HomeMy WebLinkAboutORANGE, CITY OF - 2006City of Santa Ana
- Clerk of tha Council
AGREEMENT TERMINATION
Please complete this form when the attached spreement is no longer in effect.
Retum form to the Clerk of the Council Office (M-30).
Call647-5237 if you have any questions.
- ----------------------------
-------
Theagreement with The CRy of Orange and the City of Sand Ana "BriatoULa Veta Lighting at 15 Freeway^
No. A-2006-070 was completed on 12/13!2006
and final payment has been made.
!)apartment: PWA-Design Engineering
Phone/Ext.: X5864
Jason Gabriel t --
Signature:
Rafe: 07/09/2009
ReWeetl 07.23-07
.'
/1,'(', ~"'!f,?C
(~
lilSURPlWc NOT REQUIRED
WORK r'.1W PPQCEEO
CLERK OF COUNCIL
DATE: ({-II-Die
0: (\JJA (.;2.)
((. P.eY'~L)
A-2006-070
AGREEMENT BETWEEN THE CITY OF SANTA ANA
AND THE CITY OF ORANGE FOR
CONSTRUCTION AND MAINTENANCE
OF BRISTOL/LA VETA STREET
LIGHTING AT THE 1-5 FREEWAY
This Agreement ("Agreement"), made and entered into this day of
, 2005, by and between the CITY OF ORANGE, a municipal corporation
("ORANGE"), and the CITY OF SANTA ANA, a charter city and municipal corporation
("SANTA ANA").
RECITALS:
A ORANGE and SANTA ANA desire to enter into an agreement to install
and maintain street lighting on the Bristol/La Veta Bridge at the 1-5 Freeway per the
plans and specifications prepared by DMJM / Harris ("the PROJECT"). The PROJECT
consists of twenty-six (26) new street light poles (13 in SANTA ANA and 13 in
ORANGE) and lighting for the Bridge.
B. The PROJECT lies partly within the corporate and jurisdictional limits of
SANTA ANA and partly within the corporate and jurisdictional limits of ORANGE.
C. The parties hereto desire to each provide for the PROJECT, including the
preparation of plans, specifications, and related cost estimates for construction
(collectively "the Construction Documents"); materials testing; site survey; construction
engineering; construction management; construction and maintenance.
D. The parties desire for SANTA ANA to be responsible for preparing the
Construction Documents and materials testing, site construction survey, construction
engineering, construction management, and construction for the entire PROJECT.
E. The PROJECT has received the funding in the amount of $258,000 from
SANTA ANNORANGE TSIA Board, as listed in Exhibit A, while the total PROJECT
cost is estimated at $258,000.
NOW, THEREFORE, the parties agree as follows:
I. SANTA ANA Rights and Duties:
a. SANTA ANA shall be the lead agency for prepanng the Construction
Documents.
b, SANTA ANA shall notify ORANGE in writing of any changes, increased
costs, and meetings associated with SANTA ANA's lead agency
responsibilities for the PROJECT.
1
c. SANTA ANA shall be the lead agency for materials testing, site construction
survey, construction engineering, construction management, and construction
for the PROJECT; and is authorized to hire and confer with all consulting
engineers and contractors relative to the materials testing, site construction
survey, construction engineering, construction management, and construction
for the total PROJECT in accordance with standard construction practices.
d. SANTA ANA shall have the exclusive right of approval of all plans,
specifications and cost estimates prepared by consultants for the portion of the
PROJECT within the jurisdictional boundaries of SANTA ANA.
e. All progress payments for the PROJECT shall be reviewed by SANTA ANA.
All work within SANTA ANA shall be per Santa Ana standard plans.
f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain
general liability and motor vehicle liability insurance in amounts satisfactory
to ORANGE. For any consultant contract on the PROJECT entered into after
the date of this "Agreement", SANTA ANA shall also cause ORANGE to be
named as additionally insured on insurance certificates and separate
endorsements for all consultant contracts related to the PROJECT. Copies of
such certificates and endorsements shall be provided to ORANGE prior to
consultants proceeding with work on the PROJECT.
g. SANTA ANA shall advertise and award all contracts for the PROJECT in
accordance with federal, state and local laws.
h. SANTA ANA shall, in advance, notify ORANGE as to the official advertising
dates, bid opening date, and construction start date, and request ORANGE to
attend all pertinent meetings, i.e. pre-bid, pre-construction, site, and final walk
through.
1. SANTA ANA shall provide ORANGE final Record Drawings for the
PROJECT within 120 days of the completion and acceptance of construction.
2. ORANGE Rights and Duties:
a. Change orders for work within ORANGE must receive the written approval of
the Executive Director of the Public Works Agency of ORANGE prior to
implementation, which approval shall not be unreasonably withheld.
