HomeMy WebLinkAboutMETROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA (5)M-'f i
MWD
METROPOI, I IAN WATER DISTRICT OF SOTHERN CALIFORNIA
Public Works Agency
City of Santa Ana
220 South Daisy Avenue, Building A
Santa Ana, California 92703
Attention Mr. Lee Harry
Water Resources Manager
Gentlemen:
Letter Agreement No. 6222 for Participation in
.an Irrigation Syo_tgm Efficiency IMPLOveMent PrQjert
When signed by both parties, this letter will serve as
an agreement (Agreement) between The Metropolitan Water District
of Southern California (Metropolitan) and the City of Santa Ana
(Santa Ana).
This Agreement is to be funded by Metropolitan and
Santa Ana. Metropolitan's funding is provided through the
Conservation Credits Program which is designed to assist member
and subagencies in conserving water supplies.
2120ject .-eacription
1. Santa Ana has submitted a proposal to perform the
following activities at eight city park sites: (1) remove
existing irrigation controllers at eight park sites; (2) install
and commission Calsense satellite irrigation controllers with
flow sensing and moisture sensing capabilities (System); (3)
connect satellite controllers to Santa Ana's existing central
irrigation computer control system; and (4) provide monthly water
use records for a period of two years following installation of
satellite controllers (Project). The Project description is
marked Exhibit A and is attached hereto and incorporated herein
by this reference. Under the terms of this Agreement, Santa Ana
will perform tasks as outlined in Exhibit A.
Term
2. This Agreement will be effective upon final execution.
Santa Ana will begin work on Project within 60 days after
execution of Agreement. Santa Ana will complete all work and
THE &TROPOVTAN WATER 91STRICT OF SOUTHERN CALIfORNIA
City of Santa Ana
provide all final verification
from the date of execution, or
A has been completed, whichever
this Agreement may be extended
Agreement i i a o
-2--
to Metropolitan within 32 months
when all work described in Exhibit
occurs first (Term). The Term of
at the discretion of Metropolitan.
3. Me. Alice Webb is appointed Agreement Administrator for
Metropolitan for the purpose of administering this Agreement and
making any decisions in connection therewith on behalf of
Metropolitan. Metropolitan reserves the right to change the
designated Agreement Administrator upon providing written notice
to Santa Ana.
4. Mr. Lee Harry is appointed Agreement Administrator for
Santa Ana for the purpose of administering this Agreement and
making decisions in connection therewith on behalf of Santa Ana.
Santa Ana reserves the right to change the designated Agreement
Administrator upon providing written notice to Metropolitan.
Pr _ject_Fund�ng
5. The total cost of Project is estimated to be $69,588.
These costs will be shared with Metropolitan contributing
50 percent, and Santa Ana providing the remaining 50 percent of
total Project costs. Within 60 days after execution of this
Agreement, Metropolitan will provide $6,959 to Santa Ana. This
represents an advance (Advance) of 10 percent of the total
estimated funding. These funds will be transferred by means of a
credit on Metropolitan's water service billing to Santa Ana.
G. Santa Ana will submit invoices for work performed on a
bimonthly basis during the periods of purchase, installation and
commissioning of the System. Bimonthly requests for
reimbursement must be accompanied by documentation of
expenditures. Ten percent or $3,479 of Metropolitan's total
contribution will be withheld from payment until receipt of final
report. Payments will be transferred by means of credits on
Metropolitan's water service billing to Santa Ana. Metropolitan
will reimburse only invoices that are signed and approved by
Santa Ana's Agreement Administrator.
Terw1ination
7. This Agreement may be terminated by either party hereto
for any reason 30 days after notice in writing to the other
THE METROPOLITAN WATER OGSTRICT Of SOUTHERN MRMNA114
City of Santa Ana -3-
party. Upon, such termination, Santa Ana will provide
Metropolitan, with all documentation verifying the implementation
and costs of Project up to and including the date of termination.
The value of services performed up to and including the date of
termination, will be determined in accordance with labor and
equipment costs as outlined under Section VII, Project Budget in
Exhibit A. If it is determined that funds are due from
Metropolitan, Metropolitan will credit these funds to Santa Ana
within 60 days from date it was determined that the funds are
due. These funds will be transferred, by means of a credit on
Metropolitan's water service billing to Santa Ana. If the
reconciliation indicates Metropolitan has remitted excess funds
to Santa Ana, Metropolitan will invoice Santa Ana for the excess
funds.
_NOO- • -� - tT
S. Throughout the Term of this Agreement, on a bimonthly
basis, Santa Ana will report to Metropolitan progress and actual
cost of Project, and estimated water savings. At either
completion of Project or the end of the Term of this Agreement, a
final report from Santa Ana will be provided to Metropolitan,
verifying implementation and cost of Project.
3esponsi32ili ties,
9. Santa Ana will pay invoiced amounts to Metropolitan
within 40 days from the date of invoice. If payment is received
after the due date, but within the first 30 days after the due
date, a penalty will be assessed of one-half percent of the total
invoice amount. If payment is received more than 30 days after
the due date, a penalty of one-half percent of the total invoice
amount will be assessed each 30 days thereafter.
10. Santa Ana is responsible for providing sufficient
qualified personnel and/or selecting a qualified independent
contractor to implement Project. Santa Ana is responsible for
the design, implementation, personnel, equipment and supplies,
and all capital and operating costs related to and incurred by
Project. All materials and equipment necessary to implement
Project are the exclusive property of Santa Ana. Metropolitan
has no ownership, right, title, security interest, or other
THE METROP911TAM WATER DISTRICT Of SOUTHERN CARAMA/IA
City of Santa Ana _4_
interest in any Project facilities, materials, or equipment, nor
any rights, duties, or responsibilities for operation or
maintenance thereof". Any modifications to Project which may
alter the implementation, effectiveness, and/or costs must be
agreed to in writing by both parties.
11. Santa Ana and its authorized representatives agree to
provide data and information as required by Metropolitan to
evaluate Project implementation, costs, and water savings.
