Loading...
HomeMy WebLinkAbout23A - PLAZA DR REHAB PROJREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JULY 6, 2009 TITLE: CONTRACT AWARD FOR PLAZA DRIVE REHABILITATION BETWEEN SUNFLOWER AND MACARTHUR (PROJECT N0.09-1029-C) j'~ CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 1s1 Reading ^ Ordinance on 2nd Reading ^ Implementing Resolution ^ Set Public Hearing For CONTINUED TO FILE NUMBER 1. Award a contract to Hardy and Harper, Inc., the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $429,000 for construction of Plaza Drive Rehabilitation between Sunflower and MacArthur. 2. Approve a Funding Analysis with a total estimated construction cost of $536,200. DISCUSSION The segment of Plaza Drive from Sunflower Avenue to MacArthur Boulevard has been identified as a high priority by the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, driveways, local depressions, bus pads and sidewalks are also in various states of disrepair and require replacement. This project provides for construction of new street pavement, replacement of damaged concrete curbs, gutters, sidewalks, driveway approaches and curb ramps. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the street. The Notice Inviting Bids was advertised on May were opened on June 4 2009. A summary of th the bids received, and the bid results follow. 15 and 18, 2009, and bids e bid invitations mailed, 23A-1 Contract Award For 09-1029-C July 6, 2009 Page 2 Santa Ana Contractors receiving notices: 16 Contractors requesting bidding documents: 12 Bids received: 6 Bids received from Santa Ana Contractors: 1 NAME OF RESPONSIVE BIDDER CITY BID AMOUNT 1. Hardy and Harper, Inc. Santa Ana $429,000.00 2. R. J. Noble Company Orange $429,926.50 3. All American Asphalt Corona $433,000.00 4. Sequel Contractors Santa Fe Springs $487,835.00 5. EBS, Inc. Corona $525,000.00 6. Excel Paving Long Beach $556,274.25 A total of six bids were received and all were responsive. The lowest bid was submitted by Hardy and Harper, Inc., for $429,000, which is below the Engineer's estimate of $565,000. TNVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption ER #2009-80 was filed for the project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $536,200 for the project (Exhibit 2.) Funds are available in the Traffic Congestion Relief Fund (account no. 28-552-6631). APPROVED AS TO FUNDS AND ACCOUNTS: v~ +y ~ ~ `~ James G. ss Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\07-06-09 09-1029 P1azaDrRehab 80 WD WA.docx 23A-2 N r z J Q V V1 NS ~N SUNFLOWER AVENUE LEGEND: ® PROJECT LIMITS EXHIBIT 1 SANTA ANA TITLE; j ~~, crrY couNaL CONTRACT AWARD FOR P W A Af~NDA DATE PLAZA DRNE REHABILITATION .~...,~ .R1LY 6.2009 SUNROWER AVENUE TO MACARTHUR BOULEVARD PUBLIC frORKS •GENCT (PROJECT N0. 09'1029-C) 23A-3 MACARTHUR BOULEVARD FUNDING ANALYSIS PROJECT NO. 09-1029-C PLAZA DRIVE REHABILITATION BETWEEN SUNFLOWER AND MACARTHUR Construction Contract $429,000 Contract Administration $9,300 Inspection and Testing $35,000 Survey Staking $20,000 Contingencies $42, 900 TOTAL ESTIMATED CONSTRUCTION COSTS 5536,200 Exhibit 2 23A-4