Loading...
HomeMy WebLinkAboutItem 19 - Resolution Repealing Resolution No. 2019-107 Regarding 2525 N Main St. Planning and Building Agency www.santa-ana.org/pba Item # 19 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report February 4, 2025 TOPIC: Resolution Repealing Resolution No. 2019-107 regarding 2019 environmental approvals for the project located at 2525 North Main Street AGENDA TITLE Resolution Repealing Resolution No. 2019-107 Regarding 2019 Environmental Approvals for Project Located at 2525 North Main Street RECOMMENDED ACTION Adopt a Resolution repealing Resolution No. 2019-107 (1) adopting environmental findings of fact pursuant to the California Environmental Quality Act; (2) certifying the final environmental impact report (SCH #2018021031), (3) adopting a statement of overriding considerations for the proposed project, (4) adopting the mitigation monitoring and reporting program, and (5) approving the proposed Addington multifamily residential project located within the City of Santa Ana at 2525 North Main Street. RESOLUTION NO. 2025-XXX entitled A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA RESCINDING RESOLUTION NO. 2019-107 (1) ADOPTING ENVIRONMENTAL FINDINGS OF FACT PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, (2) CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT (SCH #2018021031), (3) ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR THE PROPOSED PROJECT, (4) ADOPTING THE MITIGATION MONITORING AND REPORTING PROGRAM, AND (5) APPROVING THE PROPOSED ADDINGTON MULTI-FAMILY RESIDENTIAL PROJECT LOCATED WITHIN THE CITY OF SANTA ANA AT 2525 NORTH MAIN STREET GOVERNMENT CODE §84308 APPLIES: Yes DISCUSSION Project Approval Background In July 2019, the Project, consisting of a 476 unit residential development, was Resolution Repealing Resolution No. 2019-107 regarding 2019 environmental approvals for the project located at 2525 North Main Street February 4, 2025 Page 2 4 8 2 8 presented to the City Council. The City Council remanded the Project back to the Planning Commission for further consideration. In August 2019, the Project went to the Planning Commission with a reduction in the number of units, density, and number of stories. The vote resulted in an impasse. On October 28, 2019, the Planning Commission voted not to recommend certification of the EIR to the City Council and to deny the proposed development and related Project approvals. On November 19, 2019, the Project was presented to the City Council for consideration. This included certification and adoption of the Final Environmental Impact Report (Final EIR), clarification to the Final EIR document, a mitigation monitoring and reporting program, and a statement of overriding conditions; Development Agreement; General Plan amendment to change the land use designation of the property from Professional and Administrative Office (PAO) to District Center (DC); Amendment application to rezone the property from Professional (P) to Specific Development No. 93 (SD-93). The first reading of the zone change and development agreement were approved along with the Final EIR and mitigation monitoring program. On December 3, 2019, the second reading of the ordinances was held. The matter was continued to December 17, 2019 and then to January 21, 2020. On January 21, 2020, the zone change and development agreement ordinances were adopted. A Referendum petition regarding the zone change was circulated and ultimately successful. On May 5, 2020, the City Council rescinded approval of the zone change for the Project. CEQA Litigation In January 2020, the City was served with litigation alleging violation of the California Environmental Quality Act (“CEQA”) brought by Santa Ana Citizens for Responsible Development against the City and the developer of the Project, AC2525 Main LLC (Real Party in Interest). The matter was settled in December 2024 with no payment of monies on behalf of the City. The settlement included an agreement not to rely upon the EIR for any future development of the property. Staff recommends rescinding Resolution No. 2019-107 relating to approval of the Final EIR. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT There is no fiscal impact associated with this action. Resolution Repealing Resolution No. 2019-107 regarding 2019 environmental approvals for the project located at 2525 North Main Street February 4, 2025 Page 3 4 8 2 8 EXHIBIT(S) 1. Resolution 2. Resolution No. 2019-107 Submitted By: Minh Thai, Executive Director of Planning and Building Agency Approved By: Alvaro Nuñez, City Manager Resolution No. 2025-xx Page 1 of 5 RESOLUTION NO. 2025-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA RESCINDING RESOLUTION NO. 2019-107 (1) ADOPTING ENVIRONMENTAL FINDINGS OF FACT PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, (2) CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT (SCH #2018021031), (3) ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR THE PROPOSED PROJECT, (4) ADOPTING THE MITIGATION MONITORING AND REPORTING PROGRAM, AND (5) APPROVING THE PROPOSED