Metropolitan and Santa Ana will make available for inspection to
the other party, upon reasonable advance notice, all records,
books, computer files, and other documents relating to Project.
12. Metropolitan may, at its own expense and discretion,
provide follow-up analysis and verification of actual results
achieved through Project implementation. The Term of this
Agreement may be extended at the discretion of Metropolitan.
13. Santa Ana is responsible for assuring that Project
complies with requirements of California Environmental Quality
Act (CEQA) .
14. Metropolitan and Santa Ana each agrees that it is
responsible for its own actions under this Agreement and agrees
to indemnify and hold the other party and its officers and agents
harmless, and agrees to defend the other party against any claim
or asserted liability arising out of its actions, either willful
or negligent, or its actions in implementing the Project. Such
indemnity will include any losses relating to any claim made,
whether or not a court action is filed, and will include attorney
fees and administrative and overhead costs related to or arising
out of such claim or asserted liability. ,Santa Ana is
responsible for any such actions arising under CEQA.
Notice
15. Any written communication required or permitted to be
given hereunder will be deemed :received upon personal delivery or
48 hours after deposit in any United States mail depository,
first class postage prepaid, and addressed to the party for whom
intended, as follows:
TI/f METROPOLITAN WATER DISTRICT OF SOUTHERN CAUFORNIA
City of Santa Ana
If to Metropolitan:
If to Santa Ana:
-5-
The Metropolitan Water District
of Southern California
Post Office Box 54153
Los Angeles, California 90054
Attention Ms. Alice Webb
City of Santa Ana
220 South Daisy Avenue
Santa Ana, California 92703
Attention Mr. Lee Harry
Either party may change such address by giving notice to the
other party as provided herein.
16. It is understood that any alterations or variations
of the terms of this Agreement will not be valid unless made
in writing and signed by both parties, and that this Agreement
constitutes the entire agreement between both parties.
17. This Agreement will inure to the benefit of, and be
binding upon Metropolitan, Santa Ana, and their respective
successors. This Agreement is not assignable by either party in
whole or in part.
18. The partial or total invalidity of one or more parts
of this Agreement will not affect the intent or validity of this
Agreement.
19. This Agreement will be deemed. a contract under the laws
of the State of California, and for all purposes will be
interpreted in accordance with such laws. Metropolitan and Santa
Ana hereby agree and consent to the exclusive jurisdiction of the
courts of the State of California, and that the venue of any
action brought hereunder will be in Los Angeles County,
California.
PIT XTROP011TAN WAI'fR glpRICT OF S0j1T11t#N r ,AllfopNIA
City of Santa Ana -6-
Metropolitan has fully executed two originals of this
Agreement. If the terms are acceptable to you, please sign,
and forward one to Metropolitan and retain the others for your
records.
CITY OF SANTA ANA
By
9 lid
y 44� I
. uel A. Pu 0
By
PSS/dd
Attachment
In Duplicate
ATTEST
By
El . C.�/ Guy
erk of the Council
Date .. - ')o —�'4
APPROVED AS TO FORM
By
Edward J. Cooper
City Attorney
Date
Very truly yours,
John ,,R. Wodra ka
General Mana7l-r
By �A
Jay W. Malinowski
Director, Public Affairs
APPROVED AS TO FORM
N. Gregory Taylor
By
Deputy Gene��, a1"" Counsel
.4E DED FOR APPROVAL
7
d,
James G. Ross
Executive Director
Public Works Agency
Date
By
David N. Ream
City Manager
Date
EXHIBIT A
CITY OF
SANTA ANA
IRRIGATION SYSTEM
EFFICIENCY IMPROVEMENT PROJECT
PROPOSAL
TABLE OF CONTENTS
PROPOSAL SUMMARY SHEET
I. PROJECT SUMMARY
11. PROJECT GOALS AND OBJECTIVES
IIL PROGRAM DESIGN
IV. PROJECT TEAM
V. PROPOSED SCHEDULE AND WORK PLAN
VI. IMPLEMENTATION TIMELINE
VII. COST EFFECTIVENESS ANALYSIS
VIII. PROJECT BUDGET
ATTACHMENT A: Annual Irrigation Consumption 1987
ATTACHMENT B: Water Savings - Retrofitted Sites
ATTACHMENT C: Activity Report
1
PAGE
2
3
3
4
5
6
7
7
8
PROPOSAL SUMMARY SHEET
FY 1995-96
PARTICIPANTS
Member Agency;
City of Santa Ana
Project Participant:
Recreation and Community Services
PROJECT
Type of Project:
On -going
Landscape:
Retrofit, Improvement, Audit
Project Size:
8 Sites
Start Date:
September 1995
Completion Date:
August 1996
Duration of Project:
Installation: 1 year
Operation: Continuous for life of equipment
Target Audience:
300,000 (City population) park users
Applicable BMP(s):
5,14
AF Savings:
Approximately 29 Acre Feet annually
See Attachment A
COST
Total Cost of Project: $75,495
Breakdown of Costs: In House - Section V. Proposed Schedule and Work Plan
Contractual - Section VIII. Project Budget
FUNDING
Agency Funding.
$ 7,550
MWD Funding:
$37,747
USBR Funding.
$30,198.
Funding Method
50/40/10
0A
r
I.
11.
PROPOSAL J1
PRO ECT SUMMARY
The City of Santa Ana Recreation and Community Services Agency (Parks Division)
is requesting the assistance of MWD and USBR in funding the retrofit of 8 park sites
with an efficient irrigation system designed to save a minimum of 29 acre-feet of water
annually. Attachment A lists water saving estimates based on a comparison of 1987
usage, a year considered average by CIMIS, to industry -recognized standards
MAWA= (ETo)(0.8)(LA)(0.62).
To date, the City of Santa Ana has clearly demonstrated its commitment to the
implementation of the Best Management Practices through allocation of monetary
resources both in terms of staff and capital expenditures in retrofitting the irrigation
systems at 15 park sites throughout the city.
