The agreementwith City of Fountain
No. A-2007-028 was completed on 2008
and final payment has been made.
Department Design Engineering
Phone/Ext.: 5665
Mindy LySignature: _
Date: 0311112010
stfsedo7--23,07
INSURANCE NOT REQUIRED
WORK MAY PROCEED
CLERK OF COUNCIL
DATE: 3 - ice} C`/
(UVJ 1 i) AGREEMENT BETWEEN THE CITY OF SANTA ANA
AND THE CITY OF FOUNTAIN VALLEY FOR
REHABILITATION OF
EDINGER AVENUE FROM EUCLID TO NEWHOPE
A-2007-028
This Agreement ("Agreement"), made and entered into this 21 s t day of
November 2006, by and between the CITY OF FOUNTAIN VALLEY, a municipal
corporation ("FOUNTAIN VALLEY"), and the CITY OF SANTA ANA, a charter city
and municipal corporation ("SANTA ANA").
RECITALS:
A. FOUNTAIN VALLEY and SANTA ANA desire to enter into an
agreement to rehabilitate Edinger Avenue per the plans and specifications prepared by
Harris & Associates ("the PROJECT"). The PROJECT consists of pavement
rehabilitation, buspad construction, curb ramp construction, various other concrete
improvements as needed, and re -striping of the street.
B. The PROJECT lies partly within the corporate and jurisdictional limits of
SANTA ANA and partly within the corporate and jurisdictional limits of FOUNTAIN
VALLEY.
C. The parties hereto desire to each provide for the PROJECT, including the
preparation of plans, specifications, and related cost estimates for construction
(collectively "the Construction Documents"); materials testing; site survey; construction
engineering; construction management; construction and maintenance.
D. The parties desire for SANTA ANA to be responsible for preparing the
Construction Documents and materials testing, site construction survey, construction
engineering, construction management, and construction for the entire PROJECT.
E. The PROJECT has received the funding in the amount of $473,176 from
THE ARTERIAL HIGHWAYS REHABILITATION PROGRAM (AHRP). In addition,
the cities must provide $473,176 of local funds for the project. The funding breakdown
is shown in Exhibit "A". The total PROJECT cost is estimated at $1,044,182.
NOW, THEREFORE, the parties agree as follows:
1. SANTA ANA Rights and Duties:
a. SANTA ANA shall be the lead agency for preparing the Construction
Documents.
b. SANTA ANA shall notify FOUNTAIN VALLEY in writing of any changes,
increased costs, and meetings associated with SANTA ANA's lead agency
responsibilities for the PROJECT.
c. SANTA ANA shall be the lead agency for materials testing, site construction
survey, construction engineering, construction management, and construction
for the PROJECT; and is authorized to hire and confer with all consulting
engineers and contractors relative to the materials testing, site construction
survey, construction engineering, construction management, and construction
for the total PROJECT in accordance with standard construction practices.
d. SANTA ANA shall have the exclusive right of approval of all plans,
specifications and cost estimates prepared by consultants for the portion of the
PROJECT within the jurisdictional boundaries of SANTA ANA.
e. All progress payments for the PROJECT shall be reviewed by SANTA ANA.
All work within SANTA ANA shall be per Santa Ana standard plans.
f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain
general liability and motor vehicle liability insurance in amounts satisfactory to
FOUNTAIN VALLEY. For any consultant contract on the PROJECT entered
into after the date of this "Agreement', SANTA ANA shall also cause
FOUNTAIN VALLEY to be named as additionally insured on insurance
certificates and separate endorsements for all consultant contracts related to the
PROJECT. Copies of such certificates and endorsements shall be provided to
FOUNTAIN VALLEY prior to consultants proceeding with work on the
PROJECT.
g.SANTA ANA shall advertise and award all contracts for the PROJECT in
accordance with federal, state and local laws.
h.SANTA ANA shall, in advance, notify FOUNTAIN VALLEY as to the official
advertising dates, bid opening date, and construction start date, and request
FOUNTAIN VALLEY to attend all pertinent meetings, i.e. pre-bid, pre -
construction, site, and final walk through.
BANTA ANA shall provide FOUNTAIN VALLEY final Record Drawings for
the PROJECT within 120 days of the completion and acceptance of construction.
2. FOUNTAIN VALLEY Riehts and Duties:
a. Change orders for work within FOUNTAIN VALLEY must receive the
written approval of the Director of the Public Works Agency of FOUNTAIN
VALLEY prior to implementation, which approval shall not be unreasonably
withheld. FOUNTAIN VALLEY shall have oversight inspection review
within FOUNTAIN VALLEY jurisdictional boundaries and shall be notified
of the progress of the PROJECT for such purposes. FOUNTAIN VALLEY
shall also have the right to enter and inspect within SANTA ANA boundaries
at all times for the purposes of overseeing SANTA ANA lead agency
functions.
4
b. FOUNTAIN VALLEY shall have the exclusive right of approval of all plans,
specifications and cost estimates prepared by consultants for the portion of the
PROJECT within the jurisdictional boundaries of FOUNTAIN VALLEY.
c. FOUNTAIN VALLEY shall cause all hired consultants and contractors on the
PROJECT to obtain general liability and motor vehicle liability insurance in
amounts satisfactory to SANTA ANA. FOUNTAIN VALLEY shall also
cause SANTA ANA to be named as additionally insured on insurance
certificates and separate endorsements for all contracts related to the
PROJECT. Copies of such certificates and endorsements shall be provided to
SANTA ANA prior to construction or work by consultants.
3. Joint Rights and Duties:
a. In the event that expended costs for the PROJECT exceed funds listed in
Exhibit "A", SANTA ANA shall be solely responsible for obtaining the
additional funding for the increased costs occurring within the jurisdictional
boundary of SANTA ANA and FOUNTAIN VALLEY shall be solely
responsible for obtaining the additional funding for the increased costs
occurring within the jurisdictional boundary of FOUNTAIN VALLEY.
b. Mutual Indemnity Provision
i. Pursuant to Section 8546.7 of the California Government Code, in
the event that this Agreement involves expenditures of State funds
aggregating in excess of Ten Thousand Dollars ($10,000), both
parties shall be subject to the examination and audit of the Auditor
General of the State of California for a period of three (3) years
after final payment under this Agreement.
ii. That neither SANTA ANA nor any officer or employee thereof
shall be responsible for any damage or liability occurring by reason
of anything done or omitted to be done by FOUNTAIN VALLEY
under or in connection with any work, authority, or duties
delegated to FOUNTAIN VALLEY under this Agreement. It is
also understood and agreed that, pursuant to Government Code
Section 895.4, FOUNTAIN VALLEY shall fully indemnify,
defend, and hold SANTA ANA harmless from any liability
imposed for injury (as defined by Government Code Section
810.8), occurring by reason of anything done or omitted to be done
by FOUNTAIN VALLEY under or in connection with any work,
authority, or duties delegated to FOUNTAIN VALLEY under this
Agreement.
iii. That neither FOUNTAIN VALLEY nor any officer or employee
thereof shall be responsible for any damage or liability occurring
by reason of anything done or omitted to be done by SANTA ANA
under or in connection with any work, authority, or duties
08qcud urlelD aaluuiSgnS DdW9 90 A3
delegated to SANTA ANA under this Agreement. It is also
understood and agreed that pursuant to Government Code Section
895.4, SANTA ANA shall fully indemnify, defend and hold
FOUNTAIN VALLEY harmless form any liability imposed for
injury (as defined by Government Code Section 810.8) occurring
by reason of anything done or omitted to be done by SANTA ANA
in connection with any work, authority, or duties delegated to
SANTA ANA under this Agreement.
4. Notice:
Any notice, tender, demand, delivery, or other communication pursuant to this
Agreement shall be in writing and shall be deemed to be properly given if delivered in
person or mailed by first class or certified mail, postage prepaid, or sent by telefacsimile
or other telegraphic communication in the manner provided in this Section, to the
following persons:
and,
and,
and,
To City:
Executive Director
Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702-1988
Telefacsimile (714) 647-5622
City Attorney
City of Santa Ana
20 Civic Center Plaza (M-29)
P.O. Box 1988
Santa Ana, California 92702
Telefacsimile (714) 647-6515
City of Fountain Valley
10200 Slater Avenue
Fountain Valley, CA 92708
Attn: Mark Lewis
Telefacsimile (714)593-4554
City Attorney, Alan Burns
City of Fountain Valley
10200 Slater Avenue
Fountain Valley, CA 92708
13
Telefacsimile (714) 593-4494
A party may change its address by giving notice in writing to the other party. Thereafter,
any notice, tender, demand, delivery, or other communication shall be addressed and.
transmitted to the new address. If sent by mail, any notice, tender, demand, delivery, or
other communication shall be effective or deemed to have been given three (3) days after
it has been deposited in the United States mail, duly registered or certified, with postage
prepaid, and addressed as set forth above. If sent by telefacsimile, any notice, tender,
demand, delivery, or other communication shall be effective or deemed to have been
given twenty-four (24) hours after the time set forth on the transmission report issued by
the transmitting facsimile machine, addressed as set forth above. For purposes of
calculating these time frames, weekends, federal, state, County or City holidays shall be
excluded.
IN WITNESS WHEREOF, FOUNTAIN VALLEY has caused this Agreement to be
executed by its Mayor and attested by its Clerk, and SANTA ANA caused this
Agreement to be executed by its City Manager and attested by its Clerk, as duly
authorized by the FOUNTAIN VALLEY City Council and the SANTA ANA City
Council, respectively.
CITY OF SANTA ANA, a
municipal corporation of the
State of California
B:
David N. Ream
City Manager
A
Patricia E. Healy
Clerk of the Council
APPROVED AS TO FORM:
x Joseph W. Fletcher
City Attorney, Santa Ana
FOR APPROVAL:
G. Ross —
ive Director
Works Agency
CITY OF FOUNTAIN VALLEY, a
municipal corporation of the
State of California
CherylOBrothers
Mayor
ATTEST:
eryllZ"a(/YC-IC. c e -c �GC
S Sc ioede€
Interim Clerk of the Council
AP=4e-
TO FORM:
(SCM
Alan Burns
City Attorney, Fountain Valley
APPROVED AS TO CONTENT:
Va
dH.Kromer
nager
RECOMMENDED FOR APPROVAL:
Director of Public Works/ City Engineer
Exhibit A
Project 06-1714 Edinger Avenue Rehabilitation
Funding Analysis
FUNDING
oLai runuiny
Cost Breakdown per City
$946,352
Construction Engineering based on funding amount, not actual bid amounts.
*' Percentage based on estimated construction costs.
'*" Amounts may change based on actual bid prices.
ORIGINAL
Date
ITEM
FUND
BUDGET
Received
Design
AHRP
$53,958
01/25/06
Design
Local Match
$53,958
June 2005
Construction
AHRP
$419,218
07/16/06
Construction
Local Match
1 $419,218
June 2005
oLai runuiny
Cost Breakdown per City
$946,352
Construction Engineering based on funding amount, not actual bid amounts.