ADDINGTON MULTI-FAMILY RESIDENTIAL PROJECT LOCATED WITHIN THE CITY OF SANTA ANA AT 2525 NORTH MAIN STREET WHEREAS, AC 2525 Main, LLC (“AC 2525”) sought to develop the Addington Multi-Family Residential Project (“Project”), originally proposed as a 496-unit multi- family residential project on a 5.93-acre site at 2525 North Main Street in Santa Ana, California (“Project Site”); and WHEREAS, on January 14, 2019, the Planning Commission conducted a duly noticed public hearing to consider the EIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, seventy-nine (79) members of the public spoke on the item, thirty (30) speakers supported the project, forty-eight (48) opposed it and one speaker was neutral. After hearing all relevant testimony from staff, the public and the City’s consultant team, the Planning Commission voted to recommend that the City Council not certify the EIR or adopt the findings, the statement of overriding considerations and the mitigation monitoring and reporting program and deny the Project; and WHEREAS, on February 5, 2019, the City Council conducted a duly noticed public hearing to consider the EIR, Development Agreement No. 2018 -01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, sixty-one (61) members of the public spoke on the item, thirty-eight (38) speakers supported the project, twenty (20) speakers opposed it and three (3) speakers were neutral and the public hearing was continued to the next regular adjourned City Council meeting on February 19, 2019; and WHEREAS, on February 19, 2019, the City Council continued to conduct the duly noticed public hearing to consider the EIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, one hundred and thirty-one (131) members of the public spoke on the item, twenty-six (26) speakers supported the project and one hundred and five (105) speakers opposed it. Furthermore, one hundred and sixty-six (166) written comments were received with nine (9) in support and one Resolution No. 2025-xx Page 2 of 5 hundred and fifty-seven (157) in opposition. After hearing all relevant testimony from staff, the public and the City’s consultant team, the City Council voted that the applications go back to the Planning Commission for reconsideration after further consultation with the community; and WHEREAS, in June 2019, the applicant submitted a revised plan consisting of development 347 multi-family units (59 dwelling units per acre), with 642 parking spaces (1.85 parking spaces per unit) and parking capacity at 2.0 spaces per unit, within a 4 - story residential building wrapped around a five-level parking structure with an amenity deck on the sixth-level, private open space, and redesigned the intersection of Main Street and Walkie Way/Santiago Park Drive to provide access to the project on a 5.93 - acre site (the “June Revised Plan”); and WHEREAS, on August 12, 2019, the Planning Commission conducted a duly noticed public hearing to consider the June Revised Plan. At the meeting, seventy- seven (77) members of the expressed opposition; nine (9) supported the project, and one speaker was neutral. In addition, one-hundred (100) written comments were received with six (6) in support and ninety-four (94) in opposition. After hearing all relevant testimony from staff, the public and the City’s consultant team, the Planning Commission vote resulted in an impasse; and WHEREAS, in October 2019, in response to comments received the applicant submitted a further revised plan including redevelopment of the 5.93-acre site with 444,534 square feet of total development, including 277,281 square feet of residential buildings that would provide 256 for-rent multi-family residential units and a 167,253 square foot central parking structure and a 284 space surface level parking lot which also reduced the Project’s height, increased the Project’s setbacks, and modified the Project entrance (“October Modified Project”); and WHEREAS, the City prepared “Clarifications to the Final EIR” to determine if the October Modified Project would result in new or substantially increased environmental effects than those analyzed in the EIR such that the EIR would require recirculation prior to its certification; and WHEREAS, the Clarifications to the Final EIR include detailed analysis, based upon substantial evidence, that demonstrate that the Modified Project would not result in any new or substantially greater impacts than are disclosed in the EIR, no new mitigation measures beyond those identified in the EIR are required, and no additional feasible alternatives or mitigation measures considerably different from others previously analyzed would clearly lessen the significant environmental impacts of the project; and WHEREAS, on October 28, 2019, the Planning Commission conducted a duly noticed public hearing to consider the EIR, Development Agreement No. 2018 -01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, sixty-two (62) expressed opposition and two (2) in expressed support the project. In addition, ninety-eight (98) individuals submitted comments with ninety-four (94) in opposition and four (4) in support; and Resolution No. 2025-xx Page 3 of 5 WHEREAS, after hearing all relevant testimony from staff, the public and the City’s consultant team, the Planning Commission by a vote of 3:2, voted to recommend denial of the project. Since the entitlements required final action by the City Council, the actions were forwarded to the City Council; and WHEREAS, on November 19, 2019, the City Council conducted a duly noticed public hearing to consider the EIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and at which hearing members of the public were afforded an opportunity to comment upon Environmental Impact Report No. 2018-01. After hearing all relevant testimony from staff, the public and the City’s consultant team, the City Council voted to certify the EIR, adopt the findings, the statement of overriding considerations and the mitigation monitoring and reporting program and approve the October Modified Project; and WHEREAS, the “EIR” consists of the Final EIR, Clarifications to the Final EIR, and all attachments and appendices to both the Final EIR and the Clarifications to the Final EIR, as well as the Draft EIR and its attachments and appendices (as modified by the Final EIR); and WHEREAS, on November 19, 2019, the Project was presented to the City Council for consideration. This included certification and adoption of the Final Environmental Impact Report (Final EIR), clarification to the Final EIR document, a mitigation monitoring and reporting program, and a statement of overriding conditions; Development Agreement; General Plan amendment to change the land use designation of the property from Professional and Administrative Office (PAO) to District Center (DC); Amendment application to rezone the property from Professional (P) to Specific Development No. 93 (SD-93). The first reading of the zone change and development agreement were approved along with the Final EIR and mitigation monitoring program. WHEREAS, on December 3, 2019, the second reading of the ordinances was held. The matter was continued to December 17, 2019 and then to January 21, 2020. WHEREAS, on January 21, 2020, the zone change and development agreement ordinances were adopted. WHEREAS, the Project approved entailed, among other things, (1) demolition of the existing 81,172 square foot vacant two -story office building and 442-space surface parking lot on the Project Site; (2) redevelopment of the 5.93 -acre site with 444,534 square feet of total development, including 277,281 square feet of residential buildings that would provide 256 for-rent multi-family residential units and a 167,253 square foot central parking structure and a 284 space surface level parking lot for residential and commercial parking; (3) approval of Development Agreement No. 2018-01 between the City of Santa Ana (“City”) and Applicant; (4) approval of General Plan Amendment No. 2018-06, which would change the Project Site’s existing land use designation of Professional & Administration Office (PAO) to District Center (DC); and (5) approval of Amendment Application No. 2018-10, which would change the zoning of the Project Site from Professional (P) to Specific Development No. 93 (SD-93) designation; and Resolution No. 2025-xx Page 4 of 5 WHEREAS, the approved Project included review and certification of an Environmental Impact Report (the “EIR”) (SCH# 2018021031) (Environmental Impact Report No. 2018-01), and approval of Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10; and WHEREAS, a Referendum petition regarding the zone change was circulated and gathered sufficient signatures for placement on the ballot . On May 5, 2020, the City Council rescinded approval of the zone change for the Project. WHEREAS, in January 2020, the City was served with litigation alleging violation of the California Environmental Quality Act brought by Santa Ana Citizens for Responsible Development regarding the environmental approvals for the Project. WHEREAS, the matter settled in December 2024 and the settlement included an agreement not to rely upon the EIR for any future development of the property. WHEREAS, the Santa Ana City Council intends to rescind Resolution No. 2019- 107 relating to approval of the Final EIR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The City Council of the City of Santa Ana hereby finds, determines and declares as follows: The City Council hereby rescinds Resolution No. 2019-107 (1) adopting environmental findings of fact pursuant to the California Environmental Quality Act; (2) certifying the final environmental impact report (SCH #2018021031), (3) adopting a statement of overriding considerations for the proposed project, (4) adopting the mitigation monitoring and reporting program, and (5) approving the proposed Addington multifamily residential project located within the City of Santa Ana at 2525 North Main Street. Section 2. This Resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall attest to and certify the vote adopting this Resolution. ADOPTED this ___ day of February, 