NOTICE OF COMPLETION
NOTICE 1S HEREBY GI1rEN that the undersigned Oily of Smlta Ana. California, a
municipal corporation, with the address of City }tall, 20 Civic Center Plaza, Santa Ana,
California, 92101, is the owner of the proper(} hereinafter described, that said owner has caused
construction of PLAZA OF THE FOUNTAINS PLANTER RENOVATION AND
,IOINT REPAIR under ?ntracl entered info on _ 4.19.2010 ,with
-PARK IVEST LANDSCAPING INC.-, nn which armract -GREAT Ah1ERICAN
INSURANCE C01IPAVY? is surety. The properly on which such work improvement was
placed is in the City of Santa Ana County of Orange, Slate of California, and described as
Project No. 09-9109 located at: PLAZA OF THE FOUNTAINS (EXIBfT 1.
The work improvement on said properly was accepted as completed on _ j-6-?01 I _ .
by ?
Dated, ? City Engineer
nrrr
VERIFICAI'10?
L the undersigned, say: [ am the City Engineer of
the City of Santa Ana, C'alitornia; f e?eeuled the foregoing Notice of Completion acting on
behalf' of the owner of the property therein described; I make Ibis verification on behalf of said
corp<ration by authorization ofthe City Council of the Citpof Santa Aua; I have read said nolicemid know the comcnls (hereof; and I declare under penalty of perjury that the facts therein stag
are true.
CITY OF SANTA ANA, A MUNICIPAL 'ORf?RA'f ION
Ezeculed nn ? I? ?? ?_ , at Santa Ana, California
o ?
I tiirawru ur mdiviJuui ?w?;irnig Ihai Ih.u?nlcnl? ul Nuii?c nl Campc(ion nre WcI
THIS NOTICE OF C01IPLETIO\ MUST BG RE('ORDED 1vfIHIV Tf N (l(II UA4'S,ItTLR CQ?rIPLITI?N
•
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 19, 2010
TITLE:
CONTRACT AWARD FOR PLAZA OF
THE FOUNTAINS PLANTER
RENOVATION AND EXPANSION JOINT
REPAIR (PROJECT NOS. 099109 &
099107)
//
CITY MANAGER
RECOMMENDED ACTION
•
CLERK OF COUNCIL USE ONLY:
APPROVED 04/ 19/2010
Imo" As Recommended ~ ~-3 ~-
^ As Amended
^ Ordinance on 1St Reading
^ Ordinance on 2"d Reading
^ Implementing Resolution
^ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Award a contract to Park West Landscape, Inc., the lowest responsible bidder, in accordance
with the base bid in the estimated amount of $532,588.46 for construction of Plaza of the
Fountains Planter Renovation and Expansion Joint Repair.
2. Approve a Funding Analysis with a total estimated construction cost of $665,700 which
includes construction, contract administration, inspection, testing, and contingency costs.
DISCUSSION
The existing planters leak water into the parking area located beneath the Plaza of the Fountains
(Exhibit 1). This project provides a water proofing layer to the interior walls of the planters,
replacing the electrical and plumbing systems, providing interpretive signs to educate the public of
the native plants and garden, and repair expansion joints on the plaza deck. This is the third and
final action item associated with this project. Once completed, the improvements will increase the
aesthetic quality of the plaza garden and the surrounding area. Funding for improvements within
the Civic Center is paid for from the Civic Center Authority, a joint authority between the City and
the County of Orange.
The Notice Inviting Bids was advertised on February 17 and 19, 2010, and bids were opened on
March 9, 2010. A summary of the bid invitations mailed, the bids received, and the bid results
follows.
Santa Ana Contractors receiving notices: 18
Contractors requesting bidding documents: 6
Bids received: 3
Bids received from Santa Ana Contractors: 0
Contract Award for Plaza of the
Fountains Planter Renovations
and Expansion Joint Repair
April 19, 2010
Page 2
NAME OF RESPONSIVE BIDDER
1. Park West Landscape, Inc.
2. Mariposa Landscape, Inc.
3. 4-Con Engineering, Inc.
CITY BID AMOUNT
Corona $532,588.46
Irwindale $653,624.80
Riverside $679,340.00
A total of three bids were received and were responsive. The lowest bid was submitted by Park
West Landscape, Inc., for $532,588.24, which reflects extensive hand work resulting from the
restrictions of equipment allowed on the plaza deck and the limited access to the site.
