Loading...
HomeMy WebLinkAbout23A - THIN OVERLAY PHASE 2REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: MAY 5, 2008 TITLE: CONTRACT AWARD FOR LOCAL STREET PAVEMENT REHABILITATION - THIN OVERLAY PHASE 2 (PROJECT NO. 08-1736-C) APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 15i Reading ^ Ordinance on 2"d Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO f ' ~-~ ~~ FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Award a contract to Palp Inc. DBA Excel Paving Company, the lowest responsible bidder, in accordance with unit bid prices plus add-on alternate one in the estimated amount of $3,837,205 for construction of Local Street Pavement Rehabilitation - Thin Overlay Phase 2. 2. Approve a Funding Analysis with a total estimated construction cost of $4,604,600. DISCIISSION This project is the second phase of the thin overlay treatment that is part of the City's $100 million investment to rebuild neighborhood streets throughout the City. This project will restore the pavement of several local streets that require the least amount of repair work as identified in the City's pavement management system (Exhibit 1). In addition, some of the adjacent curbs, gutters, sidewalks, cross gutters and wheelchair ramps are in various states of disrepair and require replacement. The project provides for construction of thin asphalt concrete overlay, replacement of damaged concrete curbs, gutters, sidewalks, and curb ramps. Once completed, these improvements will enhance the ride quality and visual appearance of the neighborhoods. The Notice Inviting Bids was advertised on March 26 and 28, 2008, and bids were opened on April 15, 2008. A summary of the bid invitations mailed, the bids received, and the bid results follows. 23A-1 Local Street Pavement Rehabilitation - Thin Overlay Phase 2 May 5, 2008 Page 2 Santa Ana Contractors receiving notices: 12 Contractors requesting bidding documents: 14 Bids received: 4 Bids received from Santa Ana Contractors: 0 NAME OF BIDDER CITY 1. Palp Inc. DBA Excel Paving Company Long Beach 2. All American Asphalt Corona 3. R. J. Noble Company Orange 4. Sulley-Miller Contracting Co. Anaheim BASE BID AMOUNT 3,779,755 3,786,786 3,986,615 4,240,935 A total of four bids were received and all were responsive. The lowest base bid was submitted by Palp Inc. DBA Excel Paving Company, for $3,779,755, which is above the Engineer's estimate of $3,532,210. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project is exempt from future review. Categorical Exemption Environmental Review No. 2008-73 will be field for the project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $4,604,600 for the project (Exhibit 2). Funds are available in the Residential Street Improvement Fund (account no. 058-552-6631). APPROVED AS TO FUNDS AND ACCOUNTS: es G. Ross ~F_rancisco Gutierrez ~;~ cutive Director Executive Director lic Works Agency Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\OS-O5-2008 Overlay2 OB-1736-c ET_doc 80wd 23A-2 FUNDING ANALYSIS PROJECT 08-1736-C Local Street Pavement Rehabilitation - Thin Overlay Phase 2 Construction Contract $3,837,205 Contract Administration $191,860 Inspection and Testing $115,115 Survey Staking $76,700 Contingencies $383,720 TOTAL ESTIMATED CONSTRUCTION COSTS $4,604,600 Exhibit 2 23A-4