2025. _______________________ Valerie Amezcua Mayor Resolution No. 2025-xx Page 5 of 5 APPROVED AS TO FORM: Sonia R. Carvalho City Attorney By:________________________ Laura A. Rossini Chief Assistant City Attorney AYES: Councilmembers ___________________________________ NOES: Councilmembers ___________________________________ ABSTAIN: Councilmembers ___________________________________ NOT PRESENT: Councilmembers ___________________________________ CERTIFICATE OF ATTESTATION AND ORIGINALITY I, Jennifer L. Hall, City Clerk, do hereby attest to and certify the attached Resolution No. 2025-xxx to be the original resolution adopted by the City Council of the City of Santa Ana on February ___, 2025. Date: ____________ ____________________________ Jennifer L. Hall City Clerk City of Santa Ana LS 11.19.19 RESOLUTION NO. 2019-107 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA (1) ADOPTING ENVIRONMENTAL FINDINGSOFFACTPURSUANTTOTHECALIFORNIA ENVIRONMENTAL QUALITY ACT, (2) CERTIFYING THEFINALENVIRONMENTALIMPACTREPORT (SCH 2018021031), (3) ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR THE PROPOSEDPROJECT, (4) ADOPTING THE MITIGATION MONITORING AND REPORTING PROGRAM, AND (5) APPROVING THE PROPOSED ADDINGTON MULTI- FAMILY RESIDENTIAL PROJECT LOCATED WITHIN THE CITY OF SANTA ANA AT 2525 NORTH MAIN STREET BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA ASFOLLOWS: Section 1. The City Council of the City of Santa Ana hereby finds, determinesanddeclaresasfollows: WHEREAS, AC 2525 Main, LLC ("Applicant") seeks to develop the AddingtonMulti -Family Residential Project ("proposed Project"), originally proposed as a 496-unitmulti -family residential project on a 5.93-acre site at 2525 North Main Street in SantaAna, California ("Project Site'); and WHEREAS, during the entitlement and environmental review process, and inresponsetocommentsandconcernsraisedbythepublicandtheCity's electedofficials, the Applicant has proposed modifications to the original proposal; and WHEREAS, the Project as currently proposed now entails, among other things, 1) demolition of the existing 81,172 square foot vacant two-story office building and442-space surface parking lot on the Project Site; (2) redevelopment of the 5.93-acresitewith444,534 square feet of total development, including 277,281 square feet ofresidentialbuildingsthatwouldprovide256for -rent multi -family residential units and a167,253 square foot central parking structure and a 284 space surface level parking lotforresidentialandcommercialparking; (3) approval of Development Agreement No. 2018-01 between the City of Santa Ana ("City") and Applicant; (4) approval of GeneralPlanAmendmentNo. 2018-06, which would change the Project Site's existing land usedesignationofProfessional & Administration Office (PAO) to District Center (DC); and5) approval of Amendment Application No. 2018-10, which would change the zoning oftheProjectSitefromProfessional (P) to Specific Development No. 93 (SD-93) designation; and Resolution No. 2019-107 Page 1 of 11 WHEREAS, the proposed Project has been submitted and requires review and certification of an Environmental Impact Report (the "EIR") (SCH# 2018021031) Environmental Impact Report No. 2018-01), and approval of Development AgreementNo. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10; and WHEREAS, the Project Site is located at the northeast corner of North MainStreetandEdgewoodRoadandthepropertiesimmediatelyadjacenttothesiteincludeSantiagoParktothenorth, single-family residential homes to the south and east andtheDiscoveryScienceCenterofOrangeCountyacrossMainStreettothewest. TheProjectSiteislocatedonNorthMainStreet, an urban corridor within the City. TheProjectSiteisalsolocatedatamainentrypointtotheParkSantiagoNeighborhood, aresidentialneighborhoodpredominantlycomprisedofdetachedsingle-family dwellings; and WHEREAS, pursuant to section 21067 of the Public Resources Code, andsection15367oftheStateCEQAGuidelines (California Code of Regulations, Title 14, § 15000 et seq.), the City of Santa Ana is the lead agency for the proposed Project; and WHEREAS, in accordance with State CEQA Guidelines section 15063, the CityconductedanInitialStudytodetermineiftheProjectmayhaveasignificanteffectontheenvironmentandtoevaluatewhetheranEnvironmentalImpactReport ("EIR") was required; and WHEREAS, after conducting the Initial Study, the City determined that an EIRshouldbepreparedtoevaluatetheproposedProject's potential to have a significanteffectontheenvironmentinthefollowingareas: Aesthetics, Air Quality, BiologicalResources, Cultural Resources, Greenhouse Gas Emissions, Hazards and HazardousMaterials, Land Use and Planning, Noise, Population and Housing, Public Services, Recreation, Transportation/Traffic, and Utilities; and WHEREAS, based on the Initial Study, the City further determined that impactstoAestheticsregardingscenicresourcesincluding, but not limited to, trees, rockoutcroppings, and historic buildings within a state scenic highway; to Agriculture andForestryResourcesregardingfarmland; agricultural land, forest land timberland orconversionof; to Biological Resources regarding wetlands, conflicts with a treepreservationpolicyorordinance, conflicts with a Habitat Conservation Plan or NaturalCommunityConservationPlan; to Geology and Soils regarding a known earthquakefault, landslides, or soils incapable of adequately supporting septic tanks or waste waterdisposal; to Hazards regarding sites listed on a hazardous materials site, an airport land use plan, private airstrip or wildland fires; to Hydrology and Water Quality regardinghousingwithina100-year flood hazard area; to Land Use and Planning regardingconflictswithaHabitatConservationPlanorNaturalCommunityConservationPlan; toMineralResourcesregardinglossofamineralresourcetotheregionorlocally; to Noiseregardingconflictswithanairportlanduseplanorprivateairstrip; Population andHousingregardingdisplacingexistinghousingnecessitatingreplacementhousingor Resolution No. 2019-107 Page 2 of 11 LS 11.19.19 displacing substantial number of persons necessitating construction of replacementhousing; to Transportation/Traffic regarding a change in air traffic patterns; to UtilitiesandServiceSystemsregardingfederal, state and local solid waste regulations wouldhavenoimpactorbelessthansignificantandthusneednotbeanalyzedfurtherintheEIR; and WHEREAS, in accordance with State CEQA Guidelines section 15082, onFebruary12, 2018, the City sent to the Office of Planning and Research and eachresponsibleandtrusteeagencyaNoticeofPreparation ("NOP") - which was also published in the Orange County Register, a newspaper of general circulation - statingthatanEnvironmentalImpactReport (State Clearinghouse Number #2018021031) would be prepared; and WHEREAS, during the public comment period, copies of the Initial Study wereavailableforreviewandinspectionatCityHall (20 Civic Center Plaza), on the City'swebsite, and at the Santa Ana Public Library (26 Civic Center Plaza); and WHEREAS, pursuant to Public Resources Code section 21083.9 and StateCEQAGuidelinessections15082(c) and 15083, the City held a duly noticed ScopingMeetingonMarch1, 2018, to solicit comments on the scope of the environmentalreviewoftheproposedProject; and WHEREAS, one hundred and sixty-three (163) comment letters were received inresponsetotheNOP; and WHEREAS, a Draft Environmental Impact Report ("Draft EIR") was prepared fortheproposedProject, addressing comments received in response to the NOP and evaluating the proposed Project's potentially significant environmental impacts; and WHEREAS, the Draft EIR concluded that the proposed Project would have asignificantandunavoidableimpacttoAestheticswiththeimplementationofmitigation measures regarding the existing visual character of the Project Site and its surroundings, as implementation of the proposed Project would result in a significantandunavoidablechangeinvisualscale, height, and setbacks from Santiago Park, Edgewood Road, and North Bush Street; and WHEREAS, the Draft EIR further determined that mitigation measures wererequiredtomitigateimpactstoalessthansignificantlevelforthefollowingresourceareas: Air Quality, Biological Resources, Hazards and Hazardous Materials, Noise, andTribalCulturalResources; and WHEREAS, in accordance with State CEQA Guidelines section 15085, a NoticeofCompletionwaspreparedandfiledwiththeOfficeofPlanningandResearchonAugust7, 2018; and Resolution No. 2019-107 Page 3 of 11 WHEREAS, as required by State CEQA Guidelines section 15087(a), the City provided a Notice of Availability of the Draft EIR to the public - and published the NoticeofAvailabilityintheOrangeCountyRegister - at the same time that the City sent aNoticeofCompletiontotheOfficeofPlanningandResearchonAugust7, 2018; and WHEREAS, during the public comment period, copies of the Draft EIR andtechnicalappendiceswereavailableforreviewandinspectionatCityHall (20 CivicCenterPlaza), on the City's website, and at the Santa Ana Public Library (26 Civic Center Plaza); and WHEREAS, during the public comment period, on August 27, 2018, the PlanningCommissionheldadulynoticedpublichearingtoreceivecommentsontheDraftEnvironmentalImpactReportpursuanttoStateCEQAGuidelinessection15087(i); and WHEREAS, in response to a request from Chatten-Brown & Cartens LLP, on behalf of the North Santa Ana Preservation Alliance, the City extended the DraftEnvironmentalImpactReportpublicreviewandcommentperiodtoOctober4, 2018 to allow additional time for public review and input; and WHEREAS, consistent with State CEQA Guidelines section 15087(e), the DraftEIRwascirculatedfora59-day review period, from August 7, 2018 to October 4, 2018; and WHEREAS, during the 59-day public comment period, the City consulted with and requested comments from all responsible and trustee agencies, other regulatoryagencies, and others pursuant to State CEQA Guidelines section 15086; and WHEREAS, the City received forty-four (44) written comment letters and six (6) verbal comments on the Draft EIR at the August 27, 2018 public hearing, including awrittenacknowledgementfromtheStateClearinghousethattheCityhascompliedwith CEQA environmental review requirements; and WHEREAS, pursuant