ENVIRONMENTAL IMPACT
Environmental Review No. 2010-46 has been completed and the Categorical Exemption will be
filed upon award of the contract pursuant to the California Environmental Quality Act.
FISCAL IMPACT
The Civic Center Budget is the source of the money for this project. Half of the funds are coming
from the County and half from the City. The funding analysis shows a total estimated construction
cost of $665,700 for the project (Exhibit 2). Funds are available in the Other County Funding
(accounting unit 07413260-66220).
APPROVED AS TO FUNDS AND ACCOUNTS:
r_ ~,r '
l = ~.
Raul Godinez II ~.
Executive Directo
Public Works Agency
~ l~1cc~ Ldr ~ „~~
Francisco Gutierrez
Executive Director ~~
Finance & Mgmt. Services Agency
Gerardo Mouet
Executive Director
Parks, Recreation, and Community
Services Agency
RG/ET
Exhibit 1: Project Location Map
2: Funding Analysis
CIVIC CENTER DR.
PARKING
STRUCTURE LIBRARY
COUNTY COURTNOUSE
PROJECT
LOCATION ROSS ANNEX
CITY NALL
~ LIBRARY
STATE
~ UILDI pARKING
TRUCTUR
w
[]
J
~ FEDERAL
BUILDING
SANTA ANA BLVD (4TH
LEGEND:
PROJECT LOCATION
SANTA ANA
CITY COUNCIL
P W A AGENDA DATE:
APRIL 19. 2010
PUBLIC rORKS AGENCY
EXHIBIT 1
T[TLE:
[]
~C
.E
C
CONTRACT AWARD FOR
PLAZA OF THE FOUNTAINS PLANTER
RENOVATION AND EXPANSION JOINT REPAIR
(PROJECT NO. 099109 8 099107)
N
H
Z
N
U
FUNDING ANALYSIS
PROJECT NOS. 099109 AND 099107
PLAZA OF THE FOUNTAINS PLANTER RENOVATION
AND EXPANSION JOINT REPAIR
Construction Contract $532,588
Contract Administration $30,154
Inspection and Testing $49,700
Contingencies $53,258
TOTAL ESTIMATED CONSTRUCTION COSTS 665 700
Exhibit 2
~ i
CITY OF SANTA ANA
•
PROJECT NO.09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT N0.09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: (~ IkiLlc_. W C ST l~/~f~ OJP.~ P ~ ,~~"?~l C
REQUIREMENT:
The undersigned declares that he/she has carefully examined the location of the proposed work, that
he/she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS,
and hereby proposes to furnish all material and do all the work required to complete the said work in
accordance with said plans (if any), specifications and special provisions, for the unit price(s) or lump
sum(s) set forth in the following schedule:
Item # Bid Item Unit Quantity Unit Price Amount
1. Clearing and Grubbing LS 1 $ ~ (, Q $ $ j~ 3 3, ~ D
2. Remove Existing Wall Coping LF 800 $ ~~$ 5 $ o a
3. Remove Existing sloped veneer SF 4,290 $ 3 ~ S [ $ 7
perimeter wall
4. Removal & Disposal of cement LS 1 $ ~ 7 S.3 $ ~ t
Asbestos board
5. Furnish and Install Skate Resistant LF 800 $ ~~~~ $ 6 00
Wall Cap
6. Sandblast Exterior around Planter w/ SF 2,910 $~~ $ 1 ~, 9 ~8, 6 0
Anti-graffiti Sealant (medium
sandblast finish, color =light gray)
7. Construct PCC Color Pavement SF 3,810 $ q, 7 ~ $~.Z" 033, ~
(4"-7" thick, medium sandblast
finish, color =light gray)
8. Furnish and Install Elastomer SF 14,370 $ 5. ~ $ ti a„ g Q
• Waterproofing
TO BE INCLUDED IN BID PACKAGE
BPlof14
i
•
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO.09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL: Continued
Item # Bid Item Unit Quantity Unit Price Amount
9. Furnish and Install Small Wall Cap LF 300 $ 33.E [ $
on Tree Wells
10. Furnish and Install Planter Drain & EA 36 $ ~9, ~ 3 $ D
Filter Fabric Assembly
11. Furnish and Install 4" to 6" cobbles, SF 310 $ ~`GB $ $~,
imbedded into 3" Grout over sand
• base
12. Irrigation System- Below Structural LS 1 $ ~ 9 $ q 3
Slab
13. Irrigation System- Above Structural LS 1 $~~,,9~t3, 8 4 $ ~ 9'
