HomeMy WebLinkAbout89-064RESOLUTION NO. 89-064
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA ANA INCREASING SEWER
CONNECTION FEES
WHEREAS, section 39-53 of the Santa Ana Municipal Code
("SAMC") requires payment of a fee for sewer connections to pay
for the cost of sewer construction; and
WHEREAS, said SAMC section 39-53 provides that the
amount of the fee is based on an assessment per fixture units,
except that in the case of parcels not previously connected to a
public sewer the fee for the first occupancy unit benefitted by
the sewer connection is based upon the standard cost of
construction of a sewer main for a distance equal to the lineal
street frontage of the subject parcel; and
WHEREAS, in accordance with SAMC section 39-53, the
assessment per fixture unit and the standard cost of sewer
construction per lineal foot of street frontage is to be specified
by resolution of the City Council; and
WHEREAS, the city Council does now desire to increase
the sewer connection fee;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF SANTA ANA AS FOLLOWS:
1. For ~urposes of SAMC section 39-53, the assessment
per fixture unit is set at $28.00 and the standard cost of
construction of a main sewer line is sst at $44.00 per lineal
foot.
2. The purpose of the fee is to provide for sewers to
meet the sanitation needs of the owners and occupants of property
in the City.
3. The use to which the above said Fee will be put is
the construction, or reimbursement for construction, of sewers.
The public facilities to be financed by the Fee are identified in
Exhibit A, attached hereto and incorporated herein.
4. The fee applies to all types of development
projects, including residential, commercial, office and
industrial, which require connection to the public sewer system.
The use of the fee for sewers and the need for such facilities is
reasonably related to all types of development projects because
all such development projects generate sewage and require the
protection from sewerage provided by sewers.
5. As used hereinafter "project" means proposed
construction activity which is subject to the payment of a sewer
RESOLUTION NO. 89-064
PAGE TWO
connection fee under SAMC sections 34-191 through 34-195 and as to
which construction pursuant to a validly issued building permit
has not commenced as of the date of adoption of this resolution.
6. Ail previous resolutions of the city Council
establishing or increasing sewer connection fees are superseded by
this resolution, and the fees established by this resolution shall
apply to all projects, except as otherwise hereinafter provided.
7. Any project for which a building permit has been
issued prior to the adoption of this resolution shall be subject
to the sewer connection fee which applied to such project
immediately prior to the adoption of this resolution unless such
building permit expires without commencement of construction.
ADOPTED this 3rd day of July
, 1989.
ATTEST:
'Clerk of the CounCil/
COUNCILMEMBERS:
Acosta A~
Griset
May aye
McGuigan Aye
Norton Aye
Pulido Aye
Young Aye
APPROVED AS TO FORM:
City Attorney
EXHIBIT A
PROJECT IDENTIFICATION
SEWER CONNECTION FEE
NO. PROJECT
pROJECT DESCRIPTION
1
2
San Lorenzo Pump Station
Maxine Pump Station &
& Connecting Sewer
3 Reserve for Emergency
Repair
4 Highland Street:
Bristol to Flower
5 Richland Street:
Bristol to Flower
6 Cubbon Street:
Bristol to Shelton
7 Walnut Street:
Baker to Flower
8 Pine Street:
Baker to Flower
9 Memory Lane:
Arnett to Flower
10 Baker Street:
1st to Chestnut
11 Chestnut Street:
Halladay to Standard
12 Alley between 3rd & 4th Street:
Main to Bush
13 Sullivan Street:
1st to 5th Streets
14 Fifth Street:
Sullivan to 200" E/O Hawley
Upgrade Pump Station
Sewage Capacity
Upgrade Pump Station
& convert force main
to gravity line
Emergency repair of
sewer lines
Upgrade 6" sewer line
to 8" sewer line
Upgrade 6" sewer line
to 8" sewer line
Upgrade 6" line to
8" line
Upgrade 6" line to
8" line
Upgrade 6" line to
8" line
Upgrade 15" line to
18" line
Upgrade 12" line to
15" line
Upgrade 6" line to
8" line
Upgrade 6" line to
8" line
Upgrade 8" line to
10" line
Construct 10" Sewer
line
292
EXHIBIT
(Page 2 of
15
16
17
18
19
20
21
Segerstrom Avenue:
Susan to Harbor
Tenth Street:
Ross to Flower
Tenth Street:
Freeman to Flower
15th Street:
French to Main
civic Center:
Poinsettia to Minter
Central:
Birch to Main
Third Street:
Raitt to Pacific
Upgrade 8" line to
12" line
Construct 8" sewer
line
Construct 8" sewer
line
Construct 8" sewer
line
Construct 8" sewer
line
Construct 15" sewer
line
Upgrade 6" line to
8" line