Loading...
HomeMy WebLinkAboutGARDEN GROVE, CITY OF (17)3ANTA ANA .00pv^� —_ � 2 2 z 4 5 � � 8 � IQ II 12 IJ 14 I5 16 117 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 AGREEMENT THIS AGREEMENT, mad* and entered into this l%th day of April lg 55 ' BY AND BETWEEN CITY OF SANTA ANA, a municipal corporation, hereinafter designated as ''SANTA ANA'.' CITY OF GARDEN GROVE, a municipal corporation, hereinafter designated as'GARDEN GROVE./ RECITALS Considerable traffic congestion presently exists and is progressively increasing at the intersection ofFairview Street and Trask Avenue. A study has been completed and the conclusion drawn that traffic conditions at said Intersection warrant the installation of o traffic signal and intersection lighting system for the proper and orderly move- ment of traffic. GARDEN GROVE is willing to cooperate with 3ANT8 ANA In the Installation of the traffic signal and intersection lighting system, and GARDEN GROVE Is willing to cooperate with SANT8 ANA 'in these matters and contribute to the maintenance of said system subsequent to their installation; The intersection is to be improved with a traffic signal and inter- section lighting system and associated road *mrk. Said work of Improve- ment shall be referred to hereinafter as the Project~ NOW THEREFORE IT IS AGREED by the parties hereto as follows: l° SANTA ANA SHALL; A. Prepare the detailed plans^ specifications and estimate for the Project. B" Prepare map and deed for all necessary additional right of way~ C. Have jurisdiction of the construction area within SANTA ANA and GARDEN SK0VE, D. Be and is hereby designated as the contracting and construction agent for the parties to do and perform all acts and things necessary or required in order to construct the Project in accordance with the plans and specifications, |nciuding material � �j III control, inspection of the construction work, and to execute and �I 2 1 deliver all documents necessary or required in connection with the 3 construction and completion of said Project, including certificate 4 of day labor, equipment and material costs, and certification of 5I completion Jon of the Project, 6I� p j 2.,. GARDEN GROVE .SHALL; 7! A. Approve plans and specifications as to design and construction 2II ) features affecting the construction operation and maintenance lit 9 of the portion of the Project within GARDEN GROVE 1a it �I B— Approve map and deed of right—of—way and make all the necessary 11 arrangements to acquire the right—of—way for its portion of the it I2� Project and shad, by appropriate Resolution of the Glty Council it so certify to SANTA AKA, prior to the SANTA ANA G,17Y COl NC4L �l 1411 approving the Project plans and specifications, that such �I [�I 15 acquisition has been accomplished. Cam, At all times during the progress of construction of the Project 7' have access to the work for the purpose of inspection thereof and should GARDEN GROVE deem any remedial measures to be 1,9j i necessary, GARDEN GROVE shall notify SANTA ANA thereof.. 261) Upon completion of the Project, any and all road work necessary in 21 connection with the Project shall be paid for by the respective parties 22) on the basis of the actual work done within the 1-imits of their respective it 23 jurisdictions,, 24 4a. Upon completion of the Project, GARDEN GROWS share of the traffic r I€ 2 of signal and intersection lighting system installation will be determined 261 � in the same ratio to the total cost of such system as the number of 27i legs under GARDEN GROVES jurisdiction entering the intersection are to E 281 the total number of n Legs entering the intersectio I` 5� For the purpose of determining the proportionate share of the Project [ costs to be borne by the respective parties hereto the C.limits of GARDEN GROVE and the number of legs entering the intersection under the -52 ;i 2 - iI 3S jurisdiction of GARDEN GROVE shall be established as those existing at the time the S8NTA ANA CITY COUNCIL adopts pprovinq the Project plans and specifications for advertising for bids. 6. Upon completion of the Project, SANTA ANA agrees to submit full, true and correct copies of documents, certificates and itemized bills to GARDEN GROVE, and GARDEN GROVE shall reimburse 8ANTA ANA within 38 days upon submission of statement of such costs for the full cost of the construction as defined in paragraphs 3 and 4 hereof. 7° All construction and installation costs shall be based on the contract unit cost. 8, GARDEN GR8VE»3 share of the design, survey and construction engineering costs shall be ]O% of GARDEN GRVVE:S proportionate share of the construction and installation contract costs.. B. After the completion of the Project, the traffic signals shall be, maintained by 6ANTA ANA and GARDEN GROVE shall pay to SANTA ANA upon submission of said costs the maintenance and energy costs in the same ratio 'to the total cost as the number of legs under GARDEN GROVES juris- diction entering the Intersection are to the total number of legs enter- ing the intersection. IN WITNESS WHEREOF, S8NTAA#A has caused this Agreement to be executed by its Mayor, and attested by Its Clerk, and GARDEN GROVE has caused this Agreement to be executed by Its Mayor and attested by its Clerk, all thereunto duly authorized by Minute Order of the City Councils, respectively on the date written opposite their signatures. -]- 1 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 DATED: CITY OF SANTA ANA, a Municipal Corpgratlon. BY: May r BY* City Clerk DATED:— April 12, 1966 CITY OF GARDEN GROVE, a Municipal Corporation. ''Mayor BY: City Clerk - 4 -