Loading...
HomeMy WebLinkAboutSouth Coast Air Quality 1bAGREEMENT TERMINATION Please complete this form when the attached agreement is no longer in effect. Return form to the Deputy Clerk of the Council (M-30). Call 647-6520 if you have any questions. ----------------------------------------------------------------- The agreement with Jc'v,* Qe`,� U J /wr r�ca f A- f � 1) C61ii was completed on �` UL and final pay entM4 beer ad& ly) Department: t-O ,%vCe Pew` Signature: � Pi7o�.�(.f' G.� Date: City of Santa Ana Revised 4-16-87 Clerk of the Council �J M A —A&01 ­063 B South Coast Air Quality Management District MODIFICATION TO CONTRACT This modification consists of 5 pages. Contract No. AB27661SO102B Modification RECITALS A. The South Coast Air Quality Management District (hereinafter "AQMD") and the City of Santa Ana (hereinafter "CONTRACTOR") have previously executed a Contract No. AB 2766/S0102 for the construction of a CNG fueling station and purchase of four street sweepers; and modified by Contract No. AB 2766/S0102A to extend the term of the contract. B. CONTRACTOR needs additional time to have the street sweeper broom adjusting mechanisms re -engineered and replace damaged components. Therefore, a modification to this Contract is necessary to extend the date by which performance must be completed. 2. MODIFICATION - The parties therefore agree to modify the existing Contract, at no additional cost to AQMD, as follows: A. The term of this Contract is extended for an additional period and now terminates on March 30, 2004. Attachment 1 B - Statement of Work and Project Schedule, attached hereto and included herein by this reference, supersedes the original Statement of Work and Project Schedule. C. All other provisions of the above -referenced Contract shall remain in full force and effect. [The Remainder of this Page is Intentionally Left Blank] �J 0 Attachment 1 B — Statement of Work and Project Schedule City of Santa Ana Hereinafter Referred to as CONTRACTOR AB 2766 Contract Number S0102B Project Schedule Task Start Completion Station Construction Specification Complete July, 2001 Station Construction Bid Award October, 2001 Station Construction October, 2001 May, 2002 Order Vehicles (Elgin Broom Bear Sweeper with Cummins 8.3G+, 250 hp CNG engine) July, 2002 February, 2003 Deliver Vehicles October, 2003 Monitor Performance October, 2003 February, 2004 Quarterly Reports October, 2001 Completion of Project Annual Reports 12 mos. after first vehicle is placed into service. 60 mos. after last vehicle is placed into service. Final Report March, 2004 Hardware: Four alternative fuel vehicles as listed above. CNG Fueling Station and Equipment. Reports Quarterly Reports: CONTRACTOR shall monitor the project and prepare and submit quarterly progress reports. The first report is due the 15`" day of the fourth month after the date of Contract execution. Quarterly reports shall include, but are not limited to achievement of milestones; equipment activity, including documentation of total vehicle miles and/or engine operating hours accumulated; vehicle performance; any project delays or problems and solutions; summary and analysis of project results to date; fueling site status; preliminary findings, and recommendations for completion of project; station activity including fuel throughput for each month during the quarter (with supporting documentation) and any downtime; identification of any unexpected circumstances or potential problems with the project, especially those that may delay the project schedule; and recommendations to resolve problems. Progress Reports that do not comply will be returned to the CONTRACTOR as inadequate. Annual Reports: Emissions reductions shall be quantified on an annual basis. The CONTRACTOR shall report the required data to the AQMD for a period of five years. Emissions reductions shall be calculated by the MSRC/AQMD staff utilizing the current Attachment 1 B — Statement of Work and Project Schedule City of Santa Ana Hereinafter Referred to as CONTRACTOR AB 2766 Contract Number S0102B Air Resources Board (ARB) quantification methodologies. Reported and validated emission reductions shall be applied toward the State Implementation Plan (SIP) attainment demonstration. All emission reductions resulting from the expenditure of these funds shall be owned wholly by the AQMD, shall not be converted into tradable credits and shall be used for the sole purpose of meeting the attainment schedule contained in the most recently adopted SIP. AQMD reserves the right to verify the information provided. CONTRACTOR shall report the following data annually: Annual mileage or engine operating hours (where applicable) accumulated, using the contracted -for equipment within the geographical boundaries of the AQMD. The reporting requirements under this clause shall survive the expiration of this Contract and continue in full force and effect until a total of five (5) consecutive years of emissions data has been reported to AQMD. Annual reporting begins after first vehicles are entered into service. Final Report: A final report shall be submitted by the CONTRACTOR in the format provided by AQMD staff. Report shall include, at a minimum: a) an executive summary; and b) a detailed discussion of the results and conclusions of this project including the manner in which any replaced vehicles were retired. CONTRACTOR will identify any barriers encountered and solutions developed to overcome the barriers, impact on vehicle operating costs and impact of project on future alternative fuel deployment and near and long term AFV goals. In the event the CONTRACTOR files for bankruptcy or becomes insolvent or discontinues this project, the following items revert to the AQMD for disposition into the AB 2766 Discretionary Fund account: none 3 0 Attachment 1 B — Statement of Work and Project Schedule City of Santa Ana Hereinafter Referred to as CONTRACTOR AB 2766 Contract Number S0102B Project Description CONTRACTOR shall purchase four Elgin Broom Bear street sweepers as specified below. CONTRACTOR shall also construct a CNG fueling station as specified in Attachment 3, Supporting Documents, Station Specifications. Statement of Work CONTRACTOR shall purchase four (4) OEM CNG powered heavy-duty vehicles as follows: Vehicle Life Miles Per Year Expectancy Four Elgin Broom Bear Street Sweepers 5 years 4,120 each with Cummins 8.3G+ CNG Engine. each CONTRACTOR shall be reimbursed for each vehicle according to the costs stated in Attachment 2 — Cost Schedule, upon proof of vehicle delivery, vehicle acceptance, and placement of vehicle into service. Engines must be certified for sale in California by California Air Resources Board prior to the release of MSRC funds. CONTRACTOR shall place vehicles into service within eighteen (18) months of Contract execution and shall demonstrate and report on vehicle performance (refer to Project Schedule for reporting) for a minimum of six (6) months. CONTRACTOR shall construct CNG fueling station as specified in Attachment 3, Fueling Station Specifications. CONTRACTOR shall be reimbursed according to Attachment 2, Cost Schedule, after verification that station construction is complete and that station is fully operational. Contract No. AB27661SO102B Modification SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT CITY OF SANTA ANA By: a t-0 By:— ox'�Av , ,Barry R. Wallerstein, D. Env., Executive Officer David Ii. Ream U�•/� ®RhA er / Att C/7 �` e to By Date Patricia E. Healy loma ClerkOf The Council Exec ive Director Finance & Mgmt. Services Agency APPROVED AS TO FORM: Barbara Baird, District Counsel 7January2003 Ap(pp11 roved as t form`.' - Date Michael Vigl ott Deputy City Attorney 2