HomeMy WebLinkAboutAgenda Packet 6.18.25Zoning Administrator
Regular Meeting Agenda Packet
June 18, 2025
COUNCIL CHAMBER
20 Civic Center Plaza
Santa Ana, CA
10:30 AM
City Clerk’s Office
Legal Counsel
Ali Pezeshkpour,
AICP
Acting Executive
Director
Ricardo Soto, AICP
Acting Planning Manager
Siri A. Champion, AICP
Zoning Administrator
Gema Zapien
Acting Recording Secretary
In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this Meeting,
contact Michael Ortiz, City ADA Program Coordinator, at (714) 6475624. Notification 48 hours prior to the Meeting will enable
the City to make reasonable arrangements to assure accessibility to this meeting. The City Council agenda and supporting
documentation can be found onthe City’s website – www.santaana.org/citymeetings.
CALL TO ORDER
ROLL CALL
PLEDGE OF ALLEGIANCE
PUBLIC COMMENTS
BUSINESS CALENDAR
Public Hearing:The Zoning Administrator's decision is final unless appealed within 10
calendar days. Legal Notice was published in the Orange County Reporter on June 06,
2025 and notices were mailed on said date.
1.MINOR EXCEPTION NOS. 202501 AND 202502 FOR THE PROPERTY
LOCATED AT 1200 NORTH TUSTIN AVENUE LOCATED WITHIN THE
PROFESSIONAL (P) ZONING DISTRICT.
Project Applicant: Selena Kelaher with EPD Solutions, Inc., representing Orange
County Employees Retirement System (OCERS) (“Applicant”) and 2223 Wellington
Place Corporation (“Property Owner”)
Proposed Project:Applicant is requesting approval of Minor Exception
Application No. 202501 to exceed the maximum allowable building height of 35 feet,
by no more than twenty five percent (25%), for a total height of 43 feet and 9 inches.
Additionally, Applicant is requesting approval of Minor Exception Application No. 2025
02 to allow a reduction in the number of required offstreet parking stalls, by no more
than twenty percent (20%). The Applicant is requesting approval of both applications for
the development of a new office building.
Environmental Impact:The Zoning Administrator will consider a determination that
the project is exempt from further review pursuant to Section 15302 (Class 2) of the
California Environmental Quality Act (CEQA). Notice of Exemption, Environmental
Review No. 2024116, will be filed for this project.
Recommended Action:
1. Adopt a resolution approving Minor Exception No. 202501 (Building
Height Increase) as conditioned; and
2. Adopt a resolution approving Minor Exception No. 202502 (OffStreet
Parking Reduction) as conditioned.
***END OF BUSINESS CALENDAR***
CLOSING COMMENTS
ADJOURNMENT
WRITTEN COMMENTS
You are invited to submit a written comment in one of the following ways:
Email PBAecomments@santaana.org and reference the topic in the subject line.
Mail to Gema Zapien, Acting Recording Secretary, City of Santa Ana, 20 Civic Center
Plaza – M20, Santa Ana, CA 92701.
Deadline to submit written comments is 8:00 a.m. on the day of the
meeting.Comments received after the deadline may not be distributed to the Zoning
Administrator but will be made part of the record.
APPEAL INFORMATION
The formal action by the Zoning Administrator shall become effective after the tenday appeal
period. An appeal from the decision or requirement of the Zoning Administrator may be
made by any interested party, individual, or group. The appeal must be filed with the Clerk of
the Council, accompanied by the required filing fee, and a copy sent to the Planning
Department, within ten days of the date of the Zoning Administrator’s action, by 5:00 p.m. If
the final day to appeal falls on a City Hall observed holiday or a day when City hall is closed,
the final day to appeal shall be extended to the next day City Hall is open for public business.
Please note: Under California Government Code Sec. 65009, if you challenge in court any of
the matters on this agenda for which a public hearing is to be conducted, you may be limited
to raising only those issues which you (or someone else) raised orally at the public hearing or
in written correspondence received by the Zoning Administrator, Planning Commission, or
City Council at or before the hearing.
Zoning Administrator 1 6/18/2025
Zoning AdministratorRegular Meeting Agenda PacketJune 18, 2025COUNCIL CHAMBER20 Civic Center PlazaSanta Ana, CA10:30 AMCity Clerk’s OfficeLegal Counsel Ali Pezeshkpour,AICPActing ExecutiveDirector Ricardo Soto, AICPActing Planning ManagerSiri A. Champion, AICPZoning Administrator Gema ZapienActing Recording Secretary
In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this Meeting,
contact Michael Ortiz, City ADA Program Coordinator, at (714) 6475624. Notification 48 hours prior to the Meeting will enable
the City to make reasonable arrangements to assure accessibility to this meeting. The City Council agenda and supporting
documentation can be found onthe City’s website – www.santaana.org/citymeetings.
CALL TO ORDER
ROLL CALL
PLEDGE OF ALLEGIANCE
PUBLIC COMMENTS
BUSINESS CALENDAR
Public Hearing:The Zoning Administrator's decision is final unless appealed within 10
calendar days. Legal Notice was published in the Orange County Reporter on June 06,
2025 and notices were mailed on said date.
1.MINOR EXCEPTION NOS. 202501 AND 202502 FOR THE PROPERTY
LOCATED AT 1200 NORTH TUSTIN AVENUE LOCATED WITHIN THE
PROFESSIONAL (P) ZONING DISTRICT.
Project Applicant: Selena Kelaher with EPD Solutions, Inc., representing Orange
County Employees Retirement System (OCERS) (“Applicant”) and 2223 Wellington
Place Corporation (“Property Owner”)
Proposed Project:Applicant is requesting approval of Minor Exception
Application No. 202501 to exceed the maximum allowable building height of 35 feet,
by no more than twenty five percent (25%), for a total height of 43 feet and 9 inches.
Additionally, Applicant is requesting approval of Minor Exception Application No. 2025
02 to allow a reduction in the number of required offstreet parking stalls, by no more
than twenty percent (20%). The Applicant is requesting approval of both applications for
the development of a new office building.
Environmental Impact:The Zoning Administrator will consider a determination that
the project is exempt from further review pursuant to Section 15302 (Class 2) of the
California Environmental Quality Act (CEQA). Notice of Exemption, Environmental
Review No. 2024116, will be filed for this project.
Recommended Action:
1. Adopt a resolution approving Minor Exception No. 202501 (Building
Height Increase) as conditioned; and
2. Adopt a resolution approving Minor Exception No. 202502 (OffStreet
Parking Reduction) as conditioned.
***END OF BUSINESS CALENDAR***
CLOSING COMMENTS
ADJOURNMENT
WRITTEN COMMENTS
You are invited to submit a written comment in one of the following ways:
Email PBAecomments@santaana.org and reference the topic in the subject line.
Mail to Gema Zapien, Acting Recording Secretary, City of Santa Ana, 20 Civic Center
Plaza – M20, Santa Ana, CA 92701.
Deadline to submit written comments is 8:00 a.m. on the day of the
meeting.Comments received after the deadline may not be distributed to the Zoning
Administrator but will be made part of the record.
APPEAL INFORMATION
The formal action by the Zoning Administrator shall become effective after the tenday appeal
period. An appeal from the decision or requirement of the Zoning Administrator may be
made by any interested party, individual, or group. The appeal must be filed with the Clerk of
the Council, accompanied by the required filing fee, and a copy sent to the Planning
Department, within ten days of the date of the Zoning Administrator’s action, by 5:00 p.m. If
the final day to appeal falls on a City Hall observed holiday or a day when City hall is closed,
the final day to appeal shall be extended to the next day City Hall is open for public business.
Please note: Under California Government Code Sec. 65009, if you challenge in court any of
the matters on this agenda for which a public hearing is to be conducted, you may be limited
to raising only those issues which you (or someone else) raised orally at the public hearing or
in written correspondence received by the Zoning Administrator, Planning Commission, or
City Council at or before the hearing.
Zoning Administrator 2 6/18/2025
Zoning AdministratorRegular Meeting Agenda PacketJune 18, 2025COUNCIL CHAMBER20 Civic Center PlazaSanta Ana, CA10:30 AMCity Clerk’s OfficeLegal Counsel Ali Pezeshkpour,AICPActing ExecutiveDirector Ricardo Soto, AICPActing Planning ManagerSiri A. Champion, AICPZoning Administrator Gema ZapienActing Recording SecretaryIn compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this Meeting,contact Michael Ortiz, City ADA Program Coordinator, at (714) 6475624. Notification 48 hours prior to the Meeting will enablethe City to make reasonable arrangements to assure accessibility to this meeting. The City Council agenda and supportingdocumentation can be found onthe City’s website – www.santaana.org/citymeetings.CALL TO ORDERROLL CALLPLEDGE OF ALLEGIANCEPUBLIC COMMENTSBUSINESS CALENDARPublic Hearing:The Zoning Administrator's decision is final unless appealed within 10calendar days. Legal Notice was published in the Orange County Reporter on June 06,2025 and notices were mailed on said date.1.MINOR EXCEPTION NOS. 202501 AND 202502 FOR THE PROPERTYLOCATED AT 1200 NORTH TUSTIN AVENUE LOCATED WITHIN THEPROFESSIONAL (P) ZONING DISTRICT.Project Applicant: Selena Kelaher with EPD Solutions, Inc., representing OrangeCounty Employees Retirement System (OCERS) (“Applicant”) and 2223 WellingtonPlace Corporation (“Property Owner”)Proposed Project:Applicant is requesting approval of Minor ExceptionApplication No. 202501 to exceed the maximum allowable building height of 35 feet,by no more than twenty five percent (25%), for a total height of 43 feet and 9 inches.Additionally, Applicant is requesting approval of Minor Exception Application No. 202502 to allow a reduction in the number of required offstreet parking stalls, by no morethan twenty percent (20%). The Applicant is requesting approval of both applications forthe development of a new office building.Environmental Impact:The Zoning Administrator will consider a determination thatthe project is exempt from further review pursuant to Section 15302 (Class 2) of theCalifornia Environmental Quality Act (CEQA). Notice of Exemption, EnvironmentalReview No. 2024116, will be filed for this project.Recommended Action:1. Adopt a resolution approving Minor Exception No. 202501 (BuildingHeight Increase) as conditioned; and2. Adopt a resolution approving Minor Exception No. 202502 (OffStreetParking Reduction) as conditioned.
