Project Scope:
Line Extension Contract
Reference:
SoCalGas Project #: 00000247662
Project Location: 215 S. CENTER ST.
N-2024-132
Non -Residential, commercial, project located at 215 S. Center St. and W. First St., in the
City of Santa Ana, County of Orange.
Install Service, Meter to the specified location in Company provided trench, backfill by
SoCalGas.
The engineering required for the installation of the gas facilities as described above in the Project
Scope, based on the information you have provided us, has been completed. The attached "Exhibit A"
dated 07/06/2023 details the estimated costs and allowances, if applicable, and also indicates any
advances and contributions, if required at this time.
Please provide us with an address list for the property, if applicable, including any internal
apartment or unit numbers or letters as quickly as possible. This will assist us in providing timely
installation of the requested gas meters and/or refunds of your refundable advances, if applicable.
To acknowledge your receipt of the Exhibit A, confirmation of the scope of the Project, and receipt
and agreement with the enclosed General Conditions, please have this letter executed by your
authorized representative(s) (owner or corporate officer) and return all pages to the SoCalGas New
Business Process Team at either NewBusinessProcessTeam@esicn.semora.com, if you are executing these
documents through the electronic signature portal, or NewBusinessProcessTeam@socalcas.com, if you are
not executing these documents through the electronic signature portal. Your return of the executed
copy of this letter plus any required advance made through one of the designated SoCalGas payment
channels (e.g., online at www.socalgas.com/exhibitA, in person at a SoCalGas Branch Office, mailed to
SoCalGas Mail Payments: P.O. Box 2007, ML711D, Monterey Park, CA 91754-0957), will constitute your
request to SoCalGas to schedule the installation and your agreement to Exhibit A and the General
Conditions. Timely return of this letter will ensure that your construction is not delayed. A copy of
the letter has been provided for your records.
Thank you for this opportunity to provide you with natural gas to serve your energy requirements. We
are pleased to have you as a SoCalGas customer and want to provide you with the best possible service.
If you have any questions, please contact me at (714) 238-7286.
Sincerely,
ALEX GARCIA
LEAD PLANNING ASSOCIATE
3050 E LA JOLLA ST
ANAHEIM,CA 92806-1312
SOUTHERN CALIFORNIA GAS COMPANY - GENERAL CONDITIONS FOR LINE EXTENSIONS
These are the general conditions under which Southern California Gas Company ("SoCalGas") will provide
line extensions for Applicants.
I. COSTS
A. Estimates and Duration. The enclosed Exhibit A estimate is valid for 90 days and may be revised
after that time if the installation of gas facilities for the Project has not begun. Once SoCalGas
begins the installation, the estimated cost will remain in effect for twelve (12) months. If at the
end of the twelve (12) months the work is not complete, SoCalGas reserves the right to calculate its
costs for the work completed, less applicable allowances, and issue a new project and Line Extension
Contract for the remaining installation work. Applicants who submit a new application for gas line
extension(s) on or after July 1, 2023 must pay SoCalGas the actual cost, but the estimated amount is
due and payable in advance. Because of unforeseen contingencies and other factors, the actual cost may
be considerably higher or lower than this estimate. Therefore, the estimate is not a warranty by
SoCalGas of the actual cost. If additional monies are due, Applicant agrees to pay them within 30 days
after invoice. Applicant will be responsible for costs of engineering, planning, surveying, right of
way acquisition and other associated costs. Estimated and actual cost excludes Betterments and Utility
Convenience.
B. Allowances. Applicant(s) receiving allowances as an offset to the installation costs are
responsible for these costs and may be billed subject to the following: line extension(s) where
allowances have been granted to the Applicant based on future gas load(s) must have the gas meter(s)
installed and turned on with bona fide load within six (6) months for main/main and service(s)
installations and twelve (12) months for service(s) only installations. These time frames commence
from the date SoCalGas completed the installation of gas facilities. If Applicant fails to comply, the
Applicant will be billed for the difference between estimated allowances and authorized allowances, as
described in Tariff Rule Nos. 20 and/or 21. The bill amount will include Income Tax Component
Contribution and Advances (ITCCA/CIAC) Tax. Applicant requested temporary service(s) are fully
collectible. Refunds shall be made and calculated in accordance with Rule No. 22.
