HomeMy WebLinkAboutItem 17 - Cooperative Cost Reimbursement Agreement for the Fairview Street RehabilitationPublic Works Agency
www.santa-ana.org/pw
Item # 17
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
March 3, 2026
TOPIC: Approve a Cooperative Cost Reimbursement Agreement and Award a
Construction Contract to Onyx Paving Company Inc. for the Construction of the Fairview
Street Rehabilitation from Southern City Limits to Alton Avenue Project
AGENDA TITLE
Cooperative Cost Reimbursement Agreement with the City of Costa Mesa and Award a
Construction Contract to Onyx Paving Company, Inc. for the Construction of the
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue Project (Project
No. 21-6978) (Non -General Fund)
RECOMMENDED ACTION
1. Authorize the City Manager to execute a Cooperative Cost Reimbursement
Agreement with the City of Costa Mesa for improvements on Fairview Street
within the Costa Mesa jurisdiction from Southern City Limits to Alton Avenue
(Agreement No. A-2026-XXX).
2. Approve an appropriation adjustment recognizing $96,000 in cost
reimbursements from the City of Costa Mesa into the Select Street Construction,
Expense Reimbursement revenue account (No. 05917002-57000), and
appropriate the same amount to the Select Street Construction, Improvements
Other Than Buildings expenditure account (No. 05917660-66220) for the
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue Project.
(Requires five affirmative votes.)
3. Approve an amendment to the Fiscal Year 2025-26 Capital Improvement
Program to include an additional $96,000 in construction funds for the Fairview
Street Rehabilitation from Southern City Limits to Alton Avenue Project (No. 21-
6978).
4. Approve the Project Cost Analysis for a total estimated construction delivery cost
of $3,410,000, which includes $2,728,000 for the construction contract, $409,200
for contract administration, inspection, and testing, and a $272,800 for
unanticipated or unforeseen work.
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue
March 3, 2026
Page 2
5. Award a construction contract to Onyx Paving Company, Inc. the lowest
responsive bidder, in accordance with the base bid and alternates in the amount
of $2,728,000, subject to change orders, for construction of the Fairview Street
Rehabilitation from Southern City Limits to Alton Avenue Project (No. 21-6978),
for a term beginning March 3, 2026, and authorize the City Manager to execute
the contract.
6. Determine that, pursuant to the California Environmental Quality Act, the
recommended actions are exempt from further review. Categorical Exemption
Environmental Review No. ER-2026-3 will be filed for Project No. 21-6978.
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The rehabilitation of Fairview Street from the City's southern limits to Alton Avenue
(Exhibit 1) was approved by the City Council in the FY 24/25 Capital Improvement
Program Project No. 21-6978. The Project will rehabilitate a segment of Fairview Street
from the City's southern limits (Sunflower Avenue) to Alton Avenue by removing and
replacing failed asphalt sections, reconstructing raised medians, and replacing the
damaged concrete curbs, gutters, sidewalk, driveways, and curb ramps. The project
also includes traffic improvements, such as enhanced traffic striping and pavement
markings, as well as traffic signal modifications that incorporate video detection at the
intersections. Once completed, these improvements will enhance the ride quality and
visual appearance of the street. Pedestrian facility improvements will also comply with
Americans with Disabilities Act (ADA) standards.
The City of Costa Mesa shares the right-of-way within the project area; therefore, a
Cooperative Cost Reimbursement Agreement is required for the City of Costa Mesa to
fund the portion of the improvements within the Costa Mesa city limits (Exhibit 2). The
Cooperative Cost Reimbursement Agreement between the City of Santa Ana and the
City of Costa Mesa defines the roles and responsibilities of each party and establishes
each city's estimated share of the project costs. The City of Costa Mesa's cost share, in
an amount not to exceed $96,000, includes $7,000 in construction administration,
inspection, and testing costs. The City of Costa Mesa will immediately forward the
payment of $96,000 upon award of the construction contract.
Project Advertisement and Contractor Procurement
To provide an opportunity for local vendors to submit bids, the City notified a total of 80
regional vendors via PlanetBids, many of which are Santa Ana based. A total of seven
(7) responsive bids were received including one (1) bid from a Santa Ana contractor.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on November 17, 2025 and November 24, 2025. The project was also
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue
March 3, 2026
Page 3
advertised in PlanetBids from November 13, 2025 to December 11, 2025. Bids were
received electronically via PlanetBids on December 11, 2025.
A copy of construction plans, contracts, specifications, and all related reference
materials (such as The Greenbook) are available for public review at the City's Public
Works Agency, Central Files office located in City Hall.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID +
ALTERNATES
1
Onyx Paving Company, Inc.
Yorba Linda, CA
$2,728,000
2
R.J. Noble Company
Orange, CA
$ 2,742,000
3
Hardy & Harper, Inc.
Lake Forest, CA
$ 2,980,000
4
Toro Enterprises, Inc.
Oxnard, CA
$ 3,207,010
5
Vido Samarzich, Inc.
Santa Ana, CA
$ 3,241,720
6
Excel Paving Co.
Long Beach, CA
$ 3,448,860
7
All American Asphalt
Corona, CA
$ 3,461,115
NR
RCCI
Azusa, CA
Non -Responsive
A total of eight (8) bids were received and seven (7) were deemed responsive. Staff
determined that RCCI's bid was non -responsive because it did not meet contract
specification requirements to self -perform more than 50% of the total contract value.
Onyx Paving Company, Inc. submitted the lowest responsive base bid in the amount of
$2,673,000 (Exhibit 3). As specified in the bid documents, the lowest bid shall be
determined on the basis of the Base Bid. The add -alternate scope of work in the bid
package is the installation of a traffic video detection system at Fairview Street and
Segerstrom Avenue to improve traffic control. The total bid including the add -alternate
scope of work is in the amount of $2,728,000 and still collectively lower than the other
bids including the alternative. Based on the bid analysis and a contractor's reference
check, staff recommends awarding the construction contract, including the add -alternate
scope, to Onyx Paving Company, Inc. (Exhibit 4).
