Loading...
HomeMy WebLinkAboutC.S. LEGACY CONSTRUCTION, INC. (KING ST. URBAN GREENING) qqo Recording Requested By, Recorded in Official Records, Orange County And When Recorded Mail To: Hugh Nguyen, Clerk-Recorder City of Santa Ana,Public Works Agency M22 I��II 20 Civic Center Plaza,P.O.Box 19$$ I I NO FEE Santa Ana,CA 92702 * $ R 0 0 1 5 1 8 4 8 5 1 $ * 20240002588581:40 pm 10/04124 490 RW1A N12 1 0.00 0.00 0.00 0.00 0.00 0.00 0.000.000.00 0.00 THIS SPACE FOR COUNTY RECORDERS USE ONLY r� NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana, California, 92701, is the owner of the property hereinafter described, that said owner has caused construction of KING STREET URBAN GREENING under contract entered into on a 00 OCTOBER 18 2023, with CS LEGACY CONSTRUCTION INC., on which contract N DEVELOPERS SURETY AND INDEMNITY COMPANY is surety. The property on which Wo such work improvement was placed is in the City of Santa Ana, County of Orange, State of o z California, and described as Project No. 23-6625 located at: KING STREET. The work zw improvement on said property was accepted as completed on OCTOBER 2, 2024. L v CITY OF SANTA ANA,A MUNICIPAL CORPORATION O F By � C7 F c� QDated: I / Princi al Civil Engineer—Sean Thomas P.E. C) TrrLE O � WWp -------------------------------------------------------_------------------------------------ VERIFICA►.TION 1, the undersigned, say: I am the City Engineer — Rodolfo Rosas of the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on behalf of the owner of the property therein described; I make this verification on behalf of said corporation by authorization of the City Council of the City of Santa Ana; I have read said notice and know the contents thereof; and I declare under penalty of perjury that the facts therein stated are true. Executed on OC.JT61M '�T* 2.0 2 , at Santa Ana, California City Engineer—Rodolfo Rosas THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION - NSURANCE ON FILE WORK MAY PROCEED UNTIL INSURANCE EXPIRES �- C CITY CLER DATE; AN 0 p 1OZ4 CITY OF SANTA ANA CONSTRUCTION CONTRACT AGREEMENT PROJECT NO.: 23-6625 KING STREET URBAN GREENING EXHIBIT 3 This CONSTRUCTION CONTRACT is made and entered into this 17' day of October, 2023 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and C.S. Legacy Construction, Inc. (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the King Street Urban Greening Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed One Million Five Hundred Ninety -Eight Thousand Two Hundred One Dollars and Sixty -Six Cents ($1,598,201.66), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A", and in accordance with Section 2-7.1 of the Greenbook: Standard Specifications for Public Works Construction. The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. Page 1 of 4 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: htip://www.santa-ana.org/pwa/documents/CWA.I)d 7. CONTRACTOR shall, after award of this Contract, famish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater ofTen Thousand Dollars ($10,000) or Twenty Percent (20°/u) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of any of the obligations under the Contract Documents; Page 2 of 4 (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier., of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indetmnity in favor of CONTRACTOR against CITY or any other Indemnitee. Subcontracts, if any, shall contain a provision making them subject to all of the provisions stipulated in this Construction