C Attorneys Fees and Offset. If SoCalGas is required to bring an action to collect monies due or to
enforce any other right or remedy, Applicant agrees that SoCalGas is entitled to recover its
reasonable attorneys' fees and costs. SoCalGas may withhold from any payments due Applicant any
amounts Applicant owes SoCalGas.
II. INDEMNITY
A. General. Applicant shall indemnify and hold SoCalGas harmless from and against all liability
(excluding only Pre -Existing Environmental Liability) connected with or resulting from injury to or
death of persons, including but not limited to employees of SoCalGas or Applicant, injury to property
of SoCalGas, Applicant or a third party, or violation of local, state or federal laws or regulations
(excluding environmental laws or regulations) (including attorneys' fees) arising out of the
performance of this Contract, except only for liability to the extent it is caused by the negligence
or willful misconduct by SoCalGas.
B. Environmental. Applicant shall indemnify and hold SoCalGas harmless from and against any and all
liability (including attorneys' fees) arising out of or in any way connected with the violation or
compliance with of any local, state, or federal environmental law or regulation as a result of pre-
existing conditions at the Project site, release or spill of any pre-existing hazardous materials or
waste, or out of the management and disposal of any pre-existing contaminated soils or groundwater,
hazardous or nonhazardous, removed from the ground as a result of SoCalGas's work performed ("Pre -
Existing Environmental Liability"), including, but not limited to, liability for the costs, expenses,
and legal liability for environmental investigations, monitoring, containment, abatement, removal,
repair, cleanup, restoration, remedial work, penalties, and fines arising from the violation of any
local, state, or federal law or regulation, attorneys' fees, disbursements, and other response costs.
As between Applicant and SoCalGas, Applicant agrees to accept full responsibility for and bear all
costs associated with Pre -Existing Environmental Liability. Applicant agrees that SoCalGas may stop
work, terminate it, redesign the gas facilities to a different location, or take other action
reasonably necessary to complete its work without incurring any Pre -Existing Environmental Liability.
C. Withhold Rights. In addition to any other rights to withhold, SoCalGas may withhold from payments
due Applicant such amounts as, in SoCalGas's reasonable opinion, are necessary to provide security
against all loss, damage, expense and liability covered by the foregoing indemnity provisions.
III. WARRANTY
SoCalGas requires that Applicant warrant all materials and workmanship performed by Applicant
(directly or through a contractor other than SoCalGas) shall be free of all defects and fit for their
intended purpose. A one-year warranty on any materials and a two-year warranty on any installation
work provided are required. If Applicant's work or materials fail to conform to the warranty,
Applicant shall reimburse SoCalGas for the total cost of repair and/or replacement or SoCalGas may
give Applicant the opportunity to fix within a reasonable time such defect(s). Such reimbursements are
non-refundable and the amount of such reimbursements may be withheld by SoCalGas and offset against
refundable amounts owed Applicant, when applicable.
IV. TARIFF RULES / COMMISSION
A. This Line Extension Contract ("Contract") consists of and incorporates by reference the line
extension contract letter, Exhibits A, General Conditions and all of SoCalGas's applicable tariff
schedules and rules as submitted from time to time with the California Public Utilities Commission
("Commission"), including but not limited to, the Preliminary Statement and Rule Nos. 1, 2, 9, 9, 13,
20, 21 and 22. Copies of these rules may be obtained by visiting the SoCalGas' Internet site at
www.socalgas.com or by requesting copies from your SoCalGas representative.
B. This contract is at all times subject to such changes or modifications as the Commission may direct
from time to time in the exercise of its jurisdiction.
C. No agent of SoCalGas has authority to make any terms or representations not contained in this
Contract and the tariff schedules and Applicant hereby waives them and agrees neither SoCalGas nor
Applicant shall be bound by them.
V. JOINT AND SEVERAL LIABILITY
Where two or more parties are Applicants for a Project, SoCalGas shall direct all communications,
bills and refunds, when applicable, to the designated Applicant, but all Applicants shall be jointly
and severally liable to comply with all terms and conditions herein.
VI. STUB EXTENSIONS
For Applicant(s) receiving allowances, stub costs are refundable only to the extent the allowances
generated by stub extensions exceed the main to meter installation costs, and only for ten years from
the date of the stub installation. Refunds will be made without interest, and no refund will be made
in excess of the amount advanced.