Onyx Paving Company, Inc. has previously performed work as a prime contractor in the
City of Santa Ana within the past three (3) years, including two Local Street
Preventative Maintenance Projects and the Fremont Elementary and Spurgeon
Intermediate Safe Routes to School Projects. The Contractor satisfactorily completed
these projects and staff recommends awarding the construction contract to Onyx Paving
Company, Inc. for the construction of the Project.
Proiect Delive
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes a budget allocation for construction administration,
inspection, and testing. Construction administration and inspection may be performed
by either Staff or consultants and includes construction management, inspection of the
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue
March 3, 2026
Page 4
Contractor's work to ensure contract compliance, workmanship and quality, materials
testing, and implementation of the labor requirements.
Any of the allocated construction administration funds not spent are considered project
savings and are returned to the respective fund balance upon close out of the project.
As indicated in the Cost Analysis and as summarized in the table below, the estimated
total construction delivery cost of the project is $3,410,000.
Project Item
Total
Construction Contract Bid Amount
$2,728,000
Construction Administration
$218,240
Inspection
$136,400
Testing
$54,560
Unanticipated or Unforeseen Work
$272,800
TOTAL ESTIMATED CONSTRUCTION DELIVERY COST
$3,410,000
Project Schedule and Contract Time
The project is estimated to be completed in August 2026 barring unforeseeable
conditions such as rain, natural disasters, or other delays beyond the control of the City
and of the Contractor. The contract time for this project is 65 working days, as specified
in the bid documents. Working days are counted in accordance with the City's Standard
Specifications, which exclude weekends, City -observed holidays, and inclement
weather days that prevent work.
The contractor was required to submit a construction schedule as part of their bid to
expedite delivery of the project. The projected completion dates based on the submitted
schedule is August 2026, which is within the allotted 65 working days. If the contractor
fails to deliver on time, they will be assessed a penalty of $7,620 per calendar day as
specified in the bid documents.
Project Milestones
Milestone
Estimated
Completion
Notes
Administrative Startup
March 2026
Contract execution, bonds,
insurance
Material Procurement
April 2026
Procurement may take place
concurrently with construction.
Contractor Mobilization
April 2026
Start of construction activities
Project Completion
I August 2026
1 Based on 65 working days
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue
March 3, 2026
Page 5
Proiect Phasin
The contractor will be constructing this project in a singular phase, fulfilling the scope of
work as outlined in the contract documents. The contractor is responsible for
determining the scheduling and sequencing of activities based on their proposed means
and methods.
Public Outreach
The project scope will impact nearby businesses and residents. To ensure timely and
effective communication, the following notification measures will be implemented prior
to the start of construction:
• Electronic message signs will be installed two weeks in advance of construction
activities to provide early notice of the project's start date,
• A project information sign will be posted at the construction site, including contact
information for public inquiries,
• Residents and businesses within 1,000 feet of the project limits will receive door
hangers or mailed notifications at least two weeks before construction begins,
• A second round of notification will be issued 48 hours prior to the start of
construction to residents and businesses adjacent to the limits of work, and
• The City will also disseminate information through its official website and social
media platforms to keep the public informed of construction activities, including
any lane closures.
The Contractor is required to issue construction notices to adjacent residents and
businesses at least two weeks before construction begins. Additionally, the contractor is
required to install signage at the project site indicating project details and contact
information.
ENVIRONMENTAL IMPACT
Pursuant to the California Environmental Quality Act (CEQA), the recommended actions
are exempt from further review pursuant to Section 15301(c) of the CEQA Guidelines for
projects consisting of repair/maintenance of existing facilities. The proposed project
continues to meet these parameters of the CEQA Guidelines, and Categorical Exemption
Environmental Review No. ER-2026-3 will be filed for Project 21-6978 (Exhibit 5).
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $3,410,000. All funds are available for expenditure in Fiscal Year 2025-2026.
Any remaining balances not expended at the end of the fiscal year will be presented to
City Council for approval of carryovers into Fiscal Year 2026-2027 (Exhibit 6).
The proposed contract authorizes staff a maximum of 10% for construction contract
change orders for unanticipated or unforeseen work. Staff will return to City Council for
authorization and appropriation of additional funding if necessary.
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue
March 3, 2026
Page 6
With the approval of the requested appropriation adjustment, the cost reimbursement will
be recognized in the Select Street Construction, Expense Reimbursement revenue
account (05917002-57000) and appropriated for spending in the Select Street
Construction, Improvements Other Than Buildings expenditure account (No. 05917660-
66220).
Accounting
Accounting Unit,
Fiscal
Unit —
Fund
Account
Amount
Year
Account No.
Description
Description
(Project No.)
CURRENT BUDGET
HUTA Gas Tax -
05917665-
Select Street
RMRA,
2025-26
66220
Construction
Improvements
$3,314,000
(21-6978)
Other Than
Buildings
APPROPRIATION
ADJUSTMENT
Select Street
05917660-
Select Street
Construction,
2025-26
66220
Construction
Improvements
$96,000
(21-6978)
Other Than
Buildings
TOTAL
$3,410,000
EXHIBIT(S)
1. Location Map
2. Cooperative Cost Reimbursement Agreement
3. Bid Proposal
4. Construction Contract
5. Environmental Determination
6. Capital Improvement Project Worksheet
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director, Public Works Agency
Approved By: Alvaro Nunez, City Manager
Exhibit 1
SANTAANA Project No. 21-6970.
i Fairview Street Rehabilitation from
uaSouth City Limit (Sunflower Avenue) to
PUBLIC WORKS AGENCY I Alton Avenue
COOPERATIVE COST REIMBURSEMENT AGREEMENT
FOR FAIRVIEW STREET REHABIL.IATION FROM SOUTH CITY LIMIT (SUNFLOWER
AVENUE) TO ALTON AVENUE
COOPERATIVE COST REIMBURSEMENT AGREEMENT ("Agreement"), is made and entered
into this day of — 2025, by and between the CITY OF SANTA ANA, a
California charter city ("Santa Ana"), and the CITY OF COSTA MESA, a California municipal
corporation ("Costa Mesa"). Related work on the project will include pavement grind and overlay,
reconstruction of curb median with irrigation and landscaping, curb and gutter, driveways, bus
pads, sidewalk repair, replacement of curb ramps to be in compliance with federal Americans with
Disabilities Act requirements, signing and striping, and adjustment of manholes and water valves
to grade. In this Agreement, Santa Ana and Costa Mesa may each be individually referred to as
a "Party" and collectively referred to as the "Parties."
