Loading...
HomeMy WebLinkAbout19D - RFP - PLAN CHECK SRVSREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 4, 2011 TITLE: REQUEST FOR PROPOSALS FOR STRUCTURAL PLAN CHECK SERVICES CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ? As Recommended ? As Amended ? Ordinance on 15' Reading ? Ordinance on 2nd Reading ? Implementing Resolution ? Set Public Hearing For_ CONTINUED TO FILE NUMBER Receive and file the Request for Proposal for Structural Plan Check services. DISCUSSION The Building Safety Division in December received a plan check submittal for the construction of a 37-story high rise structure located at 1001 North Broadway. After reviewing the submittal, it was determined that special skill would still be required to plan check the structural part of this project. The attached Scope of Work has been prepared accordingly (Exhibit 1). FISCAL IMPACT There is no fiscal impact associated with this action. "y. Trevino Executive Director Planning and Building Agency FH:rb rb\reports\RFP Structural Plan Check 1001 N. Broadway Exhibit: 1. Scope of Work 19D-1 REQUEST FOR PROPOSAL STRUCTURAL PLAN CHECK SERVICES 1001 NORTH BROADWAY PROJECT SCOPE OF WORK Review and approved the structural part of the 37-story office tower at 1001 North Broadway with deferring the following items from the first submittals: cladding, equipment anchorage, stairs and elevators. 2. Also assuming that the building configurations, structural systems & framing for the subject building will be identical to the 2008 drawings that NYA reviewed & approved previously. 3. All building elements shall be redesigned as required to meet the CBC 2007 code requirements. Among others, we list below a few of the important code changes that may impact the subject building redesign: a. It should be verified by the design team & the architectural plan reviewer if the code changes triggers any occupancy category changes especially with respect to the use of the two story atrium spaces at building entry or any other public assembly type uses (the Building Importance factor, I, could go up). b. The entire lateral force resisting system will need to redesigned & rechecked due to the code change. In particular, for the 37-story tower this utilizes a dual structural system - the R factors have been reduced in the new code. New/ different redundancy checks, irregularity checks, modeling requirements, P-Delta checks, etc. will need to be performed as part of the new lateral design. c. Design needs to be updated for new code load combinations; Design of discontinuous/ irregular elements for overstrength needs to include resistance factors. d. All concrete anchorage related items need to satisfy ACI 318-05 Appendix D requirements. e. All wind design related items will need to be redone per the new code requirements. Wind load requirements are more involved & higher per the new code - especially for roof elements & misc. parapets, canopies etc. f. Steel SMRF elements & corresponding column bases/ anchorages need to be designed per AISC 2005 Seismic Provisions. g. Foundations need to be redesigned corresponding to new code forces & requirements incorporating new findings on reduced punching shear capacity of unreinforced concrete deep sections, etc EXHIBIT 1 1901-2