Loading...
HomeMy WebLinkAboutItem 12 -Appropriation Adjustment and Capital Improvement Project for Memory Lane and Flower StPublic Works Agency www.santa-ana.org/public-works Item # 12 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report April 16, 2024 TOPIC: Memory Lane and Flower Street Bikeway and Traffic Calming AGENDA TITLE Appropriation Adjustment and Capital Improvement Project Amendment for Memory Lane and Flower Street Bikeway and Traffic Calming (Project No. 23-6029) RECOMMENDED ACTION 1. Approve an appropriation adjustment to recognize Traffic System Management Grant funds in the amount of $450,000 in the State Grant-Direct revenue account, and appropriate the same amount to the Active Transportation Program, Improvements Other than Buildings expenditure account. (Requires five affirmative votes) 2. Approve an amendment to the Fiscal Year 2023-24 Capital Improvement Project to include $450,000 of funding to the Memory Lane and Flower Street Bikeway and Traffic Calming (Project No. 23-6029) ATPL-5063(217). GOVERNMENT CODE §84308 APPLIES: No DISCUSSION The City of Santa Ana received an Active Transportation Program (ATP) grant on January 26, 2024 for a traffic-calming project. This project will include the installation of various traffic calming and traffic safety improvements including rectangular rapid flashing beacons, curb extensions, a new bikeway, new/upgraded wheelchair ramps, raised crosswalks, sidewalks improvements, and median islands (Exhibit 1). The improvements will maintain the current restricted right turn at the intersection (Exhibit 2). This project was not previously included in the FY 2023-24 Capital Improvement Program (CIP) due to funding being identified after the FY 2023-24 CIP program (Exhibit 3) had been finalized and approved, which is typical. Approval of this action will allow staff to commence work on the design phase for these projects in May 2024. The United States Department of Transportation has fully executed the Program Supplement Agreement No. A456 (Exhibit 4) for project funding. Memory Lane and Flower Street Bikeway and Traffic Calming April 16, 2024 Page 2 4 1 8 5 ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. The project will assess the environmental impact for compliance with the California Environmental Quality Act (CEQA). FISCAL IMPACT Approval of the requested Appropriation Adjustment will recognize Traffic System Management Grant funds in the amount of $450,000 in the State Grant-Direct, revenue account (No. 14817002-52025) and appropriate the same amount to the Active Transportation Program, Improvements Other than Buildings expenditure account (No. 14817613-66220). With the approval of the amendment to the FY 2023-24 Capital Improvement Program, funds will be assigned, budgeted, and available for expenditure in FY 2023-24. Future phases of these projects will be budgeted in future Capital Improvement Programs. The following table summarizes the funds budgeted and available for expenditure to deliver this project. Fiscal Year Accounting Unit - Account No. (Project No.) Fund Description Accounting Unit, Account No. Description Amount 2023-24 14817613-66220 (23-6029) Traffic System Management Grant Active Transportation Program, Improvements Other Than Buildings $450,000 Total $450,000 EXHIBIT(S) 1. Conceptual Plan 2. Location Map 3. CIP Sheet Project 23-6029 4. Program Supplement Agreement No. A456 Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 1 ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY EXHIBIT 1 City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 2 PROPOSED BULB-OUTS TO SHORTEN CROSSING ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 3 PROPOSED RAISED CROSSWALK WITH RRFB'S PROPOSED BULB-OUTS TO SHORTEN CROSSING ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY . 625 feet MEMORY LANE AND FLOWER STREET BIKEWAY EXHIBIT 2 PROJECTLIMITS Memory Lane Flower StBristol StThe City DrivePROJECTLIMITS CITY OF SANTA ANA FY 23/24CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Construction of bikeway, ADA compliant sidewalks, curb ramps, bulb-outs (curb extensions), raised medians/crosswalks, traffic signal modification and channelization on Memory Lane and Flower Street. PROJECT NEED: The City of Santa Ana and City of Orange designed to increase bicyclist and pedestrian safety and mobility. PROJECT TITLE: Memory Lane and Flower Street Bikeway PROJECT CATEGORY: Traffic Improvements Street/Bridge Improvements & Widening LOCATION MAP AGENCY:DIVISION:CONTACT:DATE: Public Works CIP Engineering Gilbert Castillo, Senior Engineer 16-Apr-2024 PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 Engineering 450,000 ------ TOTAL 450,000 ------ SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 ATP 450,000 ------ TOTAL 450,000 ------ EXHIBIT 3 EXHIBIT 4