RECITALS:
WHEREAS, Santa Ana has initiated a street rehabilitation project (the "Project') to
improve the pavement condition of Fairview Street from South City Limits (Sunflower Avenue) to
Alton Avenue.
WHEREAS, Fairview Street within the Project limits contain a portion of property within
Santa Ana and a portion of the street within the boundary of Costa Mesa; and
WHEREAS, In an effort to efficiently utilize Costa Mesa resources, Costa Mesa wishes to
improve a portion of Fairview Road within its boundary at the same time the Santa Ana Fairview
Street Rehabilitation Project are conducted; and
WHEREAS, the Parties desire to repave Fairview Street (Fairview Road in the City of
Costa Mesa), within their respective boundaries as part of the "Project'.
NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable
consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties
agree as follows:
1. Santa Ana will advertise for bids, hire a contractor, approve the work and administer the
contract for street rehabilitation.
2. Costa Mesa is responsible for funding that portion of the Project within the Costa Mesa city
limits, as set forth in Exhibit A & B, attached hereto and incorporated by this reference. Costa
Mesa will remit payment to Santa Ana within ninety (90) days of receipt of invoice evidencing
Project work performed within Costa Mesa city boundary. The total project cost for the City of
Costa Mesa under this agreement shall not exceed $96,000.00.
3. Santa Ana shall coordinate the relocation of all affected utility company facilities within the city
limits of Costa Mesa in a timely manner.
4. Santa Ana and Costa Mesa shall extend cooperation to each other and proceed under this
Agreement in good faith to facilitate timely completion of the "Project'. The Parties agree that
PAGE 1 OF 11
when any component of this Project is subject to the approval of Costa Mesa, such approval shall
not be unreasonably withheld.
5. Costa Mesa will be notified as to the official advertising dates, bid opening date, construction
start date, and overall construction schedule. Also, a representative from Costa Mesa will be
invited to attend pre -construction, Project status, and final walk through meetings.
6. Change orders for work within Costa Mesa must receive the written approval of the City
Engineer of Costa Mesa or his/her designee prior to implementation.
7. The following staff members, or as otherwise designated in writing by the Executive Director of
Public Works of Santa Ana or City Engineer of Costa Mesa, shall be the selected representatives
of each City to act on each respective City's behalf with respect to this agreement. Any notices,
requests, approvals, plan submittals or communications shall be provided to each representative
noted below:
City of Santa Ana:
ATTN.- Rodolfo "Rudy" Rosas, P.E.
City Engineer
Public Works Agency
20 Civic Center Plaza, M-43
Santa Ana, CA 92701
Phone: (714) 647-3379
E-Mail: rrosas@santa-ana.org
City of Costa Mesa:
ATTN: Derek Wieske, P.E.
Assistant City Engineer
Public Works Department
77 Fair Drive
Costa Mesa, CA 92626
Phone: (714) 754-5291
E-Mail: derek.wieske@costamesaca.gov
8. Santa Ana shall cause its contractor for the "Project' to guarantee the Costa Mesa
improvements against defects in workmanship and materials for a period of one (1) year from the
date of acceptance by Santa Ana. It is further agreed that Santa Ana shall assume the
responsibility for causing the Costa Mesa improvements to be brought or restored to full
compliance with the requirements of the Plans and Specifications for any, portion of the Project
which during said one (1) year period are found not to be in conformance with the provisions of
the Plans and Specifications.
9. The City of Santa Ana shall have its contractor provide insurance as follows:
9.1 INSURANCE AMOUNTS. Contractor shall procure and maintain for the duration of the
agreement, the following insurance coverages:
9.2 MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts
and shall be at least as broad as:
Commercial General Liability (CGL) Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal & advertising injury with limits no less than $2,000,000
per occurrence and $4,000,000 aggregate.
Automobile Liability (AL: Insurance Services Office Form CA 00 01 covering Code 1 (any
auto), with combined single limits of $1,000,000. In the event Contractor does not maintain
PAGE 2 OF 11
commercial automobile liability insurance, City will accept evidence of personal
automobile insurance with existing limits, which can be lower than $1,000,000.
Workers' Compensation (W/CI as required by the State of California, with statutory limits,
and Employer's Liability Insurance with limit of no less than $1,000,000 per accident, per
employee, per policy for bodily injury or disease. This requirement can be waived if Vendor
has no employees.
Pollution Legal Liability and/or Errors and Omissions (PILL). With limits no less than
$1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
If Contractor maintains broader coverage and/or higher limits than the minimums shown
above, City requires and shall be entitled to the broader coverage and/or the higher limits
maintained by Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
9.3 Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, City of Costa Mesa, their City Councils,
and their officers, officials, employees, agents, and volunteers are to be covered
as additional insureds with respect to liability arising out of work or operations
performed by or on behalf of the Permittee including materials, parts, equipment,
and personnel furnished in connection with such work or operations.
2. All required insurance policies: Insurance company(ies) agrees to waive all
rights of subrogation against City of Santa Ana and City of Costa Mesa, their City
Councils, and their officers, officials, employees, agents, and volunteers for
losses paid under the terms of any policy which arise from work performed by
Permittee for both Cities.
3, All required insurance policies: For any claims related to this contract,
Permittee's insurance coverage shall be primary and any insurance maintained
by City of Santa Ana and City of Costa Mesa, their City Council, their officers,
officials, employees, agents, or volunteers shall not contribute with it.
