Loading...
HomeMy WebLinkAbout75-172KLG:nr RESOLUTION NO. 75-172 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA STATING ITS PREFERENCE FOR A FLOOD CONTROL PLAN FOR THE SANTA ANA RIVER WHEREAS, by Resolution No. F74-69, dated August 13, 1974, the Orange County Board of Supervisors expressed preference for a flood control plan developed for the Santa Ana River by the U. S. Army Corps of Engineers and identified as "Plan F"; and WHEREAS, the Corps of Engineers has completed a draft review report dated August 1975 entitled "Review Report on the Santa Ana River Main Stem and Santiago Creek"; and WHEREAS, "Plan F" has been changed somewhat and re- designated as "Alternative 6"; and WHEREAS, the Corps of Engineers recommends in said report the approval of a flood protection plan known as "Alternative 6" which includes: construction of a new dam and reservoir at Mentone in San Bernardino County; modification of Prado Dam including rebuilding the emergency spillway and outlet works, raising the dam 30 feet and providing a controlled discharge of 30,000 cubic feet per second contemporaneous with peak discharges from downstream tributaries; improvement of the Santa Ana River Channel through urban Orange County for standard project flood protection; and improvement of the lower portions of Santiago Creek for standard project flood protection. NOW, THEREFORE, BE IT RESOLVED, that among the alter- natives included by the Corps of Engineers in the August 1975 review report, Alternative 6 is the preference of this City Council by reason of its: Providing a level of protection com~aensurate with the present and projected level of Orange County's economic development. o Limiting the discharge from Prado Dam to 30,000 cubic feet per second contemporaneous with peak discharges from the downstream watershed tributary to the Santa Ana River during the occurrence of a standard project flood, said discharge minimizing the reloca- tion of homes in Orange, Riverside and San Bernardino counties. NOW, THEREFORE, BE IT FURTHER RESOLVED, that this support is based upon the premise that specific design approaches of particular segments of the project will be studied and developed on a cooperative basis with all affected agencies. BE IT FURTHER RESOLVED, that this resolution be for- warded to the District Engineer, Los Angeles District, U. S. Army Corps of Engineers, to all legislators representing Orange County at the state and federal levels and to the Boards of Supervisors of Orange, Riverside and San Bernardino Counties. RESOLUTION NO. 75-172 PAGE TWO PASSED AND ADOPTED by the City Council of the City of Santa Ana at its adjourned regular meeting held on the 8th day of December , 1975. ATTEST: CLERK OF THE COUNCIL STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF SANTA ANA ) I, FLORENCE I. MALONE, do hereby certify that I am the Clerk of the Council of the City of Santa Ana; that the foregoing Resolution was introduced to said Council at its adjourned regular meeting held on the ~8th day of December , 1975, and was at said meeting passed and adopted by the following vote, to wit: AYES, COUNCILMEN: Evans, Brandt, Bricken, Yamamoto, Garthe~ Ward NOES, COUNCILMEN: None ABSENT, COUNCILMEN: 0rtiz CLERK OF THE COUNCIL APPROVED AS TO FORM: KEITH L. GOW CITY ATTORNEY