***END OF BUSINESS CALENDAR***
CLOSING COMMENTS
ADJOURNMENT
WRITTEN COMMENTS
You are invited to submit a written comment in one of the following ways:
Email PBAecomments@santaana.org and reference the topic in the subject line.
Mail to Gema Zapien, Acting Recording Secretary, City of Santa Ana, 20 Civic Center
Plaza – M20, Santa Ana, CA 92701.
Deadline to submit written comments is 8:00 a.m. on the day of the
meeting.Comments received after the deadline may not be distributed to the Zoning
Administrator but will be made part of the record.
APPEAL INFORMATION
The formal action by the Zoning Administrator shall become effective after the tenday appeal
period. An appeal from the decision or requirement of the Zoning Administrator may be
made by any interested party, individual, or group. The appeal must be filed with the Clerk of
the Council, accompanied by the required filing fee, and a copy sent to the Planning
Department, within ten days of the date of the Zoning Administrator’s action, by 5:00 p.m. If
the final day to appeal falls on a City Hall observed holiday or a day when City hall is closed,
the final day to appeal shall be extended to the next day City Hall is open for public business.
Please note: Under California Government Code Sec. 65009, if you challenge in court any of
the matters on this agenda for which a public hearing is to be conducted, you may be limited
to raising only those issues which you (or someone else) raised orally at the public hearing or
in written correspondence received by the Zoning Administrator, Planning Commission, or
City Council at or before the hearing.
Zoning Administrator 3 6/18/2025
Planning and Building Agency
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Zoning Administrator Staff Report
June 18, 2025
Topic: Minor Exception Nos. 2025-01 and 2025-02 – Orange County Employees
Retirement System Headquarters (1200 N. Tustin Avenue)
RECOMMENDED ACTIONS
1. Adopt a resolution approving Minor Exception No. 2025-01 (Building Height
Increase) as conditioned; and
2. Adopt a resolution approving Minor Exception No. 2025-02 (Off-Street Parking
Reduction) as conditioned.
EXECUTIVE SUMMARY
Selena Kelaher with EPD Solutions, Inc., representing Orange County Employees
Retirement System (OCERS) (“Applicant”) and 2223 Wellington Place Corporation
(“Property Owner”), is requesting approval of Minor Exception (ME) Nos. 2025-01
(Building Height Increase) and 2025-02 (Off-Street Parking Reduction) to facilitate the
construction of a three-story 65,768-square-foot office building to serve as the
headquarters for OCERS at 1200 N. Tustin Avenue. Pursuant to Sections 41-631, 41-
632(3)(d) and 41-632(3)(g) of the Santa Ana Municipal Code (SAMC), a minor exception
may be granted to waive or modify zoning provisions pertaining to the height of buildings,
as long as the modification granted does not exceed more than twenty-five percent (25%)
of the maximum height permitted. Moreover, pursuant to the SAMC, modifications may
be granted for off-street parking reductions, as long as the reductions do not exceed more
than twenty percent (20%) of the minimum number of stalls required by the SAMC. Staff
is recommending approval of the Applicant’s request due to the project’s compliance with
the intent of Professional (P) zoning district of providing a high-quality office development
and compliance with the vision of the General Plan. Moreover, special circumstances
exist that make it difficult for the site to comply with current development standards which
warrant approval of the Applicant’s request in order for the preservation and enjoyment
of property rights.
Table 1: Project Location Information and Applicable Code Sections
Item Information
Project Address and Council Ward 1200 N. Tustin Avenue – Ward 3
Nearest Intersection Tustin Avenue and Wellington Avenue
General Plan Designation Professional and Administrative Office - Medium (PAO-1)
Zoning Designation Professional (P)
Surrounding Land Uses North Commercial
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 2
5
0
9
4
Item Information
East Office
South Office
West Office, current OCERS Headquarters
Property Size 2.7 acres (118,649 sq. ft.)
Existing Site Development The subject site is developed with a two-story 30,299-square
foot office building and associated surface lot.
Use Permissions Office permitted by right pursuant to Section 41-313 of the
SAMC
Development Standards Section 41-314 of the SAMCZoning Code Sections Affected Parking Standards Section 41-1342 of the SAMC
DISCUSSION
Project Description
Applicant is proposing to redevelop an existing 2.7-acre lot located at 1200 N. Tustin Avenue
by demolishing an existing two-story, 30,299-square-foot office building and all other
improvements, and constructing a three-story 65-768-square-foot office building and
additional site related improvements, including landscaping, utility connections, vehicular
parking, and site lighting.
The proposed building is designed with a floor area ratio (FAR) of 0.5, and would have a
maximum building height of 43 feet and 9 inches, exceeding the maximum building height
of 35 feet, as shown in the project elevations attached hereto as Exhibit 7. However, the
Applicant is seeking approval of ME No. 2025-01 to allow a twenty-five percent increase in
building height, permissible under Section 41-632(3)(d) of the SAMC. The proposed building
would provide various building finish materials that include bronze metal panels, perforated
metal panels, glass guardrails, and metal building canopies. The proposed building would
be set back twenty-five feet from North Tustin Avenue, twenty-two feet from East Wellington
Avenue, fifty-nine feet from the western property line, and 200 feet from the northern
property line.
Vehicular access to the site would be provided via two twenty-foot-wide driveways, one on
North Tustin Avenue and the second on East Wellington Avenue, and the project proposes
160 parking spaces, including standard and electric (EV) stalls. Additionally, the project
would provide parking for eight bicycles. The Applicant is also seeking approval of ME No.
2025-02 to allow a twenty percent reduction in required off-street parking, permissible under
Section 41-632(3)(g) of the SAMC.
The project also includes approximately 25,400 square feet of new drought-tolerant,
ornamental landscaping that would cover approximately twenty percent of the site.
Proposed landscaping would include 36- and 24-inch box trees, 5-gallon trees, various
shrubs, and ground covers. Additional improvements include installation of new on-site
water and sewer lines and new drainage system, construction of new curb and gutter along
Tustin Avenue and Wellington Avenue, and replacement of streetlights.
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 3
5
0
9
4
The proposed project would function as the headquarters for OCERS and the daily functions
of OCERS would be held during normal business hours between 8:00 a.m. and 5:00 p.m.
Monday through Friday, with the occasional public meetings held a few times a month.
Typical operational characteristics include employees and guests traveling to and from the
site and regular office functions. Construction is anticipated to begin in February 2026 and
would occur over 16 months. Staff provides a summary of conformance of the development
standards in Table 2 below.
Table 2: Conformance to Development Standards
Standard Required by SAMC Provided
Minimum Lot Size N/A 2.7-acres, complies
Minimum Lot Frontage N/A 290 feet, complies
Maximum Floor Area Ratio (FAR) 1.0 FAR 0.5 FAR, complies
Maximum Building Height 35 feet 43 feet and 9 inches – Does
Not Comply. ME No. 2025-01
requested to allow a twenty-five
percent increase in building
height.
Minimum Front Building &
Landscape Setback
15 feet 22 feet, complies
Minimum Side Street Building &
Landscape Setback
15 feet 25 feet, complies
Minimum Interior Building
Setback
5 feet 59-200 feet, complies
Minimum Interior Landscape
Setbacks
5 feet and 10 feet adjacent to
parcel used or zoned for
residential
5 feet and 10 feet, complies
Minimum Off-Street Parking
Required
3 parking spaces per 1,000 sq.
ft. or 197 spaces
160 spaces – Does Not
Comply. ME No. 2025-02
requested to allow a twenty
percent reduction in required off-
street parking.
Site and Project Background
The subject site is currently developed with a two-story, 30,299-square-foot office building
that was constructed in 1977. Prior to this, the property was vacant and was used for
agricultural proposes. Over the years, the building has been used for office and medical
uses and has been occupied by various tenants.
The proposed development will serve as the new headquarters for OCERS, whose current
headquarters is located on an adjacent site to the west. OCERS has been providing
retirement, death, disability, and cost-of-living benefits to employees of the County of
Orange and certain districts since 1937. OCERS’ membership has increased from less than
1,000 members in 1945 to more than 31,000 active and deferred members and more than
21,000 payees as of 2024. To keep up with demand and provide better services to its
employees and members, the Applicant submitted a Development Project Review
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 4
5
0
9
4
application (DP No. 2024-25) in November 2024 for the subject project. Since then, the
Applicant worked with Planning staff and the Public Works Agency to ensure the project
complied with applicable plans, programs, policies, ordinances, and standards. The
Applicant concluded the development project review process in May 2025.
Project Analysis
Pursuant to Sections 41-631, 41-632(a)(3), and 41-638 of the SAMC, the Zoning
Administrator may grant approval of a minor exception to obtain a waiver or modification
of certain zoning requirements and when it appears that all of the following have been
established:
1. That because of special circumstances applicable to the subject property, including
size, shape, topography, location or surroundings, the strict application of the
zoning ordinance is found to deprive the subject property of privileges not
otherwise at minor exception with the intent and purpose of the provisions of
Chapter 41 (Zoning) of the SAMC;
2. That the granting of a minor exception is necessary for the preservation and
enjoyment of one (1) or more substantial property rights;
3. That the granting of a minor exception will not be materially detrimental to the
public welfare or injurious to surrounding property; and
4. That the granting of a minor exception will not adversely affect the general plan of
the City.
Conversely, the inability to make these findings would result in denial. In analyzing the
applicant’s request, staff believes that the following analysis warrants staff’s
recommendation of approval of the requested minor exceptions.
