Loading...
HomeMy WebLinkAboutItem 17 - Award of a Construction Contract for Flower Stormwater ProjectsPublic Works Agency www.santa-ana.org/pw Item # 17 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report April 21, 2026 TOPIC: Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects AGENDA TITLE Award of a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects (No. 26-6642 and 26- 6601) (Non -General Fund) RECOMMENDED ACTION 1. Approve an appropriation adjustment recognizing $2,250,000 in the Parks Capital Grant, State Grant -Direct revenue account and appropriate the same amount into the Land & Water Conservation Grant, Improvements Other Than Buildings, Improvements Other Than Buildings expenditure account (Requires five affirmative votes). 2. Approve an appropriation adjustment recognizing $300,000 in the Federal Clean Water Protection Fund, Prior Year Carryforward revenue account and appropriate the same amount into the Federal Clean Water Protection Enterprise, Improvements Other Than Buildings expenditure account (Requires five affirmative votes). 3. Approve an appropriation adjustment recognizing $2,661,975 in the Acquisition & Development Fund, Prior Year Carryforward revenue account and appropriate the same amount into the Acquisition & Development Fund, Improvements Other Than Buildings expenditure account (Requires five affirmative votes). 4. Approve an amendment to the Fiscal Year 2025-2026 Capital Improvement Program to include an additional $4,911,975 in construction funds for the 10th and Flower Park Project (No. 26-6642). 5. Approve an amendment to the Fiscal Year 2025-26 Capital Improvement Program to include an additional $300,000 in construction funds for the 10th & Flower Park Stormwater Capture Project (No. 26-6601). Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 2 6. Approve the Project Cost Analysis for a total estimated construction delivery cost of $5,811,975, which includes $4,649,580 for the construction contract, $697,437 for contract administration, inspection, and testing, and $464,958 for unanticipated or unforeseen work. 7. Award a construction contract to Doja, Inc., the lowest responsible bidder, in accordance with the base bid and bid alternates in the amount of $4,649,580, subject to change orders, for construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects (No. 26-6642 and 26-6601), for a term beginning April 21, 2026 and authorize the City Manager to execute the contract. 8. Determine that, pursuant to the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER-2026-27 will be filed for Project No. 26-6642 and 26-6601. GOVERNMENT CODE §84308 APPLIES: No DISCUSSION The 10t" and Flower Park Project (Project No. 26-6642) will construct a new one -acre neighborhood park located at the intersection of 10t" and Flower Streets, transforming an underutilized site into an open space that provides recreational opportunities. The project includes essential site improvements and supporting infrastructure to accommodate recreational use, including a restroom, playground with interactive learning elements and shade sail, outdoor exercise equipment with shade sail, skate park, basketball court, walkways, utility connections, and amenities that support safety, accessibility, and long-term functionality (Exhibit 1). Along with the development of a new park, 10t" and Flower Park Stormwater Capture Project (No. 26-6601) features an underground stormwater infiltration system and Bioretention Basis that will help improve water quality, capture trash, and reduce flooding on Flower Street and Civic Center Drive. The stormwater quality improvements were incorporated in the park plans and the natural landscape features will complement the recreational elements. Construction of the new park and stormwater improvements will be completed at the same time allowing the City to leverage stormwater grant funds to increase open space and improve stormwater management. The projects are consistent with the City's Parks Master Plan to expand access to parks and open space in underserved areas. Prior planning efforts, along with grant funding, identified this location as well -suited for park development to address existing service gaps. The project will provide a safe and accessible recreational space for residents, contribute to neighborhood revitalization, and support the City's long-term goals of increasing equitable access to high -quality parks and community amenities. Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 3 Grant Funding Staff submitted two successful grant applications for the construction of a new park at 10t" and Flower Streets along with funding for water quality improvements at the same location. In November 2024, the Orange County Transportation Authority (OCTA) awarded the City $600,000, under the Tier 1 Environmental Cleanup Program, for the Stormwater Capture Project (No. 22-6601). Subsequently, in September 2025, the City received a grant from the State of California, Natural Resources Agency, Land and Water Conservation Program, in the amount of $2,250,000 for the 101" and Flower Park Project (No. 26-6642). The State grant requires a 50% match which will be funded out of the Park Acquisition and Development Fund. The grant also requires that this project be completed by September 9, 2030. Proiect Advertisement and Contractor Procurement To provide an opportunity for local vendors to submit bids, the City notified a total of 1,839 regional vendors via PlanetBids, many of which are Santa Ana based. Furthermore, staff specifically reached out to Santa Ana vendors to encourage their participation in bids. A total of nine bids were received. Two bids were received from Santa Ana contractors. As legally required, a Notice Inviting Bids was advertised in the Orange County Register newspaper on November 26, 2025 and December 3, 2025. The project was also advertised in PlanetBids from November 26, 2025 to December 23, 2025. Bids were received electronically via PlanetBids on December 23, 2025. No bid protest was submitted by any of the bidders during the bid protest period. A copy of construction plans, contracts, specifications, and all related reference materials (such as The Greenbook) are available for public review at the City's Public Works Agency, Central Files office located in City Hall. Bid Results Summary RANK BIDDER'S NAME LOCATION BASE BID + ADD ALTERNATE 1 Do'a, Inc. Ontario, CA $4,649,580 2 Armstrong Cal Builders Inc. Stanton, CA $4,756,925 3 RAMSA Construction LLC Sherman Oaks, CA $4,880,670 4 Environmental Construction, Inc. Woodland Hills, CA $5,140,713 5 ZECO, Inc. Yorba Linda, CA $5,144,386 6 Klassic Engineering & Construction Inc. Orange, CA $5,177,140 7 AVA Builders, Inc. North Hollywood, CA $5,349,812 8 Vido Samarzich, Inc. Santa Ana, CA $5,421,474 9 KYA Services Santa Ana, CA $5,530,809 Award a Construction Contract to Doja, Inc. for the Construction of the loth and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 4 A total of nine responsive bids were received. Doja, Inc. submitted the lowest responsive base bid in the amount of $4,280,000 (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the basis of the Base Bid. The add - alternate scope of work in the bid package includes the installation of shade sails, learning elements, and a restroom. The total bid including the add -alternate scope of work is in the amount of $4,649,580 and still collectively lower than the other bids including the alternative. Based on the bid analysis and a contractor's reference check, staff recommends awarding the construction contract, including the add -alternate scope to Doja, Inc. (Exhibit 3). This will be the first project Doja, Inc. will complete for the City of Santa Ana. Doja, Inc. has successfully delivered similar projects for other public agencies, most recently completing a park improvement project for the City of Hawthorne that included landscape, concrete, restroom construction, earthwork, electrical, and demolition improvements. Based on positive contractor reference checks, staff is confident that Doja, Inc. has the experience and capability to successfully complete the construction of the loth and Flower Park and water quality