4. All required insurance policies: A severability of interest provision must apply for
all the additional insureds, ensuring that Permittee's insurance shall apply
separately to each insured against whom a claim is made or suit is brought,
except with respect to the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be
canceled, suspended, voided, reduced in coverage or in limits, non -renewed by
the carrier, or materially changed except after thirty (30) days prior written notice
has been given to City of Santa Ana and City of Costa Mesa. Ten (10) days prior
written notice shall be provided to City of Santa Ana and City of Costa Mesa for
policy cancellation or non -renewal due to non-payment.
6. Certificate Holders on each Evidence of Insurance certificate shall be: City of
Santa Ana, Attention: (Name of Department Staff Responsible for Agreement),
Address of Department Responsible for Agreement, M-XX, Santa Ana, CA 92701
and City of Costa Mesa, Attention: City Engineer, Public Works Department, 77
Fair Drive, Costa Mesa, CA 92626.The name and location of event should be
included in the Description of Operations section of each certificate.
PAGE 3 OF 11
9.4 Self -insured Retentions
Self -insured retentions must be declared to and approved by each City. Each City may
require Contractor to purchase coverage with a lower retention or provide proof of ability to
pay losses and related investigations, claim administration, and defense expenses within
the retention.
9.5 Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of
California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable
to City.
9.6 Verification of Coverage
Permittee shall furnish the City of Santa Ana and the City of Costa Mesa with original
Certificates of Insurance including all required amendatory endorsements (or copies of the
applicable policy language effecting coverage required by this clause) and a copy of the
Declarations and Endorsement Page of the CGL policy listing all policy endorsements to
Entity before work begins. However, failure to obtain the required documents prior to the
work beginning shall not waive Permittee's obligation to provide them. Each City reserves
the right to require complete, certified copies of all required insurance policies, including
endorsements required by these specifications, at any time.
9.7 Claims Made Policies
If any of the required policies provide coverage on a claims -made basis:
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at
least three (3) years after completion of work.
3. If coverage is canceled or non -renewed, and not replaced with another claims -made
policy form with a retroactive date prior to the contract effective date, Company must
purchase "extended reporting" coverage for a minimum of three (3) years after
completion of work.
9.8 Subcontractors
Contractor shall require and verify that all sub -contractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that
Parties are additional insured on insurance required from sub -contractors,
9.9 Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of
the risk, prior experience, insurer, coverage, or other special circumstances.
10. This Agreement contains all of the agreements of the Parties regarding the Project and all
previous understandings, negotiations and agreements regarding the Project are integrated into
and superseded by this Agreement.
11. This Agreement may be amended at any time by the mutual consent of the Parties by an
instrument in writing signed by both Parties.
12. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections
contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or
PAGE 4 OF 11
decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any
of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which
are hereby declared as severable and shall be interpreted to carry out the intent of the Parties
hereunder.
13. The persons executing this Agreement on behalf of the Parties hereto warrant that they are
duly authorized to execute this Agreement on behalf of said Parties and that by so executing this
Agreement the Parties hereto are formally bound to the provisions of this Agreement.
14. This Agreement shall be binding upon and shall endure to the benefit of the Parties hereto
and their respective heirs, personal representatives, successors, and assigns.
15. This Agreement may be executed by the Parties and counterparts, which counterparts shall
be construed together and have the same effect as if all of the Parties had executed the same
Instrument.
15. This Agreement is to be governed by the laws of the State of California, in Orange County
California.
17. Each party agrees to defend, hold harmless, and indemnify the other as to any and all claims,
judgments, liabilities or damages for injuries and damages directly arising out of each party's own
performance under this Agreement, except to the extent such damage or expense is caused in
whole or in part by the other party's negligence or willful misconduct.
PAGE 5 OF 11
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed on the
day and year first written above.
CITY OF SANTA ANA
ALVARO N UN EZ
City Manager
ATTEST:
JENNIFER L. HALL
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: --
KYLE gLLESEN
Assis ant City Attorney
RECOMMENDED FOR APPROVAL:
R o d o l f o R o s a s DUK Rldli
e n2026 02fIo881639311 08'OOssas@sanla-ana org r—US
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