Slab
14. Landscaping LS 1 $ 61 6,yd~.GD $ X66 `~d~, ~
15. Tree (36" box) EA 6 $~SD ~, >.~ $ 0 0 0
16. Tree (15 gal) EA 32 $ ~9.5s $ 5
17. Signage EA 4 $ 3dT~, 3 d $ ,~ `~/ 9
18. 60 working day Maintenance Period LS 1 $ $ $ ,j oZ ,
19. Landscape Pots EA 7 $ ~{ 3, 9 g $ Q
•
TO BE INCLUDED IN BID PACKAGE
BP2of14
L J
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL: Continued
Item # Bid Item Unit Quantity Unit Price Amount
PROJECT NO. 09-9107-C
20. Sikaflex 2C SL Joint
Sealant(Limestone color)
TOTAL BASE BID----
ADD ALTERNATE I
21. Electrical & Lighting System -~
GAL. 50 $ y y g . 99 $ 4
Pr ~ 53,588, y6
LS 1 $ ~ ~f,~ $5 sls~ao
TOTAL ADD ALTERNATE IBID--------------
TOTAL BASE BID + ADD ALTERNATE IBID--
The lowest responsible bidder will be selected based on the low Total Base Bid.
$~88i143.Y~
j' This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
PROJECT NO. 09-9109 BIDDER
PLAZA OF THE FOUNTAIN Firm P F1(Zt< W~ S7" l,~-i~•(D ~ R P E , eft- .
PLANTER RENOVATION
PROJECT NO. 09-9107:
PLAZA OF THE FOUNTAIN
EXPANSION JOINT
Address 1 ~ ~ ~ ~.,~ l~P ~ + i i~ U
L'bk' ON4 i~ ~7 `~~t
•
Phone(s) ~ I ~ ~ ~ 3--~ ~ ~
BIDDER ~ -~,
Signature
>d
f'
BP3of14
------------------------------ $ S S,.S JS, 0 0
TO BE INCLUDED IN BID PACKAGE
•
CITY OF SANTA ANA
•
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB-CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; %z% of the bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: %z% of the bid
•
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
NAME .S ~4 ~e r V~ ~ 1--~ r(1 i o D ~ ~~ n ~ Tn ( ,
LOCATION [_YL pn ~c f o'~ ~C ~ ~ 4 ~~~ 3
PHONE D ~ 9 $ 5 - 4(0 (~
TYPE OF WORK Ula roo $ 0 . aO
({a4 ~x
NAME r~ Vd i ~ n
LOCATION ~ a ~. ,'~ , ~ ~
PHONE 7(`I'~ g`('~{ADO
TYPE OF WORK 5-~ $~
NAME ~~.~ e (~ =n L
LOCATION p V ~~ /1 ~ ~
PHONE ~a6~3 .31-~~q
TYPE OF WORK ~~;-6-af ~;~ $~
NAME ~; ' Ovn Send ~rS ~'~ ~~
LOCATION C i~ 5 f e c'
PHONE - ~ ~~j
TYPE OF WORK S~ ~ $~ ~. 0~~
NAME ~ 5'~" ~ ~U' ~ rD/l/-~ ~~ ~e ~
LOCATION ~~~ ~~ ~
NAME ~ n SQL ~~cC~
LOCATION ~ /J/j
PHONE 4~~~ ~ (( S
TYPE OF WORK - P ~. , $ ~
NAME
LOCATION
PHONE
TYPE OF WORK
NAME
LOCATION
PHONE
TYPE OF WORK
NAME
LOCATION
PHONE
TYPE OF WORK $
NAME
LOCATION
i •
CITY OF SANTA ANA
• PROJECT NO.09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL & CONTRACT AGREEMENT
BIDDER'S STATEMENT
BIDDER understands and agrees that this written proposal (or any part thereof specifically designated
and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement
between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by
the Clerk of the Council with her signature and official seal noting hereon the action of approval of the
Council, signed by the Public Works Agency Executive Director ~ or his duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its execution, and
when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will
furnish AGENCY all required bonds and certificate of liability insurance within ten (10) days (excluding
Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or BIDDERS bond
substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and
shall be considered as payment of damages due to the delay and other causes suffered by AGENCY
because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S
bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in
the bid schedule are solely for the purpose of comparing bids, and that final compensation under the
contract will be based upon the actual quantities of work satisfactorily completed.
All terms contained in the Specifications, the Certification of Non-Discrimination by Contractors, and
the Workers' Compensation Insurance Certificate are to be incorporated by reference into this
Agreement and are made specifically as part of this bid.
Name of Firm ~ A 1Q K 1~ CT ~ ~N ~
Signature of
BIDDER
Title ~ IZE S i p es rGT CO 2 0 iv ~ ~- v l S ~ b~
(if an individual, so state)
•
TO BE INCLUDED IN BID PACKAGE
BPSof14
i
i
CITY OF SANTA ANA
•
•
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT continued
(If a firm or co-partnership, state the firm name and give the names of all individual co-partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
P -~ i2K w~ sT- L~ N bsc ~9- P E ~~ c .
~ t M T12. ~C`I S E C(~LT~~ ~- T tZt ~ s~ ,2F'ie. , k~v i ~ C 21~1~ ~PQ~ES i ~~NTt MA~J~C--~
/. ~.
Award t~ /(~ ?~!,' M'~t.I ~ . Y r~~ ~ ~. ~^ .
on the basis of bweat responsible and h~q~~ ACTION OF COUNCIL:
bidder in the amourd of
ATTEST:
v Dti~-~ !
CLERK OF THE COUNCIL
APPROVED AS TO FORM:
Date ~ ~ ~ ~ 20 / ~,~
ACCEPTED FOR THE CITY OF SANTA ANA:
CITY ATTORNEY EXECUTIVE D CTOR
PUBLIC WORK AGENCY
BP6of14
TO BE INCLUDED IN BID PACKAGE
• i
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR
The undersigned contractor or corporate officer, during the performance of this contract, certifies as
follows:
1. The Contractor shall not discriminate against any employee or applicant for employment because
of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to their
race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination
clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he has a
collective bargaining agreement or other contract or understanding, a notice to be provided advising the
said labor union or workers' representatives of the Contractor's commitments under this section, and
shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,
and will permit access to his/her books, records, and accounts by the administering agency and the
Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations,
and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract maybe canceled, terminated, or
suspended in whole or in part and the Contractor may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
• Execution Order 11246 of September 24, 1965, and such other sanctions maybe imposed and remedies
invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order
of the Secretary of Labor, or as otherwise provided by law.
TO BE INCLUDED IN BID PACKAGE
BP7of14
•
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR (continued)
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or
purchase order as the administering agency may direct as means of enforcing such provisions, including
sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in,
or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency, the Contractor may request that the United States enter into such litigation to
protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any contractor of public works violating
this Section is su~ct to all the penalt es imposed for a violation of the Chapter.
Signed
Title ~ ~~.5 t D ~N~ Co ~-~ N A ~ ~ ~ t S - ~ ~!
Firm P~tZK. W~~- L~~usL+~-P~ , mac,
Date MAIZ~N q, Zoo
•
TO BE INCLUDED IN BID PACKAGE
BP8of14
CITY OF SANTA ANA
i
• PROJECT NO.09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
WORKERS' COMPENSATION INSURANCE CERTIFICATION
As required by California Labor Code Section 1860 and 1861, the Contractor certifies as follows:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for worker's compensation or to undertake self-insurance in accordance with the
provisions of the Code, and I will comply with such provisions before commencing the performance of
the work of this contract.
If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer
under California Labor Code Section 3300, unless the hired employee(s) is (are) persons excluded by
said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers'
compensation insurance carrier certifying that I carry such insurance and that the policy shall not be
canceled nor the cover e reduced except upon thirty (30) days prior written notice to the City of Santa
Ana. /~ _ d
Signed
Title P R,~ s ~ u~~ T Co ~ o ~~ A ~- ~t ~ S ~ b,~/
Firm 1~ A ~ZK VAST L {~ N ~~sC+q ~°~ , ~-~cC
Date fit(-k~ZG} ~ , Zo to
TO BE INCLUDED IN BID PACKAGE
BP9of14
•
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which
BIDDER has performed similar work within the past two years.
C- i y pF PIZZA- 1 C,~~I lC, C~NT~fZ C~12.CLE Y~2~A ~ A ~iL8z1
Name and Address of Owner.
~ VDU 1 ~--1 S t ~~ U (~i 14) °i°I D -1 (~ 0 O
Name and Telephone Number of person familiar with project.
~ i3, ~Sl~ , ~o~ . oa F~11 . Ct;n-s~ocTtdt~ ~sPeR~S $-is- 0~
Contract Amount Type of Work PAfZ~ Date Completed
2. ~ ITy `DF BJ~N~ P>41~LK tob5o t,E~GE-F k~~u ova ~ 3v~Nt~~A~~.. ~ °lpbz ~
Name and Address of owner.
C'tUS PV ER-1-RS (°I`~q~ 2tv1 - l 0 0l
Name and Telephone Number of person familiar with project.
-.~ 23~ ~q z5 . p p I,D~N DSC,A P~ -1 ~~ <-,aTl oN ~ ~ - I - o °i
Contract Amount Type of Work POl-t cE p ARtNI NT Date Completed
~ ~ ~r~~-o
3• C ti~C ~~ of F~~rcCN~p Cup a MoN ~, A ~ ~~SOO C,~~ t_c, CFnrr~c-(z 1~2-v CUC~ M ON ra-~ ,GA
Name and Address of owner. °I~l3o
Name and Telephone Number of person familiar with project.
l n ~ I ~ f~0 ~ . O D USN taSCR P~ ~ Zl~-f21 hPsTl i`,(~l, E l.~ CT7=lCA L 5 ~ t ~ 08
Contract Amount Type of Work ~NCYZLT~, MASptrRy Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom
BIDDER intends to procure insurance and bonds.
TbZ1~~El,E~'S P20~C-r2T ~{ (~+ASy/kl Ty OF f~M~2~G~ ~~ f~~N IZISIL. ~1vS~2~NCC SazVtC~
w~~c
~1 D~I W t ~ S 1-tt 2 E ~0 U t_G V 1k~D Lo S PrN{~E - s ~ A q l~ I -} -~b Ert r~ t S }~ e NI{ ~2D (ZI3) b3~ -13 Z L
~-,~~ A C -~t~t E r21 t~ fJ ~ N S ~ ~ ~ tJLE -~l PQN ~~
o N~ Srt Q--~ET i~ 11 b ~ c
•
BP 10 of 14
yIOS P~~~C-k- Mo~~ttA-N
~{IS) 4~b- ~Z33
TO BE INCLUDED IN BID PACKAGE
•
CITY OF SANTA ANA
• PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code
regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000
or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor under the
apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same manner as
the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to
the California Appr ticeship Co ci
• Signed ~ C~
Title S A y ~ s ~
Firm P ~ ~21L w SST LAN r~SC..~ ~~ ~ ANC
Date M F~ R C N cl ~ 2e~ ~ 0
•
TO BE INCLUDED IN BID PACKAGE
BP 11 of 14
CITY OF SANTA ANA
~~
• PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner,
directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price
of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of
any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further, that the
BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non-collusion Affidavit is part of the Proposal. Signing this Proposal on the
signature portio~~` ereof shall also constitute signature of this Non-collusion Affidavit. BIDDERS
are cautioned t making a f~se certification may subject the certifier to criminal prosecution.
Signed
State of California
County of ~c,(1'fJLI~CGLQ_
Subscribed and sworn to (or affirmed) before me on this ~ day of ~ ch 2010, by
~~v1rt ~' . ~y j(~ ,proved to me on the basis of satisfactory evidence to be the person'who
appeared before me. `'
otary Public Signature
_ X. ADAME~
1~nn COMM. # 1805811
v! NOTARY PUBLIC-CAlIF01NNA ~ .
RIVfRSIOE CWNTY
MY CONN. E%P. JULY $, 4G12
Notary Public Seal
TO BE INCLUDED IN BID PACKAGE
BP 12 of 14
•
•
CITY OF SANTA ANA
• PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING "ANTI-KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the Copeland "Anti-Kickback" Act (18 USC 74) as supplemented in
the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or
subcontractor shall be prohibited from inducing, by any means, any person employed in the construction
or repair of public w~~fk, to give up~ny~part of the compensation to which he/she is otherwise entitled.