improvements. Project Delivery To deliver a complete project, in addition to the construction contract, the estimated total project delivery cost includes a budget allocation for construction administration, inspection, and testing. Construction administration and inspection may be performed by either staff or consultants and includes construction management, inspection of the Contractor's work to ensure contract compliance, workmanship and quality, materials testing, and implementation of the labor requirements. Any of the allocated construction administration funds not spent are considered project savings and are returned to the respective fund balance upon close out of the project. As indicated in the Cost Analysis and as summarized in the table below, the estimated total construction delivery cost of the project is $5,811,975. Project Item Total Construction Contract Bid Amount $4,649,580 Construction Administration $371,966 Inspection $232,479 Testing $92,992 Unanticipated or Unforeseen Work $464,958 TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $5,811,975 Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 5 Project Schedule and Contract Time The project is estimated to be completed in January 2027 barring unforeseeable conditions such as rain, natural disasters, or other delays beyond the control of the City and of the Contractor. The contract time for this project is 160 working days, as specified in the bid documents. Working days are counted in accordance with the City's Standard Specifications, which exclude weekends, City -observed holidays, and inclement weather days that prevent work. The contractor was required to submit a construction schedule as part of their bid to expedite delivery of the project. The projected completion dates based on the submitted schedule is January 2027, which is within the allotted 160 working days. If the contractor fails to deliver on time, they will be assessed a penalty of $5,200 per calendar day as specified in the bid documents. Project Milestones Milestone Estimated Completion Notes Administrative Startup May 2026 Contract execution, bonds, insurance Material Procurement June 2026 Procurement may take place concurrently with construction Contractor Mobilization May 2026 Start of construction activities Project Completion I February 2027 Based on 160 working days Proiect Phasin The contractor will be constructing this project in a singular phase, fulfilling the scope of work as outlined in the contract documents. The contractor is responsible for determining the scheduling and sequencing of activities based on their proposed means and methods. Public Outreach Staff attended several Willard neighborhood association meetings to solicit input and provide information about the project. Upon Council approval of recommended actions, prior to start of construction, staff will notify the community of upcoming construction and distribute informational material including who to contact for additional information or to address issues of concern. To ensure timely and effective communication, the following notification measures will be implemented prior to the start of construction: • Electronic message signs will be installed two weeks in advance of construction activities to provide early notice of the project's start date, • A project information sign will be posted at the construction site, including Award a Construction Contract to Doja, Inc. for the Construction of the loth and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 6 contact information for public inquiries, • Residents and businesses within 1,000 feet of the project limits will receive door hangers or mailed notifications at least two weeks before construction begins, • A second round of notification will be issued 48 hours prior to the start of construction to residents and businesses adjacent to the limits of work, and • The City will also disseminate information through its official website and social media platforms to keep the public informed of construction activities, including any lane closures. The Contractor is required to issue