CITY OF
COSTA MESA
CECILIA GALLARDO-DALY
Interim City Manager
ATTEST:
BRENDA GIVEN -71I� I2o25
City Clerk
APPROVED AS TO FORM:
KIMBERLY HALL BARLOW
City Attorney
j - / �
By:K�✓V�.J
R j OMMENDED FOR APPROVAL:
6401
RAJA 8ETHURAMAN
Public Works Director
PAGE 6 OF 11
■
Location Map
FAIRVIEW STREET (SOUTH CITY LIMITS TO ALTON)
REHABILITATION PROJECT
PAGE 7 OF 11
LEGEND:
SANTA ANA
71
LLM4
A
�cY
AL70N AVE
w
SUNFLOWER AVE
PROJECT LIMITS
MACARTHUR RLVD
CITY LIMIT
CITY ?F SANTA ANA
CITY OF COSTA MESA
w
EXHIBIT A
P ROJ ECT 21-6978
FAIRVIEW STREET REHABILITATION
FROM SOUTH CITY LIMIT TO ALTON AVENUE
LOCATION MAP
PAGE 1 OF 1
City Cost Sharing Estimates
FAIRVIEW STREET (SOUTH CITY LIMITS TO ALTON)
REHABILITATION PROJECT
City of Santa Ana Cost Estimate
Table 7
City of Costa Mesa Cost Estimate
Table 2
PAGE 9OF11
CITY OF SANTA ANA Project No,: 21-6978
Date Revised: 06/11/25
Date Reviewed:
COST ESTIMATE
Fairview Street (In the City of Santa Ana) Rehabilitation
South City Limit to Alton Avenue
=
_`
u I?FSL�it P`P>[Ol�i tl
T
,
1
Unclassified Excavation
CX
1,600
$ 384,000,00
2
AC Pavement*
TN
1,200
$ 189,600,00
3
Cold Mill (2")*
SF
240,000
$ 124,800.00
4
Asphalt Rubber Hot Mix (ARHM)*
TN
3,300
$ 557,700,00
5
PCC Sidewalk (4")*
SF
5,900
$ 82,600.00
6
9" Thick PCC Pavement with Dowels
SF
200
$ 4,000,00
7
PCC Driveway Approach (Commercial — 8")*
SF
600
$ 12,000,00
$ 11,600,00
8
PCC Curb Ramp
SF
400
9
PCC Curb and Gutter (Type A-2-8)*
LF
2,000
$ 164,000.00
10
PCC Curb (Type B-1) (Including Steel Rebar`
LF
5,000
$ 200,000,00
$ 130,000.00
11
Colored Concrete - Brick Red, Topeast Exposed
Aggregate Finish (T=4")
SF
5,200
12
PCC Cross -Gutter (Ar(erial Street)
SF
500
$ 14,500.00
13
Concrete Bus Pad
SF
3,100
$ 170,500.00
14
Root Shave*
EA
18
$ 15,500,00
15
Furnish & Install New Water Valve Frame & Cover
to Finished Grade
EA
22
$ 33,000.00
16
Furnish and Install New Water Meter Frame & Cover
and Adjust to Finished Grade
EA
3
$ 3,600.00
17
Adjust Sewer and Drainage Manhole Frame & Cover
to Finished Grade Per C.S.A. STD. 306 Through 308
EA
4
$ 6,000.00
18
Adjust OCSAN Manhole Frame & Ccver to Finished
Grade Per STD. 5-050A, 5-055, and 5-055A
EA
7
$ 14,000.00
19
Furnish & Install New #6 Pallbox to Finished Grade
EA
5
$ 7,500.00
20
Adjust Survey Monument to Finished Grade
EA
2
$ 2,900.00
21
Landscaping & Irrigation
LS
L
$ 432,000.00
22
Construct Parkway Culvert (Type A;
EA
2
$ 18,000.00
23
Install Video Detection System at Fairview Street and
Se erstrom Avenue
LS
1
$ 50,000.00
24
Install Video Detection System at Fairview Street and
Alton Avenue
LS
1
$ 50,000.00
25
Install Video Detection System at Fairview Street and
MacArthur Boulevard
LS
1
$ 50,000.00
$ 6,600.00
26
Furnish & Install Traffic Loops Type E
EA
12
27
Street Furniture
LS
1
$ 85,600.00
28
Project Advertisement Sign
EA
2
$ 4,000.00
29
Signing & Striping
LS
1
$ 198,500.00
30
Construction Permit
LS
1
$ 8,400.00
1(?.
Design Engineering
LA SON $ 90,000.00
Contingency
10% $ 303,000.00
Constriction Engineering
i ! 13A
TQT AL PRQ3Ef „T a ; ...::;
15% $ 455000.00
$i�79yU00 Ot
CITY OF SANTA ANA
COST ESTIMATE
Project No.: 21-6978
Date Revised: 06/11/25
Date Reviewed:
Fairview Road (In the City of Costa Mesa) Rehabilitation
Sunflower Avenue Intersection haproveinents
��
a}RP��+Q���
� �
�
"^CUTIg
+t
1
Cold Mill (2")
SF
9,000
$ 4,680.00
2
Asphalt Rubber Hot Mix (ARHM)
TN
200
$ 33,800.00
3
1PCC Curb (Type B-1) (Including Steel Rebar)
LF
265
$ 10,600.00
Colored Concrete - Brick Red, Topcast Exposed
4
Aggregate Finish (T=4")
SF
410
$ 10,300.00
5
Signing acid Striping
LS
1
$ 15,000.00
}
il 1
«a..z.['"g 3,
Design Engineering
5% $ 4,000.00
Project Administration
5% $ 4,000.00
Contingency
10% $ 7,000.00
Construction Engineering
10% $ 7,000.00
€ tubs}}lr r r' d �a
i1�i tfk{7h h �3:Q.ST r i {} t
}
CITY OF SANTA ANA ADDENDUM NO.2
PROPOSAL
PROJECT NO.: 21-6978
FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE
BID PROPOSAL
TO: CITY COUNCIL OF THF. CITY OF SANTA ANA
FROM: ONYX PAVING COMPANY, INC.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
I
Unclassified Excavation
1,700
CY
$ ��12
�{
$Z �{Q{�
I
2
AC Pavement*
1,600
TN
$ 1l R
$ a70 W00
3
Cold Mill (2")*
261,000
SF
$ O _ (O3
$ 1 foy 430
4
Asphalt Rubber Hot Mix (ARHM)*
3,300
TN'
$ 148
$
488, N00
S
PCC Sidewalk (T=4")*
6,200
SF
$ 13
$
6
9" Thick PCC Pavement with
200
SF
$ 33
$ 61 (000
Dowels
7
PCC Driveway Approach
600
SF
$ �$
$ g�C7
(Commercial = 8")*
8
PCC Curb Ramp (Caltrans STD.
400
SF
$ �g
$
A88A)
9
PCC Curb and Gutter (Type A-2-8)*
2,000
LF
$
X I O D O
10
PCC Curb (Type B-1) (Including
5,200
LF
$g
�yq �p
Steel Rebar)
1 D
11
Colored Concrete - Brick Red,
5,600
SF
$ S
Topcast Exposed Aggregate Finish
9141000
(T=4")
12
Cross -Gutter (Arterial Street)
500
SF
$ 28
$ 14 p0(o
r
13
Concrete Bus Pad -73,100
SF
$ 33
91O 1300
P-1 of P-19
CITY OF SANTA ANA ADDENDUM NO.2
PROPOSAL
PROJECT NO.: 21-6978
FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE
Item
Description
Qty
Unit
Unit Price
Amount
14
Root Shave*
18
EA
$ l l
1
$ lotcm
15
Furnish & Install New Water Valve
Frame
20
EA
$
��2v0�►
$
��
& Cover to Finished Grade
16
Furnish & Install New Water Meter
3
EA
$
$
Frame & Cover and Adjust to
2D0
(0, r,000
Finished Grade
17
Remove and Install New Fire
Hydrant*
4
EA
$
2y 0 000
$
`��� 000
18
Adjust Sewer and Drainage Manhole
4
EA
$
$
Frame & Cover to Finished Grade
21 200
$ 1 g00
Per C.S.A. STD. 306 Through 308
19
Adjust OCSAN Manhole Frame &
6
EA
$
$
Cover to Finished Grade Per STD.
