Loading...
HomeMy WebLinkAbout23G - REJECT BIDS WEST PUMP STATIONREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 5, 2009 1 ~~ TITLE: REJECTION OF BIDS FOR WEST PUMP STATION FACILITIES UPGRADE (PROJECT NO. 05-3195) RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 1S` Reading ^ Ordinance on 2"d Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO FILE NUMBER Reject all bids for the West Pump Station Facilities Upgrade. DISCUSSION Santa Ana's west reservoir and pumping station was constructed in 1963 (Exhibit 1) The facility includes a six million gallon steel water reservoir with five electric motor driven booster pumps used to supply potable water to the City's distribution system. All equipment and piping is currently located outdoors within a secured site. The pumping equipment is worn and deteriorated from years of operation and exposure to the elements; the electrical panels and wiring are obsolete and operate inefficiently; and the site paving is badly deteriorated. The project provides for replacement of the pumping and electrical equipment, construction of a pump station building and reconstruction of the site pavement. The Notice Inviting Bids was advertised on October 29 and 31, 2008, and bids were opened on December 8, 2008. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 9 Contractors requesting bidding documents: 52 Bids received: 15 Bids received from Santa Ana Contractors: 0 23G-1 West Pump Station Facilities Upgrade January 5, 2009 Page 2 NAME OF BIDDER 1. F. T. Ziebarth Company 2. M. S. Construction Management 3. Mel Smith Electric, Inc. 4. Caliagua, Inc. 5. MMC, Inc. 6. Schuler Engineering 7. R. C. Foster Corp. 8. Cora Constructors, Inc. 9. SoCal Pacific Construction Corp. 10. SCW Contracting Corp. 11. Con Engineering, Inc. 12. Harbor Construction, Inc. 13. PPC Construction, Inc. 14. States Link Construction, Inc. 15. Metro Builders & Engineers Group CITY BID AMOUNT Fullerton $1,937,700.00 Dana Point $1,959,830.00 Stanton $1,962,501.20 Chino $1,974,994.31 La Palma $2,045,505.97 Corona $2,122,131.00 Corona $2,199,263.40 Palm Desert $2,220,000.00 Lake Elsinore $2,232,627.00 Fallbrook $2,247,118.00 Riverside $2,297,635.00 Irvine $2,383,962.23 Los Angeles $2,596,320.00 Huntington Beach $2,650,657.03 Newport Beach $2,734,533.21 A total of fifteen bids were received and all were responsive. The lowest bid was submitted by F. T. Ziebarth Company for $1,937,700, which is above the Engineer's estimate of $1,200,000. Based on the above, staff recommends that all bids be rejected. Staff believes revising the scope of work and rebidding the project will provide for more competitive bids. Following Council action, staff will revise the scope of work for the project. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT There is no fiscal impact associated with this action. APPROVED AS TO FUNDS AND ACCOUNTS: ~~ James G. oss Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\01-05-09 WestPump 05-3195 250WD ET.docx 23G-2 23G-4