construction notices to adjacent residents and businesses at least two weeks before construction begins. Additionally, the contractor is required to install signage at the project site indicating project details and contact information. Park Maintenance Upon completion of the construction of the loth and Flower Park, the PWA's Park Services Division will assume ongoing maintenance responsibilities. Annual maintenance costs are estimated at $79,000, which includes janitorial, landscape, pest management, utilities, and security. ENVIRONMENTAL IMPACT Pursuant to the California Environmental Quality Act (CEQA), the recommended actions are exempt from further review pursuant to Section 15303 (Class 3), 15304 (Class 4), 15332 (Class 32) of the CEQA Guidelines for projects consisting of the construction and location of limited numbers of new, small facilities, and minor public alterations. The proposed project continues to meet these parameters of the CEQA Guidelines and Categorical Exemption Environmental Review No. ER-2026-27 will be filed for Project 26-6642 and 26-6601 (Exhibit 4). FISCAL IMPACT As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is $5,811,975. With approval of the Appropriation Adjustments, all funds are available for expenditure in Fiscal Year 2025-26. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2026-2027 (Exhibit 5 & Exhibit 6). The proposed contract authorizes staff a maximum of 10% for construction contract change orders for unanticipated or unforeseen work. Staff will return to City Council for authorization and appropriation of additional funding if necessary. Approval of the requested appropriation adjustment will recognize the State of California Department of Parks and Recreation grant revenue of $2,250,000 into the PWA Parks Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 7 Capital Grants, State Grant- Direct Revenue Account and appropriate the same amount to the Land & Water Conservation Grant, Improvements Other Than Buildings expenditure account, $300,000 of prior -year fund balance in the Federal Clean Water Protection Enterprise Fund, Prior Year Carryforward revenue account, and appropriate the same amount to the Federal Clean Water Protection Enterprise, Improvements Other Than Buildings expenditure account, $2,661,975 of prior -year fund balance in the Acquisition & Development Fund, Prior Year Carryforward revenue account, and appropriate to the Acquisition & Development Fund, Improvements Other Than Buildings expenditure account. With approval of the requested appropriation adjustments, the funds will be budgeted and available for these items in the accounts below. Accounting Fiscal Unit — Account Fund Accounting Unit, Amount Year No. Description Account Description Project No. APPROPRIATION ADJUSTMENT Land & Water 2025-26 16117264-66220 Parks Capital Conservation Grant, $2,250,000 (26-6642) Grants Improvements Other Than Buildings Federal Clean Federal Clean Water 2025-26 05717640-66220 Water Protection Enterprise, $300,000 (26-6601) Protection Improvements Other Enterprise Than Buildings Acquisition & 2025-26 31213260-66220 Acquisition & Development, $2,661,975 (26-6642) Development Improvements Other Than Buildings CURRENT BUDGET Measure M- Measure M2 2025-26 03217663-66220 Street Competitive Street, $600,000 (26-6601) Construction Improvement Other Than Buildings TOTAL $5,811,975 EXHIBIT(S) 1. Location Map & Site Plan 2. Bid Proposal 3. Construction Contract 4. Environmental Determination 5. 10th & Flower Park Capital Improvement Project Worksheet 6. 