Signed
Title ~ ~~~ ~ u~~T CoFZ~v P~
Firm {~/~~~' ~ v~ST (~-.(1~.~C -9 P~ ,-n.(C,
Date M ~ (`,~k ~~ ~ 2010
TO BE INCLUDED IN BID PACKAGE
BP 13 of 14
~,
•
•
CITY OF SANTA ANA
PROJECT NO. 09-9109: PLAZA OF THE FOUNTAIN PLANTER RENOVATION
PROJECT NO. 09-9107: PLAZA OF THE FOUNTAIN EXPANSION JOINT
PROPOSAL AND CONTRACT AGREEMENT
CONTRACTOR'S LICENSING STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is
true and correct.
Contractor's Name: ~/~ ~1L W ~S ~ L~ N OS C~ ~ ~ , --,~~ ~ .
Business Address: X21 ~ C-,R prp ~}~ -I-~ -lj~ Cud ~ A , ~A gygg 1
Telephone: ~a~\~ 2-Ab _~-l g p
State Contractor's License No. and Class: ~~ 13102 A , g , C- ~1 (; (o I ! p 12
Expiratio
Signed:
• 'title:
•
TO BE INCLUDED iN BID PACKAGE
BP 14 of 14
lirR,F~T
f~.1~11~ ~t I~.:'.'~~~'
~i.7 ,. A;~'[~F g~Ar~~;~.,~
KNOW ALL MEN BY THESE PRESENTS, that we, PARK WEST LANDSCAPE, INC.
as principal, and the GREAT AMERICAN INSURANCE COMPANY, a corporation existing under the laws
of the State of Ohio, having its Administrative Office at 580 Walnut Street, Cincinnati, Ohio 45202, as surety,
are held and firmly bound unto CITY of SANTA ANA
as obligee, in the penal sum of TEN PERCENT OF AMOUNT BID
Dollars ($ io 0 of BID AMOUrrT) ,lawful money of the United States of America, for the payment of which,
well and truly to be made, we bind ourselves, our heirs, executors, administrator, successors and assigns, Jointly
and severally, firmly by these presents.
SIGNED, sealed and dated this zna
Bond No. N/A
WHEREAS, the said principal PARK WEST LANDSCAPE, INC.
herewith submitting a propOSBI for DEMOLITION, LANDSCAPE, IRRIGATION, CONCRETE AND PAVERS
NOW, THEREFORE, the condition of this obligation is such that, if the said principal shall be awarded the
said contract, and shall within ( 90 ) days after receiving notice of such award
enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null
and void otherwise the principal and surety will pay unto the obligee the difference in money between the
amount of the principal's bid and the amount for which the obligee may legally contract with another party to
perform the work, if the latter amount be in excess of the former; but in no event shall the liability hereunder
exceed the penal sutp hereof.
PARK WEST LAND PE, INC.
a~
Princi
day of March
GREAT AMERICAN INSURANCE COMPANY
Bv: ~ ~~
JULIA MO ~ Attorney-in-r act
zoio
F.9116
t
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California
County of San Francisco
On ----------- March 2, 2010 ---------------------- before me, Celeste C. Austria, Notary Public
personally appeared------------------------ Julia Mo
who proved to me on the basis of satisfactory evidence to
be the person(s) whose name(s) is/are subscribed to the
within instrument and acknowledged to me that he/she/they
executed the same in his/her/their authorized capacity(ies),
and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s)
acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true
and correct.
CELESTE C. AUSTRIA WITNESS my hand and official seal.
COMM. # 1718519 z
Z = d NOTARY PUBLIC - CALIFORNIA
~ SAN FRANCISCO COUNTY
~~ My Comm. Expires Jan. 20, 2011 _-~ ~ ~
~(~
Signature of Notary
Notary Seal
• • • •
•
GREAT AMERICAN INSURANCE COMPANY®
Administrative Office: 580 WALNUT STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE
No. 014507
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under
and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than
one is named, its true and lawful attorney-in-fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds,
undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond,
undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.
Name
JOHN T. LETTIERI
PATRICK MOUGHAN
JULIA MO
Address
ALL OF
SAN FRANCISCO,
CALIFORNIA
Limit of Power
ALL
$75,000,000.00
This Power of Attomey revokes all previous powers issued in behalf of the attorneys}in-fact named above.
IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunto affixed this 22nd day of , APRIL 2009.
Attest
STATE OF OHIO, COUNTY OF HAMILTON - ss:
GREAT AMERICAN INSURANCE COMPANY
DAVID C. KITCHIN (513412-4602)
On this 22"d day of APRIL 2009, before me personally appeared DAVID C. KITCHIN, to me known, being duly sworn, deposes and
says that he resides in Cincinnati, Ohio, that he is the Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company
described in and which executed the above instmment; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that
it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by
like authority.
