HomeMy WebLinkAbout23B - PROJ NOS 1819, 07-3202, 08-3519 r REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JULY 7, 2008 TITLE: APPROVED CONTRACT AWARD FOR BRISTOL STREET WIDENING BETWEEN PINE AND THIRD STREETS (PROJECT NOS. 1819, 07-3202 & 08-3519) o As Recommended o As Amended o Ordinance on 1st Reading o Ordinance on 2nd Reading o Implementing Resolution o Set Public Hearing For CONTINUED TO ~ FILE NUMBER RECOMMENDED ACTION 1. Approve an appropriation adjustment accepting Federal funds in the amount of $334,417 into the Select Street Construction fund (account no. 59-01-5344) and appropriating funds to the Select Street Construction fund (account no. 59-551-6631) for the Bristol Street Widening project between Third & Pine Streets. 2. Award a contract to Sequel Contractors, Inc., the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $4,522,071 for construction of Bristol Street Widening between Pine and Third Streets. 3. Approve a Funding Analysis with a total estimated construction cost of $5,652,000. DISCUSSION Bristol Street is a north-south corridor designated as a major arterial highway in the City's Circulation Element of the General Plan. The widening of Bristol Street between Warner Avenue and Memory Lane has been a long-term proj ect that will be constructed in several phases. This widening proj ect includes the segment between Pine and Third Streets (Exhibit 1). Overhead utility lines were placed underground in 2007 in accordance with the Bristol Street Specific Plan adopted by the City Council in 1993. All right-of-way has been secured for the segment. Under this proj ect, Bristol Street will be widened from two lanes to three lanes in each direction. The widening will also provide dual left turn lanes, dedicated right turn lanes and far-side bus turnouts in both the northbound and southbound directions. Finally, the project will also include enhanced parkway landscaping and sound walls adjacent to the 238-1 Bristol Street Widening July 7, 2008 Page 2 remaining parcels. Once completed, these improvements will enhance the ride quality, surface drainage, visual appearance and water capacity of Bristol Street. The Notice Inviting Bids was advertised on May 14 and 16, 2008, and bids were opened on June 3, 2008. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 21 Contractors requesting bidding documents: 38 Bids received: 9 Bids received from Santa Ana Contractors: 2 NAME OF BIDDER 1. Sequel Contractors, Inc. 2. All American Asphalt 3. Sully Miller Contracting Company 4. Alliance Street Works 5. Griffith Company 6. Elite Bobcat Service, Inc. 7. R.J. Noble Company 8. Excel Paving Company 9. Hardy & Harper, Inc. CITY Santa Fe Springs Corona Anaheim Anaheim Santa Ana Corona Anaheim Long Beach Santa Ana BID AMOUNT $4,522,071.00 $4,625,000.00 $4,732,425.00 $4,922,322.50 $4,978,165.65 $5,159,534.00 $5,254,926.80 $5,434,388.25 $6,185,195.00 A total of nine bids were received and all were responsive. The lowest bid was submitted by Sequel Contractors, Inc., for $4,522,071, which is below the Engineer's estimate of $5,400,000. ENVIRONMENTAL IMPACT An Environmental Impact Statement (EIS) for the Bristol Corridor from Warner to Memory Lane was approved by the City Council in 1990. This was followed by a reevaluation of the EIS for the Pine to Third segment in 2003. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $5,652,000 for the project (Exhibit 2). Funds are available in the Select Street Construction Fund (account no. 59-551-6631), the TSIA Fund (account no. 35-631-6631) and the Measure M Street Construction Fund (account no. 32-551-6631). 238-2 Bristol Street Widening July 7, 2008 Page 3 APPROVED AS TO FUNDS AND ACCOUNTS: k~p James G. R ss Executive Director Public Works Agency v~~~ ~anciSCO G~tierrez~ xecutlve Dlrector Finance & Mgmt. Services Agency K:\Construction\RFCA\RFCA lB19 - CONTRACT AWARD.doc 200WD 238-3 ~ SANTA ANA , PW A t , , ...., .as IGDCT , ! I =JI111'LL_ THIRD STREET I ,u_u_.._.._ I I I Ii I I 111I I ~ I II : II II I 1\ I i!1 1=__- SECOND STREET l II i II III1 i ~:j L--L I' 1111=-== I I . I II ! I I ! I : I I ! I I III I III i; !Il -"-T-r" 1 III , I II L..-.. 111111 I I I III i ' ___J__ 1\ : ill ! J_ --=- d I :6 PINE STREET ~illl[-~ ill w f!: u_.._u CI) -I o to r- a: j m _u_u_J _ CITY COUNC I L AGENDA DATE: JULY 7, 2008 TItle: FIRST STREET WALNUT STREET EXHIBIT 1 PROJECT 1819: BRISTOL ST. WIDENING FROM PINE ST. TO THIRD ST. PROJECT 07-3202: BRISTOL ST. WATER MAIN IMPROVEMENTS PROJECT 08-3519: BRISTOL ST. SEWER LATERAL ABANDONMENTS "\'-1\ \'-\ 238-4 FUNDING ANALYSIS PROJECT NOS. 1819, 07-3202 & 08-3519 BRISTOL STREET WIDENING BETWEEN PINE AND THIRD STREETS Construction Contract Contract Administration Inspection and Testing Survey Staking Contingencies $4,522,071 190,422 276,800 210,500 452,207 TOTAL ESTIMATED CONSTRUCTION COSTS $5,652,000 Exhibit 2 238-5 238-6