Contract. With respect to any conflict between such federal requirements and the terms of this Construction Contract and/or the provisions of state law and except as otherwise required under federal law or regulation, the more stringent requirement shall control. [This space intentionally left blank] [Signature page to follow] Page 3 of 4 IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney M �. m JOSE MONTOYA Assistant City Attorney RECOMMENDED FOR APPROVAL: /YABIL SABA, PE vv Executive Director Public Works Agency CITY OF SANTA ANA �ryr ,Tom Hatch Interim City Manager CONTRACTOR: C.S. Legacy Construction, Inc. Page 4 of 4 EXHIBIT A MAYOR Valerie Amezcua MAYOR PRO TEM Jessie Lopez COLINCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez David Penaloza Thai Viet Phan Benjamin Vazquez CITY OF SANTA ANA PUBLIC WORKS AGENCY 20 Civic Center Plaza • P.O. Box 1988 Santa Ana, California 92702 www.sonta-ana.om August 15, 2023 ADDENDUM No. 1 SUBJECT: PROJECT No. 23-6625 KING STREET URBAN GREENING PROJECT ADDENDUM NO. 1 PROJECT NO.23-6625 CITY MANAGER Kristine R:dge CI`o Y A17CRNEY Sonia R, Carvalho CITY CLERK ennifer L, Hall The following changes/revisions/clarifications have been made to the plans and/or specifications for subject project: Specifications 1. BID PROPOSAL: Replace pages P-1 through P-4 with new pages P-1 through P-4. A summary of the changes is listed below: a. Bid Item 4 was changed from Signage Removal to NOT USED. Signage removal is covered under Bid Item 42 - Signing and Striping (Includes Removal of Existing Striping/Pavement Markings) b. The Quantity for Bid Item 10 was changed from 2,810 SF to 500 SF c. The Quantity for Bid Item 14 was changed from 3,130 SF to 3,700 SF d. The Quantity for Bid Item 26 was changed from 3,770 SF to 2,100 SF 2. DEFINITION OF BID ITEMS: Replace page 2 with new page 2. A summary of the changes is listed below: a. Bid Item 4 was changed from Signage Removal to NOT USED. Signage removal is covered under Bid Item 42 - Signing and Striping (Includes Removal of Existing Striping/Pavement Markings) All other terms and conditions remain the same. FOR THE CITY OF SANTA ANA 4001fo Rosas, Deputy Public Works Director/City Engineer Public Works Agency A 3TA ANA CITY COON! r Jsr. rie lmttznv lissie Lope2 . ,*ar PNM Benjamn vazgrez Phi _r:- I.—RMHcm_rtaz Prc rim. "ml'a _r,-d7 Wwd2 7dri aard �.,�. .'; •ane Ot4 tiM0241.1k.�SSnt3Hna.ac,r' - r.Y,., :ez®sw' �rf b t CITY OF SANTA ANA ADDENDUM NO.1 PROJECT NO. 23-6625 PROPOSAL PROJECT NO.: 23-6625 KING STREET URBAN GREENING PROJECT BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: C • S . ���G�� �UnSTU C�CIUYI �� i�c REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount 1 Clearing and Grabbing I LS $ Z53,5j . 00 a,53, 50- 00 2 Unclassified Excavation* 500 CY $ 3210 81 $ (b 3 , H35 - 00 3 Remove Guardrail 40 LF $ "j . $ ?>! 102.00 4 i NOT USED 0 EA $0 $0 5 Remove Gates and Chain Link 1 LS $ $ 6 Fence (Including Vines) I I 6 Salvage Survey Pin and Adjust to Grade 1 Ls $ 2-41 b15. 00' $ 7K 05.00 7 Trim Tree and Root Shaving I LS $ $ b , b H 1 , 3/4" Crushed Rock (for 8 Pervious Pavement, Infiltration, 420 CY $ ',i 2 ,' ?J $ and Bioretention Systems) 9 Pervious Concrete Paving 2,480 SF $ 2-4.22 $ (.0010 66• LID 10 Curb Ramp per C.S.A. Std. 1122 500 SF $ VO , $ % 3`i0.00 Curb and Gutter per C.S.A. 11 Std. 1101, 330 LF $ 01- 9 0 $ 2t1 1 -21 0 0 A-2-8 12 6" Mow Curb 960 LF $ (Z . 