ORANGE shall have oversight inspection review within ORANGE
jurisdictional boundaries and shall be notified of the progress of the
PROJECT for such purposes. ORANGE shall also have the right to enter and
inspect within SANTA ANA boundaries at all times for the purposes of
overseeing SANTA ANA lead agency functions.
b. ORANGE shall have the exclusive right of approval of all plans,
specifications and cost estimates prepared by consultants for the portion of the
PROJECT within the jurisdictional boundaries of ORANGE.
2
c. ORANGE shall cause all hired consultants and contractors on the PROJECT
to obtain general liability and motor vehicle liability insurance in amounts
satisfactory to SANTA ANA. ORANGE shall also cause SANTA ANA to be
named as additionally insured on insurance certificates and separate
endorsements for all contracts related to the PROJECT. Copies of such
certificates and endorsements shall be provided to SANTA ANA prior to
construction or work by consultants.
d. ORANGE will be the lead agency for maintenance and operation of the
PROJECT. SANTA ANA and ORANGE will share the maintenance
operation costs equally.
3. Joint Rights and Duties:
a. In the event that expended costs for the PROJECT exceed funds listed in
Exhibit "A", SANTA ANA shall be solely responsible for obtaining the
additional funding for the increased costs occurring within the jurisdictional
boundary of SANTA ANA and ORANGE shall be solely responsible for
obtaining the additional funding for the increased costs occurring within the
jurisdictional boundary of ORANGE.
b. ORANGE and SANTA ANA shall share the cost of maintenance and
operation evenly for maintenance and operation of the work done under this
PROJECT. ORANGE shall bill SANTA ANA semi-annually.
c. Mutual Indemnity Provision:
1. Upon completion of the PROJECT, ORANGE shall accept
maintenance responsibility for the PROJECT within SANTA ANA
jurisdictional limits, and within ORANGE jurisdictional limits.
11. Pursuant to Section 8546.7 of the California Government Code, in
the event that this Agreement involves expenditures of State funds
aggregating in excess of Ten Thousand Dollars ($10,000), both
parties shall be subject to the examination and audit of the Auditor
General of the State of California for a period of three (3) years
after final payment under this Agreement.
111. That neither SANTA ANA nor any officer or employee thereof
shall be responsible for any damage or liability occurring by reason
of anything done or omitted to be done by ORANGE under or in
connection with any work, authority, or duties delegated to
ORANGE under this Agreement. It is also understood and agreed
that, pursuant to Government Code Section 895.4, ORANGE shall
fully indemnify, defend, and hold SANTA ANA harmless from
any liability imposed for injury (as defined by Government Code
Section 810.8), occurring by reason of anything done or omitted to
3
be done by ORANGE under or in connection with any work,
authority, or duties delegated to ORANGE under this Agreement.
IV. That neither ORANGE nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of
anything done or omitted to be done by SANTA ANA under or in
connection with any work, authority, or duties delegated to
SANTA ANA under this Agreement. It is also understood and
agreed that pursuant to Government Code Section 895.4, SANTA
ANA shall fully indemnify, defend and hold ORANGE harmless
form any liability imposed for injury (as defined by Government
Code Section 810.8) occurring by reason of anything done or
omitted to be done by SANTA ANA in connection with any work,
authority, or duties delegated to SANTA ANA under this
Agreement.
4
IN WITNESS WHEREOF, ORANGE has caused this Agreement to be executed by its
Mayor and attested by its Clerk, and SANTA ANA caused this Agreement to be executed
by its City Manager and attested by its Clerk, as duly authorized by the ORANGE City
Council and the SANTA ANA City Council, respectively.
CITY OF SANTA ANA, a
municipal corporation of the
::teofcaliUeffia.
David N. Ream
City Manager
CITY OF ORANGE, a
municipal corporation of the
State of California
1",-
Mark A. Murphy
Mayor
By:
~'dk
-' -
Patricia E. Healy
Clerk of the Council
ATTEST:
/ G'{"
Ll~~~(: _L~_~
Mary E. Mllrphy-
Clerk of the Council
APPROVED AS TO FORM
~.~~
~ Joseph W. Fletcher
City Attorney
OVAL:
Ja es G. Ross
xecutive Director
Public Works Agency
.' .
.
.
Exhibit A
Project 2609 Bristol/La Veta Bridge Street Lights
Funding Analysis
FUNDING
ORIGINAL Date
ITEM FUND BUDGET Received
Design TSIA $50,000 June 2000
Progress Payment TSIA $158,000 June 6, 2002
Additional Construction Costs TSIA $50,000 June 27, 2005
Total Funding $258,000