This Power of Attomey is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by
unanimous written consent dated March 1, 1993.
RESOLVED: That the Division President, the Division Senior Vice President, the several Divisional Vice Presidents and Divisional Assistant Vice Presidents,
or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety, any and all
bonds, undertakings and contracts ofsuretyship, or other written obligations in the nature thereof,• to prescribe their respective duties and the respective limits of their
authority; and to revoke arty such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid o„~rcers and arty Secretary or Assistant Secretary of the Company
maybe affixed by facsimile to arty power of attorney or cerf~cate of either given for the execution of arty bond, undertaking, contract or suretyship or other written
obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original
seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed.
CERTIFICATION
I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and
the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect.
Signed and sealed this 2ND
day of, MARCH 2010 .
S1029Y (10/08)
CAL~ORNIA ALL-PURP~E
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of ~~(,(/`~~0~
On `1~/C~(/h ~, 2 0/ (~ before me,
personally appeared
. ~I c~a.m.e, ~v f--~ 6~c~d-~
(here insert name and title oft a officer)
V C. ~
c~
who proved to me on the basis of satisfactory evidence to be the person~s~~whose name~s}Q'are subscribed to
the within instrument and acknowledged to me thathe/they executed the same in~her/their authorized
capacity.~iesj, and that by~'s~her/their signature(~j on the instrument the persons}; or the entity upon behalf of
which the persor~acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS m hand and official seal. ,~ X. ADAMS
- Coal. # 1805811
Gr} twre~rPUeuc•cra~clraa~ d.
°~ 'y. RIVEII~IOE ~WN1Y -
_ __ ~ / (~~ ., '.~ ; ':~ NY CONY. EXP. JULY 2, 2d1t
Signature of Notary Public i'°' e
ADDITIONAL OPTIONAL INFORMATION
DESCRI/P~TION OF THE ATTACHED DOCUMENT
/C~ l (;~ ~ D /~ GJ~
(Title or description of attached document)
C c ~/ (~ ~ ~ ~a~ ~~i2GL~
(Title or riptio of attached document continued)
Number of Pages ( Document Date 3~ ~~
~G~1 ~--w~~ T L ~N~.S (~4~t ~
(Additional information)
CAPACITY CLAIlvIED BY THE SIGNER
^ Individual (s)
^ Corporate Officer
(Title)
^ Partner(s)
^ Attorney-in-Fact
^ Trustee(s)
^ Other
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California must contain verbiage exactly as
appears above in the notary section or a separate acknowledgment form must be
properly completed and attached to that document. The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California (i.e. certifying the authorized capacity of the signer). Please check the
document carefully for proper notarial wording and attach this form if required.
• State and County information must be the State and County where the document
signer(s) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeazed which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e.
ire/she/ is /are) or circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be cleaz and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re-seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
-- ---
-- _ _ - -- -
CAPA v12.10.07 800-873-9865 www.NotaryClasses.com
MEMORANDUM
David Ream
To: City Manager
rn
u
Date: February 8, 201 1
Raul Godinez II, Executive Director
From: Public Works Agency
subject: PROJECT NOS: 09-9109 AND 09-9107
PLAZA OF THE FOUNTAINS -PLANTER RENOVATION AND EXPANSION JOINT
REPAIR
CHANGE ORDER NO. 1
Contractor: Park West Landscape, Inc.
1215 Graphite Drive
Corona, CA 92881
Project Description: PLAZA OF THE FOUNTAINS -PLANTER RENOVATION AND
EXPANSION JOINT REPAIR
Change Order Number: 1 Amount: $50,165
Account Unit: 07413260
Original Contract Cost:
Amount of The
Change Order:
Previously Approved
Change Orders:
Total Change Orders:
REASON FOR CHANGES
$ 50,165
$ -O-
$ 50,165
Activity: 09910901028
of Original
7.5%
O%
7.5%
1. The contract documents call for the removal and replacement of concrete
topping slabs around the planters, after removing the existing concrete it
was discovered that the waterproofing between the structural slab and the
topping slab was missing. Therefore it was recommended to waterproof the
structural slab prior to installing the new topping slab.