0, $ Midwest Guardrail System 13 Standard Railing per CALTRANS Std. A77L2 with 190 LF j $ t57 - 00 $ r - 0 o Circle Reflectors P-1 of P-19 CITY OF SANTA ANA ADDENDUM 1 PROJECT NO. 23-66-6625 PROPOSAL PROJECT NO.: 23-6625 KING STREET URBAN GREENING PROJECT Item Description Qty Unit Unit Price Amount 14 Pi 04 Sidewalk per C. S.A. Std. 3,700 SF $ (� , 0 $ 341 O 00 Driveway Approach per C.S.A. 15 Std. 11122 150 SF $ 16 Cross 1109 Gutter per C.S.A. Std. 710 SF a $ Z�j 3 $ / 610 17 Local Depression at Culvert per C.S.A. Std.305 2 EA $Zia31 •50 $ 5(015.00 18 12" PVC and Bedding 40 LF $ 2 1 2-, 1 $ lit V OS - 00 19 24" HDPE and Bedding 120 LF $ $ 2-of ZQ 10 LF $ $ 1 f 1 0/1( . -7O 20 Culvert, 4 Wide 21 Culvert, 6' Wide 50 LF $ 1511 H 0 $ �1 1 1 U , Q0 Subsurface Infiltration System 22 (includes Unclassified Excavation, Export, Backfill, 1 LS $ S 11 b5$ 70 $ 15 11 b* . 'to Access, Geotextiles, etc.) 24" x 36" Precast Concrete 23 Drain Inlet with Grate and 1 EA $ 16,90Z $ 19' g r/{ 1 . �l/ FilterV 24 Bubble -Up Manhole 1 LS $ (�ji ►�J� b , 00 $ 15, 45b.00 25 Junction Chamber, Type A 2 EA $ 141 �.�1�� $ .Z81 W.Sy .50 Bioretention Basin (Including 26 Grading, Unclassified 2,100 SF $ Z'j ,7 b $ 51b, �G��, _ pp Excavation, and Soil Layer) 27 Cobblestone Energy Dissipator Decomposed Granite Path Bench 140 SF $ �7 $ 3 4 U 1 , 4 0 28 2,140 SF $ $ '71 0 H . 2 V 29 6 EA $Z117V.15 $ (61174S- 05 30 Decorative Boulder 34 EA $ � G� t0 q 55 $ b1 loci b .30 31 Bollard 3 EA $ 20 ( , 37 $ ?j / bb [� , ( 32 6' High Block Wall per SPPWC Std. 601-5 110 LF $ 11 . 1$4qfq05_q0 P-2 of P-19 CITY OF SANTA ANA ADDENDUM PROJECT N0.23-662-6625 PROPOSAL PROJECT NO,: 23-6625 KING STREET URBAN GREENING PROJECT Item Description Qty Unit Unit Price Amount 33 SPPWC Std. 601-5 Block Wall per LF $ � 13 p, $ 1212 0 34 6" AC Over Compacted Material (Includes Slot Patch) 200 TON $ 3 . $ U (psi . co �` 35 Waste Receptacle Pad with Anti -Littering Signage (Waste Rece ,tacles Provided by City) Interpretive Sign 3 EA $ qqy $ Z , qay , V1 36 1 EA $ o,�i2 -sa Cy $ at 0' 2 -so 37 Artesia oSign (by Contractor) ) CAoomm � ity Art Mural (by 1 EA $ 55� 012 . S 0 $ � 01 Z.-50 5f 38 1 1 LS LS $27,867.00 $20,550.00 $27,867.00 $20,550.00 39 Artesia Pila Sign (by Artist) 40 Wall Stucco Preparation 600 SF $ IZ , H 9 $ 71 q q 4 - 06 41 Utility Box Wrapping 2 EA $ It b45. 00 $ 31 M 0 .00 42 Signing and Striping (Includes Removal of Existing Stri)in *'Pavement Marldnus) 1 LS $ 22 l q 6Z .OS $ 22 J 61b 2 - 6 43 Wayfinding Sign 1 EA $ I xs, 00 $ 1,165.06 44 Landscape and Irrigation 1 LS $ 01S _ 0b $ I 1 q, 0 i s . 00 45 90-Day Landscape Establishment 1 LS a $ q IM � U 3 $ 4, 1 y 5. 0 3 46 Lighting and Electrical Service 1 LS $ 1061 KO. 06 $ I Q 0 1160 .00 47 Adjust Water Valve to Grade New Water Meter and Adjust to Grade 5 EA $ 5 01 , 5 U $ 2-M7 - G6 48 1 EA $ g i 0 (2 -50 $ 01 8 ( 2 - 56 49 Adjust Pullbox to Grade 1 EA $ 58"1 -So $ 50 Adjust Manhole to Grade 1 1 EA LS $ ,Ig37 50 $5,000 $12,452 $ $5,000 $12,452 51 As -Built Plans 52 Construction Permit 1 LS P-3 of P-19 TOTAL BASE BID CITY OF SANTA ANA PRADDENDUM 1 OJECT NO. 23-66-6625 PROPOSAL PROJECT NO.: 23-6625 KING STREET URBAN GREENING PROJECT $ I,W,201 Job The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one hundred (100) workina daN s after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long -lead time items (i.e. light poles, subsurface infiltration system, etc.). Work must be completed by Ma` 2024. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $1,800 per calendar day. Name of Firm • S • `,"6k(� , LQ M (V G 4 p h ,' n C • Signature of BIDDER Title Qe�,����,n� ) (If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-4 of P-19 Mai, Danny From: City of Santa Ana <certificate-request@ctraxjdidata.com> Sent: Tuesday, November 21, 2023 9:55 AM To: Mai, Danny; Perez, Ricardo; Thomas, Sean Subject: Internal Notice of Compliance NOTICE OF COMPLIANCE CITY STAFF: PRINT THIS PAGE AND INCLUDE WITH AGREEMENT TO THE CLERK OF THE COUNCIL Contractor CS Legacy Construction, Inc Name: Project Number: 23-6625 Project King Street Urban Greening Name: The Certificate of Insurance (COI) submitted indicates that the coverages are in compliance with the insurance requirements. No further action is required at this time. The compliant coverage(s) are: TYPE OF INSURANCE POLICY NUMBER EXPIRATION COI DATE FILE NAME DATE AUTOMOBILE LIABILITY 504610192757001 09/19/2024 03/24/2023 South Main Certificate.pdf CSL Cent - City of GENERAL LIABILITY VCGP029252 03/19/2024 11/20/2023 SA - King Street.pdf Professional PROFESSIONAL LIABILITY WAIVER 12/14/2023 11/18/2022 Liability Letter - CS Legacy.pdf G L (a i-pw-ws) - Auto - WC (ws) - WORKERS COMPENSATION AND EMPLOYERS' XS - Comp. Ops - CSWC459765 11/15/2024 11/16/2023 Poll Opt. 1 Opt. LIABILITY 2 Equipment - C S Legacy Construc.pdf 1 CITY OF SANTA ANA :11___>Rcll►yclaf-1_tc]4 W CONTRACT CHANGE ORDER Project Number Project No. 23-6625; King Street Urban Greening Change Order Number To C.S. Legacy Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED PRICE 1. To compensate the contractor for the removal of trees conflicting with new block wall per PCO#02 dated December 11. 2023. AGREED PRICE = $14,903.17 2. To compensate the contractor for the water main abandonment on King Street per PCO#03 dated March 7, 2024. AGREED PRICE = $23,456.37 3. To compensate the contractor for repairs of the South end of the West CMU wall per PCO#04 dated February 8,2024. AGREED PRICE = $2,318.09 4. To compensate the contractor to substitute full depth asphalt replacement with a 2" grind/overlay at Fairview St and 91 Street and replace the PCC cross -gutter per PCO#05 dated February 13, 2024. AGREED PRICE = $12,407.29 5. To compensate the contractor to place an additional 2" of stucco on the wall cap to facilitate a continuous mural per PCO#06 dated February 14, 2024. AGREED PRICE = $1,494.32 6. To compensate the contractor for extra 10 sq-ft of the Artist mural per PCO#07 dated February 20, 2024. AGREED PRICE = $499.95 7. To compensate the contractor for relocating light poles 1' away from the 2222 W 1 Oth St. property line and 1' away from the Artist mural per PCO#08 dated April 5, 2024. Page 1 of 3 AGREED PRICE = $6,150.35 8. To compensate the contractor for the installation of (8) additional 3' diameter boulders for added safety in the park per PCO#10 dated March 15, 2024. AGREED PRICE = $783.57 9. To compensate the contractor for sandblasting and painting east walls with Dunn Edwards Navajo White paint per PCO#10 dated March 19, 2024. AGREED PRICE = $14,591.05 10. To compensate the contractor for trimming the trees hanging over the mural on the west side and over the light poles on the east side per PCO#11 and PCO#12 dated March 22, 2022. AGREED PRICE = $8,471.28 11. To compensate the contractor for abandoning the water main on Fairview Street per PCO#13 dated March 28, 2024. AGREED PRICE = $23,749.75 12. To compensate the contractor for cleaning up art images and reprinting the utility box wraps per PCO#14 dated April 15, 2024. AGREED PRICE = $1,133.22 13. To compensate the contractor for repairing and sealing the top of the wall with the Artist mural per PCO#15 dated April 18, 2024. AGREED PRICE = $8,604.59 TOTAL AGREED PRICE: $118,563.00 Page 2 of 3 ATTI CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number Project No. 23-6625; King Street Urban Greening Change Order Number To C.S. Legacy Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated Compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ _e_---------- INCREASE $ 118,563.00 By reason of this order the CONTRACT TIME completion will be adjusted as follows: Thirty (30) Working Days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the ps shown a ve, Accepted, ate L Zti Z Contractor C.S. Legacy Construction, Inc. By 7T Tide Approval recommended by ,�_ . _.�.4r.�� Date PUBLIC WORKSAGENCYDIECUTIV IR TOR Approved by !fits ) Alva unez Date 2 CITYMANAGER A ting Manager STAttest: Date ail CITY CLERK _L^. J nifer L. all - Page 3 of 3 t A,, , CITY OF A 1TA ANA rti �( is * a, PUBLIC WORKS AGENCY * IK,.'ri1 •,; � ;? CONTRACT CHANGE ORDER 1 I'I r t1.a„ Project Number Project No. 23-6625; King Street Urban Greening Change Order Number 2 To C.S.Legacy Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment Is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED PRICE 1. To compensate the contractor for costs associated with repairing the mural wall due to damage caused by water intrusion per PCO#16 dated April 26, 2024. AGREED PRICE=$3,321.79 .". 2. To compensate the contractor for costs associated with applying stucco to the East wall to achieve a smoother look per PCO#17 dated April 28, 2024. AGREED PRICE=$13,434.83 3. To compensate the contractor for costs associated with applying a second application of anti- graffiti coating on the mural per PCO#18 dated April 30,2024. AGREED PRICE=$602.80 4. To compensate the contractor for costs associated with painting light pole columns brown per PCO#19 dated May 31, 2024. AGREED PRICE=$2,360.88 5. To compensate the contractor for costs associated with the installation of vines along the East wall to deter graffiti per PCO#20R1 dated June 14, 2024. ; AGREED PRICE=$13,358.26 '' 6. To compensate the contractor for costs associated with the installation of SS wire for the new vines and PCC pad to view interpretive signage per PCO#21 dated July 3, 2024. AGREED PRICE=$6,957.89 .• TOTAL AGREED PRICE:$40,036.45 Page 1 of 2 A �,, r CITY 5•JF Sj+I, TA ANA PUBLIC WORKS AGENCY r-t' ' CONTRACT CHANGE ORDER • t gy:t� Project Number Project No. 23-6625; King Street Urban Greening Change Order Number 2 To C.S. Legacy Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. j Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor,all Subcontractors,and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ INCREASE $ 40,036.45 By reason of this order the CONTRACT TIME completion will be adjusted as follows: Twenty(20)Working Days We the undersigned contractor have given careful consideration to the change proposed and hereby agree,if this proposal is approved,that we will provide all equipment,fumish all materials,except as may otherwise be noted above,and perform all service necessary for the work above specified,and will accept as full payment therefor the prices sho n above. Accepted,Da , Contractor C.S. Legacy Construction, Inc. By a Title Approval recommende y f�{ 4 Date 7 'c 1 lz G}. �'}� _PUBLIC WORKS A NCY EXECUTIVE DIRECT II (� Approved by Date l �/7,0 L Li CITY MANAGER SnT♦ Attest: � > 151'14.11• Date 1 /acA'. CITY CLER Page 2 of 2