HomeMy WebLinkAboutELECNOR BELCO ELECTRIC, INC. (TRAFFIC SIGNAL MOD AT SEGERSTROM & RAITT AND SEGERSTROM & FLOWER; PED HYBRID BEACON INSALLATION AT EDINGER & TOWNER)INSURMH ON PLE
WORT( ViAY PROCEEL)
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
1n1
5 PROJECT 25-6033 & 22-6018
o=hwA (z) TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND
SEGERSTROM AVENUE & FLOWER STREET; PEDESTRIAN HYBRID BEACON INSTALLATION AT
EDINGER AVENUE & TOWNER STREET
This CONSTRUCTION CONTRACT is made and entered into this 5"' day of November, 2025 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and Elecnor Belco
Electric, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Traffic Signal Modification at Segerstrom Avenue & Raitt Street
and Segerstrom Avenue & Flower Street; Pedestrian Hybrid Beacon Installation at Edinger Avenue &
Towner Street Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in
and in accordance with the Contract Documents prepared by the City's Public Works Agency and
approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed One Million Three Hundred Ninety -Nine
Thousand Two Hundred Eighty -Four Dollars and No Cents ($1,399,2$4.00), as set forth and
identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A".
Page 1 of 4
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: CWA City of Santa Ana 12-20-2023
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
Page 2 of 4
(1) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
Kfy1e Nellesen
Assistant City Attorney
CITY OF SANTA
!(/U6—+ #
ALVARO NL
City Manager
CONTRACTOR:
Elecnor Belco Electric, Inc.
AME: Pablo Sanchez
TITLE: Chief Oper. Officer
Page 3 of 4
RECOMMENDED FOR APPROVAL:
Rodolfo Rosas'
RODOLFO ROSAS, P.E.
Acting Executive Director
Public Works Agency
Page 4 of 4
CITY OF SANTA ANA EXHIBIT A
INSTRUCTIONS TO BIDDERS
PROJECT NO.: 25-6033
TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND
SEGERSTROM AVENUE & FLOWER STREET
PROJECT NO.: 22-6018
PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND
TOWNER STREET
INSTRUCTIONS TO BIDDERS FOR PROPOSAL SUBMISSION
INTENT OF PROPOSAL
The purpose of this Proposal is to identify a Prime Contractor to enter into a contract with the City
of Santa Ana, referred to as AGENCY, to complete the Work shown on the Contract Documents.
PROPOSAL
The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be
accompanied by the following documents:
1. Bid Proposal
2. Bidder's Statement
3. Contractor's Licensing and Registration Statement
4. Prevailing Wage Compliance and Monitoring Statement
5. Ownership Affidavit
6. Bid Bond
7. List of Sub -Contractors
8. References
9. Additional References
10. Non -Collusion Affidavit
11. Non -Discrimination Certificate
12. Statement Regarding Apprenticeship Requirements
13. Statement Regarding "Anti -Kickback" Requirements
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwise entitled.
Signed:
Title: EXFICUTAVE VCE PRESIDENT
Firm: ELECNOR-BrrCO ELECTRIC, INC.
14,
15. Fleet Compliance Certification
16. Public Contract Code Section 10162 Questionnaire
17. Statement Regarding Community Workforce Agreement (CWA) Requirements
x
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 25-6033
TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND
SEGERSTROM AVENUE & FLOWER STREET
PROJECT NO.: 22-6018
PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND
TOWNER STREET
BID PROPOSAL,
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Elecnor Belco Electric, Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Traffic Signal Modification at
1
LS
$
$
Segerstrom Avenue and Raitt
3-�� l02
31e1, 702
Street
2
Traffic Signal Modification at
1
LS
$
$
Segerstrom Avenue and Flower
7W 0%
zcxl.� 0%
Street
3
Pedestrian Hybrid Beacon
1
LS
$
$
Installation at Edinger Avenue
2Z5 Kul
2 ZS `i01
and Towner Street
4
* Install 2" PVC Conduit
100
LF
$ 37-
5
* Install 3" PVC Conduit
3375
LF
$ 55
$1Pfv S
6
* Install 4" PVC Conduit
820
LF
$
$
f,E,88i0
7
Install No. 5 Pull Box
1
EA
$ I
$ I
8
Install No, 6 Pull Box
21
EA
$1 25�
$� N IS
9
Install No. 6E Pull Box
10
EA
$i
10
Install N40 Pull Box
I
EA
$
$
5=0
5,
P-1 ofP-19
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 25-6033
TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND
SEGERSTROM AVENUE & FLOWER STREET
PROJECT NO.: 22-6018
PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND
TOWNER STREET
Item
Description
Qty^
Unit
Unit Price
Amount
11
IP Communication System
I
LS
$
$
34,300
3N,300
12
* Install 12 Strand SMFO Cable
350
LF
$
$
3
I,oSo
13
* Install 144 Strand SMFO
4075
LF
$
$20
Cablegn5
15
14
* Fusion Splice Strands of
144
EA
$
44
$
SMFO_
Gz3c.
15
Fiber Optic Splice Enclosure
_
3
EA
$
$
1 128
16
Signing and Striping
1
LS
$
$i,n g(.o
17
* Pothole Pole Locations for
16
EA
$
$
Utility Conflicts
18,980
18
Temporary Overhead Wiring
1
LS
$
$
22,lbf0
22,1oc,
19
PCC Sidewalk (T=4")
250
SF
$
cbo
$ 5100
2 2
20
PCC Curb Ramp
250
SF
$1% qo
$14
22S
21
CCTV Inspection of Existing
1
LS
$
$
Sewer Main and Laterals (Pre
ld o00
lQ QCC)
and Post Construction)
22
Project Advertising Sign(s)
3
EA
$
$
1,loo
3p
23
Construction Permit
1
LS
$ 8,000
12W113V
CITY OF SANTA ANA
PROPOSAI.
