CITY COUNCIL MEETING DATE:
JANUARY 5, 2009
TITLE:
CONTRACT CHANGE ORDER NO. 4
FLOWER STREET BRIDGE
REHABILITATION
PROJECT NO. 1780
~~ ~ "
i~ ''~ ~~~ . J r/ ~y~^------~
n,
CITY MANAGER
RECOMMENDED ACTION
~J
CLERK OF COUNCIL USE ONLY:
APPROVED
^ As Recommended
^ As Amended
^ Ordinance on 1ST Reading
^ Ordinance on 2"d Reading
^ Implementing Resolution
^ Set Public Hearing For_
CONTINUED TO
FILE NUMBER
Approve Change Order No. 4 for Flower Street Bridge Rehabilitation
Project for an estimated cost of $50,471.
DISCUSSION
Change Order Number: 4
Project Description: Flower Street Bridge Rehabilitation
Contractor: Noeti Corp.
15 Cavalier
Laguna Niguel CA 92677
Original Contract Cost: $464,400
Amount of this
Change Order: $50,471 10.8%
Previously approved
Change Order: $112,440 24.2%
Total Change Orders: $162,911 35.1%
23B-1
•~
Change Order No. 4
Project Nos. 1780
January 5, 2008
Page 2
REASON FOR CHANGE
The Flower Street Bridge is more than 70 years old and accurate as-
built information was not available. After demolishing the sidewalk and
girder on east side of the bridge, it was discovered that an old
underground telephone duct, whose exact location was not shown on the
original plans, would interfere with the new girder for the widened
bridge. Due to its fragile state and the numerous wires inside, this
duct could not be relocated. As a result, the girder had to be revised
to a different shape with added reinforced steel to straddle over the
duct. The new girder is 160 feet long, 4 feet deep and 6 feet wide. Due
to this change, the existing abutment walls at both ends of the bridge
could no longer be used to support the new girders. They were
demolished and replaced with new walls.
AGREED PRICE _ $50,471
FISCAL IMPACT
The cost for the change order is estimated at $50,471. Funds are
available in the Measure M Turn-back Fund (account no. 32-551-6631).
APPROVED AS TO FUNDS AND ACCOUNTS:
v` ~~~u ~'~~ ~~
James G. oss Francisco Gutierrez v
Executive Director ~~xecutive Director
Public works Agency Finance & Mgmt. Services Agency
K:\Construction\RFCA-draft\1780 Flower Bridge 2009-O1-OS C04.doc