Loading...
HomeMy WebLinkAbout23A - SIESMIC RETROFIT REQUEST FOR COUNCIL ACTION ~ ~ CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JANUARY 18, 2005 TITLE: CONTRACT AWARD FOR SEISMIC RETROFIT OF THREE BRIDGES OVER THE SANTA ANA RIVER (PROJECT NOS. 1800, 1801, AND 1802) APPROVED 0 As Recommended 0 As Amended 0 Ordinance on 1st Reading 0 Ordinance on 2nd Reading 0 Implementing Resolution 0 Set Public Hearing For ¡2~. CITY MANAGER CONTINUED TO FILE NUMBER ¡ /RECOMMENDED ACTION V 1. Award a contract to D. W. Powell responsible bidder, in accordance estimated amount of $1,845,316 for bridges over the Santa Ana River. Construction, Inc., the lowest with unit bid prices in the the seismic retrofit of three 2. Approve an appropriation adjustment accepting funds in the amount of $672,303 for this proj ect into the Select Street Construction fund (account no. 59-01-5343), and appropriating the same into the Select Street Construction Fund (account no. 59-551-6631). 3. Approve a Funding Analysis with a total estimated construction cost of $2,306,600. DISCUSSION The City has submitted applications to the California Department of Transportation (Caltrans) under the Highway Bridge Replacement Program and received approval for funding to perform the seismic retrofit of three bridges over the Santa Ana River. Caltrans is providing funding for both the design and construction phases of the proj ect. This proj ect involves First Street, Fifth Street and McFadden Avenue Bridges over the Santa Ana River (Exhibit 1). The proposed retrofit improvements will enhance public safety over the bridges. The project will include various measures to minimize effect of a seismic event on each bridge. The measures include tying the bridge girders together with steel cable retainers, placement of additional piles at the bridge abutments, and construction of new pile caps. 23A-1 Seismic Project January Page 2 Retrofit of Three Bridges Nos. 1800, 1801, and 1802 18,2005 The Notice Inviting Bids was advertised on October 27 and 29, 2004 and bids were opened on December 1, 2004. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: Contractors requesting bidding documents: Bids received: Bids received from Santa Ana Contractors: 3 21 5 0 NAME OF BIDDER CITY BID AMOUNT 1. D.W. Powell Construction, Inc. 2. O'Donnell Construction, Inc. 3. Griffith Company 4. Beador Construction Company, Inc. 5. Highland Construction, Inc. Fontana San Dimas Santa Fe Springs $1,845,316.00 $1,958,105.20 $2,060,903.00 $2,635,700.00 $2,844,598.50 Corona Orange A total of 5 bids were received and all were responsive. The lowest bid was submitted by D.W. Powell Construction, Inc. for $1,845,316, which is above the Engineer's estimate of $1,207,168. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption ER no. 2003-174, 2003-173, 2003-172 were filed for the First, Fifth, and McFadden Avenue Bridges, respectively. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $2,306,600 for the project (Exhibit 2). With approval of the appropriation adjustment, funds in the amount of $672,303 for this project will be recognized in the Select Street Construction fund (account no. 59-01-5343); and the same will be appropriated in the Select Street Construction Fund (account no. 59-551-6631). Jah~~~ Executive Director Public Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: '{~~~~ ß) \~.. , Francisco Gutierrez ~J Executive Director l' Finance & Mgmt. Services Agency ? (I, Pwa_f_serv\Engineering\Construction\RFCA-draft\1800 180WD 23A-2 MCFADDEN AVE. BRIDGE NO. 55C0163 FIFTH ST. BRIDGE NO. 55C0372 FIRST ST. BRIDGE NO. 55COO22 JC TII II 1=]1 :: . . . I . ... . I 1.__. EDINCER I WARNER CITY of SANTA ANA ..~." LOCATION MAP ORANGE COUNTY CALIFORNIA 'I......IiI'" "'IIII..JIfO SC"""E .. FUT EXHIBIT 1 SANTA ANA , P W A t DATE: , , January 18, 2005 PIJIU _5 ACEOI:Y Title: SEISMIC RETROFIT OF THREE BRIDGES OVER SANTA ANA RIVER PROJECT NOS. 1800, 1801, AND 1802 FUNDING ANALYSIS PROJECT NOS. 1800, 1801, AND 1802 SEISMIC RETROFIT OF THREE BRIDGES OVER THE SANTA ANA RIVER Construction Contract $1,845,316 94,753 Contract Administration Inspection and Testing Survey Staking 150,000 32,000 Contingencies 184,531 TOTAL ESTIMATED CONSTRUCTION COSTS $2.306.600 Exhibit 2 23A-4