HomeMy WebLinkAbout23A - ARTESIA PILAR NEIGHBORHOODREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 5, 2009 TITLE: CONTRACT AWARD FOR ARTESIA PII,AR NEIGHBORHOOD (PROJECT NOS. 09-7705 AND 09-1757-C) CONTINUED TO FILE NUMBER 1. Award a bidder, in the Artesia contract to Excel Paving Company, in accordance with unit bid prices estimated amount of $2,165,697.50 Pilar Neighborhood Improvements. ^ As Recommended ^ As Amended ^ Ordinance on 15t Reading ^ Ordinance on 2"d Reading ^ Implementing Resolution ^ Set Public Hearing For the lowest responsible and add-on alternate one for construction of the 2. Approve a Funding Analysis with a total estimated construction cost of $2,824,800. DISCUSSION This project is part of the City's $100 million investment to rebuild neighborhood streets throughout the City. Segments of local streets located within the Artesia Pilar Neighborhood have been identified as a high priority for rehabilitation in the City's pavement management system (Exhibit 1}. The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, sidewalks, cross gutters and wheelchair ramps are also in various states of disrepair and require replacement. The project provides for recycling of existing asphalt pavement with the cold-in-place process, construction of asphalt concrete overlay, construction of cement treated base, and replacement of damaged concrete curbs, gutters, sidewalks, and curb ramps. Bid alternate one provides for re-establishing the survey monuments. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the neighborhood. CLERK OF COUNCIL USE ONLY: APPROVED 23A-1 :~ RECOMMENDED ACTION 1 Artesia Pilar Neighborhood Improvements January 5, 2009 Page 2 The Notice Inviting Bids was advertised on October 31 and November 3, 2008, and bids were opened on December 10, 2008. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 11 Contractors requesting bidding documents: 19 Bids received: 5 Bids received from Santa Ana Contractors: 0 NAME OF BIDDER CITY BID AMOUNT 1. Excel Paving Company Long Beach $2,165,697.50 2. Sequel Contractors Santa Fe Springs $2,180,765.00 3. R. J. Noble Company Orange $2,257,145.00 4. All American Asphalt Corona $2,357,000.00 5. M. S. Construction Management Dana Point $2,516,922.00 A total of five bids were received and all were responsive. The lowest bid was submitted by Excel Paving Company for $2,165,697.50, which is above the Engineer's estimate of $2,004,880. ENVIRONMENTAL IMPACT In accordance with California Environmental Quality Act, the proposed project is exempt from future review. Categorical Exemption Environmental Review No. 2008-43 will be filed for this project. In addition, a Certification of Categorical Exclusion and Statutory Worksheet have been prepared in accordance with the National Environmental Policy Act. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $2,824,800 for the project (Exhibit 2). Funds are available in the Community Development Block Grant Fund (account no. 135-149-6631) and the Residential Street Improvement Fund (account no. 058-552-6631). APPROVED AS TO FUNDS AND ACCOUNTS: James G. R s Francisco Gutierrez ~f~/ Executive Director Executive Director ""~ Public Works Agency Finance & Mgmt. Services Agency 23A-2 Artesia Pilar Neighborhood Improvements January 5, 2009 Page 3 Cynthia J. elson Deputy City Manager for Development Services Community Development Agency K:\Construction\RFCA-draft\O1-OS-09 ArtesiaNeigh 09-7705 70WD WA.docx 23A-3 ~j ~' IST ST ~ PROJECT LCATION ~a r I I f , ("~ > ~ ' N I' H r ~ ~ o a a J r M RIDAY LN o ~ w U ~ D) MARTHA LN m J NA8HINOTON AV WASHINGTON AV r I> '^ a 12TH ST I TH ST o a z w > a IITH ST IITH ST i 'n ~ a a 0 o a rl r ~` N 107H ST IOTH ST N r O ~^ 9TH ST > 9TH ST rr- ~~ v ~I IVIC CENTER DR J TTH sr '" r TTH sr ~, N Q p i a 3 '^ N ~ a rH T 6 T m z ~ ~ J° LL 5TH ST 5TH{{'' S~~T '~ r 4TH Si I ANi ~ ~ ~I 3RD ST > ~ ~ ~--~ ~f'-~I I R S T a w w ~ I a 2ND ST r ¢ ~ 2ND ST EXHIBIT 1 SANTA aNa TITLE: P W q CITY COUNCIL ARTESIA PILAR AGENDA SATE: NEIGHBORHOOD IMPROVEMENTS JANUARY 5, Zoos (PROJECT NOS. 09-7705 AND 09-1757-C) PU&.IC IIORKS AGENCY '~ IBTH ST 17TH ST ~ 17TH 8T ; ~~ ~`~~ 17TH ST FUNDING ANALYSIS PROJECT NO. 09-7705 ARTESIA PILAR NEIGHBORHOOD IMPROVEMENTS Construction Contract Contract Administration Inspection and Testing Survey Staking Contingencies TOTAL ESTIMATED CONSTRUCTION COSTS Exhibit 2 $2, 165, 697 $67,800 $113,000 $45,218 $433, 139 $2,824,800 23A-5 23A-6