PROJECT NO.: 25-6033
TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND
SEGERSTROM AVENUE & FLOWER STREET
PROJECT NO.: 22-60I S
PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND
TOWNER STREET
TOTAL BASE BID- ITEMS 1-23 ,3(o-7, 2stG .OQ
ADD ALTERNATE BID
24
Install GTT Opticom EVP System at
I
LS
S
$
Segerstrom Avenue and Raitt Street
25
install GTT Opticom EVP System at
I
LS
S
$
Segerstrom Avenue and Flower Street
TOTAL ALTERNATE BID —ITEMS 24-25 � fit, 99$
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LI UIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within One Hundred Twenty (120) working days after the commencement date stated in
the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place
order for long -lead time items (i.e. Traffic Signal Poles, Electrical Meter Pedestal and Fiber Optic
Cable). The absolute maximum time of completion of improvement (including time extensions,
weather, and material procurement) shall not exceed 365 calendar days.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $4,200 per calendar day.
Name of Firm Elecnor Belco Electric, Inc.
Signature of BIDDER t=sl,John Wong
Title Executive Vice Prc;
(If an individual, so state. IALOH' -Kr co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-3 of P-19
Page 1 of 2
A� " CERTIFICATE OF LIABILITY INSURANCE
°11/17/z 25Y'
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Willis Towers Watson Northeast, Inc.
o/0 26 Century Blvd
P.O. Box 305191
CONTACT Marie Hofer
PHONE 1-877-945-7376 FAX 1-888-467-2378
AIC No
M'..X'Certifi..t;Q.@.tco.co.
ADDRESS:
INSURERS AFFORDING COVERAGE
NAIL#
Nashville, IN 372305191 USA
INSURERA: North Pointe Insurance Company
27740
INSURED
Elecnor Heloo Electric, Inc.
14320 Albers Way
INSURER B: QBE Insurance Corporation
39217
Navigators Insurance Company
INSURER C: 9
42307
INSURER O: Markel American Insurance Company
289532
Chino, CA 91710
INSURER E: at Paul Surplus Lines Insurance Company
3
INSURER F :
COVERAGES CERTIFICATE NUMBER: W41823012 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION
OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED
BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE
BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
JIM
BUBR
MIDPOLICY
NUMBER
POLICY EFF
MMIDDM'YY
POLICY EXP
MMIDDfYYYY
LIMITS
x
COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
CLAIMS -MADE �X OCCUR
-DAMAGETO300,000
PREMISESSEa occurrence
$
MED EXP(Any one eman)
$ 10,000
A
PERSONAL &ADV INJURY
$ 1,000,000
I
y
175001144
11/01/2025
11/01/2026
GEN'L AGGREGATE LIMIT APPLIES PER:
X POLICY 0 jEC('T- r I LOG
GENERAL AGGREGATE
$ 2,000,000
PRODUCTS - COMPICPAGG
$ 2,000,000
$
OTHER:
AUTOMOBILE
LIABILITY
COMBINED SINGLE LIMIT
Ea modem
$ 1,000,000
x
BODILY INJURY (Per person)
$
ANY AUTO
A
OWNED SCHEDULED
AUTOS ONLY AUTOS
y
y
165001222
11/01/2025
11/01/2026
BODILY INJURY Per accident
( )
$
PROPERTY DAMAGE
Per moment
$
HIRED NON -OWNED
AUTOS ONLY AUTOS ONLY
B
X
UMBRELLALIAB
X
OCCUR
EACH OCCURRENCE
$ 4,000,000
AGGREGATE
$ 4,000,000
EXCESS Li
CLAIMS -MADE
195001123
11/01/2025
11/01/2026
DED I X I RETENTION$ 10, 000
$
A
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY YIN
ANYPROPRIETORIPARTNERIEXECUTIVE
OFFICERIMEMBER EXCLUDED? No
(Mandatory in Ni
NIA
y
155000127
11/Ol/2025
11/Ol/2p26
v PER OTH-
^ STATUTE ER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE -POLICY LIMIT
$ 1, 000, 000
C
let Excess Liability
RE25EXC918906IV
11/01/2025
11/01/2026
Each Occurrence
$3,000,000
$3M xs $414Ti
Aggregate
$3,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS VEHICLES (ACORD 101, Additional Remarks Schedule,
maybe attached if more space is required)
Certificate Holder is included as an Additional Insured as respects to General Liability and Auto Liability.
General Liability and Auto Liability shall be Primary and Non-contributory with any other insurance in force for or
which may be purchased by Additional Insured.
Waiver of Subrogation applies in favor of Additional Insured with respects to General Liability, Auto Liability and
Worker Compensation, as permitted by law.
SEE ATTACHED
FAP�PR!OVEID
CERTIFICATE HOLDER U ran'. byTUTran
�.
CANCELLATION Tu TNguyen at li:55 am Nov 18, 2025
Nguyen 085534-08008
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
City of Santa Ana,
AUTHORIZED REPRESENTATIVE
20 Civic Center Plaza, M-22
tj,,,.. r , it '],
Santa Ana, CA 92701
VMAA(,k% N' 4
01988-2016 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD
Be ID: 20BB2382 sAmce: 4208840