to Public Resources Code section 21092.5, on November15, 2018, the City provided copies of its responses to commenting public agencies andinterestedorganizationsandpartiesmorethanten (10) days prior to the City's consideration of the Final EIR; and WHEREAS, on November 15, 2018, the City released the Final EIR ("Final EIR"), which consists of the Draft EIR, all technical appendices prepared in support of the DraftEIR, all written comment letters received on the Draft EIR, written responses to allwrittencommentlettersreceivedandverbalcommentsreceivedontheDraftEIR, revisions to the Draft EIR and technical appendices, and the Mitigation Monitoring and Reporting Program; and WHEREAS, on November 26, 2018, the Planning Commission continued a duly noticed public hearing for the project to January 14, 2019 and held a second study Resolution No. 2019-107 Page 4 of 11 LS 11.19.19 session to overview the Project and fifty-eight (58) verbal comments were receivedtwenty-five (25) in support; thirty (31) in opposition and two (2) neutral) and eleven (11) written comments were received (two (2) in support and nine (9) in opposition); and WHEREAS, on January 14, 2019, the Planning Commission conducted a dulynoticedpublichearingtoconsidertheEIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, seventy-nine (79) members of the public spoke on the item, thirty (30) speakers supported the project, forty-eight (48) opposed it and one speaker was neutral. After hearing all relevant testimony from staff, the public and the City's consultant team, the Planning Commission voted to recommend that the City Council not certify the EIR or adopt the findings, the statementofoverridingconsiderationsandthemitigationmonitoringandreportingprogramanddenytheProject; and WHEREAS, on February 5, 2019, the City Council conducted a duly noticedpublichearingtoconsidertheEIR, Development Agreement No. 2018-01, General PlanAmendmentNo. 2018-06, and Amendment Application No. 2018-10 and solicited comments on the EIR. At the meeting, sixty-one (61) members of the public spoke ontheitem, thirty-eight (38) speakers supported the project, twenty (20) speakers opposeditandthree (3) speakers were neutral and the public hearing was continued to the next regular adjourned City Council meeting on February 19, 2019; and WHEREAS, on February 19, 2019, the City Council continued to conduct thedulynoticedpublichearingtoconsidertheEIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 andsolicitedcommentsontheEIR. At the meeting, one hundred and thirty-one (131) members of the public spoke on the item, twenty-six (26) speakers supported theprojectandonehundredandfive (105) speakers opposed it. Furthermore, one hundredandsixty-six (166) written comments were received with nine (9) in support and one hundred and fifty-seven (157) in opposition. After hearing all relevant testimony fromstaff, the public and the City's consultant team, the City Council voted that the applications go back to the Planning Commission for reconsideration after furtherconsultationwiththecommunity; and WHEREAS, in June 2019, the applicant submitted a revised plan consisting ofdevelopment347multi -family units (59 dwelling units per acre), with 642 parking spaces1.85 parking spaces per unit) and parking capacity at 2.0 spaces per unit, within a 4- story residential building wrapped around a five -level parking structure with an amenitydeckonthesixth -level, private open space, and redesigned the intersection of MainStreetandWalkieWay/Santiago Park Drive to provide access to the project on a 5.93- acre site (the "June Revised Plan"); and WHEREAS, on August 12, 2019, the Planning Commission conducted a dulynoticedpublichearingtoconsidertheJuneRevisedPlan. At the meeting, seventy- seven (77) members of the expressed opposition; nine (9) supported the project, and Resolution No. 2019-107 Page 5 of 11 one speaker was neutral. In addition, one -hundred (100) written comments werereceivedwithsix (6) in support and ninety-four (94) in opposition. After hearing allrelevanttestimonyfromstaff, the public and the City's consultant team, the Planning Commission vote resulted in an impasse; and WHEREAS, in October 2019, in response to comments received the applicantsubmittedafurtherrevisedplanincludingredevelopmentofthe5.93-acre site with444,534 square feet of total development, including 277,281 square feet of residentialbuildingsthatwouldprovide256for -rent multi -family residential units and a 167,253squarefootcentralparkingstructureanda284spacesurfacelevelparkinglotwhichalsoreducedtheProject's height, increased the Project's setbacks, and modified the Project entrance ("October Modified Project"); and WHEREAS, the City has prepared "Clarifications to the Final EIR" to determine iftheOctoberModifiedProjectwouldresultinneworsubstantiallyincreasedenvironmentaleffectsthanthoseanalyzedintheEIRsuchthattheEIRwouldrequire recirculation prior to its certification; and WHEREAS, the Clarifications to the Final EIR include detailed analysis, baseduponsubstantialevidence, that demonstrate that