Minor Exception No. 2025-01 for Building Height Increase
Pursuant to Section 41-632(a)(3)(d) of the SAMC, the Zoning Administrator may grant a
minor exception to increase building height by no more than twenty-five percent of the
maximum height permitted. Staff has reviewed the applicant’s request for a building
height increase from 35 feet to 43 feet and nine-inches and the following analysis warrants
staff’s recommendation of approval.
The project site exhibit’s special circumstances related to its location and surroundings.
The project is within an established office corridor. Strict application of the thirty-five foot
maximum height would prevent development of a modern, efficient office building with
appropriate clear height (i.e., the height from finished floor to the lowest hanging structural
or mechanical element) needed to accommodate evolving workplace needs and essential
mechanical equipment. This restriction would deprive the property of a development
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 5
5
0
9
4
privilege commonly afforded to similarly situated parcels within the Professional (P)
zoning district and the surrounding urban context. Additionally, there are surrounding
properties that are developed with buildings that exceed the maximum building height of
thirty-five feet. Moreover, similar requests to exceed the maximum building height have
been approved by the City in past. Table 3 provides a summary of buildings with a height
greater than thirty-five feet within the general vicinity and the entitlement type that
permitted such development.
Table 3: Surrounding Properties with Building Heights Greater than 35 Feet
Address Assessor Parcel Number Entitlement Type
1) 400 N. Tustin Avenue 400-043-09 Variance No. 1978-27
2) 801 N. Tustin Avenue 400-021-02 Variance No. 1971-30
3) 1001 N. Tustin Avenue 400-021-08 Variances Nos. 1970-16
4) 1401 N. Tustin Avenue 400-221-04 Height Exemption Area
5) 1403 N. Tustin Avenue 400-221-03 Height Exemption Area
6) 1551 N. Tustin Avenue 400-211-11 Height Exemption Area
7) 1525 N. Tustin Avenue 400-211-12 Height Exemption Area
The property immediately to the west of the project site, 2223 E. Wellington Avenue, is
developed with a three-story forty-four-foot high office building. The property to the
southeast, 1001 N. Tustin Avenue, is developed with a seven-story medical office
building, and the properties to the northeast, 1401 and 1403 N. Tustin Avenue, are
developed with three-story office buildings.
Approval of ME No. 2025-01 is necessary to preserve the property owner’s right to
develop and utilize the site for a viable office use consistent with surrounding
development. The immediate area includes office and medical uses that exceed thirty-
five feet in height. Without the minor exception, the applicant would be deprived of the
ability to construct a competitively modern office building that aligns with industry norms,
tenant expectations, and allowable land uses within the Professional zoning district.
Furthermore, the proposed height increase will not result in adverse effects to the public
or surrounding properties. The proposed project is consistent with the zoning district and
land use context, which is characterized by low- to mid-rise office development. The
project will maintain compliance with all other development standards, including setbacks,
landscaping, and screening. In addition, the building has been placed adjacent to Tustin
Avenue and Wellington Avenue, away from the residential community to the northwest
corner of the property, in order to mitigate any aesthetics and shade/shadow issues.
Lastly, the subject site, located on the westside of Tustin Avenue, is identified to be just
outside of the height exempt area boundary. Properties on the eastside of Tustin Avenue
are allowed unlimited building heights. If the subject property were located within the
height exemption area, the proposed building height of 43-feet and nine-inches would be
permitted by right. Approval of ME No. 2025-01 is also consistent with other building
height increases recently approved by the Zoning Administrator (e.g., ME No. 2024-01
approved by the Zoning Administrator on August 20, 2024 allowed a building height
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 6
5
0
9
4
increase from 35 feet to 43 feet and nine-inches at a new industrial building located at
300 and East Dyer Road).
Minor Exception No. 2025-02 for Off-Street Parking Reduction
Pursuant to Section 41-632(a)(3)(g) of the SAMC, the Planning Manager may grant a
minor exception to reduce the number of required off-street parking stalls by no more than
twenty percent of the required number of parking stalls. However, since the applicant is
also requesting a minor exception for an increase in building height, this matter has been
forwarded to the Zoning Administrator to review the project comprehensively and make a
determination. In accordance with Section 41-638.1 of the SAMC, minor exceptions from
the off-street parking regulations shall be subject to grant or denial based upon the
standards set forth in Section 41-638.1 of the SAMC and not upon the standards set forth
in section 41-638 of the SAMC. A minor exception for parking may be granted when two
or more uses share required parking stalls, provided no conflict will arise between parking
for either use due to differences in time of primary utilization of parking. Staff has reviewed
the applicant’s request for a reduction in required off-street parking at the subject site and
the following analysis warrants staff’s recommendation of approval.
The new building will serve as OCERS headquarters for approximately 121 employees
but will also provide a board room for OCERS’ board members to host their board
meetings. The primary use has been determined by staff to be office and, therefore,
parking is set forth by Section 41-1342 of the SAMC, which requires three parking spaces
for each 1,000 square feet of gross floor area. Based on this parking ratio, the project
requires a total 197 parking spaces. However, this ratio does not consider differences in
time of primary uses and secondary uses for which the applicant is seeking approval of
ME No. 2025-02. The proposed building features multiple secondary or ancillary uses
that will not be in operation simultaneously. This includes the 3,128-square-foot board
room with a closed session office and breakroom; interview rooms on the ground floor;
multiple training rooms and workshop/collaboration spaces on the second floor; a 1,303-
square-foot café; a 2,178-square foot wellness center; and multiple meeting rooms on the
third floor. These amenities are also required to accommodate employees needs and
involving workplaces.
The project proposes 160 parking spaces which is more than sufficient for OCERS’
needs. Of the 160 parking spaces, 107 parking spaces will be allocated to its 121
employees, which include full-time and part-time employees with varying working hours,
and 46 parking spaces will be allocated to visitors with varying visiting hours. The project
will also provide eight bicycle parking spaces. In addition, the project site is located in a
mode-shift friendly environment with transit, bicycling, and walking amenities that facilitate
and encourage alternative modes of transportation, further contributing to reduction in
parking demand. Two Orange County Transit Authority (OCTA) routes (Route 60 Long
Beach – Tustin and Route 71 Yorba Linda – Newport Beach) are within 0.5 miles of the
project site. No parking deficiencies or traffic congestion is anticipated from the proposed
facility. As part of the development process, the Public Works Agency reviewed the
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 7
5
0
9
4
project and did not identify the need for any traffic mitigations. As a condition of approval,
staff is recommending that the applicant prepare a parking management plan in the event
that on-site parking becomes a concern. Approval of ME No. 2025-02 is also consistent
with other parking reductions recently approved by the Planning Manager. Table 4
provides a summary of recently approved parking minor exceptions. (e.g., ME Nos. 2020-
01, 2022-01, 2022-02, and 2023-03).
Table 4: Recently Approved Minor Exceptions for Off-Street Parking Reductions
Minor Exception
Number
Date Approved Address Off-Street Parking
Reduction Allowed
1) ME No. 2020-01 February 2, 2020 1126 E. Washington Avenue 14-percent parking
reduction for a housing
development.
2) ME No. 2022-01 June 1, 2022 200 E. First American Way 20-percent parking
reduction for a housing
development.
3) ME No. 2022-02 May 12, 2022 1327 N. Main Street 13-percent parking
reduction for a restaurant.
4) ME No. 2023-03 July 20, 2023 3009 S. Daimler Street 20-percent parking
reduction for an office
building.
General Plan Consistency
Approval of these minor exceptions is consistent and supported by several goals and
policies of the General Plan. The Professional and Administrative Office - Medium (PAO-
1) land use designation of the General Plan supports the permitting of a variety of office
and office-related uses, including professional and administrative office parks, up to three
stories in height. Goal 1 of the Land Use Element (LU) encourages a balance of land uses
that meet Santa Ana’s diverse needs. Specifically, the project is consistent with Policy
LU-2.1 that encourages a broad spectrum of land uses and development that offer
employment opportunities for current and future Santa Ana residents. Policy LU-2.6
promotes rehabilitation/redevelopment of properties that encourage increased levels of
capital investments to create a safe and attractive environment. The proposed project will
redevelop an existing lot with a new office that has not been rehabilitated since the 1970s
and will provide on-site and off-site improvements that will contribute to creating a safe
and attractive environment for the neighborhood. Policy LU-2.7 also supports land use
decisions that encourage the retention of businesses in the City. Approval of these minor
exceptions will allow OCERS to remain in Santa Ana in a new building that meets their
needs.
The project is also consistent with the Economic Prosperity Element (EP) Policy EP-3.4
which encourages the development of “complete communities” that provide a range of
housing, services, amenities, and transportation options that support the retention and
attraction of skilled workforce and employment. Policy EP-3.6 encourages flexible and
up-to-date land use regulations that are responsive to changing business trends, best
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 8
5
0
9
4
practices, technological advancements, and community needs. Approval of the requested
minor exceptions are consistent with these two policies because the project will support
the retention of employment and it is meeting the needs of OCERS’ and its employees,
as they adapt to workplace changes.
The project is consistent with Policy UD-1.1 of the Urban Design Element (UD) which
requires that all developments feature high quality design, materials, finishes, and
construction. The project will provide a high-end office environment with amenities and
will include building finish materials such as bronze metal panels, perforated metal
panels, glass guardrails, and metal building canopies. Lastly, the project is consistent with
Policy UD-2.2 which encourages buffers and other urban design strategies to encourage
computability of new development with the scale, bulk, and pattern of existing
development. The project has been designed to be compatible with nearby buildings and
it is setback from the adjacent residential development to the northwest of the project site.
Public Notification and Community Outreach
Project notifications were posted, published, and mailed in accordance with City and State
regulations. Copies of the public notice, including a 1,000-foot notification radius map,
and the site posting are provided in Exhibit 9. The project is not located within the area of
a neighborhood association; however, staff contacted the leaders of the Meredith
Parkwood, Portola Park, and Marbury Park neighborhood associations to ensure they
were aware of the project and public hearing and to identify any concerns. At the time
this report was printed, no issues of concern were raised.
