COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JANUARY 5, 2009
TITLE:
AMENDMENT TO AGREEMENT WITH PACE
FOR DESIGN ENGINEERING SERVICES
FOR FOUNTAIN NO.1 REHABILITATION
(PROJECT 09-9108-C)
CITY MANAGER
CLERK OF COUNCIL USE ONLY:
APPROVED
^ As Recommended
^ As Amended
^ Ordinance on 15' Reading
^ Ordinance on 2"d Reading
^ Implementing Resolution
^ Set Public Hearing For_
CONTINUED TO
FILE NUMBER
authorize the City Manager and the Clerk of the Council to execute the
attached amendment to the agreement with Pacific Advanced Civil
Engineering Inc. (PACE), subject to non-substantive changes approved by
the City Manager and City Attorney, to provide design engineering
services for Fountain No. 1 in the amount not to exceed $31,500 for a
total contract amount of $122,550.
DISCUSSION
In May 2008, the City entered into an agreement with PACE to provide
engineering services for the renovation of the Fountain No. 3 in the
Plaza of the Fountains. Since then, Fountain No. 1 has been identified as
needing repair due to deterioration and maintenance problems (Exhibit 1).
The Parks, Recreation and Community Services Agency has allocated
additional funds to address cracks and leakage in the fountain, provide
new spray center jet and lighting, and replace the electrical and
plumbing systems. This project will contribute to the ongoing efforts to
enhance the aesthetic needs of the Civic Center Plaza.
The construction for the renovation of both fountains is anticipated to
commence in June 2009.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
231-1
Amendment to Consultant Agreement With PACE
Project No. 09-9108-C
January 5 2009
Page 2
FISCAL IMPACT
Funds are available in the Civic
074-243-6631, project 09-9108-C)
project.
Center Maintenance fund (account no.
for the Fountain No. 1 Rehabilitation
APPROVED AS TO FUNDS AND ACCOUNTS:
James G. Ross
Executive Director
Public Works Agency
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
.v,~ i'
Gerardo R. Mouet
Executive Director
Parks, Recreation, and Community
Services Agency
231-2
CIVIC CEN R D u~
FOUNTAIN NO. 1
cn
0
5TH ST
FOU A N NO. 3
SANTA AN LVD qTH ST
~~
PROD CT
LOCATION
LEGEND:
PROJECT LIMITS
EXHIBIT 1
SANTA ANA ~'~E:
CITY COUNCIL AMENDMENT TO THE AGREEMENT WITH
P W A AGENDA DATE PACE FOR DESIGN ENGINEERING SERVICES
PUBL'C~ JANUARY 5 2 FOR FOUNTAIN N0.1 REHABILITIATION
(PROJECT 09-9108-C)
N
H
2
W
a
N
BLVD
>--
Q
O
0
231-3
FIRST AMENDMENT TO AGREEMENT
THIS FIRST AMENDMENT TO AGREEMENT is entered into on January 5, 2009, by
and between Pacific Advanced Civil Engineering, a California corporation ("Consultant") and the
City of Santa Ana, a charter city and municipal corporation organized and existing under the
Constitution and laws of the State of California ("City").
RECITALS:
A. The parties entered into that certain Agreement A- 2008-085, dated May 5, 2008, (hereinafter
"said Agreement") by which Consultant has provided engineering services related to pool and
fountain renovation.
B. In accordance with the terms and conditions of said Agreement, the parties wish to amend the
Scope of Services to include the assessment and construction support required to renovate an
additional fountain, and increase compensation to pay for additional services.
WHEREFORE, in consideration of the covenants contained in said Agreement, and subject to all
the terms and conditions of said Agreement, except those amended in this First Amendment to
Agreement, the parties agree as follows:
1. Section 1, SCOPE OF SERVICES, shall be deleted in its entirety and replaced with the
following:
"Consultant shall provide professional engineering services, including assessment and
analysis of existing conditions, the preparation of Plan, Specification and Estimate, and
construction support for the renovation of the Memorial Pool and Fountain #3, in the Plaza of
the Fountains, as set forth in City's Request for Proposal dated January 23, 2008 (hereinafter
"RFP"), and Consultant's Proposal, collectively attached to said Agreement as Exhibit A.