the Modified Project would not resultinanyneworsubstantiallygreaterimpactsthanaredisclosedintheEIR, no newmitigationmeasuresbeyondthoseidentifiedintheEIRarerequired, and no additionalfeasiblealternativesormitigationmeasuresconsiderablydifferentfromotherspreviouslyanalyzedwouldclearlylessenthesignificantenvironmentalimpactsofthe project; and WHEREAS, on October 28, 2019, the Planning Commission conducted a dulynoticedpublichearingtoconsidertheEIR, Development Agreement No. 2018-01, General Plan Amendment No. 2018-06, and Amendment Application No. 2018-10 andsolicitedcommentsontheEIR. At the meeting, sixty-two (62) expressed opposition andtwo (2) in expressed support the project. In addition, ninety-eight (98) individualssubmittedcommentswithninety-four (94) in opposition and four (4) in support; and WHEREAS, after hearing all relevant testimony from staff, the public and theCity's consultant team, the Planning Commission by a vote of 3:2, voted to recommenddenialoftheproject. Since the entitlements require final action by the City Council, the actions were forwarded to the City Council; and WHEREAS, on November 8, 2019, the City gave public notice of a City Council public hearing for consideration of Environmental Impact Report No. 2018-01 (StateClearinghouseNumber #2018021031) by advertising in the Orange County Register, anewspaperofgeneralcirculation, and by mailing to owners of property and residents within 500 feet of the Project; and WHEREAS, on November 19, 2019, the City Council conducted a duly noticed public hearing to consider the EIR, Development Agreement No. 2018-01, General Plan Resolution No. 2019-107 Page 6 of 11 LS 11.19.19 Amendment No. 2018-06, and Amendment Application No. 2018-10 and at whichhearingmembersofthepublicwereaffordedanopportunitytocommentuponEnvironmentalImpactReportNo. 2018-01. After hearing all relevant testimony fromstaff, the public and the City's consultant team, the City Council voted to certify the EIR, adopt the findings, the statement of overriding considerations and the mitigation monitoring and reporting program and approve the October Modified Project; and WHEREAS, the "EIR" consists of the Final EIR, Clarifications to the Final EIR, and all attachments and appendices to both the Final EIR and the Clarifications to theFinalEIR, as well as the Draft EIR and its attachments and appendices (as modified bytheFinalEIR); and WHEREAS, all potentially significant adverse environmental impacts weresufficientlyanalyzedintheEIR; and WHEREAS, as contained herein, the City Council has endeavored in good faithtosetforththebasisforitsdecisionandrecommendationsontheProject; and WHEREAS, all of the requirements of the Public Resources Code and the StateCEQAGuidelineshavebeensatisfiedbytheCityinconnectionwiththepreparationoftheEIR, which is sufficiently detailed so that all of the potentially significantenvironmentaleffectsoftheProjecthavebeenadequatelyevaluated; and WHEREAS, all of the findings and conclusions made by the City CouncilPursuanttothisResolutionarebasedupontheoralandwrittenevidencepresentedtoitasawholeandtheentiretyoftheadministrativerecordfortheProject, which areincorporatedhereinbythisreference, and not based solely on the information providedinthisResolution; and WHEREAS, the City Council finds that the Project's significant environmentalimpactsthatcannotbemitigatedtoalessthansignificantlevelevenwiththeincorporationofallfeasiblemitigationmeasures, as identified in the EIR, are describedinSection7oftheCEQAFindingsofFact, attached hereto as Exhibit "A"; and WHEREAS, the City Council finds that the Project's environmental impacts thatarelessthansignificantwiththeincorporationofmitigationmeasures, as identified intheEIR, are described in Section 8 of the Findings of Fact, attached hereto as ExhibitA"; and WHEREAS, the City Council finds that environmental impacts that are identifiedintheEIRaslessthansignificantanddonotrequiremitigationaredescribedinSection9oftheFindingsofFact, attached hereto as Exhibit "A"; and WHEREAS, the cumulative impacts of the Project identified in the EIR aredescribedinSection9.17 of the Findings of Fact, attached hereto as Exhibit "A'; and Resolution No. 2019-107 Page 7 of 11 WHEREAS, the potential significant and irreversible environmental changes thatwouldresultfromtheproposedProjectidentifiedintheEIRandsetforthherein, aredescribedinSection10oftheFindingsofFact, attached hereto as "Exhibit A"; and WHEREAS, the existence of any growth -inducing impacts resulting from theproposedProjectidentifiedintheEIRandsetforthherein, are described in Section 11oftheFindingsofFact, attached hereto as Exhibit "A"; and WHEREAS, alternatives to the proposed Project that might further reduce theproposedProject's environmental impacts are described in Section 12 of the Findings of Fact, attached hereto as Exhibit "A"; and WHEREAS, prior to taking action, the City Council has heard, been presented with, reviewed and considered all of the information and data in the administrativerecord, including but not limited to the EIR, and all oral and written evidence