My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROLINK (SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY) (3)
Clerk
>
Contracts / Agreements
>
M
>
METROLINK (SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:48:30 PM
Creation date
9/16/2024 10:44:18 AM
Metadata
Fields
Template:
Claims
Claim #
2024-170
Claimant Name
Zhengzhong Wang
Date Received
8/6/2024
Date of Occurrence
2/7/2024
Claim Description
Property damage-car wheels due to pothole
Claim Location
Car pool connector ramp from 55 North to 5 North freeways
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SETTLEMENT AGR-E EMENT <br />RELATING TO METROLINK INSTALLATION <br />OF SECOND MAIN TRACK IN SANTA ANA <br />This agreement ("the Agreement") is niade and entered into this (61, day of <br />by and among the City of Santa Ana, a charter city duly organized <br />under the Constitution and laws of the State of California ("CITY"), and the Southern <br />California Regional Rail Authority, a body corporate and politic ("SCRRA"); together the <br />"PARTIES," AGREE AS FOLLOWS: <br />Whereas, SCRRA plans to acquire property rights and construct improvements <br />for the operation of a second main track immediately adjacent to and west of the existing <br />single railroad track from approximately La Veta Avenue in the City of Orange and south <br />to Seventeenth Street in the City of Santa Ana. Construction would include L8 miles of <br />second main track, a second railroad bridge over Santiago Creek, construction of a barrier <br />along the east side of Lincoln Avenue and any necessary utility relocations. (hereafter <br />referred to as the "Project"); and <br />Whereas, in addition, SCRRA, in Consultation with the City, has identified a <br />series of improvements that are designed to enhance the character and appearance of the <br />connnunity in the project area. (hereafter referred to as "Enhancements" or " Project <br />Enhancements"). The construction of these improvements will demonstrate SCRRA's <br />desire to build goodwill in the project area neighborhood. In consultation with the City, <br />the enhancements authorized by the City and referenced in this Agreement would be built <br />concurrently with the second main track project; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.