Loading...
HomeMy WebLinkAbout23C - CIVIC CENTER DRAINAGE AND PAVEMENT IMPROVEMENTSREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: APRIL 6, 2009 TITLE: CONTRACT AWARD FOR CIVIC CENTER DRAINAGE AND PAVEMENT IMPROVEMENTS (PROJECT NOS.09-9103-M, 09-9104-M AND 09-9105-C) CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 15' Reading ^ Ordinance on 2nd Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO FILE NUMBER 1. Award a contract to Belaire West Landscape, Inc., the lowest responsible bidder, in accordance with unit bid lump sum prices for the base bid plus add-on alternate one in the estimated amount of $218,525 for construction of Civic Center Drainage and Pavement Improvements. 2. Approve an appropriation adjustment recognizing $310,000 in the Civic Center Maintenance fund revenue account (no. 74-O1-5324) and appropriate same to the Civic Center Maintenance fund expenditure account (no. 74-243-6631) for construction of Civic Center Drainage and Pavement Improvements. 3. Approve a Funding Analysis with a total estimated construction cost of $273, 100. DISCUSSION This project addresses improvements in three areas in the Civic Center (Exhibit 1). The planter drainage system at the main entrance of the Police Department building has deteriorated beyond repair. This project provides for installation of a larger drainage pipe and cleanout structures to enhance the drainage system. Also, the walkway surfaces at the library parking structure are stone tiles that have been broken or degraded and were repaired individually. The project provides for replacement of existing tiles with a uniformly colored concrete surface. In addition, the existing concrete pad of the inner courtyard will be replaced with decomposed granite and the existing concrete in the front will be replaced at the County Sheriff's Administration Building. 23C-1 Contract Award For Civic Center Drainage and Pavement Improvements April 6, 2009 Page 2 The Notice Inviting Bids was advertised on February 13 and 18, 2009, and bids were opened on March 5, 2009. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 0 Contractors requesting bidding documents: 7 Bids received: 3 Bids received from Santa Ana Contractors: 0 NAME OF RESPONSIVE BIDDER CITY BID AMOUNT 1. Belaire West Landscape, Inc. Buena Park $218,525.00 2. Green Giant Landscape, Inc. La Habra $244,185.00 3. T K Engineering Company Los Angeles $268,137.50 A total of three bids were received and all were responsive. The lowest bid was submitted by Belaire West Landscape Inc., for $218,525, which is below the Engineer's estimate of $285,000. ENVIRONMENTAL IMPACT In accordance with California Environmental Quality Act, the proposed project is exempt from future review. Categorical Exemption Environmental Review Nos. 2009-32, 2009-33, and 2009-34 will be filed for this project. In addition, a Certification of Categorical Exclusion and Statutory Worksheet have been prepared in accordance with National Environmental Policy Act. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $273,100 for the project (Exhibit 2). The appropriation adjustment will enhance the Civic Center Maintenance fund revenue (account no. 74-01- 5324) and expenditure (account no. 74-243-6631) by $310,000. With approval of the appropriation adjustment, funds are available in Civic Center Maintenance Fund (account no. 74-243-6631). 23C-2 Contract Award For Civic Center Drainage and Pavement Improvements April 6, 2009 Page 3 U~ James G. Ros Executive Director Public Works Agency ~ Gerardo Mouet Executive Direc or Parks, Recreation, and Community Services Agency APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\04-06-09 CC DrainageImprv 09-9103 40 WD 23C-3 W w z 0 J W IIV11 11V V LIVILI V I J ~ PROJECT LCATION EXHIBIT 1 SANTA ANA CITY COUNCIL CIVIC CENTER DRAINAGE AND P W A AGENDA DATE: PAVEMENT IMPROVEMENTS APRIL 6, 2009 (PROJECT NOS. 09-9103-M, 09-9104-M & 09-9105-C) i~ „__ t' w ~~ 1 ~ i 0 i ~ ~~~- ~~,. ~~r ~.~ 1 1 1 1 t~ 23C-4 PROJECT 09-9103-M PROJECT 09-9104-M PLANTER DRAINAGE PAVEMENT IMPROVEMENTS IMPROVEMENTS FUNDING ANALYSIS PROJECT NOS. 09-9103-M, 09-9104-M AND 09-9105-C CIVIC CENTER DRAINAGE AND PAVEMENT IMPROVEMENTS Construction Contract $218,525 Contract Administration $5,723 Inspection and Testing $16,000 Survey Staking $11,000 Contingencies $21,852 TOTAL ESTIMATED CONSTRUCTION COSTS 273,100 Exhibit 2 23C-5 23C-6