COUNTY OF ORANGE
ARTERIAL HIGHWAY FINANCING PROGRAM
PROJECT ADMINISTRATION AGREEMENT
Flower Street
Boulevard
Drive
MEMORANDUM OF AGREEMENT
day of
19 by and between:
"4-f0--0 1.2,
entered into this
CITY OF SANTA ANA, a municipal corporation,
hereinafter referred to as CITY, and
COUNTY OF ORANGE,,a political subdivision of
the State of California, hereinafter referred
to as COUNTY.
WITNESSETH:
WHEREAS, the Orange County Board of Supervisors by Resolution of May 31,
1956 adopted the Master Plan of Arterial Highways to serve the entire COUNTY
including the incorporated cities thereof; and
WHEREAS, Articles 2 and 3 of Chapter 9, Division 2, commencing with
Section 1690 of the Streets and Highways Code authorize a county, if it so
desires, to expend funds apportioned to it out of the California Highway Users
Tax Funds for aid to cities and in the improvement, construction, or repair of
streets within a city; and
WHEREAS, the Orange County Board of Supervisors and the Orange County
Division of the League of California Cities have agreed upon a cooperative
financial program for the establishment, construction, and maintenance of a
County --wide Arterial Highway System known as the Arterial Highway Financing
Program; and
WHEREAS, the Orange County Board of Supervisors has, by appropriate
action, provided in the Road Budget for the Fiscal Year 1989-90 funds for the
improvement of streets within the incorporated cities of COUNTY, which streets
are a part of COUNTY's Master Plan of Arterial Highways; and
WHEREAS, Orange County Board of Supervisors on November 5, 1958, has by
formal resolution adopted the formal procedure for the administration of the
Arterial Highway Financing Program, as revised, which procedure is outlined in a
document on file with the County Clerk, formally known as the County of Orange
Arterial Highway Financing Program Procedure Manual; and
WHEREAS, FLOWER STREET, from Santa Ana Boulevard to Civic Center Drive,
a street included in the Orange County Master Plan of Arterial Highways, is a
street of general COUNTY interest and was selected for improvement in accordance
with the policies of the Arterial Highway Financing Program as contained in the
AHFP Procedure Manual, and as shown by the approved AHFP project scope, plans
and specifications on file with COUNTY's Environmental Management Agency. Said
work of such improvement shall be referred to hereinafter as PROJECT; and
Be
AHFP No. 1255
WHEREAS, CITY, as Lead Agency, has completed the environmental
assessments as required by the California Environmental Quality Act of 1970, as
amended, by approving a Notice of Exemption for PROJECT, a copy of which is on
file with COUNTY; and
WHEREAS, CITY has filed the Notice of Determination with the County
Clerk; and
WHEREAS, no additional environmental documents are required for
compliance with the California Environmental Quality Act; and
WHEREAS, CITY has reviewed PROJECT for conformance with the requirements
of Section 65402 of the California Government Code and applicable local
ordinances and CITY has acted as required.
NOW, THEREFORE, IT IS AGREED by the parties hereto as follows:
1. The Arterial Highway Financing Program (AHFP) Procedure Manual
herein referred to shall be and is hereby made a part of this agreement.
2. The Contracting Authority for PROJECT is hereby designated as CITY.
3. The Project Engineer for PROJECT is hereby designated as CITY.
4. The Construction Engineer for PROJECT is hereby designated as CITY.
5. All soils engineering and material and construction testing
necessary for PROJECT shall be performed by COUNTY. This shall include
preliminary soils investigations, structure foundation investigations,
recommendations for structural sections and compaction requirements, and quality
control of materials and construction.
6. The work shall be subject at all times to inspection by the
authorized representatives of both parties.
follows:
7. Funds to be used for PROJECT:
a. The estimated cost of PROJECT covered by this agreement is:
Design Engineering: $ 70,000
Construction Contract:. 620,000
Construction Engineering: 50,000
Total: $740,000
b. On the basis of the above estimate, PROJECT will be financed as
COUNTY Funds: $344,000
CITY Matching Funds: 344,000
CITY Funds:* 52,000
Total: $740,000
*For items not eligible for AHFP participation.
-2-
AHFP No. 1255
C. If upon completion of detailed design, it appears that PROJECT's
estimate will exceed the original allocation, the Contracting Authority shall
follow the procedures set forth in the AHFP Procedure Manual for Adjustment of
Allocation.
d.
costs will be
percent (50Y),
allocation.
Except as noted in (e) below, final adjustments of PROJECT's
made on the basis of COUNTY fifty percent (50%), CITY fifty
on eligible items in the contract up to the maximum COUNTY AHFP
e. COUNTY participation in longitudinal storm drain costs shall not
exceed a maximum of twenty-five percent (25%) of the total cost of eligible
storm drain construction.
f. It is the intent of the parties hereto to comply with all
applicable rules regarding the expenditure of State Gas Tax Funds. Eligibility
of any storm drain item will be subject to final audit and determination by the
State Controller's Office. Any future adjustment required by said'Controller's
Office shall be made by CITY with CITY funds, including complete refunds to
COUNTY of any COUNTY gas tax funds declared by the Controller to have been
expended on ineligible construction.
g. Any funds spent prior to July 1, 1987 shall not be considered in
the final accounting of PROJECT.
