Loading...
HomeMy WebLinkAbout23C - BRISTOL ST WIDENING - MCFADDEN TO PINEAward a contract to All bidder, in accordance with $8,315,754 for constructio Avenue to Pine Street. CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 1 S` Reading ^ Ordinance on 2"d Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO FILE NUMBER American Asphalt, unit bid prices in n of Bristol Street the lowest responsible the estimated amount of Widening from McFadden 2. Approve a Funding Analysis with a total estimated construction cost of $11,226,000. REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: MAY 4, 2009 TITLE: CONTRACT AWARD FOR BRISTOL STREET WIDENING FROM MCFADDEN AVENUE TO PINE STREET (PROJECT NOS. 06-1500, 07-3206, AND 09-3521) DISCUSSION Bristol Street is the north-south corridor designated as a major arterial highway in the City's Circulation Element of the General Plan. The widening of Bristol Street between Warner Avenue and Memory Lane is a long-term project that will be constructed in several phases. This project includes the segment between McFadden Avenue and Pine Street (Exhibit 1). Overhead utility lines were placed underground in 2008 in accordance with the Bristol Street Specific Plan adopted by the City Council in 1993. With this project, Bristol Street will be widened from two lanes to three lanes in each direction with a landscaped median. The widening will also provide bus turnouts in both directions, enhanced parkway landscaping, sound walls adjacent to the remaining parcels and alleys, a new water main, sidewalk, and curb and gutter. Once completed, these improvements will enhance the ride quality, surface drainage, and visual appearance of Bristol Street. 23C-1 Contract Award For Bristol Street Widening, Phase I May 4, 2009 Page 2 The Notice Inviting Bids was advertised on February 18 and 20, 2009, and bids were opened on April 1, 2009. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 21 Contractors requesting bidding documents: 63 Bids received: 11 Bids received from Santa Ana Contractors: 2 NAME OF RESPONSIVE BIDDER CITY BID AMOUNT 1. All American Asphalt 2. Sequel Contractors, Inc. 3. R. J. Noble Company 4. Shawnan 5. Hillcrest Contracting, Inc. 6. Sukut Construction, Inc. 7. Excel Paving Company 8. Griffith Company 9. Los Angeles Engineering, Inc. 10. Beador Construction Co., Inc. 11. Sully Miller Contracting Corona Santa Fe Springs Orange Downey Corona Santa Ana Long Beach Santa Ana Covina Corona Anaheim $8,315,754.00 $8,487,462.50 $8, 526, 993.70 $8,998,734.50 $9,244,429.50 $9,506,664.00 $9,655,333.00 $9,738,147.00 $10,004,064.00 $10,807,700.00 $10,836,371.30 After the bids were opened, Sequel Contractors, Inc. (Sequel) submitted a bid protest claiming that the bid submitted by All American Asphalt (AAA) was non-responsive. According to a procedure established in the bidding documents, the Director of Public Works Agency conducted an administrative hearing to determine the merit of the protest. Specific assertions of Sequel and staff's findings are summarized below. First, Sequel stated that in the bidding document AAA had listed two sub-contractors but indicated that AAA would perform a portion of the work. Sequel asserted that by doing so, AAA would be allowed to do "bid shopping". Second, Sequel claimed that by adding up the amounts of the bid prices, included in the List of Sub-Contractors, AAA would perform less than 500 of the work. This would not be in compliance with the Standard Specifications for Public Works Construction. Public Works staff and the City Attorney's office after listening to the information presented at the protest hearing by Sequel and AAA, has determined that AAA's bid is responsive and recommends that they be awarded the construction contract for the Bristol Street Widening. 23C-2 Contract Award For Bristol Street Widening, Phase I May 4, 2009 Page 3 ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project has been determined to be adequately evaluated in the previously prepared Environmental Impact Report/Environmental Impact Assessment EIR No. 89-O1 approved by City Council in 1990. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $11,226,000 for the project (Exhibit 2.) Funds are available in the Select Street Construction Fund (account no. 059-553-6631, Project No. 06-1500), Acquisition & Construction Water Utility Capital Projects Fund (account no. 066-579-6631, Project No. 07-3206) and the Sanitary Sewer Service Fund (account no. 056-575-6631, Project No. 09-3521-M). APPROVED AS TO FUNDS AND ACCOUNTS: 6i'61LiZL v~ James G. R s Executive Director Public Works Agency ~- ~. ~ ~ ,~ Francisco Gutierrez ,r~~ ^' c~--~ Executive Director Finance & Mgmt. Services Agency ` K:\Construction\RFCA-draft\04-20-09 06-1500 BristolWid WA 200 WD.docx 23C-3 -- ~----~ I I j I I ~ I i • I ~--1----~-•T-- I --~------~ ~------ I I I-------~ I I PANE ST PINE ST .. IJ __ _ _ __ • i. __Ial __-- I - ---1 I . ~ ' - ---~ '-~ r-_--- 1 I - _-r--i -- ----~ ~----- j I _ _ ---j j------ i I I I _.J ~_- - ~ _ __ 1•ICHESTNUT AVE ----I ~_--_- a i - -I I ----1 ~------ -I I - I --I,I- --- I __- I ~,, • ----Ian I MYRTLE STREET MYRTLE S7 --~ --- I I -- ~ _ I , -- ~ ----- I --Ir-I ~ Ir I j -- ~a _--- I -- L. I - - -.CAM1.4E S7 _-.~ -_-__ I I __.~ _____ I I -_.~ __-__ I •• ----a ----- I .w • ----~a ..L..L.. WILLITS 57 BISHOP ST .. T.. .. ~..~ I I I I I I I • -_~--~- MATCH LINE SEE ABOVE RIGHT MATCH LINE SEE BELOW LEFT RAYMAR ST _ RAYMAR I I ~ _ I---~--- ~ .T.. ~ I I I I I ~ • _ __I __ I RICHLAND AVE I I . __ I I I I I I ..L..1.. 1~-~1-- -' RICHLAND AVE I __r.. .~..~.. TOLLIVER S7 - --~- I _-_~ _- _ __~ I _--~~ HIGHLAND $T 'a ___~ I I I I ---~ -----I-- ~ ---~ I I- I j --- ~ I ~ • j ~_.1 --' _-~• BROOK ST --- ~ ~ ,~~ --- .__ I - II ~ I II -_- I I --- I f ---_ I I I t--_- --- i r-_- ~'f '_ ~~•-.I ~---- i-- i•.~..i. ~--- i - --~ j i '~w~---- ~ I I I I lal--_-- I I I I ..J L I MCFAODEN AVENUE wulni~- ~ saNra aNa TITLE CITY COUNCIL BRISTOL STREET WIDENING, FROM P W A AGENDA DATE MCFADDEN AVENUE TO PINE STREET, PHASE I MAY 4, 2009 (PROJECT NOS. 06-1500, 07-3206, AND 09-3521) PUBLIC WORMS AGENCY ~ . ~ i FUNDING ANALYSIS PROJECT NOS. 06-1500, 07-3206 AND 09-3521 BRISTOL STREET WIDENING FROM MCFADDEN AVENUE TO PINE STREET, PHASE Construction Contract $8,315,754 Contract Administration $147,096 Inspection and Testing $650,000 Survey Staking $450,000 Contingencies $1,663,150 TOTAL ESTIMATED CONSTRUCTION COSTS $11,226,000 Exhibit 2 23C-5 23C-6