VII. AUTHORIZED SIGNATURE
I£ Applicant is a corporation, partnership, joint venture, or a group of individuals, the subscriber
hereto represents that he has the authority to bind said corporation, partners, joint venture, or
individuals as the case may be.
My signature below represents my agreement and acceptance of the Project confirmation, Exhibit A and
Southern California Gas Company's General Conditions For Line Extension. I acknowledge and agree that
SoCalGas's cost estimates and allowances, if applicable, for this Project were based on information
provided by me or my authorized representative. I further acknowledge and agree that my signature
represents my/my company's agreement and understanding that subsequent changes in Project scope may
affect the installation price and further, that if allowances have been granted, an additional
contribution may be required if the future loads on which the allowances were based do not
Address:
(Future bills, refunds, and correspondence will be
mailed to the address provided)
215 S. Center St
Santa Ana, CA 92703
Telephone:
Social Security or Federal Tax ID No.
No. 95-6000785
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written.
ATTEST:
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
I=
Jose Montoya
Assistant City Attorney
CITY OF SANTA ANA
Alvaro Nunez
Acting City Manager
RECOMMENDED FOR APPROVAL:
�- S,<: 7�' -sF
Nabil Saba, PE
Executive Director,
Public Works Agency
Date Mailed
07/06/2023
Project ID 00000247662
Exhibit A
COST AND ALLOWANCE CALCULATION (ESTIMATES)
(x) Trenching by Company
(x) Backfill by SoCalGas
$ 107627.31
Project Cost
$ 000
* Site Preparation
Advance Required (Refundable)
Advance Required (Non -Refundable)
ITCCA (CIAC Tax)
Payment Received
Total Amount Due
$ 72378.78
(x) Gas Only Trench
$ 35248.53
Allowance Applied
X 24 %
$ 72378.78
$ 000
$ 72378.78
_ $17370.90
$ 000
$ 89749.68
* Site preparation reimbursement for applicant provided trench will be treated per
Tariff Rules 20 & 21 and payments, if any, will be based on the agreed upon
price per foot times the actual footage of the trench used.
Form 3905-Dr Effective 09/05 Line Extension Contract #: 00000247662-1
If paying online, go to www.socalgas.com/exhibitA. If paying by mail or in
Date Mailed person, detach and return this portion with your payment.
07/06/2023 THIS BILL IS NOW DUE AND PAYABLE
LUUSCITY OF SANTA ANA
AN 92
. SS. CENTER
ANTA ANA, CA 92703
NBMS Project ID 00000247662-1
PLEASE PAY THIS AMOUNT 89749.68
9200024766201000000897496850000 92 000247662 5
Sean Djalilvand
Sr. Insurance & Risk Advisory Analyst
JS SEMPRA
January 23, 2024
City of Santa Ana
Risk Management
20 Civic Center Plaza
Santa Ana, CA 92701
Insurance & Risk Advisory
488 81n Ave. HQ06N1, San Diego, CA 92101
insurance@sempra.com
Re: Work Permit - Project # 247662
Angie
Aceve
do
Digitally signed
by Angie
Acevedo
Date:
2024.02.08
16:39:00-08'00'
Please accept this letter as compliance with your request for evidence of self-insurance in
accordance with the terms of the above -referenced agreement, as dictated under the
terms of the agreement, between Southern California Gas Company ("SoCa/Gas'l and
requester. SoCalGas hereby acknowledges that it is permissibly self -insured by the State
of California and that the following program(s) are in full force and effect:
Type of Insurance
Type of Policy
Policy Period
Limit
Commercial General
Liability
Self -Insured
Continuous
$1,000,000
Automobile Liability
Self -Insured
Continuous
$1,000,000
Workers' Compensation
Self -Insured
Continuous
Statutory
Any claims resulting from our operations may be referred to:
Southern California Gas Company
Attention: Roy Christian, Claims Manager
555 W. 511 Street
Los Angeles, CA 90013-1011
Should you have any questions or require additional coverage information, please feel free
to contact me.
cc: Ami Desai
sempra.com
By its duly authorized representative,
SearvwVj> rlGlvcnd
Sean Djalilvand
Sr. Insurance & Risk Advisory Analyst
100
lUsk MRmgemmtDivision
RE)AEwm&APPRav®By:
`®
Risk Management Specialist