Additionally, Consultant will provide professional engineering services, including assessment
and analysis of existing conditions, the preparation of Plan, Specification and Estimate, and
construction support for the renovation of Fountain #1, in the Plaza of the Fountains, as set
forth in Change Order Authorization 1, dated November 5, 2008, attached hereto as Exhibit
A-1 and incorporated by this reference. Said services shall conform to the standards set forth
in City's RFP."
2. Section 2, COMPENSATION, shall be amended to increase compensation by $31,500.00,
which includes a 15% contingency, to pay for the additional services provided in the
renovation of Fountain # 1. The total amount to be expended pursuant to said Agreement
shall not exceed $122,550.00 during the term of said Agreement.
3. Except as hereinabove amended, all terms and conditions of said Agreement shall remain in
full force and effect.
//
//
231-4
//
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to Agreement
on the date and year first written above.
ATTEST:
PATRICIA E. HEALY
Clerk of the Council
APPROVED AS TO FORM:
JOSEPH W.FLETCHER
City Attorney
By:
Laura Sheedy
Assistant City Attorney
CITY OF SANTA ANA
DAVID N. REAM
City Manager
PACE ADVANCED
CIVIL ENGINEERING
SONNY O. SIM
Vice President
231-5
PACE
A,dcronc~d Wrxter Eirginerring
EXHIBIT A-1
AUTHORIZATION FOR CHANGE ORDER
TO: City of Santa Ana
Public Works Agency
20 Civic Center Plaza, MS M36
PO Box 1988
Santa Ana, CA 92702
ATTN:
DATE:
PROJECT:
PROJECT NUMBER:
C.O. AUTHORIZATION #:
Description of Services:
Fees:
Task 00 -Reimbursables/Expenses fTBE) $ 500
(To include all blueprinting, shipping, travel, reproduction, and other miscellaneous direct project
expenses. Reimbursables are invoiced separately at cost plus 10%.)
Task 06 - Fountain #1 Assessment $ 4,000
Renovation of Fountain #1 will include management and administration of the Fountain #1 Renovation.
PACE will provide an assessment report to determine the existing conditions of Fountain #1 equipment
and fittings to include the following:
• Waterproofing
• Nozzles
• Piping
• Chemistry control & delivery
• Pump
• Filtration
• Materials
• Lighting
This report will help the City of Santa Ana to determine the necessary areas of the fountain that need
repair or replacement.
Task 07 -Fountain #1 Construction Documents $ 16,900
Fountain #1 Construction Documents will incorporate the City of Santa Ana's decision for the final
renovation design. The plans will include:
• Demolition plan
• Fountain details and sections
• Utility coordination
• Piping Schematics
• Electrical requirements
• Specifications
• Chemical treatment
PACE will provide electronic files in both ACAD and Micro-station format.
231-6
Kenny Nguyen
November 5, 2008
Renovation of Fountains
9076E
1
Mr. Kenny Nguyen November 5, 2008
City of Santa Ana /Renovation of Fountains /#9076 Page 2 of 2
Task 08 -Bid Services and Services During Construction $5,800
Provide owner with a list of potential contractors, prepare bid form and quantity take-off to be included
with overall project bid package. Attend pre-bid and construction meetings with contractors. Provide
clarification, revisions and addenda, as needed to the water feature construction documents to respond to
bidders requests and to assist issuance and negotiation of final pricing and contractor selection. Review
shop-drawing submittals from contractors of products and materials for conformance to construction
documents. At the conclusion of the construction document phase, consultant to (1) assist in reviewing
bids to determine the most qualified contractor at the most reasonable cost, (2) attend pre-construction
meeting to kick off the start of construction appropriately and answer any questions or issues early on in
the process, (3) review shop drawing submittals by the chosen contractor for conformance with the
construction document, (4) clarify construction documents if required, (5) assist in the issuance and
negotiation of pricing of change orders, (6) conduct necessary site visits as required during construction
for review of construction progress, (7) conduct a final on-site review of construction and provide a
completion punch list report. Punch list to be created only once. Owner is responsible for follow through
of items on the punch list, (8) review completeness of contractor's final as-built drawings. Water feature
construction requires oversight by the engineer due to the specialized nature of the work. This item is not
optional and is required for the contract.
Amount of Compensation:
This Request -Change Order #01:
f
Estimated 6 : ~-'`°A "~
Y November 5. 2008
Sonn~b. m, P. Date
AGREED TO AND ACCEPTED BY:
By
City of Santa Ana -Public Works Dept Date
~..».~,
PACE