10th & Flower Stormwater Capture Capital Improvement Project Worksheet Award a Construction Contract to Doja, Inc. for the Construction of the 10th and Flower Park and 10th and Flower Stormwater Capture Projects April 21, 2026 Page 8 Submitted By: Rodolfo Rosas, P.E., Acting Executive Director— Public Works Agency Approved By: Alvaro Nunez, City Manager Exhibit 1 SANTA ANA PROJECT NO. 26-6642: 10TH AND FLOWER PARK PROJECT NO.26-6601: 10TH AND FLOWER uai STORMWATER CAPTURE PUBLIC WORKS AGENCY Para Entry -- -- -- - - Lawn Area. Typ. Site FurrWkn, Typ. Fitness Area W Shade S&UCWN Playground w) Shade Structure Basketball Court Pedestrian Walk Typ Site Landscape. Typ Site Ltahttno Tvv Site Plan — W W W E>tisiing Resden0al Lot taring Area Skate Park CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 10TH & FLOWER PARK 01119319011141 • TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: 1 > Inc, REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount BASE BID: 1 Mobilization (no more than 5% of 1 LS S 197,032.50 S 197,032.50 total bid) 2 Clear and Grub 1 LS S 15,000.00 $ 15,000.00 3 Construction Signage 1 LS $ 4,000.00 $ 4,000.00 4 Unclassified Excavation 5,300 CY S 5&00 $ 307,400.00 5 Remove and Dispose of Existing 650 LF $ $ Chain Link Fence 7.00 4,550.00 6 Remove and Dispose of Existing 3 EA $ 1,100.00 $ 3,300.00 Trees and Tree Roots 7 Remove and Dispose of Existing 2 EA S $ Water Service to existing Corp Stop 3,500.00 7,000,00 & Cap at Main 8 Remove and Dispose of Backflow 1 EA S S Preventer and Lateral & Cap at Main 4,500.00 4,500.00 9 Remove and Dispose of Existing PCC 1,875 SF $ S Sidewalk 3.00 5,625.00 10 Remove and Dispose of 2 EA S $ ExistingPower Poie 3,000.00 6,000.00 11 Remove and Dispose of Existing 2 EA $ 1,000.00 $ 2,000.00 Parkway Drain 12 Remove and Dispose of Existing 245 LF 15.00 $ 3,675.00 Gravel Swale P-1 ofP-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 LOTH & FLOWER PARK Item Description Qty Unit Unit Price Amount 13 Sawcut, Remove and Dispose of 2 foot wide AC Pavement 20 LF $ 100.00 $ 2,000.00 14 4" thick PCC Sidewalk 4,675 SF $ 18.00 S 84,150.00 15 8" thick PCC Pavement 7,953 SF $ 22.50 b 178,942.50 16 5" thick PCC Basketball Court 4,230 SF $ 18.50 S 78,255.00 17 6" Wide PCC Mow Curb 411 LF $ 15.00 $ 6.165.00 18 Tree Well 2 EA $ 1,500.00 $ 3,000.00 19 Under Sidewalk Curb Drain 2 EA $ 1,500.00 $ 3,000.00 20 4" SCH 40 PVC Conduit 40 LF $ 75.00 $ 3,000.00 21 Rubber Surfacing t 5,850 SF $ 31.00 $181,350.00 22 12"x12" Atrium Grated Inlet with Geotextile Fabric 25 EA $ 1,800.00 $ 45,000.00 23 Catch Basin I EA 5 3,500.00 S 3,500,00 24 4" SDR-35 PVC Storm Drain 20 LF S 195.00 S 3,900.00 25 24" Diameter Dry Well 1 EA $ 25,000.00 5 25,000.00 26 96" Diameter Undcr6Tound Infiltration Chambers'{' 1 LS $ 262,000.00 S 262,000.00 27 60" Diameter Underground Infiltration Chambers" 1 LS $ 195,000.00 S 195,000.00 28 4' x 8' Water Quality Pretreatment Chamber i 1 LS $ 30,000.00 $ 30,000.00 29 10' Diameter Water Quality Pretreatment Chambcr i 1 LS $ 165,000.00 $ 165,000.00 30 G' SDR-35 PVC Storm Drain 930 LF $ 155.00 $ 128,650.00 31 24" SDR-35 PVC Storm Drain 224 LF $ 425 $ 95,200.00 32 1" Water Line 84 LF $ 55.00 $ 4,620.00 33 1" Ball Valve l EA $ 3,500.00 $ 3,500.00 P-2 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 10TH & FLOWER PARK Item Description Qty Unit Unit Price Amount 34 1" Domestic Meter 1 LS S 9,500.00 S 9,500.00 35 2" Irrigation Meter 1 LS $ 9,500.00 S 9,500.00 36 2" Reduced Pressure Backflow Preventer (RPBD) I EA $ 7,500.00 $ 7,500.00 37 Drinking Fountain 1 EA $ 15,000.00 $15,000.00 38 Construction Permits 1 Allow $50,000 $50,000 39 Project Advertisement Sign 2 EA S 2,500.00 S 5,000.00 40 Shade Sail Structure - Playground JrI Yb LS $ 125,OOO.DO S 125,000.00 41 Skate Park I LS $ 595,000.00 S 595,000.00 42 Fitness Equipment t 1 LS S 60,000.00 ' S 60,000,00 43 Play Equipment i I LS $ 205,000.00 S 205,000.00 44 Basketball Court Marking and Striping 1 LS $ 22,00000 S 22,000.00 45 Basketball Court Pole, Backboard and Net 2 EA $ 6,800.00 $ 13,600.00 46 Goalpher Soccer Goal i 2 EA $ 7,500.D0 S 15,000.00 47 6" Wide Concrete Curb at Rubber Surfacing 50 LF $ 20.00 S 1,000.00 48 6' Bench 11 EA S 2,100.00 S 23,100.00 49 Table and Chairs Set 5 EA S 4,400.00 S 22,000.00 50 Bike Rack 1 EA S 5,500.00 S 5,500.00 51 Trash Receptacle 5 EA S 4,200.00 S 21,000.00 52 Stabilized Decomposed Granite Material 730 SF 5 6.00 S 4,380.00 53 Signage - Park Regulation 2 EA S 24,000.00 S 48,000.00 54 Park Lights and Lighting System 1 LS `' 395,000.00 S 395,000.00 P-3 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 1OTH & FLOWER PARK Item Description Qty Unit Unit Price Amount 55 Site Fence and