Loading...
HomeMy WebLinkAbout22D - MOTOR CONTROL CTR UPDATE REQUEST FOR 8 COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JUNE 21, 2004 TITLE: CONTRACT AWARD FOR MOTOR CONTROL CENTER UPGRADE AT WALNUT PUMPING STATION (SPEC. NO. 04-057) APPROVED 0 As Recommended 0 As Amended 0 Ordinance on 1 st Reading 0 Ordinance on 2nd Reading 0 Implementing Resolution 0 Set Public Hearing For CONTINUED TO FILE NUMBER RECOMMENDED ACTION Award a contract to Leed Electric, Inc. to upgrade the motor control center at the Walnut Pumping Station in the amount of $259,170. 8 DISCUSSION The Public Works Agency's Water Resources Division uses a variable frequency drive to regulate the quantity of water pumped from most of the City's wells and pump stations. Currently, the Walnut Street pump station does not use a variable frequency drive. Installation of two variable frequency drives will allow the Walnut Street pumps to start smoothly, use less energy and will reduce pressure surging into the water lines. In addition, once the variable frequency drives are installed, the City will qualify for a $32,344 energy saving rebate. The notice inviting bids was advertised on bids were solicited. A summary of the received is as follows: April 26 and 28, bid invitations 2004, and and bids 13 Invitations For Bid mailed 3 Bids received Bids were received, opened on June 2, 2004, and evaluated (Exhibit 1). The bid from Leed Electric, Inc. is responsive to the specification. 8 22D-1 CS.383 Contract Award for Motor Control Center Upgrade at Walnut Pumping Station (Spec. No. 04-057) June 21, 2004 Page 2 FISCAL IMPACT Funds are budgeted and available in the Water Utility Water Production and Supply Other Contract Services account (account no. 64-574-6291). APPROVED AS TO FUNDS AND ACCOUNTS: Ja es G. oss E ecutive Director ublic Works Agency ':( Þ... . JGR/WO/04-057.9:li oloma Execu ve Directorf0 Finance & Mgmt. Services Agency 22D-2 8 ABSTRACT OF BIDS CONTRACT AWARD FOR MOTOR CENTER UPGRADE AT WALNUT (SPEC. 04-057) CONTROL PUMPING STATION Vendor Leed Electric, Inc. Pier Electric CDM Constructors, Inc. Location Norwalk Alameda Hesperia Labor/ Materials* $245,612.00 $261,888.00 $263,995.00 8 Price *Tax @ 7.75% $ 13,558.00 $ 15,005.00 $ 13,185.00 (materials only) Total Cost $259,170.00 $276,893.00 $277,180.00 1% Local Vendor Preference N/A N/A N/A 8 EXHIBIT 1 22D-3 22D-4