�
t{ $ t 0 ou
S-050A, S-055, and S-055A
1000
20
Furnish & InstalI New #6 Puli6os to
9
EA
$ i 300
$
Finished Grade
1
,� t740
21
Adjust Survey Monument to
I
EA
$
$
Finished Grade
2-1 ?-0()r
ZOO
22
Landscaping & Irrigation
1
LS
Z 4 6N8
$
23
Construct Parkway Culvert (Type A)
2
FA
$ 191500
$
.311000
24
Install Video Detection System at
I
I.S
$ 55, 000
$ 55 000
Fairview Street and Alton Avenue
1
25
Furnish & Install Traffic Loops Type
12
EA
$ -777
$ 9
L
3;L {
r
26
Street Furniture
I
LS
$
X,OoU
$
2$,000
27
Project Advertisement Sign
2
EA
$ )1 900
$ 5
� (7 00
28
Signing & Striping
I
L5
$ 1421000
$ 1421 ODO
29
Construction Permit
I
I..,S
$8,400
$8,400
P-2 of P-19
CITY OF SANTA ANA ADDENDUM No. 2
PROPOSAL
PROJECT NO.: 21-6978
FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE
TOTAL BASE BID (Items 1-29) $ 216-731 ppo
ADD ALTERNATE BID
Item
Description
Qty
Unit
Unit Price
Amount
30
Install Video Detection System at
1
LS
$
$
Fairview Street and Segerstrom
551000
i �CXD
Avenue
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROV
EMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number 05) working days after the commencement date stated in the Notice to
Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for
long -lead time items (bus shelters, bus benches, and trashcans).
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $7,620 per calendar day.
Name of Firm ONYX PAVING COMPANY, INC.
Signature of BIDDER
Title COREY R. KIRSCHNER - CEO
(if an individual, so state. If firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
J '
V
_
P-3 of P-19
CITY OF SANTA ANA ADDENDUM No. 2
PROPOSAL
PROJECT NO.: 21-6978
FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain, otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm ONYX PAVING COMPANY INC.
Signature of BIDDER ! X
Title COREY R. KIRSCHNER - CEO
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-4 of P-19
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 21-6978
FAIRVIEW STREET REHABILITATION FROM SOUTH CITY LIMIT (SUNFLOWER AVENUE) TO
ALTON AVENUE
This CONSTRUCTION CONTRACT is made and entered into this Yd day of March, 2026 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and Onyx Paving
Company, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, Fairview Street Rehabilitation (hereinafter referred to as the
"WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents
prepared by the. City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Two Million, Seven Hundred Twenty -Eight
Thousand Dollars and Zero Cents ($2,728,000), as set forth and identified in the itemized BID
PROPOSAL uploaded by the Contractor to PlanetBids, which is attached hereto and incorporated
herein as Exhibit "A".
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev. 09/01/2017 Page 1 of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements and Liquidated Damages section of the BID PROPOSAL
(Exhibit `B") including commencing construction within the timeframe therein specified after
issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: Santa Ana CWA
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
JENNIFER L. HALL
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
"A"
' A� ert/1
By:
KYLE NELLESEN
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
CUE
CEe Digitally signed by Rodolfo Rosas
ROdOlfO Rosa Dnai —rr sas@s nta-a
(,� Il email=rrosas@santa-ana.org, c=US
Date: 2026.02.12 14:09:38-08'00'
RODOLFO ROSAS, P.E.
Acting Executive Director
Public Works Agency
CITY OF SANTA ANA
ALVARO NUNEZ
City Manager
CONTRACTOR:
Onyx Paving Company, Inc.
B
TITLE: CEO
Page 3 of 3
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Oran
On 2/11/2026 before me, David Wiltfong, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared
of
who proved to me on the basis of satisfactory evidence to be the person(x) whose name(!&) is/aYe
subscribed to the within instrument and acknowledged to me that he/stve/tliey executed the same in
his/her/their authorized capacity(i(�C), and that by his/h)Rr/their signature(g) on the instrument the person(R),
or the entity upon behalf of which the person(x) acted, executed the instrument.
*my
DAVID WILTFONG
Notary Public - California ZZ
Orange County
Commission # 2536462
Comm. Expires Oct 24, 2029
Place Notary Seal Above
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature QnjL
Signature of Notary Public
OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document:
Number of Pages:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
rl Corporate Officer — Title(s):
EI Partner — U Limited General
Ll Individual ❑ Attorney in Fact
11 Trustee ❑ Guardian or Conservator
Other:
Signer Is Representing:
Signer's Name:
El Corporate Officer — Title(s):
❑ Partner — Ci Limited L General
`! Individual C1 Attorney in Fact
El Trustee D Guardian or Conservator
C_ I Other:
Signer Is Representing:
;cattcc.sk cc�c3kekcxr ?Ee<ze .� r�z mac= efv<cGe e4c{cz;�zCr~ticz(ti
02014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907
City of Santa Ana
Fairview Street Rehabilitation From South City Limits to Alton Avenue (Project 921-6078), bidding on 12/11/2025 2:00 PM (PST)
Page 1 of 3
Printed 0112312 0' 6
Bid Results
Bidder Details
Vendor Name Onyx Paving Company, Inc.