Swing Gates I LS S 46,500.00 $ 46,500.00 56 Planting - Trees (24" Box) 43 EA $ 435.00 S 18,705.00 57 Planting Area (Shrubs and Ground Cover) 16,940 SF S 3.25 $ 55,055.00 58 Marathon Turf 3,660 SF $ 1.65 $ 6,039.00 59 3" Thick Wood Mulch 172 CY $ 90.00 $15,480.00 60 Soil Preparation and Amendment 22,960 SF $ 0 60 $ 13,776.00 61 Irrigation System I LS $ 200,000.00 S 200,000.00 62 90 Calendar Days Landscape and Irrigation Maintenance l LS $ 5,800.00 $ 5,800.00 63 As -Built Plans I LS $5,000 $5,000 64 Security System i 1 Allow $75.000 575,000 65 8'-0" Concrete Block Wall 105 LF S 450.00 $ 47,250.00 66 3'-6" Concrete Block Wall with Fence 85 LF S 500.00 $ 42,500.00 67 Water Quality Bioretention Basins I LS S 15,500.00 S 15,500.00 68 Stormwater Pollution Prevention Plan (SWPPP) - Risk Level 2 1 LS S 20,000.00 S 20,000.00 TOTAL BASE BID s 4,280,000.00 Item Description Qty Unit Unit Price Amount ADD ALTERNATE 1: 69 Shade Sail Structure— Fitness I LS $ S Equipment (Add -Alternate 1) i 95,000.00 45,000.00 P-4 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 1 OTH & FLOWER PARK Item Description Qty Unit Unit Price Amount � ADD ALTERNATE 2: 70 3D Leannuig Elements (Add -Alternate 1 LS 30,000.00 S 30,000.00 ADD ALTERNATE 3: 71 Restroom Building (Add -Alternate 3) f 1 LS S 230,000.00 S 230,000.00 72 3" SDR-35 PVC Sewer Pipe with 25 LF S 150.00 $ 3,750.00 Clean Out (For Rest Room Add- Altemate 3) 73 1 '/" Water fine (For Rest Room Add- 114 LF S 95.00 $ 10,830.00 Alternate 3) The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). 1 This bid item is considered a Specialty Item per Section 2-3.23-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one -hundred sixty (160) working days after the commencement date stated in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,200 per calendar day. Name of Firm Signature of BIDDER Title ZSW'C-tN (If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-5 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 26-6642 1 OTH & FLOWER PARK BIDDER'S STATEMENT BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct. Name of Firm Signature of BIl (If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-6 of P-21 CITY OF SANTA ANA CONSTRUCTION CONTRACT PROJECT 26-6642 1 OTH & FLOWER PARK This CONSTRUCTION CONTRACT is made and entered into this 21"day of April, 2026 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Doja, Inc. (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, I oth & Flower Park (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed Four Million Six Hundred Forty -Nine Thousand Five Hundred Eighty Dollars and No Cents ($4,649,580.00), as set forth and identified in the itemized BID PROPOSAL uploaded by the Contractor to P1anetBids, which is attached hereto and incorporated herein as Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. rev. 09/0 ] /2017 Pagel of 3 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements and Liquidated Damages section of the BID PROPOSAL (Exhibit "B") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY' S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: Santa Ana CWA 7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of any of the obligations under the Contract Documents; Page 2 of 3 (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: JENNIFER L. HALL City Clerk APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By: E NELLESEN Assistant City Attorney RECOMMENDED FOR APPROVAL: Digitally signed by Rodolfo Rosas Rodol fO Rosa em cnrrosas s nta-a fl ,7 J email=rrosas@santa-ana.org, c=US Date: 2026.04.03 14:15.40-07'00' RODOLFO ROSAS, P.E. Acting Executive Director Public Works Agency CITY OF SANTA ANA ALVARO NUNEZ City Manager CONTRACTOR: Doja, Inc. 7�' BY: TITLE: {� r a-'e--rr�- Page 3 of 3 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California San Bernardino County of On March 27, 2026 before me, Sleiman Obeid/Notary Public (insert name and title of the officer) personally appeared Ayad Jaber who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. C Signature SLEIMAN OBEID = Notary Public -California Z San Bernardino County a Commission # 2413206 My Comm. Expires Aug 18, 2026 (Seal) MAYOR Valerie Amezcua MAYOR PRO TEM David Penaloza COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez Thai Viet Phan Benjamin Vazquez PUBLIC WORKS AGENCY 20 Civic Center Plaza (M-36) P.O. BOX 1988 • Santa Ana, California 92702 (714) 647-5690 • Fax (714) 647-5823 www.santa-ana.org CITY MANAGER Alvaro Nunez CITY ATTORNEY Sonia R. Carvalho CLERK OF THE COUNCIL Jennifer L. Hall NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act (CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTY CLERK From: City of Santa Ana County of Orange Public Works Agency P.O. Box 238 20 Civic Center Plaza (M-36) Santa Ana, CA 92702 Santa Ana, CA 92702 Project Title: 10th & Flower Park/10th & Flower Stormwater Capture Project Number(s): 26-6642 & 26-6601 Project Location: 10th and Flower City: Santa Ana County: Orange ER Number: ER-2026-27 Date of Approval: 03/26/2026 Project Description: Construction of a new park including lighting, landscaping, stormwater infiltration systems, utilities, recreational features, irrigation, concrete work, and asphalt work. Applicant Name: City of Santa Ana, Public Works Agency Applicant Address: 20 Civic Center Plaza M-36 Santa Ana, CA 92702 Name of Public Agency Approving Project: City Council Name of Agency Carrying Out Project: Public Works Agency Exempt Status: ❑ Ministerial (Sec. 15268) ❑ Declared Emergency (Sec. 15269 (a)) ❑ Emergency Project (Sec. 15269 (b through e)) ❑ General Rule (Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: 0 Categorical Exemption: 15303 (Class 3), 15304 (Class 4), 15332 (Class 32) Reason(s) Why Project is Exempt From CEQA: The project involves development of a new community park which constitutes: construction and location of limited numbers of new, small facilities or structures; minor public alterations in the condition of land, water, and vegetation which do not involve removal of healthy, mature, scenic trees; and an in -fill development project. City Contact: Robert Aguirre Title: Senior Civil Engineer Telephone: (714) 647-5652 Signature: Date: PROJECT TITLE: 10th and Flower Park PROJECT CATEGORY: City & Park Facility Improvements Park Facility LOCATION MAP A N CITY OF SANTA ANA FY25/26CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: The project features the construction of a new park and includes site preparation, grading, and construction ofpark improvements such as walking paths, landscaped areas, irrigation systems, lighting, and related amenities. PROJECT NEED: The project addresses the need for additional neighborhood park space by improving access to recreational amenities, enhancing neighborhood livability, and activating an underutilized site. PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 Construction 3,749,580 - - - - - - Contingency 464,958 Engineering 697,437 TOTAL 4,911,975 - - - - SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 A & D District 2 2,661,975 - - - - - - LAND & WATER 2,250,000 CONSERVATION GRNT TOTAL 4,911,975 - - - - - AGENCY: DIVISION: CONTACT: DATE: Public Works Parks, Fleet & Facilities Mike Ortiz, Deputy PIN Director/Parks, Fleet, and 20-Mar-2026 Facilities PROJECT TITLE: 10th and Flower Park Stormwater Capture PROJECT CATEGORY: Utility/Drainage/Lighting Improvements Storm Drain/Water Quality LOCATION MAP A N AGENCY: Public Works CITY OF SANTA ANA FY25/26CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: The project features the installation of a subsurface stormwater infiltration system, catch basin inlets, pre-treatment devices, and Bioretention Basins at the new park at 10th St & Flower St. IPROJECT NEED: Stormwater infiltration provides multiple benefits, including improving water quality, enhancing local water supplies, and reducing flooding. PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 Construction 900,000 - - - - - - TOTAL 900,000 - - SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 FED CLEAN WATER 300,000 - - - - - - MEASURE M2 COMPETITIVE 600,000 TOTAL 900,000 - - - - - - DIVISION: Construction Engineering CONTACT: Craig Foster, NPDES Manager DATE: 20-Mar-2026