Loading...
HomeMy WebLinkAbout88-050· BY: ORD/RE O ? - - 8'7 RESOLUTION NO. 88-50 REL :mb(14) 6/15/88 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA SETTING SEWER CONNEC- TION FEES WHEREAS, section 39-53 of the Santa Ana Municipal Code ("SAMC") requires payment of a fee for sewer connections to pay for the cost of sewer construction; and WHEREAS, said SAMC section 39-53 provides that the amount of the fee is based on an assessment per fixture units, except that in the case of parcels not previously connected to a public sewer the fee for the first occupancy unit benefitted by the sewer connection is based upon the standard cost of construction of a sewer main for a distance equal to the lineal street frontage of the subject parcel; and WHEREAS, in accordance with SAMC section 39-53, the assessment per fixture unit and the standard cost of sewer construction per lineal foot of street frontage is to be speci- fied by resolution of the City Council; and WHEREAS, the City Council does now find it necessary to increase the sewer connection fee; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS FOLLOWS: 1. For purposes of SAMC section 39-53, the assess- ment per fixture unit is set at $26.00 and the standard cost of construction of a main sewer line is set at $42.00 per lineal foot. 2. The purpose of the fee is to provide for sewers to meet the sanitation needs of the owners and occupants of property in the City. 3. The use to which the abovesaid Fee will be put is the construction, or reimbursement for construction, of sewers. The public facilities to be financed by the Fee are identified in Exhibit A, attached hereto and incorporated herein. 4. The fee applies to all types of development pro- jects, including residential, commercial, office and industrial, which require connection to the public sewer system. The use of the fee for sewers and the need for such facilities is reasonably related to all types of development projects because all such development projects generate sewage and require the protection from sewage provided by sewers. 5. As used hereinafter "project" means proposed construction activity which is subject to the payment of a sewer connection fee under SAMC sections 34-191 through 34-195 and as to which construction pursuant to a validly issued 335 336 RESOLUTION NO. 88-50 PAGE TWO building permit has not commenced as of the date of adoption of this resolution. 6. Ail previous resolutions of the City Council establishing or increasing sewer connection fees are superseded by this resolution, and the fees established by this resolution shall apply to all projects, except as otherwise hereinafter provided. 7. Any project for which a building permit has been issued prior to the adoption of this resolution shall be subject to the sewer connection fee which applied to such project immediately prior to the adoption of this resolution unless such building permit expires without commencement of construction. ADOPTED this 5th day of July , 1988. ATTEST .' COUNCILMEMBERS: Young A.¥e McGuigan A.¥e Hart Absent M ay Aye Acosta Ave Pulido Ave Griset Aye APPROVED AS TO FORM: ~er City Attor-~ey 5 6 7 8 9 10 11 12 13 14 15 16 ~' 17 18 2O 21 22 23 EXHIBIT A PROJECT IDENTIPICATION SEWER CONNECTION FEE PROJECT San Lorenzo Pump Station Maxine Pump Station & Connecting Sewer 3rd St: Bristol to Flewer 6th St: Bristol to Flower Reserve for Emergency Repair Highland St: Bristol to Flower Richland St: Bristol to Flower Cubbon St: Bristol to Flower Walnut St: Baker to Flower Pine St: Baker to Flower Memory Lane: Arnett to Flower Baker St: 1st to Chestnut Chestnut St:Halladay to Standard Alley bet. 3rd & 4th St: Main to Bush Sullivan St: 1st to 5th Streets Fifth St: Sullivan to 200' E/O Hawley Segerstrcm Ave: Susan to Harbor Tenth Street: Tenth Street: 15th Street: Rosa to Flower Freeman to Flower French to Main Civic Center:Poinsettia to Minter Central: Birch to Main Third Street: Raitt to Pacific PROJECT DESCRIPTION Upgrade Pump Station Sewage Capacity Upgrade Pump Station Sewage Capacity & convert force main to gravity line Upgrade 6" sewer line to 8" sewer line Upgrade 6' sewer line to 10" & 8" sewer lines Emergency repair of sewer lines Upgrade Upgrade Upgrade Upgrade Upgrade Upgrade Upgrade Upgrade 6" sewer line to 8" sewer line 6" sewer line to 8" sewer line 6" line to S" line 6" line to 8" line 6" line to 8" line 15" line to 18" line 12" line to 15" line 6" line,to 8" line Upgrade 6" line to 8" line Upgrade 8" line to 10" lien Construct 10" Sewer line Upgrade 8" line to 12" line Conetruet 8" sewer Line Construct 8" sewer line Construct 8" sewer line Construct 8" sewer line Construct 15" sewer line Upgrade 6" line to 8" line 337