Address 22707 LA PALMA AVE
YORBA LINDA, California 92887
Respondee
COREY R. KIRSCHNER
Respondee Title
CEO
Phone
714-632-6699
Email
bids@onyxpaving.com
Vendor Type
CADIR
License #
630360
Bid Detail
Bid Format
Electronic
Submitted
12/11/202512:58 PM (PST)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
460761
Respondee Comment
Buyer Comment
Attachments
File Title
SCANNED BID -SANTAANA.pdf
SCANNED OWNERSHIP AFFIDAVIT -
SANTAANA.pdf
File Name
SCANNED BID - SANTAANA.pdf
SCANNED OWNERSHIP AFFIDAVIT -
SANTAANA.pdf
SCANNED BID BOND -SANTA ANA.pdf SCANNED BID BOND -SANTA ANA.pdf
SCANNED NONCOLLUSION-SANTA SCANNED NONCOLLUSION-SANTA
ANA.pdf ANA.pdf
File Type
General Forms
Ownership Affidavit (Notary Public) - REQ Original Hard Copy
Submittal in Addition
Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy
Submittal in Addition
Non -Collusion Affidavit (Notary Public) - REQ Original Hard
Copy Submittal in Addition
PlanetBids
City of Santa Ana
Fairview Street Rehabilitation from South CRy Limits to Alton Avenue (Pmject#21-6978), bidding on 12/11/2D25 2:00 PM (PST)
Page 2 of 3
Printed D 1/23/2026
Line Items
Discount Terms No Discount
- ------------
item - item
# ; Code Type, Item Description
OOM'; QTY
i Unit Price Line Total 111 i
TOTALBASEBID
----- .----- -------- ------ _.._-------- -._...._...__....__... ...... .... ...... ...._..___--_____.__..._._...__'---_--_--__.___..__..___....__.__.___.._._..__:.____.__..._..-.---
i $2,673,000.00 i
_._,.,._..._.._.._.._.._.;.__...__..
1
_ _.__ . _..._..._.. _._. _._.._._.__._ _..._._.__-. _._.._. _._. _._...._..._...._._..._._.__......__...__._.._..._....... -.................. ............................._.._..._......
i Unclassified Excavation
___...�._._.._.
i CY 1700
__,_.__.__...__...J....._._....._._..._._. _i .___.
814200 1 $241A00.60 ; Yes
2
! AC Pavement•
', TN Iwo$169.00
$270,400.00 Yes
3 i
' Cold Mill, (P9•
i SF 1261000 1: $0 63 $164,430A0 Yes
4 —
;Asphalt Rubber No[M6c(ARHM)•
!
tN 3300
1
j 514&00 I $488,400.00 i Ye
s i
j PCC sidewalk(T-4")•
SF 6200
._
$13.00 1 $80.600.0o Yes
6 !
' 9" Thick PCC Pavement with Dowels
i SF i 200
i 533.00 $6,600.00 j Yes
7 !
! PCC Driveway Approach (Commercial=8'•
_ SFY =600
$28.00 576,900.00 i Yes
PCC Curb Ramp (Caltrans STD. A89Q
.... ........ -._-___-__.—.—___-.-_
SP 400
1$28.00 $11,200AC Yes
9 (
PCC Curb and Gutter (Type A-2.8)•
LF 2000
!$63A0 $126,000.00 Yes
10
PCC Curb (Type Bd) (including Steel Reber)
- LF ! 5200
J
i $48.00 1 $249,600.00 I Yes
Colored Concrete - Brick Red, Topcast Exposed Aggregate Finish(T-4")
ASP j5600
1$15.00 I$84,000.00 jYes
12 1
PCCCross.Gutter(A[teriatStroet)
SF 500
1$28.00 $14,000.00_ Yes
13 i
! Concrete Bus Pad -�-- —�_-� _- - �— -`�`--
Si 33100
—
1 S33A0 $102,300AD Yes
141
Root shave- ---^_---
EA 7B
1 $1,111.00 $19,998.00 1 Yes
15 i !
; Furnish & install Now Water Valve Frame & Cover to Finished Grade -_
: EA' 20 ! 52,200.00 j $44p60.00 _ ;Yes
16 1
? Furnish and Install New Water Meter Frame & Cover and Adjust to Finished Grade
EA ; 3
$2,200.00 $6,600.60 ! Yes
17 !
1 Remove and install New Fire Hydrant• , EA 14
$24AD0.00 1 596,006A0 1 Yes
18 t !
Adjust Sewer and Drainage Manhole Frame& Cover to Finished Grade Per C.S.A. STD. 306 Through 308
;EA 14
I$2,200.00 1sBA"A0 ,Yes
19 ! 1 Adjust OCSAN Manhole Frame & Cover to Finished Grade Per STD. 5-050A, 5-055, and S-055A
- EA { 6
- $8,000.00 1 $48,000.00 Yes
20 l i
- _.1
E Furnish & Install New #6 Pullbox to Finished Grade
_...-.—__.______.............___.._._.___.._.-___.....__..__...__.,._.__R___..___.,...__.-.......__—.
j EA 9
f $1,300.00 yL$11,700.00 I Yes
21 {
Adjust Survey Monument to Finished Grade
1EA I1
($2900.00 $2,200A0 1Yes
22
;Landscaping& irrigation
I LS ! 1
(5294.648.00 $294,648.00 I Yes
23
�- -_��-
I Construct Parkway Culvert (Type A)
FA 12
i $18,500.00 $37,000.00 ;Yes
24
i lastalWiden Detection Systemat Fairview Street and Alton Avenue
�.LS '1
J _.
�SS5,000.00 �555,000.00 Yes
I
25 !
1
i
Furnish & Install Traffic Loops Type E
EA ! 12
,
$777.00 I $9,324A0 Yes
- ._..___-..._.._�...___.__-_�_.._
26 f
_
1 Street Furniture -
LS i 1
I $28,000.66 $28,000.06 1 Yes
27 1 i
Project Advertisement Sign -
j EA 2
$2,800.000 J S5,600.00 j Yes
28 i
j 5igning &Striping
LS ! 1
$142,O0OA0 I $142,000.00 Yes
29 !