With the availability of increasingly sophisticated landscape systems, Parks Division staff
consulted with various manufacturers to find an irrigation system which would
comprehensively address their irrigation needs. Calsense, a state-of-the-art
computerized irrigation management system, was selected. The installation dramatically
reduced the water demand at the 15 park sites as illustrated in Attachment B.
Unique to our project, is the temporary assignment of a Park Maintenance Worker 11
to the position of Water Resources Manager/Planner/Scheduler to spearhead the
project. The full duties of this position are outlined in Section IV of this proposal. We
are confident that once the installation of Calsense has been completed throughout the
city parks, monetary savings from water use reduction will justify the permanent
reclassification of a full time position to continue managing the project.
PRO FECT GOALS AND OBJECTIVES
The goal of this project is to further reduce our water usage by a minimum of 29 acre-
feet annually by installing the Calsense system at an additional 8 park sites.
A. Irrigation System Installation
Replace all irrigation controllers with the Calsense computerized irrigation
controllers in the 8 park sites. Flow sensors will be installed to provide
automatic shutdown in the event of a systems failure. To optimize the system,
moisture sensors will be installed and connected to the central controller.
3
B. Water Audit
Monthly water audits and field surveys will be conducted at each park site.
These audits will be performed internally by trained Park operations staff
following State of California "Water Irrigation Auditor Handbook Guidelines".
C. Training
Provide ongoing training of Park Division staff utilizing the continuous
improvement cycle methodology. The Calsense Company is committed to assist
with on -going Training of key staff who will depend on their product for
managing irrigation park sites. Staff who will have priority in on -going training
are:
• General Maintenance Supervisor
• Acting General Maintenance Leadman
• Water Resources Manager/Planner/Scheduler
• Park Supervisors
• Park Maintenance Leadman
D. Reclassification
Parks Division believes establishing a position to directly manage and coordinate
with field staff is critical to the success of this project. For this reason, a Park
Maintenance Worker II is temporarily assigned to the position of Water
Resources Manager/Planner/Scheduler. This individual has extensive experience
in irrigation management and his duties are outlined in Section IV.
III. PROGRAM DESIGN
Description
Irrigation will be managed through one centralized computer which is satellite
programmed and controlled. Water usage will be regulated through moisture sensors
and flow meters and valves. Consumption will be recorded monthly in an "Activity
Report" (Attachment C).
This system:
• will automatically bypass a station if the ground has sufficient moisture (rainfall,
humidity, etc.)
• will automatically turn off a station when the flow valve senses excessive water
flow due to a water line rupture (vandalism).
4
• will allow staff at one central unit to adjust water usage at multiple locations in
the event of extreme drought, flooding or limited water periods during
construction or special events.
Implementation Methodology
Program implementation will be a two part process: Part I - Installation, Part II -
Examination.
First, a qualified irrigation/landscape contractor will be selected through a competitive
bidding process to provide installation of the Calsense system.. Project management of
the construction phase will be administered by the project team.
Second, information gathered during water audits will be used to refine our expertise
in two areas: 1) to monitor/measure the program's success; and 2) to operate, adjust,
and manipulate the system to achieve optimum water savings.
IV. PROJECT TEAM
The Project Team will consist of the Assistant Park Landscape Planner and the Water
Resources Manager who will be responsible for carrying out this project.
Assistant Park Landscape Planner duties:
• acquisition of inter/intea departmental review and approvals.
• advertisement for bids for general contractor.
• construction administration.
Water Resources Manager duties:
• survey field staff for personal information on site.
• water audits, following State of California "Water Irrigation Auditor Handbook"
guidelines.
• perform site analysis including soil analysis, determining plant species
requirements, sun and wind exposure, topography, precipitation rates, available
water pressure, etc.
• evaluate condition of irrigation systems and make recommendations concerning
their improvement.
• take water meter readings to compare with billings.
Other related duties include:
• regularly updating irrigation equipment inventory.
5
• coordinating with Calsense Company to update computer program and training
of staff.
• attending other related training programs to enhance capabilities.
• preparing presentations related to the effectiveness of the Calsense system.
• performing field investigations to update "as -built" irrigation drawings and to
update the SAPORTS (Santa Ana Park Operations Resource Tracking System)
inventory program.
• creating monthly reports providing water usage/cost information to be used by
staff to make recommendations/decisions.
V.
TASK '1
CONTRACT' DOCUMENT
PREPARATION & BID
AWARD
Personnel: Assistant Park
Landscape Planner
Rate: 80 hours @ $20.79/hour
CONSTRUCTION
Personnel: Assistant Park
Landscape Planner
Rate: 80 hours @ $20 79/hour
Personnel: Water Resources
Manager
Rate: 80 hours @ $16.13/hour
WATER AUDIIS
Personnel: Water Resources
Manager
Rate: So hours @ $16.13/hour
r
IMPLEMENTATION TIMELINE
VIL COST EFFECTIVENESS ANALYSIS
PROGRAM STATISTICS:
Number of Sites Retrofitted
Calculated Water Savings:
Annually
29 AF
Life of Project
COST:
10 years
Contractual
$ 69,587,55
In-house
Total
$ 5,907.20
BENEFITS:
$ 75,494.75
Annual Water Savings
Lifetime Water Savings
$ 12,932.00
BENEFIT/COST ANALYSIS:
$141,592,00
BC = Benefits 141592 —
Analysis —�`s�
1.9
7
M I J .1 !01-11
-5
VA
6194
pa
'g-02
o
C-4
cc
ri0
s
cl
3 cn
I
4'0-
E
PRI ==ME
c7s
F
4 M1 �l n�
i In
0
0
coo
�
o
o
U
W
OH
p
� t-1
rl
e-1 H
r-i
e-1
rl
w
+
�
en
00
ao
n
o`OoT
�
h
o
in
t-
00
�'
�
C ti
00
�
O
�
cT
cl
V
00
in
oho
C7i
�
M
oo
h
v
'a'
a,
of
0
C,
r-q c
00
00
h
Et, 00
n
rot
�
r
ko
C-
Iq I n I in
N f mt
N
a�
A
dp]
a
CU
W
ta
_
�
a
A
ATTACHMENT
ANNUAL IRRIGATION CONSUMPTION
Previously Retrofitted Sites - 1994
MONTH
PROGRAMMED
ANNUAL IRRIGATION
IRRIGATION
(W/MOISTURE SENSING )
PERCENT
SAVINGS
(Gallons)
(Gallons)
JANUARY
2,236,387
2,012,494
10 01%
FEBRUARY
2,049,713
978,089
52.28%
MARCH
2,605,793
1,613,608
38.08%
APRIL
3,616,724
2,968,116
17.93%
MAY
4,884,307
3,981,979
18.47%
JUKE
1,313,183
1,147,466
12.62%
JULY
3,659,195
3,099,263
15.30%
AUGUST
8,751,679
7, 663,278
12.44%
SEPTEMBER
6,822,087
5,801,712
14.96%
OCTOBER
6,080,286
4,447,$$9
26.85%a
NO VEMBER
3,994,673
2,775,143
30.53%
DECEMBER
1,351,092
757,777
43.91%
•
Data as shown is available on file 'in RCSA Water Manager's Office, Calsense Activity R ..r ..