presented to it during all meetings and hearings; and WHEREAS, the EIR reflects the independent judgment of the City Council and isdeemedadequateforpurposesofmakingdecisionsonthemeritsoftheProject; and WHEREAS, no comments made in the public hearing conducted by the CityCouncilandnoadditionalinformationsubmittedtotheCityhaveproducedsubstantialnewinformationrequiringrecirculationoftheEIRoradditionalenvironmentalreviewoftheProjectunderPublicResourcesCodesection21092.1 and State CEQA Guidelines section 15088.5; andWHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred; and NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA ANA DOES RESOLVE, DETERMINE, FIND, AND ORDER AS FOLLOWS: 1. The City Council hereby finds that it has been presented with theEIR, which it has reviewed and considered, and further finds that the EIR is an accurate and objective statement that has beencompletedinfullcompliancewithCEQAandtheStateCEQAGuidelines, and that the EIR reflects the independent judgment and analysis of the City. 2. The City Council declares that no evidence of new significant impacts or any new information of "substantial importance", asdefinedbyStateCEQAGuidelinessection15088.5, has beenreceivedbytheCityaftercirculationoftheDraftEIRthatwould require recirculation of the EIR. NOW THEREFORE, THE CITY COUNCIL HEREBY: Resolution No. 2019-107 Page 8 of 11 LS 11.19.19 1. Adopts the Findings of Fact, attached hereto and incorporated herein as Exhibit "A." 2. Certifies the EIR based on the entirety of the record of proceedings. 3. Adopts the Statement of Overriding Considerations, attached hereto and incorporated herein as Exhibit "B", after balancing the significant and unavoidable aesthetic impacts of the Project against the benefits of the Project. 4. Adopts the Mitigation Monitoring and Reporting Program attached hereto and incorporated herein as Exhibit "C", consistent with Public Resources Code section 21081.6; make implementation of the Mitigation Measures contained in the Mitigation Monitoring and Reporting Program a condition of approval of the Project; and find that in the event of any inconsistencies between the Mitigation Measures set forth herein and the Mitigation Monitoring and Reporting Program, the Mitigation Monitoring and Reporting Program shall control. 5. Directs City staff to cause a Notice of Determination to be filed and posted with the County of Orange Registrar-Recorder/County ClerkandtheStateClearinghousewithinfive (5) working days of the City Council's final Project approval. Section 2. INDEMNIFICATION. The Applicant has agreed to and shall indemnify, protect, defend and hold the City and/or any of its officials, officers, employees, agents, departments, agencies, authorized volunteers, and instrumentalitiesthereof, harmless from any and all claims, demands, lawsuits, writs of mandamus, and other proceedings (whether legal, equitable, declaratory, administrative or adjudicatoryinnature), and alternative dispute resolution procedures (including, but not limited toarbitrations, mediations, and such other procedures), judgments, orders, and decisions collectively "Actions"), brought against the City and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, any action of, or any permit or approval issued by the City and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City) for or concerning the Project, whether such ActionsarebroughtundertheRalphM. Brown Act, California Environmental Quality Act, the Planning and Zoning Law, the Subdivision Map Act, Code of Civil Procedure sections1085or1094.5, or any other federal, state or local constitution, statute, law, ordinance, charter, rule, regulation, or any decision of a court of competent jurisdiction. It is expressly agreed that the City shall have the right to approve, which approval will not beunreasonablywithheld, the legal counsel providing the City's defense, and thatApplicantshallreimbursetheCityforanycostsandexpensesdirectlyandnecessarily incurred by the City in the course of the defense. City shall promptly notify the Applicant Resolution No. 2019-107 Page 9 of 11 of any Action brought and City shall cooperate with Applicant in the defense of theAction. Section 3. EXECUTION OF RESOLUTION. The Mayor shall sign this ResolutionandtheClerkoftheCouncilshallattestandcertifytotheadoptionthereof. ADOPTED this 19th day of November . 2019. APPROVED AS TO FORM: Sonia R. Carvalho City Attorney By: c Lisa Storck Assistant City Attorney AYES: Councilmembers NOES: ABSTAIN: NOT PRESENT: Councilmembers Councilmembers Councilmembers Iglesias, Pena loza, Sarmiento Solorio(4) Bacerra Pulido Ville as 3 None (0) None (0) CERTIFICATE OF ATTESTATION AND ORIGINALITY I, DAISY GOMEZ, Clerk of the Council, Resolution No. 2019-107 to be the original City of Santa Ana on November 19, 2019 Date: // Resolution No. 2019-107 Page 10 of 11 do hereby attest to and certify the attached resolution adopted by the City Council of the Daisy Gomez Clerk of the Council City of Santa Ana LS 11.19.19 FOR EXHIBITS REFERENCE LASERFICHE Resolution No. 2019-107 Page 11 of 11