RECOMMENDED ACTION
1. Award a contract to F. T. Ziebarth Company, the lowest responsible bidder, in accordance with
unit bid prices in the estimated amount of $1,717,000 for construction of the West Pump
Station Facilities Upgrade.
2. Approve a Funding Analysis with a total estimated construction cost of $2,146,200.
DISCUSSION
Santa Ana's West Reservoir and pumping station was originally constructed in 1963 (Exhibit 1).
The facility includes a 6-million-gallon steel reservoir with five electric motor driven booster pumps
used to supply potable water to the City's distribution system. All equipment and piping is currently
located outside and the site secured with a chain link fence. The pumping equipment is worn and
deteriorated from years of operation and exposure to the elements, and the electrical panels and
wiring are old, obsolete, and operate inefficiently. Additionally, the site pavement is badly
deteriorated. The project would provide for replacement of the pumping and electrical equipment,
construction of a pump station building, and reconstruction of the site pavement.
The Notice Inviting Bids was advertised on March 24 and 26, 2010, and bids were opened on
April 28, 2010. A summary of the bid invitations mailed, the bids received, and the bid results
follows.
Santa Ana Contractors receiving notices: 15
Contractors requesting bidding documents: 34
Bids received: 10
.Bids received from Santa Ana Contractors: 0
23E-1
Contract Award For West Pump Station
Facilities Upgrade
June 21, 2010
Page 2
NAME OF RESPONSIVE BIDDER CITY BID AMOUNT
1. F. T. Ziebarth Company Fullerton $1,717,700.00
2. Pacific Hydrotech Corp. Perris $1,783,900.00
3. Environmental Construction, Inc. Woodland Hills $1,873,779.00
4. Cora Construction, Inc. Palm Desert $1,887,000.00
5. Pascal & Ludwig Construction Ontario $1,958,922.00
6. Socal Pacific Construction Corp. Lake Elsinore $2,016,000.00
7. Schuler Engineering Corp. Corona $2,024,495.00
8. Fleming Environmental, Inc. Fullerton $2,097,662.00
9. States Link Construction, Inc. Huntington Beach $2,105,662.00
10. SCW Contracting Corp. Fallbrook $2,109,423.00
A total of ten bids were received and all were responsive. The lowest bid was submitted by F. T.
Ziebarth Company, for $1,717,000, which is below the Engineer's estimate of $1,875,000.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended action is exempt
from further review. Categorical Exemption No. 2007-65 has been filed.
FISCAL IMPACT
The funding analysis shows a total estimated construction cost of $2,146,200 for the project
(Exhibit 2). Funds are available in the Water Utility Capital Projects Fund (accounting unit
06617647-66301).
APPROVED AS TO FUNDS AND ACCOUNTS:
~ ~ ~
Raul Godinez I Francisco Gutierrez
Executive Direc or Executive Director
Public Works Agency Finance & Management Services Agency
RG/ET
Exhibit 1: Project Location Map
2: Funding Analysis
23E-2
i
I
I
iIi
I
22
WESTMINISTE AVE
0
~ >
~ ~
m
1ST ST
z
o:
o
o
~ • ~
a
0
J n-
~ PROJEC LOCATION
(WEST PUM STATION AND RESERVOIR
W w
z
McFADDEN AVE
PROJECT LOCATION
Npi i0 SCKE
EXHIBIT I
p,?t0/y
SQNIA ANA Title: m°~ ~s~
L1 ~i~ COU"1C11 r
F A Agenda Date PROJECT °05-3195 ~
J~.,ne 2t.201fG WEST PUMP STATION FACILITIES UPGRADES
Aec wou.5 ~uuHC.
i
23E-4
FUNDING ANALYSIS
PROJECT NO. 053195
WEST PUMP STATION FACILITIES UPGRADE
Construction Contract $1,717,000
Contract Administration $67,500
Inspection and Testing $190,000
Contingencies $171,700
TOTAL ESTIMATED CONSTRUCTION COSTS $2,146,200