ENVIRONMENTAL IMPACT
Pursuant to the California Environmental Quality Act (CEQA) and the CEQA Guidelines,
the project is exempt from further review, pursuant to Section 15302 (Class 2) of the
CEQA Guidelines (Replacement or Reconstruction), because the project is consistent
with the applicable general plan designation and applicable general plan policies, as well
as with applicable zoning designation and regulations. Moreover, the project meets the
criteria for categorically exempt development projects listed in CEQA Guidelines Section
15302 and it would not have a significant effect on the environment. The above-
mentioned analysis and use of a Class 2 Categorical Exemption is supplemented by the
analysis provided as Exhibit 9 of this report. Based on this analysis, a Notice of
Exemption, Environmental Review No. 2024-116, will be filed for this project.
FISCAL IMPACT
There is no fiscal impact associated with this action.
Minor Exception Nos. 2025-01 and 2025-02
OCERS Headquarters (1200 N. Tustin Avenue)
June 18, 2025
Page 9
5
0
9
4
EXHIBITS
1. Resolution for ME No. 2025-01 (Building Height Increase)
2. Resolution for ME No. 2025-02 (Off-Street Reduction)
3. Vicinity Zoning & Aerial View Map
4. Site Photos
5. Conceptual Site & Landscape Plan
6. Floor Plans
7. Elevations & Renderings
8. Class 2 Categorical Exemption Analysis
9. Copy of Public Notices
Submitted By:
Jerry C. Guevara, AICP, Senior Planner
Approved By:
Ricardo Soto, AICP, Acting Planning Manager, Planning and Building Agency
RESOLUTION NO. 2025-XX
A RESOLUTION OF THE ZONING ADMINISTRATOR OF
THE CITY OF SANTA ANA APPROVING MINOR
EXCEPTION NO. 2025-01, AS CONDITIONED, TO EXCEED
THE MAXIMUM ALLOWABLE BUILDING HEIGHT OF 35
FEET, BY NO MORE THAN TWENTY-FIVE PERCENT, FOR
A TOTAL HEIGHT OF 43 FEET AND 9 INCHES, FOR THE
DEVELOPMENT OF A NEW OFFICE BUILDING AT 1200 N.
TUSTIN AVENUE (APN: 400-152-02)
BE IT RESOLVED BY THE ZONING ADMINISTRATOR OF THE CITY OF SANTA
ANA AS FOLLOWS:
Section 1. The Zoning Administrator of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Selena Kelaher with EPD Solutions, Inc., representing Orange County
Employees Retirement System (OCERS) (“Applicant”) and 2223 Wellington
Place Corporation (“Property Owner”), is requesting approval of Minor
Exception (ME) No. 2025-01 to exceed the maximum allowable building
height of 35 feet, by no more than twenty-five percent, for a total height of
43 feet and 9 inches, to facilitate the construction of a new three-story
65,768-square-foot office building to serve as the headquarters for OCERS
at 1200 N. Tustin Avenue (“Project”).
B. Pursuant to Section 41-315 of the Santa Ana Municipal Code (“SAMC”),
buildings in the Professional (“P”) zoning district are limited to a maximum
height of 35 feet.
C. Pursuant to Section 41-632(a)(3)(d) of the SAMC, applications may be
made to obtain a waiver or modification to the maximum allowable building
height, not to exceed more than twenty-five percent of the maximum height
permitted.
D. Pursuant Section 41-638 of the SAMC, the Zoning Administrator is
authorized to review and approve minor exceptions from the development
standards set forth by the SAMC.
E. On June 18, 2025, the Zoning Administrator held a duly noticed public
hearing on ME No. 2025-01.
F. The Zoning Administrator of the City of Santa Ana determines that the
following findings, which must be established in order to grant a Minor
Exception pursuant to Section 41-638 of the SAMC, have been established
for ME No. 2025-01 to exceed the maximum allowable height of 35 feet, by
no more than twenty-five percent, for a total allowable height of 43 feet and
9 inches:
Resolution No. 2025-XXX
Page 2 of 9
1. That because of special circumstances applicable to the subject
property, including size, shape, topography, location or
surroundings, the strict application of the zoning ordinance is found
to deprive the subject property of privileges not otherwise at variance
with the intent and purpose of the provisions of this Chapter.
The Project’s site has special circumstances related to its
location and surroundings. The Project is within an
established office corridor and strict application of the 35-foot
maximum height would prevent development of a modern,
efficient office building with appropriate clear height (i.e., the
height from finished floor to the lowest hanging structural or
mechanical element) needed to accommodate evolving
workplace needs and essential mechanical equipment. This
restriction would deprive the property of a development
privilege commonly afforded to similarly situated parcels
within the Professional zoning district and the surrounding
urban context. Additionally, there are surrounding p roperties
that are developed with buildings that exceed the maximum
building height of 35 feet. The property immediately to the
west of the project site, 2223 E. Wellington Avenue, is
developed with a three-story 44-foot high office building, the
property to the southeast, 1001 N. Tustin Avenue, is
developed with a seven-story medical office building, and the
properties to the northeast, 1401 and 1403 N. Tustin Avenue,
are developed three-story office buildings.
2. That the granting of a minor exception is necessary for the
preservation and enjoyment of one or more substantial property
rights.
The granting of this minor exception is necessary for the
preservation and enjoyment of substantial property rights.
Approval of ME No. 2025-01 is necessary to preserve the
property owner’s right to develop and utilize the site for a
viable office use consistent with surrounding development.
The immediate area includes office and medical uses that
exceed 35 feet in height. Without the minor exception, the
Applicant would be deprived of the ability to construct a
competitively modern office building that aligns with industry
norms, tenant expectations, and allowable land uses within
the Professional zoning district. Furthermore, the proposed
height increase will not result in adverse effects to the public
or surrounding properties. The proposed Project is consistent
with the zoning district and land use context, which is
characterized by low- to mid-rise office development. The
Project will maintain compliance with all other development
standards, including setbacks, landscaping, and screening. In
Resolution No. 2025-XXX
Page 3 of 9
addition, the building has been placed adjacent to Tustin
Avenue and Wellington Avenue, away from the residential
community to the northwest corner of the property, in order to
mitigate any aesthetics and shade/shadow issues. Lastly, the
subject site is identified to be just outside of the height exempt
area boundary by being on the westside of Tustin Avenue.
Properties on the eastside of Tustin Avenue are allowed
unlimited building heights. If the subject property were located
within the height exemption area, the proposed building height
of 43-feet and nine-inches would be permitted by right.
Approval of ME No. 2025-01 is also consistent with other
building height increases recently approved by the Zoning
Administrator (e.g., ME No. 2024-01 approved by the Zoning
Administrator on August 20, 2024 allowed a building height
increase from 35 feet to 43 feet and nine -inches at a new
industrial building located at 300 and East Dyer Road).
3. That the granting of a minor exception will not be materially
detrimental to the public welfare or injurious to surrounding property.
The granting of this minor exception will not be detrimental to
the public or surrounding properties. The height increase
authorized by the exception will only allow the Applicant to
develop the property with an office use, which is a typical use
for this area. Further, the request will not be materially
detrimental to the public welfare or injurious to surrounding
property in that surrounding uses are office in nature and
several such uses also exceed the 35-foot height limit. In
addition, approval of the minor exception will not affect the
type or intensity of the use on the property and the property
will be required to comply all other development standards, in
order to ensure that the development of the property does not
injure or detrimentally affect surrounding properties. Lastly,
the subject site is identified to be just outside of the height
exempt boundary by being on the westside of Tustin Avenue.
The properties located on the eastside of Tustin Avenue, are
located inside the height exempt area, which allows unlimited
building height. If the subject property were located within the
height exemption area, the proposed building height of 43-feet
and nine-inches would be permitted by right.
4. That the granting of a minor exception will not adversely affect the
General Plan of the city.
Approval of ME No. 2025-01 is consistent and supported by
several goals and policies of the General Plan. The
Resolution No. 2025-XXX
Page 4 of 9
Professional and Administrative Office - Medium (PAO-1) land
use designation of the General Plan supports the permitting
of a variety of office and office-related uses, including
professional and administrative office parks, up to three
stories in height. Goal 1 of the Land Use Element (LU)
encourages a balance of land uses that meet Santa Ana ’s
diverse needs. Specifically, the Project is consistent with
Policy LU-2.1 that encourages a broad spectrum of land uses
and development that offer employment opportunities for
current and future Santa Ana residents. Policy LU-2.6
promotes rehabilitation/redevelopment of properties that
encourage increased levels of capital investments to create a
safe and attractive environment. The proposed Project will
redevelop an existing lot with a new office that has not been
rehabilitated since the 1970s and will provide on-site and off-
site improvements that will contribute to creating a safe and
attractive environment for the neighborhood. Policy LU-2.7
also supports land use decisions that encourage the retention
of businesses in the City. Approval of these minor exceptions
will allow OCERS to remain in Santa Ana in a new building
that meets their needs.
The Project is also consistent with the Economic Prosperity
Element (EP) Policy EP-3.4 which encourages the
development of “complete communities” that provide a range
of housing, services, amenities, and transportation options
that support the retention and attraction of skilled workforce
and employment. Policy EP-3.6 encourages flexible and up-
to-date land use regulations that are responsive to changing
business trends, best practices, technological advancements,
and community needs. Approval of the requested minor
exceptions are consistent with these two policies because the
Project will support the retention of employment and it is
meeting the needs of OCERS’ and its employees as they
adapt to workplace changes.
The Project is consistent with Policy UD-1.1 of the Urban
Design Element (UD) which requires that all developments
feature high quality design, materials, finishes, and
construction. The Project will provide a high-end office
environment with amenities and will include building finish
materials such as bronze metal panels, perforated metal
panels, glass guardrails, and metal building canopies. Lastly,
the Project is consistent with Policy UD-2.2 which encourages
buffers and other urban design strategies to encourage
computability of new development with the scale, bulk, and
pattern of existing development. The Project has been
Resolution No. 2025-XXX
Page 5 of 9
designed to be compatible with nearby buildings and it is
setback from the adjacent residential development to the
northwest of the project site.
Section 2. Pursuant to the California Environmental Quality Act (CEQA) and the
CEQA Guidelines, the Project is exempt from further review, pursuant to Section 153 02
(Class 2) of the CEQA Guidelines (Replacement or Reconstruction), because the Project
is consistent with the applicable general plan designation and applicable general plan
policies, as well as with applicable zoning designation and regulations. Moreover, the
Project meets the criteria for categorically exempt development projects listed in CEQA
Guidelines Section 15302 and it would not have a significant effect on the environment.
The above-mentioned analysis and use of a Class 2 Categorical Exemption is
supplemented by the analysis provided for this Project. Based on this analysis, a Notice
of Exemption, Environmental Review No. 2024-116, will be filed for this Project.
Section 3. The Applicant shall indemnify, protect, defend and hold the City
and/or any of its off icials, officers, employees, agents, departments, agencies, authorized
volunteers, and instrumentalities thereof, harmless from any and all claims, demands,
lawsuits, writs of mandamus, and other and proceedings (whether legal, equitable,
declaratory, administrative or adjudicatory in nature), and alternative dispute resolution
procedures (including, but not limited to arbitrations, mediations, and such other
procedures), judgments, orders, and decisions (collectively “Actions”), brought against
the City and/or any of its officials, officers, employees, agents, departments, agencies,
and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or
annul, any action of, or any permit or approval issued by the City and/or any of it s officials,
officers, employees, agents, departments, agencies, and instrumentalities thereof
(including actions approved by the voters of the City) for or concerning the Project,
whether such Actions are brought under the Ralph M. Brown Act, California
Environmental Quality Act, the Planning and Zoning Law, the Subdivision Map Act, Code
of Civil Procedure sections 1085 or 1094.5, or any other federal, state or local constitution,
statute, law, ordinance, charter, rule, regulation, or any decision of a cou rt of competent
jurisdiction. It is expressly agreed that the City shall have the right to approve, which
approval will not be unreasonably withheld, the legal counsel providing the City’s defense,
and that Applicant shall reimburse the City for any costs and expenses directly and
necessarily incurred by the City in the course of the defense. City shall promptly notify
the Applicant of any Action brought and City shall cooperate with Applicant in the defense
of the Action.
Section 4. The Zoning Administrator of the City of Santa Ana, after conducting the
public hearing, hereby approves Minor Exception No. 2025-01 as conditioned in “Exhibit A”
attached hereto and incorporated as though fully set forth herein for the Project located at
1200 N. Tustin Avenue. This decision is based upon the evidence submitted at the above
said hearing, which includes, but is not limited to: the Request for Zoning Administrator
Action dated June 18, 2025, and exhibits attached thereto; and the public testimony, written
and oral, all of which are incorporated herein by this reference.
Resolution No. 2025-XXX
Page 6 of 9
ADOPTED this 18th day of June 2025 by the Zoning Administrator.
_______________________
Siri Champion, AICP
Zoning Administrator
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:________________________
Melissa M. Crosthwaite
Senior Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, GEMA ZAPIEN, Acting Recording Secretary, do hereby attest to and certify the
attached Resolution No. 2025-XXX to be the original resolution adopted by the Zoning
Administrator of the City of Santa Ana on June 18, 2025.
Date: ________________ ____________________________________
Acting Recording Secretary
Resolution No. 2025-XXX
Page 7 of 9
EXHIBIT A
Conditions of Approval for Minor Exception No. 2025-01
Minor Exception No. 2025-01 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal
Code, the California Administrative Code, the California Building Standards Code, and all
other applicable regulations. In addition, they shall meet the following conditions of approval:
The Applicant must comply with each and every condition listed below prior to exercising
the rights conferred by this minor exception.
The Applicant must remain in compliance with all conditions listed below throughout the life
of the development project. Failure to comply with each and every condition may result in
the revocation of the minor exception.
A. Planning Division Conditions:
1. All proposed site improvements must conform to Development Project
Review (DP No. 2024-25) and the staff report exhibit.
2. Any amendment to this Minor Exception, including modifications to approved
materials, finishes, architecture, site plan, landscaping, parking, and square
footages must be submitted to the Planning Division for review. At that time,
staff will determine if administrative relief is available or if the Minor Exception
must be amended.
3. Prior to submittal into building plan check, a full landscape and irrigation plan
is to be submitted to the Planning Division for review and approval. The
landscape plan shall conform to the commercial landscape standards,
Citywide Design Guidelines, and the City’s Water Efficient Landscape
Ordinance.
4. Prior to issuance of a building permit for any onsite grading activities, the
Applicant shall provide the Planning Division a proposed construction plan
with details on truck routes used for construction traffic and an overall
construction schedule. The truck routes shall avoid passage through
neighborhoods with sensitive land uses such as school, parks, and residential
land uses.
5. The idling of trucks and passenger vehicles on and in the vicinity of the
property, including on adjacent streets, is prohibited.
Resolution No. 2025-XXX
Page 8 of 9
6. Contact information for an onsite manager or other individual responsible
for the daily operations during construction shall be posted in a prominent
location at the front entry in the event that noise, traffic, and/or parking
complaints need reporting.
7. Subject to review and applicability by the Planning and Building Agency, the
Community Development Agency, the Public Works Agency, and the City
Attorney, to ensure that the property and all improvements located
thereupon are properly maintained, Applicant (and the owner of the property
upon which the authorized use and/or authorized improvements are located
if different from the Applicant) shall execute a Property Management
Agreement. The Agreement shall be recorded against the property by the
City and shall be in a form reasonably satisfactory to the City Attorney. The
executed agreement must be submitted to the Planning Division by the
Applicant within 90 days of the approval of this Resolution. The Agreement
shall contain covenants, conditions and restrictions relating to the following:
a. Compliance with operational conditions applicable during any
period(s) of construction or major repair (e.g., proper screening and
securing of the construction site; implementation of proper erosion
control, dust control and noise mitigation measure; adherence to
approved project phasing etc.);
b. Compliance with ongoing operational conditions, requirements and
restrictions, as applicable (including but not limited to hours of
operation, security requirements, the proper storage and disposal of
trash and debris, enforcement of the parking management plan,
and/or restrictions on certain uses;
c. Ongoing compliance with approved design and construction
parameters, signage parameters and restrictions as well as
landscape designs, as applicable;
d. Ongoing maintenance, repair and upkeep of the property and all
improvements located thereupon (including but not limited to controls
on the proliferation of trash and debris about the property; the proper
and timely removal of graffiti; the timely maintenance, repair and
upkeep of damaged, vandalized and/or weathered buildings,
structures and/or improvements; the timely maintenance, repair and
upkeep of exterior paint, parking striping, lighting and irrigation
fixtures, walls and fencing, publicly accessible bathrooms and
bathroom fixtures, landscaping and related landscape improvements
and the like, as applicable);
e. If Developer and the owner of the property are different (e.g., if the
Applicant is a tenant or licensee of the property or a ny portion
thereof), both the Applicant and the owner of the property shall be
Resolution No. 2025-XXX
Page 9 of 9
signatories to the Agreement and both shall be jointly and severally
liable for compliance with its terms;
f. The Agreement shall further provide that any party responsible for
complying with its terms shall not assign its ownership interest in the
property or any interest in any lease, sublease, license or sublicense,
unless the prospective assignee agrees in writing to assume all of
the duties, obligations and responsibilities set forth under the
Property Maintenance Agreement; and
g. The Agreement shall contain provisions relating to the enforcement
of its conditions by the City and shall also contain provisions
authorizing the City to recover costs and expenses which the City
may incur arising out of any enforcement and/or remediation efforts
which the City may undertake in order to cure any deficiency in
maintenance, repair or upkeep or to enforce any restrictions or
conditions upon the use of the property. The maintenance
agreement shall further provide that any unreimbursed costs and/or
expenses incurred by the City to cure a deficiency in maintenance or
to enforce use restrictions shall become a lien upon the property in
an amount equivalent to the actual costs and/or expense incurred by
the City.
RESOLUTION NO. 2025-XX
A RESOLUTION OF THE ZONING ADMINISTRATOR OF
THE CITY OF SANTA ANA APPROVING MINOR
EXCEPTION NO. 2025-02, AS CONDITIONED, TO ALLOW
A REDUCTION IN THE NUMBER OF REQUIRED OFF-
STREET PARKING, BY NO MORE THAN TWENTY
PERCENT, FOR THE DEVELOPMENT OF A NEW OFFICE
BUILDING AT 1200 N. TUSTIN AVENUE (APN: 400-152-02)
BE IT RESOLVED BY THE ZONING ADMINISTRATOR OF THE CITY OF SANTA
ANA AS FOLLOWS:
Section 1. The Zoning Administrator of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Selena Kelaher with EPD Solutions, Inc., representing Orange County
Employees Retirement System (OCERS) (“Applicant”) and 2223 Wellington
Place Corporation (“Property Owner”), is requesting approval of Minor
Exception (“ME”) No. 2025-05 to allow a reduction of required off-street
parking, by no more than twenty percent, to facilitate the construction of a
new three-story 65,768-square foot office building to serve as the
headquarters for OCERS at 1200 N. Tustin Avenue (“Project”).
B. Pursuant to Section 41-1342 of the Santa Ana Municipal Code (“SAMC”),
offices require three parking spaces for each 1,000 square feet of gross
floor area. Based on this parking ratio, the Project is required to provide a
total 197 parking spaces.
C. Pursuant to Section 41-632(a)(3)(g) of the SAMC, applications may be
made to obtain a waiver or modification to the m inimum required off-street
parking, not to exceed more than twenty percent of the required number of
off-street parking spaces.
D. Pursuant Section 41-638 SAMC, the Zoning Administrator is authorized to
review and approve minor exceptions from the development standards set
forth by the SAMC.
E. On June 18, 2025, the Zoning Administrator held a duly noticed public
hearing on ME No. 2025-02.
F. Pursuant to Section 41-632(a)(3)(g) of the SAMC, the Planning Manager
may grant a minor exception to reduce the number of required off -street
parking stalls by no more than twenty percent of the required number of
parking stalls. However, since the Applicant is also requesting a minor
exception for an increase in building height (ME No. 2025-01), this matter
has been forwarded to the Zoning Administrator to review the Project
comprehensively and make a determination.
Resolution No. 2025-XXX
Page 2 of 8
G. The Zoning Administrator of the City of Santa Ana determines that the
following findings, which must be established in order to grant a minor
exception pursuant to Section 41-638.1 of the SAMC, have been
established for ME No. 2025-02 to allow a reduction of the required number
of off-street parking spaced by no more than twenty percent:
1. That because two or more uses share required parking stalls
provided no conflict will arise between parking for one use and
parking for another due to differences in time of primary utilization of
parking as between such uses.
The new building will serve as OCERS headquarters for
approximately 121 employees but will also provide a board
room for OCERS’ board members to host their board
meetings. The primary use has been determined by staff to
be office and, therefore, parking is set forth by Section 41-
1342 of the SAMC, which requires three parking spaces for
each 1,000 square feet of gross floor area. Based on this
parking ratio, the Project requires a total 197 parking spaces.
However, this ratio does not consider differences in time of
primary uses and secondary uses for which the Applicant is
seeking approval of ME No. 2025-02. The proposed building
features multiple secondary or ancillary uses that will not be
in operation simultaneously. This includes the 3,128-square-
foot board room with a closed session office and breakroom;
interview rooms on the ground floor; multiple training rooms
and workshop/collaboration spaces on the seco nd floor; a
1,303-square-foot café; a 2,178-square foot wellness center;
and multiple meeting rooms on the third floor. These
amenities are also required to accommodate employees
needs and involving workplaces.
The Project proposes 160 parking spaces which is more than
sufficient for OCERS’ needs. Of the 160 parking spaces, 107
parking spaces will be allocated to its 121 employees, which
include full-time and part-time employees with varying
working hours, and 46 parking spaces will be allocated to
visitors with varying visiting hours. The Project will also
provide eight bicycle parking spaces. In addition, the Project
site is located in a mode-shift friendly environment with transit,
bicycling, and walking amenities that facilitate and encourage
alternative modes of transportation, further contributing to
reduction in parking demand. Two Orange County Transit
Authority (OCTA) routes (Route 60 Long Beach – Tustin and
Route 71 Yorba Linda – Newport Beach) are within 0.5 miles
of the Project site. No parking deficiencies or traffic congestion
is anticipated from the proposed facility. As part of the
development process, the Public Works Agency reviewed the
Resolution No. 2025-XXX
Page 3 of 8
Project and did not identify the need for any traffic mitigations.
As a condition of approval, staff is recommending that the
Applicant prepare a parking management plan in the event
that on-site parking becomes a concern. Approval of ME No.
2025-02 is also consistent with other parking reductions
recently approved by the Planning Manager (e.g. ME Nos.
2020-01, 2022-01, 2022-02, and 2023-03).
H. Approval of Minor Exception No. 2025 -02 is consistent and supported by
several goals and policies of the General Plan. The Professional and
Administrative Office - Medium (PAO-1) land use designation of the General
Plan supports the permitting of a variety of office and office-related uses,
including professional and administrative office parks, up to three stories in
height. Goal 1 of the Land Use Element (LU) encourages a balance of land
uses that meet Santa Ana’s diverse needs. Specifically, the Project is
consistent with Policy LU-2.1 that encourages a broad spectrum of land
uses and development that offer employment opportunities for current and
future Santa Ana residents. Policy LU-2.6 promotes
rehabilitation/redevelopment of properties that encourage increased levels
of capital investments to create a safe and attractive environment. The
proposed Project will redevelop an existing lot with a new office that has not
been rehabilitated since the 1970s and will provide on-site and off-site
improvements that will contribute to creating a safe and attractive
environment for the neighborhood. Policy LU-2.7 also supports land use
decisions that encourage the retention of businesses in the City. Approval
of these minor exceptions will allow OCERS to remain in Santa Ana in a
new building that meets their needs.
The Project is also consistent with the Economic Prosperity Element (EP)
Policy EP-3.4 which encourages the development of “complete
communities” that provide a range of housing, services, amenities, and
transportation options that support the retention and attraction of skilled
workforce and employment. Policy EP-3.6 encourages flexible and up-to-
date land use regulations that are responsive to changing business trends,
best practices, technological advancements, and community needs.
Approval of the requested minor exceptions are consistent with these two
policies because the Project will support the retention of employment and it
is meeting the needs of OCERS’ and its employees, as they adapt to
workplace changes.
The Project is consistent with Policy UD-1.1 of the Urban Design Element
(UD) which requires that all developments feature high quality design,
materials, finishes, and construction. The Project will provide a high-end
office environment with amenities and will include building finish materials
such as bronze metal panels, perforated metal panels, glass guardrails, and
metal building canopies. Lastly, the Project is consistent with Policy UD-2.2
which encourages buffers and other urban design strategies to encourage
computability of new development with the scale, bulk, and pattern of
Resolution No. 2025-XXX
Page 4 of 8
existing development. The Project has been designed to be compatible with
nearby buildings and it is setback from the adjacent residential development
to the northwest of the Project site.
Section 2. Pursuant to the California Environmental Quality Act (CEQA) and the
CEQA Guidelines, the Project is exempt from further review, pursuant to Section 153 02
(Class 2) of the CEQA Guidelines (Replacement or Reconstruction), because the Project
is consistent with the applicable general plan designation and applicable general plan
policies, as well as with applicable zoning designation and regulations. Moreover, the
Project meets the criteria for categorically exempt development projects listed in CEQA
Guidelines Section 15302 and it would not have a significant effect on the environment.
The above-mentioned analysis and use of a Class 2 Categorical Exemption is
supplemented by the analysis provided for this Project. Based on this analysis, a Notice
of Exemption, Environmental Review No. 2024-116, will be filed for this Project.
Section 3. The Applicant shall indemnify, protect, defend and hold the City
and/or any of its officials, officers, employees, agents, departments, agencies, authorized
volunteers, and instrumentalities thereof, harmless from any and all claims, demands,
lawsuits, writs of mandamus, and other and proceedings (whether legal, equitable,
declaratory, administrative or adjudicatory in nature), and alternative dispute resolution
procedures (including, but not limited to arbitrations, mediations, and such other
procedures), judgments, orders, and decisions (collectively “Actions”), brought against
the City and/or any of its officials, officers, employees, agents, departments, agencies,
and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or
annul, any action of, or any permit or approval issued by the City and/or any of its officials,
officers, employees, agents, departments, agencies, and instrumentalities thereof
(including actions approved by the voters of the City) for or concerning the Project,
whether such Actions are brought under the Ralph M. Brown Act, California
Environmental Quality Act, the Planning and Zoning Law, the Subdivision Map Act, Code
of Civil Procedure sections 1085 or 1094.5, or any other federal, state or local constitution,
statute, law, ordinance, charter, rule, regulation, or any decision of a court of competent
jurisdiction. It is expressly agreed that the City shall have the right to approve, which
approval will not be unreasonably withheld, the legal counsel providing the City’s defense,
and that Applicant shall reimburse the City for any costs and expenses dire ctly and
necessarily incurred by the City in the course of the defense. City shall promptly notify
the Applicant of any Action brought and City shall cooperate with Applicant in the defense
of the Action.
Section 4. The Zoning Administrator of the City of Santa Ana, after conducting the
public hearing, hereby approves Minor Exception No. 2025-02 as conditioned in “Exhibit A”
attached hereto and incorporated as though fully set forth herein for the Project located at
1200 N. Tustin Avenue. This decision is based upon the evidence submitted at the above
said hearing, which includes, but is not limited to: the Request for Zoning Administrator
Action dated June 18, 2025, and exhibits attached thereto; and the public testimony, written
and oral, all of which are incorporated herein by this reference.
Resolution No. 2025-XXX
Page 5 of 8
ADOPTED this 18th day of June 2025 by the Zoning Administrator.
_______________________
Siri Champion, AICP
Zoning Administrator
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:________________________
Melissa M. Crosthwaite
Senior Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, GEMA ZAPIEN, Acting Recording Secretary, do hereby attest to and certify the
attached Resolution No. 2025-XXX to be the original resolution adopted by the Zoning
Administrator of the City of Santa Ana on June 18, 2025.
Date: ________________ ____________________________________
Acting Recording Secretary
Resolution No. 2025-XXX
Page 6 of 8
EXHIBIT A
Conditions of Approval for Minor Exception No. 2025-02
Minor Exception No. 2025-02 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal
Code, the California Administrative Code, the California Building Standards Code, and all
other applicable regulations. In addition, they shall meet the following conditions of approval:
The Applicant must comply with each and every condition listed below prior to exercising
the rights conferred by this minor exception.
The Applicant must remain in compliance with all conditions listed below throughout the life
of the development project. Failure to comply with each and every condition may result in
the revocation of the minor exception.
A. Planning Division Conditions:
1. All proposed site improvements must conform to Development Project
Review (DP No. 2024-25) and the staff report exhibit.
2. Any amendment to this Minor Exception, including modifications to approved
materials, finishes, architecture, site plan, landscaping, parking, and square
footages must be submitted to the Planning Division for review. At that time,
staff will determine if administrative relief is available or if the Minor Exception
must be amended.
3. Prior to submittal into building plan check, a full landscape and irrigation plan
is to be submitted to the Planning Division for review and approval. The
landscape plan shall conform to the commercial landscape standards,
Citywide Design Guidelines, and the City’s Water Efficient Landscape
Ordinance.
4. Prior to issuance of a building permit for any onsite grading activities, the
Applicant shall provide the Planning Division a proposed construction plan
with details on truck routes used for construction traffic and an overall
construction schedule. The truck routes shall avoid passage through
neighborhoods with sensitive land uses such as school, parks, and residential
land uses.
5. The idling of trucks and passenger vehicles on and in the vicinity of the
property, including on adjacent streets, is prohibited.
6. Contact information for an onsite manager or other individual responsible
for the daily operations during construction shall be posted in a prominent
Resolution No. 2025-XXX
Page 7 of 8
location at the front entry in the event that noise, traffic, and/or parking
complaints need reporting.
7. Prior to building permit issuance, a Parking Management Plan (PMP) must
be submitted to the Planning Division for review and approval. The PMP
shall address measure on how to address parking deficiencies and impacts
to the neighborhood should any arise.
8. Subject to review and applicability by the Planning and Building Agency, the
Community Development Agency, the Public Works Agency, and the City
Attorney, to ensure that the property and all improvements located
thereupon are properly maintained, Applicant (and the owner of the property
upon which the authorized use and/or authorized improvements are located
if different from the Applicant) shall execute a Property Management
Agreement. The Agreement shall be recorded against the property by the
City and shall be in a form reasonably satisfactory to the City Attorney. The
executed agreement must be submitted to the Planning Division by the
Applicant within 90 days of the approval of this Resolution. The Agreement
shall contain covenants, conditions and restrictions relating to the following:
a. Compliance with operational conditions applicable during any
period(s) of construction or major repair (e.g., proper screening and
securing of the construction site; implementation of proper erosion
control, dust control and noise mitigation measure; adherence to
approved project phasing etc.);
b. Compliance with ongoing operational conditions, requirements and
restrictions, as applicable (including but not limited to hours of
operation, security requirements, the proper storage and disposal of
trash and debris, enforcement of the parking management plan,
and/or restrictions on certain uses;
c. Ongoing compliance with approved design and construction
parameters, signage parameters and restrictions as well as
landscape designs, as applicable;
d. Ongoing maintenance, repair and upkeep of the property and all
improvements located thereupon (including but not limited to controls
on the proliferation of trash and debris about the property; the proper
and timely removal of graffiti; the timely maintenance, repair and
upkeep of damaged, vandalized and/or weathered buildings,
structures and/or improvements; the timely maintenance, repair and
upkeep of exterior paint, parking striping, lighting and irrigation
fixtures, walls and fencing, publicly accessible bathrooms and
bathroom fixtures, landscaping and related landscape improvements
and the like, as applicable);
Resolution No. 2025-XXX
Page 8 of 8
e. If Developer and the owner of the property are different (e.g., if the
Applicant is a tenant or licensee of the property or any portion
thereof), both the Applicant and the owner of the property shall be
signatories to the Agreement and both shall be jointly and severally
liable for compliance with its terms;
f. The Agreement shall further provide that any party responsible for
complying with its terms shall not assign its ownership interest in the
property or any interest in any lease, sublease, license or sublicense,
unless the prospective assignee agrees in writing to assume all of
the duties, obligations and responsibilities set forth under the
Property Maintenance Agreement; and
g. The Agreement shall contain provisions relating to the enforcement
of its conditions by the City and shall also contain provisions
authorizing the City to recover costs and expenses which the City
may incur arising out of any enforcement and/or remediation efforts
which the City may undertake in order to cure any deficiency in
maintenance, repair or upkeep or to enforce any restrictions or
conditions upon the use of the property. The maintenance
agreement shall further provide that any unreimbursed costs and/or
expenses incurred by the City to cure a deficiency in maintenance or
to enforce use restrictions shall become a lien upon the property in
an amount equivalent to the actual costs and/or expense incurred by
the City.
ME Nos. 2025-01 & 2025-02 for OCERS1200 N. Tustin Avenue
Exhibit 3 - Vicinity Zoning & Aerial View Map
Zoning
400 feet
.
A B C D E F G H
3
4
5
6
2
1
40' - 0"28' - 0"32' - 0"24' - 0"32' - 0"32' - 0"28' - 0"28' - 0"28' - 0"28' - 0"28' - 0"32' - 0"156' - 0"204' - 0"
MAIN
ELECTRICAL
MDF
ELEC
BOARD
CHAMBERS
MPOE
RISER
ROOM
ELEVATOR
CONTROL
INTERVIEWOFFICEOFFICE
OFFICE
INTERVIEW
OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
VEST.
OFFICE
OFFICE
OFFICE
MENS
WOMENS
OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICEOFFICE OFFICE
OFFICE
MOTHERS
TOILET
JANITOR COPY
OFFICE
OFFICE
OFFICE
INTERVIEW
INTERVIEW
STAIR 1
INTERVIEW
RECEPTION
WOMENS
MENS
AV
TOILET
TOILET
SERVERY
CLOSED
SESSION
CONF.
MAIL /
LOADING
STAIR 2
PANTRY
LOBBY
OPEN
OFFICE
OFFICE
OFFICE
COPY
BUILDING
ENGINEER
STORAGE
OPEN
OFFICE
OFFICE
OFFICE
OPEN
OFFICE
OPEN
OFFICE
SCALE:1/8" = 1'-0"
CONSTRUCTION PLAN - LEVEL 01 DPR01
A B C D E F G H
3
4
5
6
2
1
32' - 0"28' - 0"28' - 0"28' - 0"28' - 0"28' - 0"32' - 0"40' - 0"28' - 0"32' - 0"24' - 0"32' - 0"156' - 0"204' - 0"
MENS
OFFICE
TELECOMM
OPEN TO BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
TRAINING
ROOM
OFFICE
MOTHERS
RM
JANITOR
TOILET
TRAINING
STOR.
MEETING
HUDDLE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE
ELEC
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE IT
WORKSHOP/
STOCK
MEETING
WOMENS
OFFICE
OFFICE OFFICE
OFFICE OFFICE OFFICE
OFFICE OFFICEOFFICE
OFFICE
TERRACE
COPY/
PANTRY
OFFICE
OPEN
OFFICE
OPEN
COLLABORATION
OPEN
COLLABORATION
OPEN
OFFICE
STAIR 2
OPEN
OFFICE
(TRADING)
OPEN
OFFICE
SCALE:1/8" = 1'-0"
CONSTRUCTION PLAN - LEVEL 02 DPR01
A B C D E F G H
3
4
5
6
2
1
40' - 0"28' - 0"32' - 0"24' - 0"32' - 0"32' - 0"28' - 0"28' - 0"28' - 0"28' - 0"28' - 0"32' - 0"156' - 0"204' - 0"
OPEN
TO
BELOW
OPEN
TO
BELOW
TELECOM
OFFICEOFFICE
MOTHERS
RM
OFFICE
OFFICE
OFFICE
MEETING
OFFICEOFFICE
COMMS/ VID
STUDIO
JANITOR
TOILET
MPR/GENERAL
STOR.
OFFICE OFFICE OFFICEOFFICE
OFFICE
MPR
HUDDLE
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
WELLNESS
CENTER
WOMENS
MENS
MEETING
COMMS
STORAGE
OFFICE
OFFICEOFFICE
OFFICE
LIBRARY/
MEETING
OFFICE
HUDDLE
TERRACE
ELEC
PANTRY/
COPY
OPEN OFFICE
CAFE
OPEN
SEATING
CEO MTG
CEOOPEN
OFFICEOFFICEOFFICEOFFICE
OFFICEOFFICEOFFICE
STAIR 2
CHANGE RM
02
CHANGE RM
01
SHOWER
RM
SHOWER
RM
TERRACE
STAIR 1
SCALE:1/8" = 1'-0"
CONSTRUCTION PLAN - LEVEL 03 DPR01
LEVEL 1
0' - 0"
ROOF
43' - 9"
LEVEL 3
29' - 0"
LEVEL 2
14' - 6"
3456 2 1
14' - 9"14' - 6"14' - 6"MP-01
43' - 9"TYPE G
/01 A5.209
SB-01
ML-01
MP-03
MP-02
GL-02
ML-02
MP-01SB-02GL-02 ML-02
MP-04
MP-02
GL-02
GL-01
SB-01
GL-01
SB-01
ML-01
SB-01
ML-02
LEVEL 1
0' - 0"
ROOF
43' - 9"
LEVEL 3
29' - 0"
LEVEL 2
14' - 6"
3 4 5 621
14' - 9"14' - 6"14' - 6"MP-01
MP-02
GL-02
ML-02
MP-04
MP-03
MP-02
GL-02
ML-02
GL-03
ML-02
MP-02
GL-02
SB-01
GL-01
SB-01
ML-01
GL-01
MP-01
SB-01PT-E2
PT-E2
OCERS
WHITE METAL PANEL
GL-02
BRONZE MULLION
WHITE MULLION
GLASS TYPE 2
MP-01
DARK BRONZE
METAL PANEL
MP-02
GL-01
GLASS TYPE 1
ML-02
ML-01
METAL LOUVER
MP-04
PERFORATED METAL PANEL
MP-03
PT-E2
METAL BUILDING CANOPY PAINT TO MATCH BRONZE METAL PANEL
GL-03
GLASS GUARDRAIL
SB-01
SHADOW BOXEXTERIOR SIDE: GLASS TYPE 1
WHITE METAL BEHIND THE GLASS
SB-02
SHADOW BOXEXTERIOR SIDE: GLASS TYPE 2
DARK BRONZE METALBEHIND THE GLASS
GUARDIAN GLASSSNX 70 UltraClear
GUARDIAN GLASSSNX 70 UltraClear
W/BRONZE TINT
LEVEL 1
0' - 0"
ROOF
43' - 9"
LEVEL 3
29' - 0"
LEVEL 2
14' - 6"
A B C D E F G H
14' - 9"14' - 6"MP-04
14' - 6"MP-01
GL-02
ML-02 43' - 9"MP-02
SB-01
SB-01
GL-01
GL-01
SB-01
SB-01
GL-01
GL-01
SB-01
ML-01
LEVEL 1
0' - 0"
ROOF
43' - 9"
LEVEL 3
29' - 0"
LEVEL 2
14' - 6"
ABCDEFGH
14' - 6"14' - 9"14' - 6"GL-01
ML-01
SB-01 43' - 9"MP-02
GL-02
ML-02
SB-01
ML-01
GL-01
MP-02 GL-02GL-03MP-01
MP-03 GL-02 ML-02
PT-E2PT-E2PT-E2
MP-04
SB-01
MP-02
SB-01
GL-01
SB-01
SB-01
WHITE METAL PANEL
GL-02
BRONZE MULLION
WHITE MULLION
GLASS TYPE 2
MP-01
DARK BRONZE METAL PANEL
MP-02
GL-01
GLASS TYPE 1
ML-02
ML-01
METAL LOUVER
MP-04
PERFORATED METAL PANEL
MP-03
PT-E2
METAL BUILDING CANOPY PAINT TO
MATCH BRONZE METAL PANEL
GL-03
GLASS GUARDRAIL
SB-01
SHADOW BOXEXTERIOR SIDE: GLASS TYPE 1
WHITE METAL BEHIND THE GLASS
SB-02
SHADOW BOXEXTERIOR SIDE: GLASS TYPE 2
DARK BRONZE METALBEHIND THE GLASS
GUARDIAN GLASSSNX 70 UltraClear
GUARDIAN GLASSSNX 70 UltraClearW/BRONZE TINT
Lead Agency:
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
Project Applicant:
Orange County Employees Retirement System
2223 E Wellington Avenue
Santa Ana, CA 92701
CEQA Consultant:
3333 Michelson Drive, Suite 500
Irvine, CA 92612
April 2025
Orange County Employees
Retirement System HQ
Class 2 Exemption
Orange County Employees Retirement System HQ
City of Santa Ana Class 2 Exemption
This page intentionally left blank.
Orange County Employees Retirement System HQ
City of Santa Ana Class 2 Exemption
i
Table of Contents
1. INTRODUCTION ............................................................................................................................. 1
1.1. PURPOSE OF THE EXEMPTION .................................................................................................................... 1
1.2. DOCUMENT ORGANIZATION ..................................................................................................................... 2
2. ENVIRONMENTAL SETTING ........................................................................................................... 3
2.1. PROJECT LOCATION ..................................................................................................................................... 3
2.2. EXISTING LAND USE ...................................................................................................................................... 3
2.3. EXISTING GENERAL PLAN LAND USE AND ZONING DESIGNATIONS .............................................. 3
2.4. SURROUNDING LAND USES ........................................................................................................................ 3
3. PROJECT DESCRIPTION ............................................................................................................... 21
3.1. PROJECT OVERVIEW .................................................................................................................................. 21
3.2. PROJECT FEATURES .................................................................................................................................... 21
3.3. CONSTRUCTION ......................................................................................................................................... 22
3.4. OPERATION .................................................................................................................................................. 23
3.5. DISCRETIONARY ACTION CHECKLIST ..................................................................................................... 23
4. CLASS 2 EXEMPTION FINDINGS .................................................................................................. 35
4.1. PROJECT CONSISTENCY WITH CLASS 2 ............................................................................................... 35
4.2. EXEMPTION EXCEPTIONS .......................................................................................................................... 40
5. REFERENCES ................................................................................................................................ 42
Figures
FIGURE 2-1: REGIONAL LOCATION........................................................................................................................................ 5
FIGURE 2-2: LOCAL VICINITY ................................................................................................................................................. 7
FIGURE 2-3: AERIAL VIEW...................................................................................................................................................... 9
FIGURE 2-4A: EXISTING SITE PHOTOS ................................................................................................................................ 11
FIGURE 2-4B: EXISTING SITE PHOTOS................................................................................................................................. 13
FIGURE 2-4C: EXISTING SITE PHOTOS ................................................................................................................................ 15
FIGURE 2-5: EXISTING LAND USE ........................................................................................................................................ 17
FIGURE 2-6: EXISTING ZONING .......................................................................................................................................... 19
FIGURE 3-1: CONCEPTUAL SITE PLAN ................................................................................................................................. 25
FIGURE 3-2A: ELEVATIONS .................................................................................................................................................. 27
FIGURE 3-2B: ELEVATIONS .................................................................................................................................................. 29
FIGURE 3-3: CONCEPTUAL RENDERINGS ............................................................................................................................ 31
FIGURE 3-4: LANDSCAPE PLAN ........................................................................................................................................... 33
Orange County Employees Retirement System HQ
City of Santa Ana Class 2 Exemption
ii
Tables
TABLE 2-1: GENERAL PLAN LAND USE AND ZONING OF SURROUNDING USES .................................................................... 3
TABLE 3-1: PROPOSED PARKING ........................................................................................................................................ 21
TABLE 4-1: COMPARATIVE TRIP GENERATION .................................................................................................................... 36
TABLE 4-2: REGIONAL CONSTRUCTION EMISSIONS ........................................................................................................... 37
TABLE 4-3: REGIONAL OPERATIONAL EMISSIONS .............................................................................................................. 38
TABLE 4-4: PROJECT CONSTRUCTION GHG EMISSIONS ................................................................................................... 38
TABLE 4-5: PROJECT TOTAL GHG EMISSIONS ................................................................................................................... 39
Appendices
APPENDIX A TRIP GENERATION, VMT, AND LOS SCREENING ANALYSIS
APPENDIX B AIR QUALITY, ENERGY, AND GREENHOUSE GAS IMPACT ANALYSIS
Orange County Employees Retirement System HQ
City of Santa Ana Class 2 Exemption
1
1. INTRODUCTION
The Project Applicant is requesting approval from the City of Santa Ana for a Minor Exception and a
Development Site Review to demolish an existing two-story 30,299 square feet (SF) professional service
building and construct a three-story, approximately 65,768 SF professional office building with parking,
landscaping, and access improvements (proposed Project). The City of Santa Ana is the Lead Agency for the
proposed Project and will utilize this document as evidence that the proposed Project qualifies for the Class
2 Replacement or Reconstruction Project Exemption, which is further described below.
1.1. PURPOSE OF THE EXEMPTION
Article 19 of the California Environmental Quality Act (CEQA) Guidelines includes, as required by Public
Resources Code Section 21084, a list of classes of projects which have been determined not to have a
significant effect on the environment. This document demonstrates that the proposed Project qualifies for a
CEQA Exemption as a Replacement or Reconstruction Project (Class 2), consistent with the provisions of CEQA
Guidelines Sections 15302 and 15300.2 and provides information for City decision-makers to find that the
proposed Project is exempt under CEQA.
Pursuant to CEQA Guidelines Section 15302 (Cal. Code Regs. tit. 14 § 15302), Class 2 consists of
replacement or reconstruction of existing structures and facilities where the new structure will be located on
the same site as the structure replaced and will have substantially the same purpose and capacity as the
structure replaced, including but not limited to:
a. Replacement or reconstruction of existing schools and hospitals to provide earthquake resistant structures
which do not increase capacity more than 50 percent;
b. Replacement of a commercial structure with a new structure of substantially the same size, purpose, and
capacity.
c. Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no
expansion of capacity.
d. Conversion of overhead electric utility distribution system facilities to underground including connection
to existing overhead electric utility distribution lines where the surface is restored to the condition existing
prior to the undergrounding.
In addition to meeting the requirements stated above, CEQA Guidelines Section 15300.2 provides specific
instances where exceptions apply to a project that would otherwise meet the requirements for an exemption.
These exceptions are:
a. Location: Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located
– a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive
environment be significant. Therefore, these classes are considered to apply in all instances, except
where the project may impact on an environmental resource of hazardous or critical concern where
designated, precisely mapped, and officially adopted pursuant to law by federal, State, or local
agencies.
b. Cumulative Impact: All exemptions for these classes are inapplicable when the cumulative impact of
successive projects of the same type in the same place, over time is significant.
c. Significant Effects: A categorical exemption shall not be used for an activity where there is a reasonable
possibility that the activity will have a significant effect on the environment due to unusual circumstances.
d. Scenic Highways: A categorical exemption shall not be used for a project which may result in damage
to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar
Orange County Employees Retirement System HQ
City of Santa Ana Class 2 Exemption
2
resources, within a highway officially designated as a State scenic highway. This does not apply to
improvements which are required as mitigation by an adopted negative declaration or certified EIR.
e. Hazardous Waste Sites: A categorical exemption shall not be used for a project located on a site which
is included on any list complied pursuant to Section 65962.5 of the Government Code.
f. Historical Resources: A categorical exemption shall not be used for a project which may cause a
substantial adverse change in the significance of historical resources.
This document demonstrates that the proposed Project and its circumstances would be consistent with the
requirements under CEQA Guidelines Section 15302 and would not result in any exceptions identified in
Section 15300.2.
1.2. DOCUMENT ORGANIZATION
This Class 2 Exemption includes the following sections:
Section 1. Introduction
Provides information about CEQA, its requirements for environmental review, and explains the Exemption
Checklist that evaluates the potential impacts of the proposed Project to the physical environment.
Section 2. Environmental Setting
Provides information about the proposed Project’s location.
Section 3. Project Description
Includes a description of the proposed Project’s physical features and characteristics.
Section 4. Class 2 Exemption Findings
Includes the Exemption Checklist and evaluates the proposed Project’s potential to result in significant adverse
effects to the physical environment, as well as whether exceptions to the Exemption apply.
Section 5. References
Includes a list of references cited and used to support the information in this document.