Account: 66220
$532, 588.46
Agreed Price = $34,165.00
PROJECT NOS: 09-9109 AND 09-9107
PLAZA OF THE FOUNTAINS -PLANTER RENOVATION AND EXPANSION JOINT
REPAIR
CHANGE ORDER NO. 1
February 8, 201 1
Page 2
2. While cleaning the existing planter cast iron drains several pipes were
discovered to be cracked and in need of replacement. There for it was
recommended to replace the cracked cast iron pipes.
Agreed Price = $1 ,465.00
3. During the submittal review of the planter wall caps it was determined that
the wall caps were undersized for the existing wall widths and needed to
be increased in size by 1-1/2 inches to provide a '/?" overhang. Therefore it
was recommended to increase the size of the wall caps.
Agreed Price = $1,935.00
4. After removing the dirt from the central planter it was discovered that the
northwest corner was cracked and could not be waterproofed in that
condition. Therefore it was recommended to repair the northwest corner of
the central planter.
Agreed Price = $1,024.00
5. Parks Department requested to have clean outs installed at each planter
drain location to provide easy access for maintenance.
Agreed Price = $3,190.00
6. After removing the dirt from the west planter it was discovered that the
planter did not have an existing drain- Therefore it was recommended to
install a new drain.
Agreed Price = $209.00
7. Parks Department requested to have an additional 150 linear feet of wall
cap installed along the south planters.
Agreed Price = $8,177.00
APPROVED AS TO FUNDS AND ACCOUNTS:
? _
Rau odinez, II Francisco Gutierrez ?I??
Executive Director Executive Director ?_ ?l
Public Works Agency Finance and Management Services Agency
K:\Construction\Projacts\09-9108\Change Orders\09-9108 RFA CO 1.doc
?_ CITY OF SANTA ANA
y , PUBLIC WORKS AGENCY
?' " I CONTRACT CHANGE ORDER
?'
Project Number PROJECT NO. 09-9109 -PLAZA OF THE FOUNTAINS Change Order Number 1
- PLANTER RENOVATION AND JOINT REPAIR
To Park West Landscape, Inc_ Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by Pl1Rl IC W(7RKS Ac?F NCY
EXTRA WORK AT AGREED PRICE
1 . Provide and install 3,785 sq ft waterproofing at PCC bands around the existing planters as
directed per City of Santa Ana.
AGREED PRICE _ $34,165.00
2. Remove and replace 150 If of cracked ductile iron drain pipe, 20 locations, as directed per
City of Santa Ana.
AGREED PRICE _ $1,465.00
3. Increase the width of the new wall cap by 1-1/2", 800 If of wall cap, as directed per City of
Santa Ana.
AGREED PRICE _ $1 ,935.00
4. Repair 560 sq ft of the PCC planter floor located by the State Building as directed per City of
Santa Ana.
AGREED PRICE _ $1,024.00
5. Provide and install new clean outs at each drain, 29 locations, as directed per City of Santa
Ana.
AGREED PRICE _ $3,190.00
6. Core the existing planter wall located at the northwest stairwell to install a new 3" drain as
directed per City of Santa Ana.
AGREED PRICE _ $209.00
7. Provide and install 230 If ft of wall cap at the two planters located by the south stairwell as
directed per City of Santa Ana.
AGREED PRICE _ $8,177.00
Page 1 of 2
'?. CITY OF SANTA ANA
i.t '? ? PUBLIC WORKS AGENCY
i
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 09-9109 -PLAZA OF THE FOUNTAINS Change Order Number 1
- PLANTER RENOVATION AND JOINT REPAIR
To Park West Landscape, Inc.
Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this final change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged work- By signing this final change order, the
Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers,
that the stipulated compensation includes payment for all work contained in this final change order,
plus all payment for interruption of schedules, extended field overhead, home office overhead,
profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract.
The signing of this final change order constitutes full mutual accord and satisfaction for all changes
and work performed on this project, and that the time and cost paid per this final change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all
Suppliers for all work performed on this project. The Contractor on behalf of himself, all
Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ _ _ _ _ _ INCREASE $ 50,165.00
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Add 20 Working Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the prices shown above.
Accepted, Dat Z Contractor Park West Landscape, Inc.
By w!l tl ? KEVIN C. ROFF, DIVISION PRESIDENT )
Approval commended b? ? Date ? ? ( ? ( I
PUBLIC W S AGENC XE V /RECTOR
Approved by ?_ Date 7 ?2 ? Jul
CITY MANAGER ?
Page 2 of 2