+ Data as show is representative of 15 park sites covering approximately 79 acres. ePot.
12
MEMORANDUM
To: Mike Lopez
Date:
From: Robert Gomes
Subject: MONTHLY WATER MANAGEMENT REPORT - JUNE 1995
I. Data collection e+ction sates
ATTACHMENT C
July 19, 1995
The data contained in this report was derived from 41
Calsense irrigation controllers of which 19 are centrally
controlled units (via phone line and modem) and 22 are
"stand alone', units. Data from "stand alone'$ units is
collected with a lap top computer (via direct wire access)
at the controller.
II. Water savin s from moistu a seLagjaq
DUNE 1995 savings:
$is 852
Gallons: 11458,276
The ETo for June 1995 was 5.41 inches compared to the ETo
for May 1995 which was 5.39 inches. The ETo for June 1995 and
May 1995 were nearly equal as were the total actual
gallons
used for each month. The equality of usage is consistent with
the rate of ETo for the two months , this is very good ;
however, if we do not know how many inches of water we applied
Per sq. ft., then we do not know exactly how well We are
managing our water. In summary We could have applied much
more than the measured ETo 5.40 inches making us appear
excessive in theory. The equality between May and June appears
to be a positive usage pattern.
In looking back at June 1994 our actual irrigation applied
was 1,147,466 gallons compared with June 1995 were our usage
was 4,078,125 gallons. since June 1994 we
controllers to the June 1995 report. Also The dfhave added e
1994 was a transitional period between the changing Ofwater
managers.
III. Water savin s due to overflow rotection
The month of June saw no significant savings from overflow
protection.
CS N1W 13
Monthly water management report - June *950 (page 2)
IV. General informat' b area
A. Bomo Loral: The restoration of the parks irrigation has
been completed for the A controller which controls most of
the park and operates most of the impact rotors.
Approximately 25 rebuilt rainbird impact rotors (41-11/64 and
47-7/32 heads) were installed where heads were determined to
be non repairable.
B. Parks: several parks such,as Lillie King and Thornton
are in need of a large scale irrigation restoration similar
to that 'of Homo Koral. Common problems include heads that do
not rotate, broken swing joints or laterals, grass growing
into heads and heads too low or nearly perpindicular to grade.
V. OnMoing faci i ies 'm rovements train incr and brainstormin
Training of staff continues, when appropriate, on controller
usage, sprinkler head adjustment of late model heads and
basic troubleshooting.
It is important that we maintain and tune-up our irrigation
systems in preparation for upcoming audits and future water
use restrictions that may be imposed upon us in the near
future.
PLEASE BE SURE IRRIGATION CHECKS ARE BEING PERFORMED,
IT IS VITAL TO THE QUALITY OF OUR FACILITIES AND VITAL
TO OUR ONGOING EFFORTS AT FACILITIES IMPROVEMENTS ASWELL
AS RESPONSIBLE WATER USE.
c: Paul Johnson
C.J. Keller
Chris Laugenaur
Loren Rossignol
Art Sarinana
Nancy Bailey
Attached: Calsense activity report
Spreadsheet and Graph
CIMIS for June 1995
Manual test/Non controller totals summary
page
Em
CALSENSE ACTIVITY REPORT for the period 06/01/1995 through 06/30/1995
-w--------------------------------------w-----w-------ww--------------------w--w
BOMO KORAL PARR #1
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK:
1160
97181
129.92
12343
$$94.69
WITH MOISTURE SENSING:
919
74553
99.67
PERCENT SAVED:
20.7%
23.3%
23.3%
23.3%
COST OF WATER PER 100 CU.FT.:
$0.95
DOLLARS SAVED THIS PERIOD: $28.74
------`"i-----„-----w-----------------
BOMO
w-------w---------------------------
KORAL FART{ #2
w-------
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK:
4112.
265573
355.04
33729
$224.
WITH MOISTURE SENSING:
2732
177051
236.70
$86
PERCENT SAVED:
33.6$
33.3%
33.3%
33.3%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $112.43
�- - - - - - - ---- - ------ - - - - - ---- - - - - - w- -- - - -- --- ------ -- - - - - --- -- -- - --w - - w ---w- ww --
#A CENTENNIAL SOCCER FIELD
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 2697 59078 (78.98
03
WITH MOISTURE SENSING: 2075 46296 61.89 $75.$80
PERCENT SAVED: 23.1� 21.6% 21.6% 21.6%
COST OF WATER PER 7.00 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $16.23
-----------------------------
#B CENTENNIAL SOCCER FIELD-----------------w --
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 2625 63063 (84.31
WITH MOISTURE SENSING: 2359 56340 75.32 $71.09
$
PERCENT SAVED: 10.1% 10.7% 10.7% 10.7%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $8.54
pa%O 2
CALSENSE ACTIVITY REPORT for the period 06/01/1995 through 06/30/1995
--------------------------------------------------------------------------------
DELHI PARK
MINUTES
GALLONS
CU.FT.
