HomeMy WebLinkAbout90-075RESOLUTION NO. 90- 075
REL:mb(7)
5/18/90
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF SANTA ANA VACATING
HESPERIAN STREET BETWEEN SANTA ANA
BOULEVARD AND FIFTH STREET.
WHEREAS, this Council heretofore adopted on
June4 , 1990, Resolution No. 90-57, wherein it
declared its intention to vacate, pursuant to and in accordance
with the provisions of Chapter 3 of Part 3 of Division 9 of the
Streets and Highways Code of the State of California, Hesperian
Street between Santa Ana Boulevard and Fifth Street.
WHEREAS, said Resolution gave notice that on
J~y2, , 1990, at 7:30 p.m., or as soon there-
after as the matter could be heard, in the Council Chambers of
the City of Santa Ana, 20 Civic Center Plaza, Santa Ana, Cali-
fornia, this Council would hear any and all persons interested
in or objecting to said proposed vacation of the said street;
and
WHEREAS, this Council finds that said Resolution has
been published in the manner prescribed by law for the publish-
ing of ordinances of the City; and
WHEREAS, this Council further finds that notices of
said proposed street vacation stating the purposes of said
Resolution and the time and place set for hearing were posted
as directed by the Council and required by law; and
WHEREAS, this Council at the time and place set for
hearing as thus continued heard any and all persons interested
in or objecting to said proposed vacation of said street, and
received and considered all evidence submitted;
WHEREAS, this Council finds from all the evidence
submitted that the said street described in "Exhibit A" attached
hereto, are unnecessary for present or prospective public use,
based upon the following findings of fact:
1. Said street is not necessary to provide access to
abutting property owners.
2. Said street is not necessary or convenient for
servicing the flow of traffic.
WHEREAS, pursuant to the provisions of § 2381 of the
Streets and Highway Code of the State of California, the City
Council does hereby find and determine that neither said street
nor part thereof, are useful as nonmotorized transportation
facilities, as defined in ~ 156 of said Code;
272
RESOLUTION NO. 90-~5
PAGE TWO
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF SANTA ANA AS FOLLOWS:
1. That this Council does hereby order that Hesperian
Street between Santa Ana Boulevard and Fifth Street, described
in "Exhibit A" attached hereto and made a part hereof by this
reference, be, and the same is, hereby vacated.
2. Pursuant to the provisions of ~ 8340(c) of
the said Streets and Highways Code, the City Council does hereby
find and determine that there are in-place utility facilities
that are in use in said street, but that the public convenience
and necessity requires that all public utility facilities be re-
moved from said street in order that the areas presently
occupied by said street may be used as parts of the site of a
school to be constructed by the Santa Ana Unified School Dis-
trict. Therefore no public service easement is reserved from
the abovesaid street vacation.
3. The Clerk of the Council is hereby directed to
cause a certified copy hereof, attested by her under seal, to
be recorded in the office of the Recorder of Orange County at
such time as the Executive Director of the Public Works Agency
provides the Clerk of the Council with written notification
that the conditions set forth in Exhibit B, attached hereto and
incorporated herein have been satisfied.
4. Hesperian Street between Santa Ana Boulevard
and Fifth Street shall not be deemed vacated until this resolu-
tion is recorded.
ADOPTED this
ATTEST:
~i~e C. Guy / ,~/
Clerk of the Council~/
COUNCILMEMBERS:
2nd day of Ju]~ , 1990.
Young
Ac os t a Ah~ta i
Griset Aye,
May
McGuigan
Norton Aye
Pulido Aye
APPROVED AS TO FORM:
City Attorne~
Legal Description
Abandonment No. 89-A3
That certain portion of public street called Hesperian Street, 60.0 femt
wide, as shown on a map of the Pacific Electric Subdivision of the Ross
Tract recorded in Book 4, page 14 of Miscellaneous Maps of Orange County,
California, bounded Southerly by a line parallel with and distant
Northerly 52.0 feet from the centerline of Fourth Street, now called
Santa Ana Boulevard, and bounded Northerly by the South line of Fifth
Street;
Together with that certain spandrel-shaped area granted to the City of
Santa Ana by deed recorded October 8, 1976, as Instrument No. 10384 in
Book 11917, page 1451 in Official Records of said Orange County.
HL:jwe/J7
274
5.
6.
7.
EXHIBIT
RgL:mb(19)
5/21/90
CONDITIONS TO RECORDATION OF
RESOLU'FION VACATING HESPER[AN
STREET BETWEEN SANTA ANA BOULE-
VARD AND FIFTH STREET.
The Santa Aha Unified School District ("District") shall
dedicate for street purposes, the following:
Santa Aha Boulevard for a width of 52 feet survey
centerline to property line.
b. A 27 foot radius property spandrel at the northeast
corner of Santa Aha Boulevard and Pacific Avenue.
A 17 foot radius property spandrel at the southeast
corner of Fifth Street and Pacific Avenue.
The District shall submit a Surface Drainage Plan showing
the direction and means of flow to the adjacent streets to
the Public Works Agency of the City of Santa ana ("PWA").
The plan is to include existing and proposed elevations at
and adjacent to all property lines. Drainage routed to
the street must be directed beneath the sidewalk and
through the curb.
The District shall submit Street Improvement Plans, prepared
by a registered Civil Engineer, for Santa Aha Boulevard,
Pacific Avenue and Fifth Street to the PWA. All existing
and proposed water and sewer services must be shown on the
improvement plans.
The District shall submit a ChannelJzation and Signage
Plan to the PWA.
The District shall relocate the two existing fire hydrants
in Hesperian Street per PWA approved improvement plans.
The District shall abandon the existing water line in
Hesperian Street per PWA approved improvement plan.
The District shall pay the following fees
established by City Council resolution at
is made.
in the amount
the time payment
a. Drainage Assessment Fee (Area XIII).
Plan Checl< Fees - Surface Drainage, Improvement,
Channelization, and Signage.
-1-
275
10.
The District shall also pay cost of water service and
fire protection facilities' installation - deposit
varies as to size and requirements (prior to applica-
tion for service). Two sets of improvement plans are
required at the time of application.
The District shall arrange for installation of any needed
new water service and/or fire protection facilities in the
public right-of-way as required by the Public Works Agency.
These facilities will be installed by City forces at
District's expense. Proper plans are required.
The District shall furnish ornamental street lighting with
underground service on all fronting streets as directed by
the City Engineer.
The District shall construct street tree wells and plant
minimum 24 inch box trees per City Standard #1124 on all
fronting streets at locations in accordance with approved
improvement plans.
11. The District shall improve Santa Ana Boulevard as follows:
Remove all existing street improvements from curb to
property line.
Reconstruct the curb and gutter at 44 feet from the
street centerline.
Construct a full 8 foot wide sidewalk with street
tree wells. Construct adjacent paving as required.
d. Construct two drive approaches in accordance with
approved improvement plan.
Remove and construct all damaged asphalt pavement to
join the existing.
12. The District shall improve Fifth Street as follows:
Remove all damaged curb, gutter, and sidewalk.
Construct new curb, gutter, and full width sidewalk
including across former Hesperian Street.
Remove and close all existing drive approaches with
curb, gutter, and sidewalk.
Ce
Construct two drive approaches in accordance with
approved Site Plan and per City Standard ~1112, Case 2.
-2-
276
13.
14.
The
a.
District shall improve Pacific Avenue as follows:
Remove the curb return to be removed at the corner of
Fifth Street and reconstruct the curb return with a
25 foot radius and wheelchair ramp. Construct adjacent
paving as required.
b. Remove all damaged curb, gutter, and sidewalk.
Construct new curb, gutter, and full width sidewalk.
Close all drive approaches with curb, gutter, and
sidewalk.
Construct a 35 foot radius curb return at the northeast
corner of Santa Ana Boulevard with a wheelchair ramp
and cross gutter.
The District shall install street striping and signage per
approved Channelization and Signage Plan.
-3-