' AGREEMENT TERMINATION
please complete this form when the attached agreement is no longer in effect.
Return form to the Clerk of the Council Office (M-30).
Call 647-5237 if you have any questions.
-----------------
The agreement with
No =k- .13 (11-7-05)(Cost Sharing
Ag>ee� at grade crossing at Warner
and final payment has been made"
was completed on 11-12-2007
Department. Design Engineer PWA
phone?Exd"_
Signature:
Date:
' A-2001-134
COPY
O : PV'A C3)
COST SHARING AGREEMENT
THIS AGREEMENT, made and entered into this %t�'- day of tJr;V&xbe-,p ,
2005, by and between Union Pacific Railroad Company, a Delaware corporation,
hereinafter referred to as "Railroad" and the City of Santa Ana, a municipal
corporation, organized and existing under the Constitution and laws of the State of
California, hereinafter referred to as "City".
RECITALS:
The parties hereto desire to set forth by this instrument their agreement with
respect to the improvements of an at -grade crossing of Warner Avenue where it
crosses the tracks of Railroad at or near Santa Ana, County of Orange, State of
California (Crossing MP-51910) on the Santa Ana Industrial Lead.
WHEREFORE, in consideration of the mutual and respective covenants and
promises, and subject to all the terms and conditions hereinafter set forth, the
parties hereto agree as follows:
1. OBLIGATIONS OF RAILROAD
A. Railroad shall furnish the necessary labor and materials, tools and
equipment to perform, and shall perform or cause to be performed,
the following work, attached hereto as Exhibit A, and made a part
hereof.
1. Relaying of rail.
2. Resurfacing and reconditioning of track in crossing area.
3. Installation of concrete panel (200') crossing surface.
B. Railroad shall obtain all required permits and licenses to complete the
work, including a street work permit issued by the Public Works Agency of
the City of Santa Ana.
C. Railroad shall ensure the work complies with all applicable laws and
local requirements. Railroad shall permit the City of Santa Ana or its
designee(s) to examine and inspect the work.
D. Following execution of this Agreement, Railroad will order the
delivery of all materials required to perform the work contemplated herein.
When the crossing surface has been place in operation, Railroad shall submit
to City a detailed invoice for City's share of the estimated cost of applicable
material furnished and installed by Railroad.
F. The work to be performed by Railroad shall be commenced as soon as
labor and materials are available following execution of this instrument.
2. OBLIGATIONS OF CITY
A. City shall reimburse Railroad for costs associated with the installation
of 200 feet of concrete panel crossing and temporary paving, in an amount
not to exceed Thirty -Five Thousand Eight Hundred Twenty -Nine Dollars
and Seventy Cents (S35,829.70), attached hereto as Exhibit B, and made a
part hereof.
B. City will provide traffic control and roadway paving.
C. City payment shall be made thirty-five (35) days after final inspection
and acceptance of all work to be performed, following receipt of invoice
evidencing work performed and satisfactory release of liens or claims for
liens by Contractor, subcontractors, laborers, and material suppliers for
completed work or installed materials.
3. INDEPENDENT CONTRACTOR
It is understood and agreed that Railroad shall, during the entire term of this
Agreement, be acting in a wholly independent capacity and not as agent,
employee, partner or joint venture of the City. This Agreement is not
intended nor shall it be construed to allow the City to exercise discretion or
control over the professional manner in which Railroad performs the
services which are the subject matter of this Agreement; however, the
services to be provided by Railroad shall be provided in a manner consistent
with all applicable standards and regulations governing such services.
4. INSURANCE
City acknowledges that Railroad will be performing the work set forth in
Section 1 and that Railroad is self -insured and will be self -insuring all risks
under this Agreement.
5. INDEMNIFICATION
Railroad shall indemnify, defend and hold harmless the City of Santa Ana,
its officers, employees, agents, consultants and representatives from and
against any and all loss or damage, and from any suits, actions and claims
filed or brought by any person(s) however caused, arising out of its negligent
or reckless performance or failure to perform any and all things required to
be done by it pursuant to the terms of this Agreement.
6. NOTICES
Notices to the parties shall, unless otherwise requested in writing, be sent by
U.S. mail, postage prepaid, and addressed as follows:
TO CITY: Santa Ana Public Works Agency
20 Civic Center Plaza (M-36)
P.O. Boa 1988
Santa Ana, California 92702-1988
Facsimile: (714)64705635
Attn: Souri Amirani
TO RAILROAD: Union Pacific Railroad Company
R.C. Gonzales, Sr. Manager
Industry and Public Projects
19100 Slover Avenue
Bloomington, California 92316
Facsimile (909) 879-6289
7. VALIDITY
The invalidity in whole or in part of any provision of this Agreement shall
not void or affect the validity of any other provision of the Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
date and year first above written.
ATTEST:
i
PATRICIA E. HEALY
Clerk of the Council
APPROVED AS TO FORM
JOSEPH W. FLETCHER
City Attorney
Laura Sheedy
Assistant City Attorney
RECOMMENDED FOR
:ive Director
Works Agency
CITY OF SANTA ANA, a municipal
Corporation of the State of California
DAVID N. REAM
City Manager
UNION PACIFIC RAILROAD
Je sa
Assistant Genera Solicitor
AL: UNION PACIFIC RAILROAD
Tom T. Ogee
Assistant Vice President Engineering
Mr
EXHIBIT A
r_10 T=, 6 T „
EILIT
CONCT10
-- _j_-20 C_�Dlj . - ---
UNION PACIFIC SHALL:
1. RELAY RAIL.
2. RESURFACE AND RECONDITION TRACK
IN CROSSING AREA.
3. INSTALL CONCRETE PANEL (200')
CROSSING SURFACE.
IQ
RR CROSSING AT WARNER AVE.
DATE: 10/laW
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
DESCRIPTION OF WORK
LOS NIETOS (SANTA ANA) SUB I MP 519.10I WARNER AVE I SANTA ANA, CALIF.
PROPOSE TO PARTICIPATE WITH THE CITY OF SANTA ANA IN IMPROVING THE
PUBLIC CROSSING AT WARNER AVE. IN SANTA ANA, CALIF.
PID: 41221 AWO: 04806 MP, SUB DIV. 519.10, SANTA ANA
SERVICE UNIT: 20 CITY: SANTA ANA STATE: CA
DESCRIPTION QTY UNIT
LABOR
MATERIAL
RECOLL
UPRR
TOTAL
ENGINEERING WORK
ENGINEERING
2329
2329
2329
TOTAL ENGINEERING
2329
2329
2329
SIGNAL WORK
MATL STORE EXPENSE
11
11
11
SALES TAX
g
8
g
SIGNAL
220
220
220
TOTAL SIGNAL
0
239
239
239
TRACK& SURFACE WORK
CITY OF SANTA ANA (FIXED RATE)
35829
35829
35829
BALLAST 4 CL
1508
1508
1508
DISPOSAL FEE
720
720
720
EQUIP RENT
5760
5760
5760
FIELD WELD
116
116
116
FOREIGN LINE FREIGHT
1440
1440
1440
LABOR ADDITIVE
34872
34872
34872
MATL STORE EXPENSE
1225
1225
1225
OTM
1051
4339
5390
5390
PER DIEM
17125
17125
17125
RAIL 640 LF
1426
3954
5380
5380
RDKING 200 TF
6202
19355
25557
25557
SALES TAX
1420
1420
1420
SIG GENERAL
I
1125
1125
TRK-SURF,LIN
3660
3660
3660
WELD
1652
890
2542
2542
XTIE 200.00 EA
6915
5523
14438
14438
TOTAL TRACK & SURFACE
59019
99068
35829
122278
158107
LABOR/MATERIAL EXPENSE
613 88
99327
RECOLLECTIBLEIUPRR EXPENSE
124846
ESTIMATED PROJECT COST
35829
EXISTING REUSEABLE MATERIAL CREDIT
0
SALVAGE NONUSEABLE MATERIAL CREDIT
0
RECOLLECTIBLE LESS CREDITS
160675
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
City of Santa Ana
Clerk of the Council
AGREEMENT TERMINATION
Please complete this form when the attached agreement is no longer in effect.
Return form to the Clerk of the Council Office (M-30).
Call 647-5237 if you have any questions.
-------------------------------------------------------
-----------cl--
The agreement with Union Pacific Railroad'
No. A-2001-134 (11-7-05)(Cost Sharing was completed on
Agree) at grade crossing at Warner
and final payment has been made.
11-12-2007
Department:
_ Ya
Design Engineer— PWA
Phone/Ext.: 5664
Jason Gabrie
Signature:
Date: