CONSTRUCTION CONTRACT
PROJECT 26-6009
TRAFFIC SIONAL MODIFICATION AT MACARTHUR BOULEVARD AND FLOWER STREET
This CONSTRUCTION CONTRACT is made and entered into this 16th day of July, 2026. by
and between the City of Santa Ana, California, a charter city and municipal corporation organized
and existing under the Constitution and laws of the State of California (hereinafter "CITY"),
and California Professional Engineering,Inc. (hereinafter"CONTRACTOR")..
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and-to the satisfaction
of the City Engineer of the CITY, Tragic Signal Modification at MacArthur Boulevard and Flower
Street (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance
with the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the"Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
•. Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Three Hundred Ninety Two Thousand One
Hundred Seventy One Dollars and No Cents ($392,171.00),as set forth and identified in'the itemized
BID PROPOSAL uploaded by the Contractor to PlanetBids,which is attached hereto and incorporated
herein as Exhibit"A".
The BID PROPOSAL contains a .schedule of unit price(s) or lump suln(s) based on approximate
quantities only,and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev.09101/1017 Page I of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements and Liquidated Damages section of the BID PROPOSAL
(Exhibit "B") including commencing construction within the timeframe therein specified after
issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay,all employees on the WORK
OF IMPROVEMENT a salary or wage at least.equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre-hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: http://www.santa-ana.oriz/pwa/documents/CWA.jdf
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work(Performance Bond),and one in the amount of One Hundred Percent(100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment,furnish a warranty performance and payment bond (Warranty Bond). -Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars($500,000),the Warranty Bond amount shall be the greater of Ten Thousand Dollars($10,000)
or Twenty Percent (20%) of the final contract,price. For projects above Five Hundred Thousand
Dollars($500,000),the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000)or Ten Percent(10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions,to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents;
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs.-
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property,arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury,property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST: CITY OF SANTA
NNIFE HA L "' ALVARO NUNEZ
City C.1 City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO CONTRACTOR:
City Attorney California Professional Engineering, Inc.
E NELLESEN B Van Nguyen
Assistant City Attorney TI LE: president
RECOMMENDED FOR APPROVAL;
4 OD OLf 0 R S, P.E.
Acting Executive Director
Public Works Agency
Page 3 of 3
CUy ei Sonia Ana Page 1 of 3
Traffic Signal htodllicallun at MacArlhur Boulevard and rinwor St tot(Project N26-6000).hidding on 03M02026 00 PM(PST) Printod 03f1312026
Submission
Bidder Details
Vendor Name California Professional Engineering,Inc.
Address 19062 San Jose Ave
La Puente,California 91748
United States
Respondee Van Nguyen
Respondee Title President
Phone 626-810-1338
Email estimating@cpengineeringinc.com
Vendor Type CAD IR,SBE,MBE
License 0 793907
Submission Detail
Submission Format Electronic
. Submitted 03/04/2026 1:38 PM(PST)
Delivery Method
Responsive
submission status submitted
Confirmation# 472276
Respondee Comment
Buyer Comment
Attachments
File Title File Name File Type
Nan-Cotlusion Affidavit(Notary Public)-REQ Original
Non Collusion.pdF Nan Collusion.pdf Hard Copy Submittal in Addition
Bid Bond Guaranty(Notary Public)-REQ original Hard
Bid Bond.pdF Bid Bgnd.pdF Copy Submittal in Addition
Ownership Affidavit(Notary Public)-REQ Original Hard
Ownership AFFIdavlt.pdF ownership AFfidavit.pdF Copy Submittal in Addition
Santa Ana-TS Mod at MacArthur Blvd and Santa Ana-TS Mod at MacArthur Blvd and General Attachment
Flower St-CPE.pdf Flower St-CPE.pdf
Santa Ana-TS Mod at MacArthur Blvd and Santa Ana-TS Mod at MacArthur Blvd and Baseline Construction Schedule
Flower St-CPE.pdF Flower St-CPE.pdf
Bid Bond.pdf Bid Bond.pdf Bid Bond
Cily of Santa Ann Page 2 of 3
Tragic Slgnnl Modifivation at MacArthur Boulevard and r1ower Btroot(Project 926�6009),niddlriy on 031041202.6 2:00 FM(PST) Printud 0511=026
Line Items
Discount Terms No Discount
i
lftem;Item �TypeL Item Description UOM QTY Unit Price I Line Total Respons_ mm�[oenE-�,
TOTAL BASE OLD 5392,171,00
..._._.......,._._.._..__.__....._,_....,__....__._._______.__.,_..___.__._.__...... ____. _ ._
_TrafflcSignalModificationatMacArthurBoulevardandFlowerStreet iLS ,1 $284,441.00 $204,441Ao Yes !
(2 Install 2"PVe conduit• !LF E80 $75A0 $4,000A0 Yes T�
I
�3 IInstall a"PVC Conduit• µ� W LF 40 $100A0 $4,000.00 3Yes
14 t l iInstalL4"PVCCOnduit1 LF 400 $50.00 $20.4noo Yes '
5 lE Install Na.6Pall Box IEA 15 $1,200,00 S6A0000 Yes
EA--Z $1,200.90 $2,400.00 Yes
lnstallho.6B Pull Box '
IPtemmunkation System Ls 7 $12.673.00 $12,673.00 Yes
8 31 ilnstailt2Sten"dSMF0 Cable• iLF I250 $4.64 $1,16040 Yes I -
9 i F $64.00 $3,0TZA0 Yes
usion Splice 5trends of SMFO EA 48
W_-- _...
_�_.�__1...__.__l
10 ! Fiber Optic Splice Enclosure--, — BA- - ---' I 1 $1,153A0 $1,155,00 Yes
11 T Signing and striping 10 1 $86400A0 $B,g00A0 `k Yes `
12 Pothole Pole locations far Utility Conflicts• EA 2 Ssso.00 $1,300,00 Yes
13 ` Tenipetary Overhead Signal Wiring 510,000,00 Yes _
—i!
14_L I Pee Sidewalk(T-4"I 1 SF�250 $92.50 $6,12SA0 Yes
15 II 111�---PCCC Curb Ramp- $F 230 02.50 $06135,00 Yes
16 I CCTV Inspection of Sewer Main:and Laterals(Pre and Post Construction) LS 1 $4,060.00 $4,06040 - Yes -
iT f. AC pavement TN S 52,320.0p $6,960.0.0 Yes 1
I ProjectAdvertising 5lgnol EA 2 $99tao $1,000.00 Yes
19. Construction Permit- 0A
.�--�--.._�_____..���.��----.__._—_-_..__....__......__.�_..�.�- -�..• LS 1 $2,500 $2s0oA0 yes
�-------
-
Asterisk Notes per P-4 of Speciflcetleas-NOT part of Base Bid Calculation S0wa
The gaantity for this bld Item It shown far bid comparlson only.Thts bid Rem shalt not he subjocgto the"2596"limit as skated In _
20 t Sect[on3-;ofthe Standard$peclflutlons.The octaA amount for this item will be dictated by the actual quantity usad,a0dthe �a 0 S0.d0 $040 €Yes v
i Agency reserves the right to Increase or decrease theq y
uantity of this Item accordingly,
Gly of Santa Ana - Paga 3 of 0
Tra010 Signal Mo(Mica0on at MaoArlhur BouInvard end Nowar Slra21{Pmjnot 06-6009).bidding on 0310412.026?=PM(PST) Prtnte-d 0WI M026
Line Item Subtotals
Section Title Une Total
TOTAL BASE BID
Asterisk NOW per P-4 of Specifications-NOT part of Base Bid[akulation
$392,1LJ..o
CITY OF SANTA ANA
PROPOSAL
.PROJECT NO.:26-6009
TRAFFIC SIGNAL MODIFICATION AT MACARTHUR BOULEVARD AND FLOWER
STREET
TOTAL BASE BID $ -3 3�� 171
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any,all,or none of the add-alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item.per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS,AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within Six 60) working clays after the commencement date stated in the Notice to
Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for
long-lead time items (i.e. Traffic Signal Poles). The absolute maximum time of completion of
improvement(including time extensions,weather,and material procurement)shall not exceed 365
calendar days.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications,shall be$3,600 per calendar day. .
E
Name of Firm California Prof*s1goal Engine , Inc. a
Signature of BIDDER
1
• k
Title President/se 1
(If an individual, so state. It a firm or co-partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager,thereof.)
P-3 of P-19 r
CALIFORPRO KELVINM
CERTIFICATE OF LIABILITY INSURANCE DATE(M s122o2v202YYY}
�—� 6
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER License#0252636 fiRMIAcT George Duran
Duran Risk&Insurance Services it No,Exl: 949 933-2$45 PAX
3257 E.Guasti Ave,Sulte 104 ( ) (AIC,No):
Ontario,CA 91761 atrtfi :george@drisinc.com
INSURER 5 AFFORDING COVERAGE NAIC p' -
INSURER A:Endurance American Specialty Insurance Company 41718
INSURED INSURER B;MS Transverse Specialty Insurance Company 41807
California Professional Engineering Inc. INSURER C:RSUI Indemnity Company 22314
19062 San Jose Avenue INSURER DACE American Insurance Company 22667
La Puente,CA 91748
INSURER E:Admiral Insurance Company 24856
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EPF POLICY EXP LIMITS
LTR MM DD W M DD .
A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
CLAIMS-MADE � OCCUR X X PGL30005056100 41212026 4/212027 DAE�GETOFRENTED qpCurrericel $ 10D,000
X Owner's&Contractor 5,040
MEDEXP An are arson $
PERSONAL&ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE $ 2,000,000
X POLICY❑ PRO-CT —1 LOC PRODUCTS-COMPIOPAGG $ 2,000,000 _
JE
OTHER: $
B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000J000
Ea accident $
X ANY AUTO X X TSRSCA000027800 511912025 6/1912026 BODILY INJURY Perperson) $
OWNED SCHEDULED
AURTOS ONLY AUTOS BODILY INJURY Per accident
X AUTOS ONLY X AUUTOSONLY OaER ntAMAGE
C UMBRELLA LIAB X OCCUR EACH OCCURRENCE 5,000,4D0
X EXCESS LIAR CLAIMS-MADE NHA606723 $11912025 6/1912026 AGGREGATE $ 5,000,400
PEP RETENTION$
D WORKERS COMPENSATION X PER E OTH-
AND EMPLOYERS'LIABILITY STATUTER
ANY FROPRIETORIPARTNERlEXECUTIVE YIN X 912981 5/19/2026 511912027 1,00UD0
ppYPRO�/RIE EXCLUDED? ❑Y NIA
E.L.EACH ACCIDENT
?Mandato"in NH) E.L.DIS EAS E-EA EM PLOYEE 1,000,0110
IFyyees,describe under 1 000 00D
❑ESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT }
E Excess-5M xs 5M UX00000001903 5/19/2025 6119/2026 Agg&Each Occur 5,000,000
DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLES (ACORD 101.Additional Remarks Schedule,may be attached if more space Is required)
The City of Santa Ana,20 Civic Center Plaza,Santa Ana,California 92701 and Its officers,employees,agents,volunteers and representatives are named as
additional Insureds with respects to General Liability per forms CG20101219&CG20371219 and Auto Liability per form CA20481013.A waiver of subrogation
in favor of The City of Santa Ana,20 Civic Center Plaza,Santa Ana,California 92701 and its officers,employees,agents,volunteers and representatives
applies as respects to General Liability per form CG24041219,Auto Liability per form CA04441013,and Worker's Compensation per form WC900375(05118).
*At least thirty(30)days written notice of cancellation.
APPROVED
Sy Tu-Tran Nguyen-07:18 am,Jun 03,202&-
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Santa Ana,M-93 ACCORDANCE WITH THE POLICY PROVISIONS,
20 Civic Center Plaza
Santa Ana,CA 92702
AUTHORIZED REPRESENTATIVE -
ACORD 25(2016103) 01988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD