Loading...
HomeMy WebLinkAbout23D - PROJ FAIRVIEW/MACARTHUR CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: REQUEST FOR COUNCIL ACTION MAY 7, 2007 TITLE: APPROVED CONTRACT AWARD FOR FAIRVIEW/ MACARTHUR INTERSECTION WIDENING AND EDINGER/MOHAWK TRAFFIC SIGNAL MODIFICATION (PROJECT NOS. 05-1707 AND 07- 1026) o As Recommended o As Amended o Ordinance on 1" Reading o Ordinance on 20d Reading o Implementing Resolution o Set Public Hearing For /~ Ma. CITY MANAGER CONTINUED TO ---- FILE NUMBER /RECOMMENDED ACTION 1. Award a contract to Alliance Streetworks, Inc. , the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $668,966 for construction of Fairview/MacArthur intersection widening and Edinger/Mohawk traffic signal modification. 2. Approve a Funding Analysis with a total estimated construction cost of $836,400. DISCUSSION The proposed widening at Fairview Drive and Edinger Avenue provides for the addition of right-turn lanes for the southbound and eastbound approaches (Exhibit 1). These improvements are needed to improve traffic flow through the intersection which currently is not operating at an acceptable level of service. This proj ect provides for construction of new street pavement, sidewalks, curbs, gutters, and curbs ramps. The project also includes a traffic signal modification at the intersection of Edinger and Mohawk to provide protective left-turn movements and right-turn movements. Improvements include replacing traffic signal poles, foundations, conduits and signal equipment. Once completed, these improvements will enhance safety and traffic flow for the Hector Godinez High School students. The Notice Inviting Bids was advertised on March 7 and 9, 2007, and bids were opened on March 29, 2007. A summary of the bid invitations mailed, the bids received, and the bid results follows. 230-1 Fairview/MacArthur Intersection Widening And Edinger/Mohawk Traffic Signal Modification May 7, 2007 Page 2 Santa Ana Contractors receiving notices: Contractors requesting bidding documents: Bids received: Bids received from Santa Ana Contractors: NAME OF BIDDER 1. Alliance Streetworks, Inc. 2. Sequel Contractors, Inc. 3. Hillcrest Contracting 4. Elite Bobcat Service, Inc. 5. L.H. Engineering, Inc. 6. Oak Engineering, Inc. 7. Palp, Inc. DBA Excel Paving Company 8. Hardy & Harper, Inc. 9. PCN3, Inc. 12 23 9 1 CITY BID AMOUNT Anaheim $ 668,966.00 Santa Fe Springs $ 672,758.50 Corona $ 679,576.14 Corona $ 679,835.50 Anaheim $ 744,760.00 Pomona $ 747,004.00 Long Beach $ 776,366.05 Santa Ana $ 906,261.00 Long Beach $ 980,228.00 A total of nine bids were received and all were bid was submitted by Alliance Streetworks, Inc., below the Engineer's estimate of $684,688. ENVIRONMENTAL IMPACT responsive. The lowest for $668,966, which is In accordance with the California Environmental Quality Act, the proj ect is exempt from further review. Categorical Exemption, 2002-440 and 2006-175 were filed for this project. 230-2 proposed ER Nos. Fairview/MacArthur Intersection Widening And Edinger/Mohawk Traffic Signal Modification May 7, 2007 Page 3 FISCAL IMPACT The funding analysis shows a total estimated construction cost of $836,400 for the project (Exhibit 2). Funds are available in the Measure M Street Construction fund (account no. 32-551-6631) and the Select Street Construction fund (account no. 59-551-6631). APPROVED AS TO FUNDS AND ACCOUNTS: Ja~~ ~g ,c.-... ~a~J~ /t~ranci~co G~tierrez 1) Executlve Dlrector Finance & Mgmt. Services Agency ./ A Executive Director Public Works Agency K:\Construction\RFCA-draft\2007\OS-1707 RFCA 2007-QS-07.doc 230-3 PROJECT AREA: SANTA ANA , PW A a , , ....--. CITY COUNCIL AGENDA DATE' MAY 7,2007 5 t J EDf<OERAVE (N. T. S. I VICINITY MAP Iii i IAAC AR1H.Il Iii I VICINITY MAP IN. T.S. l EXHIBIT 1 N.T.S UAC AA1K.ft B..VO FAlRVlEW / MACARTHUR INTERSECllON WIDENING EDINGER / MOHAWK SIGNAL MODIFlCA llON (PROJECTS 05-1707/07-1026) Title' 230-4 SANTA ANA FUNDING ANALYSIS PROJECT NOS. 05-1707 AND 07-1026 FAIRVIEW/MACARTHUR INTERSECTION WIDENING AND EDINGER/MOHAWK TRAFFIC SIGNAL MODIFICATION Construction Contract $ 668,966 34,437 42,800 23,300 66,897 Contract Administration Inspection and Testing Survey Staking Contingencies TOTAL ESTIMATED CONSTRUCTION COSTS $ 836,40Q Exhibit 2 230-5 230-6