I Construction Permit
LS ; 1
1$8A00.00 i 58,400.00 i Yes
ADD ALTERNATE SID
$55,000.00
30
Install Video Detection System at Fairview Street and 5egarstromAvenue
_-__^---
LS ii
4-
,565,000.00 $55,000.00 IYes
^-
NOTES
$0.00
31 i
i Asterisk Notes per P-3 of Specifications
HA .0
1$0 eo ' 50.00 -. Yes
32
—_...__ . _ _. __. _ .--_.._._- .__. ....
�• The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the n2SW'limit as stated
In Section 7-35 of the Standard Specifications. The actual amount for this Item will be dictated by the actual quantity used, iNA i0
i$0.00 j$0.00 Yes
and the Agency reserves the right to Increase or decrease the quantity of this item accordingly._.._ . _
i-_.___-. __._..._- -._ ..______ .____. _ ____- _ __-_-...-_.._.._.._
i
....._. _--_
i 1 j
t_______. ------
PlanetBids
City of Santa Ana
Page 3 of 3
PlanstBlds
EXHIBIT B
CITY OF SANTA ANA ADDENDUM NO.2
PROPOSAL
PROJECT NO.: 21-6978
FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE
TOTAL BASE BID (Items I-29) $ 2r 613 , OOV
ADD ALTERNATE BID
Item
Description
Qty
Unit
Unit Price
Amount
30
Install Video Detection System at
I
LS
$
$
Fairview Street and Segerstrom
551000
55 1 Doo
Avenue*
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "2501o" limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number 65 working days after the commencement date stated in the Notice to
Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for
long -lead time items (bus shelters, bus benches, and trashcans).
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $7,620 per calendar day.
Name of Firm ONYX PAVING COMPANY, INC.
Signature of BIDDER
Title COREY R. KIRSCHNER - CEO
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-3 of P-19
Signature: CeSW- U Ea-rera
Cesar E Barrera (Feb 12, 2026 13:54:37 PST)
Email: cbarrera@santa-ana.org
03 03 26 PWA 02 Exh 03 Construction Contract
(Missing PWA Director)
Final Audit Report 2026-02-12
Created: 2026-02-12
By: Kevin Santamaria (ksantamaria@santa-ana.org)
Status: Signed
Transaction ID: CBJCHBCAABAA1_BVJiY3mQBabKf3cbnJKjLLvKUCCJrf
"03 03 26 PWA 02_Exh 03 Construction Contract (Missing PWA
Director)" History
Document created by Kevin Santamaria (ksantamaria@santa-ana.org)
2026-02-12 - 9:50:12 PM GMT
Document emailed to Cesar Barrera (cbarrera@santa-ana.org) for signature
2026-02-12 - 9:50:41 PM GMT
Email viewed by Cesar Barrera (cbarrera@santa-ana.org)
2026-02-12 - 9:53:40 PM GMT
'6 Signer Cesar Barrera (cbarrera@santa-ana.org) entered name at signing as Cesar E Barrera
2026-02-12 - 9:54:35 PM GMT
6 Document e-signed by Cesar E Barrera (cbarrera@santa-ana.org)
Signature Date: 2026-02-12 - 9:54:37 PM GMT - Time Source: server
Agreement completed.
2026-02-12 - 9:54:37 PM GMT
0 Adobe Acrobat Sign
MAYOR
Valerie Amezcue
MAYOR PRO TEM
Benjamin Vazquez
COUNCiLMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Thai Viet Phan
PUBLIC WORKS AGENCY
20 Civic Center Plaza (M-36)
P.O, BOX 1988. Santa Ana, California 92702
(714) 647-5690 • Fax (714) 647-5823
www.santa-ana.org
CITY MANAGER
Alvaro Nunez
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Jennifer L. Hall
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
Fee Exemption per California Government Code Section 6103
To: COUNTY CLERK From: City of Santa Ana
County of Orange Public Works Agency
P.O. Box 238 20 Civic Center Plaza (M-36)
Santa Ana, CA 92702 Santa Ana, CA 92702
Project Title: Fairview Street Rehabilitation from SCL to Alton Avenue
Project Number(s): 21-6978
Project Location: Fairview Street from South City Limit (Sunflower Avenue) to Alton Avenue in the City of Santa Ana
City: Santa Ana County: Orange ER Number: ER-2026-3 Date of Approval: 12/04/2025
Project Description: The project includes excavation, cold mill, grading, removal & replacement of asphalt concrete pavement,
the replacement of damaged sidewalk, curb ramps, curb & gutter, bus pads, improving concrete medians,
landscaping & irrigation, adjusting utility covers, adjusting survey monument frames and covers.
Applicant Name: City of Santa Ana, Public Works Agency
Applicant Address: 20 Civic Center Plaza M-36
Santa Ana, CA 92702
Name of Public Agency Approving Project: City Council
Name of Agency Carrying Out Project: Public Works Agency
Exempt Status:
❑ Ministerial (Sec. 15268)
❑ Declared Emergency (Sec. 15269 (a))
❑ Emergency Project (Sec. 15269 (b through e))
❑ General Rule (Sec. 15061(b)(3)1(5))
❑ Statutory Exemption:
0 Categorical Exemption: 15301(c)
Reason(s) Why Project is Exempt From CEQA:
15301(c) consists of existing streets, sidewalks, gutters, and similar facilities.
City Contact: c Canta Title: Senior Civil Engineer Telephone: (714) 647-5649
Signature: Date: r Z6
EXHIBIT 5
PROJECT TITLE:
Fairview St Rehab: S City Limits -
Alton
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP A
N
CITY OF SANTA ANA FY 25/26CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
Irepairs, and maximize the return from available funding for street
pavement. This segment of Fairview Avenue pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32
Construction 3,410,000 - - - - - -
Engineering -
TOTAL 3,410,000 - - - - - -
SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32
RMRA SB1 3,314,000 - - - - - -
SELECT STREET 96,000
CONSTRUCTION
TOTAL 3,410,000 - - -
AGENCY: DIVISION: CONTACT: DATE:
Public Works C/P Engineering Alex Bangean, Senior Civil Engineer 11-Feb-2026