8. Funds allotted by COUNTY for PROJECT shall revert to the Arterial
Highway Financing Program in the event CITY fails, for any reason, to advertise
and award the contract for PROJECT prior to September 30, 1990 and CITY shall
reimburse COUNTY for any expenditures incurred by COUNTY in connection with
PROJECT.
9. This agreement shall become null and void in the event that CITY,
for any reason, advertises PROJECT for bids prior to the granting of
authorization to advertise by COUNTY in accordance with the procedures set forth
in the Arterial Highway Financing Program Procedure Manual.
10. Upon acceptance of the completed AHFP PROJECT by the awarding
authority or upon the contractor being relieved of the responsibility for
maintaining and protecting certain portions of the work, CITY shall maintain
PROJECT or such portions of the work in a manner satisfactory to COUNTY. If
within ninety (90) days after receipt of notice from COUNTY that PROJECT or any
portion thereof is not being properly maintained, CITY has not remedied the
conditions complained of to COUNTY's satisfaction, COUNTY may withhold the
programming or approval of further AHFP projects of CITY until PROJECT shall
have been put in a condition of maintenance satisfactory to COUNTY. The
maintenance referred to herein shall include not only the preservation of the
general physical feature of the roadway, roadside, and surfacing, but also
safety and regulatory features, devices and appurtenances built into PROJECT.
11. County -wide Extension of Arterial System:
To promote uniformity of County Arterial Highway System with City
Master Plan of Major Streets, both parties agree to continue the promulgation of
the AHFP as outlined in the aforementioned Procedure Manual.
-3-
AHF'P No, 1255
IT IS MUTUALLY UNDERSTOOD AND AGREED:
1. Pursuant to and in accordance with Section 10532 of the California
Government Code, in the event that this Contract involves expenditures of State
funds aggregating in excess of ten thousand dollars ($10,000), the parties shall
be subject to the examination and audit of the Auditor General of the State of
California for a period of three (3) years after final payment under this
Contract.
2. That neither COUNTY nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done or
omitted to be done by CITY under or in connection with any work, authority or
jurisdiction delegated to CITY under this agreement, It is also understood and
agreed that, pursuant to Government Code Section 895.4, CITY shall fully
indemnify, defend and hold COUNTY harmless from any liability imposed for injury
(as defined by Government Code Section 810.8), occurring by reason of anything
done or omitted to be done by CITY under or in connection with any work,
authority or jurisdiction delegated to CITY under this agreement.
3. That neither CITY nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done or
omitted to be done by COUNTY under or in connection with any work, authority or
jurisdiction not delegated to CITY under this agreement. It is also understood
and agreed that, pursuant to Government Code Section 895.4, COUNTY shall fully
indemnify, defend and hold CITY harmless from any liability imposed for injury
(as defined by Government Code Section 810.8), occurring by reason of anything
done or omitted to be done by COUNTY under or in connection with any work,
authority or jurisdiction not delegated to CITY under this agreement.
-4-
AHFP No. 1255
IN WITNESS WHEREOF, CITY has caused this agreement to be executed by its
Mayor and attested by its Clerk, and COUNTY has caused this agreement to be
executed by the Chairman of its Board of Supervisors and attested by its Clerk
on the dates written opposite their signatures, all thereunto duly authorized by
the City Council and the Board of Supervisors, respectively.
CITY OF SANTA ANA, a municipal
corporation
Dated: 19� By
'��� ayor
ATTEST:
C+ty Manager
Dated:
19
SIGNED AND CERTIFIED THAT A COPY OF
THIS DOCUMENT HAS BEEN DELIVERED TO
THE CHAIRMAN OF THE BOARD.
Linda D. Ruth
Cleric of the Board of Supervisors
of Orange County, California
TRB:dw
APPROVED AS TO FORM
A�
Ci Attorney
COUNTY OF ORANGE, a political subdivision
of the State of California
By
Chairman, Board of Supervisors
APPROVED AS TO FORM
ADRIAN KUYPER, COUNTY COUNSEL
ORANGE COUNTY, CALIFOANIA
iJ
Deputy
Date
-5-
RIGHT OF WAY CERTIFICATION
The City of Santa Ana hereby certifies in connection with the
right-of-way for AHFP Project No. 1255, Flower Street Improvements
from Santa Ana Boulevard to Civic Center Drive, that:
1. All work is within existing right-of-way and no addi-
tional right-of-way is necessary.
2. No building improvement nor utility exists within the
right-of-way area that will interfere with construction.
In Making this certification, the City of Santa Ana agrees to
hold the County of Orange harmless from any liability which may
arise by reason of the County's reliance upon this Certificate and
its use of right-of-way.