designation and conforms to all applicable requirements of the City’s
Zoning and Subdivision codes.
•The development site is physically suitable for the type and density of
the development and will not cause substantial environmental damage
or substantially and avoidably injuries to fish or wildlife of their
habitat.
•The development will not cause serious public health problems.
•The development will not conflict with easements necessary for public
access through or use, of property within the proposed project.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 13
Analysis of Appeals
Appeal Application No. 2023-02 (SAFER)
•Appellant is requesting that the City Council overturn the Planning Commission’s
decision based on the following:
1.The decision of the Planning Commission was in “violation” of CEQA;
2.The City’s determination that the Project was analyzed in the 2010 Metro East Mixed Used
(MEMU) Overlay Zone EIR and Subsequent EIR was incorrect;
3.The Project would have new and different significant environmental impacts that were not
analyzed in the MEMU EIR; and
4.That a project-specific EIR should have been prepared to analyze the Project.
•The appellant does not provide any substantial evidence that the Project would
result in any new or more significant impacts than analyzed in the MEMU Certified
EIR or that new mitigation is required.
•The appellant does not provide information as to why they believe a project-
specific EIR should have been prepared, or what new and different significant
environmental impacts would result from the Project that have not already been
analyzed in the MEMU Certified EIR.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 14
Analysis of Appeals (Cont.)
Appeal Application No. 2023-03 (SWMSRCC)
•Appellant is requesting that the City Council overturn the Planning
Commission’s decision based on the following:
1.Requirement of a local workforce;
2.Training requirements to prevent community spread of Covid-19 and
other infectious diseases;
3.CEQA compliance; and
4.Inconsistency with the City’s General Plan
•On August 17, 2023, the City received a supplemental comment letter
from SWMSRCC, which was outside of the 10-day appeal period, as
outlined in Section 41-645(b) of the SAMC. The letter outlined
additional points:
1.Infeasible transportation mitigation requirements in the Certified EIR; and
2.Adequate analyzes of noise impacts
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 15
Analysis of Appeals (Cont.)
•There are no substantial changes to the circumstances
under which the Project would be undertaken that
would result in new or more severe significant
impacts, and there is no new information of
substantial importance that has become available that
would result in new or more severe significant
impacts.
•No subsequent EIR would be required for the Project.
•Pursuant to CEQA Guidelines Section 15168, the
MEMU Certified EIR adequately described the Project
activity for purposes of CEQA.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 16
Analysis of Appeals (Cont.)
•The Project was deemed to be exempt from the preparation of any
further VMT analysis and may be presumed to have a less than
significant CEQA-related transportation impact.
•The Project is consistent with applicable plans, policies, and
regulations adopted for the purpose of reducing the emissions of
GHG emissions
•The Project incorporates all applicable mitigation measures of the
MEMU Certified EIR. Mitigation measures beyond those required
by the Certified EIR are not required unless the Project would
result in new or more severe impacts compared to those analyzed
in the Certified EIR.
•Project is in compliance with the AHOCO and is not required to
provide local skilled and trained workforce.
•Additional responses to appellant comments can be found in
Exhibit 10 of the staff report.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 17
Fiscal and Economic Impact Analysis
•Based on a total construction budget of $249 million, the project is
projected to generate a recurring revenue of approximately $22.8
million. Total City expenditures over the next 25 years after build-out
are expected to be $14.5 million, resulting in net revenue of $8.3
million.
•During construction, the project will generate approximately 1,913
jobs (1,266 direct, 323 indirect, and 323 induced). After completion,
the project will maintain approximately 32 jobs (21 direct, 6 indirect,
and 6 induced).
•The City will receive approximately $15.5 million in revenue from
permit fees, AHOCO in-lieu fees, park impact fees, and other
development impact fees.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 18
California Environmental Quality Act (CEQA)
Analysis
•In accordance with CEQA and the CEQA Guidelines, the project is
within the scope of the 2007 Metro East Mixed-Use Overlay Zone
Environmental Impact Report (EIR) and 2018 Subsequent EIR (SEIR)
(SCH No. 2006031041).
•The 2007 EIR and 2018 SEIR, anticipated potential development of
5,551 residential units, 963,000 square feet of commercial
development, and 690,000 of office development.
•There is no new information of substantial importance, and there are
no new environmental impacts or mitigation measures needed.
•All applicable mitigation measures applied to the previously prepared
2007 EIR and 2018 SEIR will be applied to this project.
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 19
Staff Recommendation
•Adopt a resolution denying Appeal
Application Nos. 2023-02 and 2023-03, and
upholding the Planning Commission’s
approval of two resolutions to approve Site
Plan Review (SPR) No. 2023-01 and
Tentative Tract Map (TTM) No. 2023-03
(County Map No. 19243)
Cabrillo Town Center
Planning and Building Agency
Item # 18
October 3, 2023
Slide 20
Questions?