DOLLARS
(100s)
PROGRAMMED ON CLOCK: 1636
100974
134.99
$128.24
WITH MOISTURE SENSING: 1623
100230
134.00
$127.30
PERCENT SAVED: 0.8%
0.7%
0.7%
0.7%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $0.95
------------------------------------------- ----------- -- r ----------------r--rw--
LILLIE KING
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 6499 565869 756.51 $718.68
WITH MOISTURE SENSING: 4652 403870 539.93 $512.94
PERCENT SAVED: 28.4% 28.61% 28.6% 28.6%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $205.75
--------------------- --------------------------------------------------------
J'EROME PARK WEST BALLFIELD
MINUTES GALLONS CU.FT. DOLLARS
(100s)
PROGRAMMED ON CLOCK: 3585 236943 316.77 $300.93
WITH MOISTURE SENSING: 2868 191579 256.12 $243.32
PERCENT SAVED: 20.0% 19.1% 19.1% 19.1%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $57.61
--------------------------------------------------------------------------------
MEMORIAL PARK #A
MINUTES GALLONS CU.FT. DOLLARS
(100s)
PROGRAMMED ON CLOCK: 2784 163784 218.96 $208.01
WITH MOISTURE SENSING: 2216 127312 170.20 $161.69
PERCENT SAVED: 20.4% 22.3% 22.3% 22.3%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $46.32
page 3
CALSENSE ACTIVITY REPORT for the period 06/01./1.995 through 06/30/1995
--------------------------------------------
MEMORIAL PARK #B
-------------
MINUTES GALLONS
CU.FT.
DOLLARS
(100s)
PROGRAMMED ON CLOCK: 2405 133193
178.07
$169.16
WITH MOISTURE SENSING: 1873 103843
138.83
$131.89
PERCENT SAVED: 22.1% 22.0%
22.0%
22.0%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $37.28
--------------------------------------------------------------------------------
MEMORIAL PARK #C
MINUTES GALLONS
CU.FT.
DOLLARS
(100s)
PROGRAMMED ON CLOCK: 6154 405291
541.83
$514.74
WITH MOISTURE SENSING: 3548 253025
338.27
$321.35
PERCENT SAVED: 42.4% 37.6%
37.6%
37.6%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $193.39
--------------------------------------------------------------------------------
OLD COURTHOUSE
MINUTES GALLONS
CU.FT.
DOLLARS
(100s)
PROGRAMMED ON CLOCK: 3740 91572
122.42
$116.30
WITH MOISTURE SENSING: 3096 81359
108.77
$103.33
PERCENT SAVED: 17.24; 11..2%
11.2%
11.2%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $12.97
---------------------------------------------------------------------------------
A ROSITA PARK
MINUTES GALLONS
CU.FT.
DOLLARS
(100s)
PROGRAMMED ON CLOCK: 5908 104819
140.13
$133.13
WITH MOISTURE SENSING: 5616 98628
131.86
$125.26
PERCENT SAVED: 4.9% 5.9%
5.9%
5.9%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $7.86
Page
CALSENSE ACTIVITY REPORT for the period 06/oi/19g5 through 06/30/1995
--- ------ ww---�rw-rww--w-www�w
#B ROSITA PARK w-
MINUTES
PROGRAMMED ON CLOCK: 0
WITH MOISTURE SENSING: 0
PERCENT SAVED: -------
w---------------------------------------„"---------'
------r---------------wr--ww-�
RTC
PARKING
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK:
752
26658
C35.64
$.
WITH MOISTURE SENSING:
302
10713
14.32
$133.61
PERCENT SAVED:
59.9%
59.8%
59.8%
59.8%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $20.25
----------------------------------------------- w--------------------------------
STEAM PLANT
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 1206 42327 (56.59
WITH MOISTURE SENSING: 1148 41494 55.47 $520
.7
PERCENT SAVED: 4.8$ 2.0% 2.0$ $52.00%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $1.06
-------------------w------w------------------------------------------w--------w-
SASS9CER PARK
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 3564 132902 177.6g
WITH MOISTURE SENSING: 2522 96660 129.22 $122.76
PERCENT SAVED: 29.2% 27.3% 27.3% $127.3%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $46.03
page
Fm
CALSENSE ACTIVITY REPORT for the period 06/01/1995 through 06/30/1995
-----------------------------------------------------------------------•---------
LIBRARY
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK. 3919 35938 (48.0�
$45.67
WITH MOISTURE SENSING: 3918 35958 48.07 $45.67
PERCENT SAVED: 0.0% 0.0% 0.0% 0.0%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $0.00
- --- - - - - - - - -- - - - -- - - - - -- - - - - - - -- - -- - - - - -- --- ---- --- - ---- - -- -- -- - - -------- - - --- --
GREENVILLE PARKWAY
MINUTES GALLONS CU.FT. DOLLARS
(100sPROGRAMMED ON CLOCK: 3016 110458 147.6�
4029
WITH MOISTURE SENSING: 2926 107187 143.30 $136.
$113
PERCENT SAVED: 3.0% 3.0$ 3.0$ 3.0%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $4.15
-----------------------------•---------- ------•--------------------------------
CITY YARD #A
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 1902 80012 106.97
62
WITH MOISTURE SENSING: 1722 73997 98.93 $93. $98
PERCENT SAVED: 9.5% 7.5% 7.5% 7.5%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $7.64
----------------------------------
CITY YARD #B ------
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 3614 226493
(02.8
8766
WITH MOISTURE SENSING: 3370 209503 280.08 $266.
$208
PERCENT SAVED: 6.7% 7.5% 7.5% 7.5%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $21.58
page
s
CALSENSE ACTIVITY REPORT for the period OG/01/1995 through p6/3o/�9P
_---------------------------------------------------------------------~---------
CORONERS OFFICE
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 2196 67815 (90.66
13
WITH MOISTURE SENSING: 2191 67611 90.39 $85.$887
PERCENT SAVED: 0.2% 0.3% 0.3-% 0.3%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $0.26
--------'--------------------------------------------------------------r-w-------
DETENTION CENTER
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 1146 23011 (30-76
WITH MOISTURE SENSING: 878 16678 22.30 $29.23
$21-18
PERCENT SAVED: 23.3% 27.5$ 27.5% 27.5$
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $8.04
•-- - - - - - ---------- - - - - - - - - ---- - -- - - - -- - - - - -- -- - - -- - - - - - - -- - -- - - - - - -- - - - - - -- -- --
ADAMS PARK
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 4545
WITH MOISTURE SENSING:
319318
426.90
40555
$229.
2668
PERCENT SAVED: 41.3%
180521
43.5-1
241.34
$7
43.5%
43.5%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $176.28
-------------------------------------------------------------------------------•-
CITY HALL
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 3773 29818 (39.86
3787
WITH MOISTURE SENSING: 2724 22387 29.93 $28.
$43
PERCENT SAVED: 27.8% 24.9-W 24.91 24.9%
COST of WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $9.44
page
CALSENSE ACTIVITY REPORT for the period 06/01/1995 through 06/30/1995
•-_r__-r-__r------------------------------------'rw__--_-_----r_
#1 OWENS DRIVE - MEDIANS
----------------
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 9297
WITH MOISTURE SENSING:
286202
382.62
36349
$216.
5518
PERCENT SAVED: 40.5%
170174
40.5%
227.50
$13
40.5%
40.5%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $147.36
---------------------------- ------ --------
--------------------------------------
#2 OWENS DRIVE PARKWAY
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 4681
WITH MOISTURE SENSING:
223939
299.38
84.
$275.21
4551
PERCENT SAVED: 2.8%
216694
289.70
$2
3.2%
3.2%
3.2%
COST OF WATER PER l00 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $9.20
----------
-----------------------.._....___--------------------------»--------»------
HERITAGE PARK
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 6490
WITH MOISTURE SENSING:
354469
473.89
45019
$286.
4286
PERCENT SAVED: 34.0%
225424
36.4%
301.37
$30
36.4%
36.4%
COST OF WATER PER 100 CU.FT.:. $0.95
DOLLARS SAVED THIS PERIOD: $163.89
-_r------------------r--r---r___-__r"._------ _------- _------------ _r-_r-_--------
JEROME PARK EAST BALLFIELD
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 5397 444778 594.62
564
WITH MOISTURE SENSING: 4538 378297 505.5 $$480.8
.76
PERCENT SAVED: 15.9% 14.9% 14.9% 14.9%
20ST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $84.43
page
CALSENSE ACTIVITY REPORT for the Period 06/01/199S through 06/30/1995
--------- -------------- ---------------------------------
MADISON PARK
------ -----.-----------
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 3001
216022
288.80
$274-36
WITH MOISTURE SENSING: 2397
167426
223.83
$212.64
PERCENT SAVED: 20.1%
22.5%
22.5%
22.5%
COST OF WATER PER 100 CU.FT-.: $0.95
DOLLARS SAVED THIS PERIOD: $61.72
---------------------- ------------------------------ ----------------------------
PRENTICE PARK .ZOO - AMAZON'S EDGE
MINUTES GALLONS CU.FT. DOLLARS
PROGRAMMED ON CLOCK: 1153 23731 C31.73
14
WITH MOISTURE SENSING: 852 16523 22.09 $20.
$0.99
PERCENT SAVED: 26.1-1 30.4% 30.4% 30.41%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $9.15
---------------------------------------------------------------------------------
SANDPOINTE PARK
MINUTES GALLONS CU.FT. .DOLLARS
PROGRAMMED ON CLOCK: 360 19980 C26071
38
WITH MOISTURE SENSING: 84 4610 6.16 $$5.5.86
PERCENT SAVED: 76.8-t 76.9% 76.90 76.9-t
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $19.52
----------------------------- -----------------1----------------------------------
SANTA ANITA
PARK
MINUTES
GALLONS
CU.FT.
DOLLARS
ON CLOCK: 5475
WITH MOISTURE
236309
(100sPROGRAMMED
315.9�
30013
$127.
SENSING: 1980
PERCENT SAVED:
100564
134.44
$72
63.8%
57.0
57.4%
57.4%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $172.40
page
9
CALSENSE ACTIVITY REPORT for the period 06/01/1995 through 06/30/1995
----------------------------------
SANTIAGO PARK
------------
BOWLING
----------------
GREENS
------------------
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 3236
WITH MOISTURE SENSING:
169269
2263 (�..
0
$214.98
2686
PERCENT SAVED: 17.0%
154608
8.73%
206.70
$196.36
8.7%
8.7%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $18.62
--------------------------------------------------------------------------------
SOUTHWEST SENIOR CENTER
MINUTES
GALLONS
CU.FT.
DOLLARS
PROGRAMMED ON CLOCK: 3607
179592
240.10
22809
$$85.11
WITH MOISTURE SENSING: 1220
67009
89.58
PERCENT SAVED: 66.2%
62.7%
62.7%
62.7-%
COST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $142.99
.-------------------------------------------------------------------------------
THORNTON PARK #A
MINUTES
PROGRAMMED ON CLOCK: 4953
WITH MOISTURE SENSING: 4939
PERCENT SAVED: 0.3%.
------------------------------------------------------•-----------------------------
THORNTON PARK #B
MINUTES
PROGRAMMED ON CLOCK: 4653
WITH MOISTURE SENSING: 4341
PERCENT SAVED: 6.7%.
Page to
CALSENSE ACTIVITY REPORT for the period 06/01/1993 through 06/30/1995
-------------------------------- Ir--------- ��.r.r ----------- ----------------------
THORNTON PARK #C
MINUTES
PROGRAMMED ON CLOCK: 4219
WITH MOISTURE SENSING: 3480
PERCENT SAVED: 17.5-1
-------------------------------------- Ili ------------------------~-------------------
THORNTON PARK #D
MINUTES
PROGRAMMED ON CLOCK: 5145
WITH MOISTURE SENSING: 4587
PERCENT SAVED: 10.8%
-- --- - --- - - - --- - -- -- - - - - - - - - - -- - - - ---- -------- --- - - - - - -- -- - ----- - --- - - -- - - - - - - - --
THORNTON PARK #E'
MINUTES
PROGRAMMED ON CLOCK: 4319
WITH MOISTURE SENSING: 3693
PERCENT SAVED: 14.5%
----------------------------w---'----- ------Y-------iw-----------------------------w-----
EDINGER/LYON #B
MINUTES
PROGRAMMED ON CLOCK: 2715
WITH MOISTURE SENSING: 2693
PERCENT SAVED: 0.8%
Pag• 11
CALSENSB ACTIVITY REPORT for the period 06/01/1995 through 06/30/1993
+wrrrrwrrrr�rrrrrwrrw rwrrwrrrrrrrrrrr wrwwrrrrrwrwrrww wrrrrrwr rr.�rrrrrrrr rrrrrwrw
.rr�rrrrrr �rrrwrrrrrrrwwrwrrrrrrrrrrrrrrr.rrrrwrrrwwwwrrrwrrrrr rrrrrr rrrwrrrwrwr
REPORT SUMMARY
MINUTES GALLONS CU.FT. DOLLARS
(1008)
PROGRAMMED ON CLOCK: 141638 5536401 7401.61 $7031.53
WITH MOISTURE SENSING: 109790 4078125 5452.04 $5179.44
PERCENT SAVED: ' 22.5% 26.3% 26.3% 26.3%
;OST OF WATER PER 100 CU.FT.: $0.95
DOLLARS SAVED THIS PERIOD: $1852.09
0
i�ro g
to o
,r
kototDto,o
to{lto0cn
b
b
0
0
tncnwwN
cnoowow
wLgNHH
a
n
01 W 00 to w
�+
�(Ainoin
tmi
OmlDHN
H W W
H
M
x
H
H
r.
H
H
1-3
�C
1.3
b
!
� wH
01DLDw4'.
a~or
H
V Ln W It1 F4
H H
00 00 N
r . to
Hw%0tD,p
MH
GI
ea0Ln 71N
Ln
2
L�H
H
Z
x
t4
LO
0
V
Ln
WyV
LN
NW�10i0
,bn
a, ba 1- t31
W.A.1001N
Q
H
ck* 0 dB 0 dP
C! G]
U*11y Wmt-her Data► for Station 1 75
eC[M
VAPOR
Alit 7W.
lid+. HCM.
EIN IMD I= AVE
IPIQ'E
Elb
PFM=
MO
AVE
MX
PM
AVE
MX MIIV
AVE
Pr
AVE IW S=
in.
in.
Ly/ray mBars
F'atreaheit--
F
oph
mi F
6/ 1 Th
0.03F
0.00
74
12.8
62
32R
6o
78
61
72
51
2.8H
67 74
6/ 2 Fr
0.05
0.00
205
13.2
67
57
60
81
62
74
52
3.5
85 73
6/ 3 S3
0.08
0.00
283
13.0
66
53
61
86
61
72
51
3.2
76 72
-
-AVERA=:
WEF.1C
0.16
0.00
187
13.0
65
55
60
82
62
73
52
3.2
76 73
6/ 4 Su
0.21
0.00
6977
14.0
72
52
62
87
59
74
53
3.8
91 72
6/ 5 lrb
0.04
0.00
189
14.7
65
57
61
88
74
81
55
2.9
70 73
6/ 6 Tu
0.22
0.00
6"
12.7
72
53
63
87
33
65
51
4.5
109 73
6/ 7 We
0.21
0.00
647
11.3
69
51
59
82
48
65
48
5.9
141 73
6/ 8 2h
0.20
0.00
684
10.6
67
51
60
81
46
61
46
4.3
102 73
6/ 9 Fr
0.22
0.00
732
12.4
76
48
62
85
47
65
50
4.0
96 73
6/10 Sa
0.24
0.00
737
13.1
84
51
67
83
39
58
52
3.8
92 74
IEM
1.35
O.Oo
6/11 SU
0.26
0.00
6/12 MO
0.25
0.00
6/13 TU
0.23
0.00
6/14 We
0.13
0.00
6/15 Th
0.11
0.15
6/16 Fr
0.04
0.511
6/17 Sa
0.18
0.00
um
1.20
0.66
6/18 Sta
0.22
0.00
6/19 No
0.23
0.00
6/20 Tu
0.22
0.00
6/21 We
0.19
0.00
6/22 Th
0.20
o.00
6/23 Fr
0.21
0.00
6/24 Sa
0.21
0.0o
1.48
. „".
0.00
6/25 Su
0.18
0.00
6/26 Mo
0.18
0.00
6/27 Tu
0.22
0.00
6/28 We
0.20
0.00
f/29 Th
0.21
0.00
6/30 rr
0.22
0.00
am
1.22
: -----
0.00
Nimm
5.41
0.66
626
12.7
72
52
62
85
49
67
51
4.2
100 73
749
13.7
88
54
71
76
31
53
53
3.7
88 75
743
14.6
86
57
70
85
36
58
55
3.7
89 76
710
15.3
77
55
65
89
56
73
S6
3.6
86 76
438
14.4
71
56
62
89
58
76
54
4.0
95 76
352
13.6
67
57
61
89
57
74
53
6.0
145 75
218
12.3
61
52
56
89
64
80
50
3.S
84 73
644
12.9
69
51•
60
89
57
73
51
3.4
83 72
-AVERPLOS.,
551
13.8
74
55
64
87
51
70
53
4.0
96 75
i
744
13.4
76
50
63
88
46
• 68
52
3.6
86 73
722
14.4
77
53
64
89
50
70
54
3.7
88 74
708
14.2
76
52
64
89
51
71
S4
4.0
96 75
610
14.5-
73
53
62
90
S7
76
54
3.6
86 75
643
15.8
76
58
65
88
57
75
57
3.5
83 75
663
16.5
77
59
66
89
59
76
58
3.4
82 76
654
16.5
77
59
66
89
'S8
76
58
3.9
94 77
-AVERAGES:
67.8
15.0
76
55
64
89
54
73
55
3.7
88 75
593
16.3
71
60
64
86
68
79
58
4.7
112 77
SU
16.3
76
60
66
86
59
75
58
3.7
90 77
672
17.1
78
61
68
86
57
74
59
3.7
89 77
624
17.0
80
62
67
88
56
74
59 -3.8
90 78
648
15.6
77
58
67
84
53
70
57
3.6
87 78
697
15.5
78
56
66
88
52
71
56
3.5
83 78
--AVEWKM:
530
16.3
77
60
66
87
58
74
S8
3.8
92 77
578
14.3
74
5S
64
86
54
71
54
3.8
92 75
Ly/d&y*-484=W/sq.m in.*25.4--mri (F-32)*5/9=C mph*.447=mis *.l,-M
FLAGS,---IMMMME
N/A -not avail 8-not in service Y-out of zurxp H-hOUrIy flagged senrere
noo-tad asl,c R--out of range Q-all QC not done F-esfiimafi ed
N/C at oollectW
FACILITY
MANUALITUr
gamins
NON -CONTROLLER
8etlom
TOTAL
ga0am
COST
eS0.95lhcf
MOGRAM ED
gallon
APPLMD
saibm
Saodpois"
Linea King
Bono Koral #1
37,229
3,169
1,8250
65
3,635
362,630•
37,294
6,801
364,4550
$47.30
$8.63
$000•
19.980
565,869
97,181
4,610
403.970
74.553
Bomo Koral,l2
27,127•
90,508-
117,6350
5000•
265,S73
177,051
Adams
2,072
124
2.196
$2,79
319,318
180,521
Memmial M
Memorial #B
18,442•
19,3770
129,5500
147,976•
147,992°
167,353•
$0000
$Me
163,784
133,193
I27,312
103,843
Memorial #C
42,324
15,517
57,841
M.36
405,291
253,025
Delhi
5,515
0
5,515
$7.00
100,974
100,230
Madison
9,384
768
10,152
$12.97
216,022
167,426
Amamm Edge
22.046
96
22,142
$28.02
23,731
16,523
Santa Anita
16,403
5
16,408
$20.81
236,309
100,564
13erit3g0
CMLSOccer #A
68,700
72,956
178
107
68.878
73.063
$97.37
$92.67
354,469
S9,078
225,424
46,296
Cent_Saeaor #B
89,210
854
90,064
$114.23
63,063
56,340
S.W. Senior
36,369
2,537
38,906
$49.35
179.592
67,009
Jerome B.
17,245
44,135
61,380
577.85
444,779
378,297
Jerome W.
34,464
28,924
63,388
$80.39
269,943
191,579
Rosita
3,618
18,160
21,778
$27.62
104,819
98,628
L.B.C.B.
47,390
27,567
74,957
$95.07
169,269
154,608
Owens Drive
8,631
808
9,439
$12.00
223,939
216,694
Labnuy
1,072
2,583
3,655
$4.64
35,959
35,958
Coroner
❑
0
0
$0.00
67,315
67,611
Sasscer park
10.569
18,751
29,320
$37.19
132,902
96,660
Stwn Plant
15.07.1
4,989
20,060
$25.44
42,327
41,494
RTC parking
11,067
2
11,069
$14.09
1 26.658
10,713
City YAM #A
2,176
0
2,176
52.76
80,012
73,997
City Yard #B
CON
113
8,117
$10.29
226,493
209,503
Detention co.
1.818
16,658
19,476
523.43
23,011
16,678
TOTALS JUNE 95 5b6,502
186,S76
753,078
$955.16
5,536,401
4,079,125
FACiLTTY
XAMAL/TEST
gallons
NON -
CONTROLLER
gallons
TOTAL
gallons
COST
Q$0.95/
hct
Sandpointe
44,386
78
44,386
$56.40
Lillie King
814
172
986
$1.25
Bomo Koral 11
2,155
249,379
2510534
$319.04
Bomo Koral #2
4,522
84,641
89,163
$113.09
Adams
1,247
145
1,392
$1.77
Memorial #A
25,376
160,020
185,396
$235.15
Memorial #B
330246
114,786
148,032
$187,76
Memorial #C
69,727
16,218
85,945
$74.59
Delhi
5,490
0
5,490
$6.96
Madison
1,336
932
20268
$2.88
Amazons edge
22,065
105
22,170
$28.12
Santa Anita
20,253
5
20,258
$25.69
Heritage
46,136
1
46,137
$58.52
Cent.Soccer PA
36,321
6.0
36,327
$46.08
Cent.Soccer IB
540180
2.5
54,183
$68.73
S.W. Senior
15,778
81318
24,096
$30.56
Jerome E.
13,803
61729
20,532
$26.04
Jerome W.
10,917
28,469
39,386
$49.96
Rosita
4,560
12,337
16,897
$21.43
L.B.C.H.
40;349
1
40,350
$25.69
Owens Drive
6,050
121F338
18,388
$23.32
Library
44
4,706
4,750
$6.02
Coroner,
0
0
0
$0.00
Sasscer park
4,775
30,150
34,925
$44.29
Steam Plant
6,112
201
6,313
$8.01
RTC parking
558
0
558
$0.71
City yard ,1`A
2,050
32
2,082
$2.64
City yard IB
7,814
15
7,829
$9.93
Detention ctr.
351
7,987
8,338
$10.58
TOTALS MAY 95
480p415
1737o774
1,218,189
$1,545