NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
a construction of FIRST STREET BRIDGE REPLACEMENT under contract entered into on
March 21, 2011. with POWELL, CONSTRUCTORS, INC., on which contract FIDELITY AND
DEPOSIT COMPANY OF MARYLAND is surety. The property on which such work
oimprovement was placed is in the City of Santa Ana, County of Orange, State of California, and
o'z described as Project No. 06-1723 located at: FIRST STREET. The work improvement on said
A property was accepted as completed on July24_, 2014.
CITY PR AN , A M ICIPAL CORPORATION
x o �..
by
w Dated: ly d" � _ City Engineer
TITLE
*� __.._.._--_-_.._........___........_______________________..__,. ..____,_d..____-__----__-__-_-_-----_----
O
VERIFICATION
1, the undersigned, say: I ain the City Engineer ___of
the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on
behalf of the owner of the property therein described; I make this verification on behalf of said
corporation by authorization of the City Council of the City of Santa Ana; I have read said notice
and Imow the contents thereof; and I declare under penalty of perjury that the facts therein stated
are true.
Executed o ., _ :- .,mac,:,, .�. at.Spspta Ana, Calif, ,
_
1P (Signature of individual_s1 _ling that the
contents,of Notl� col i letion are true.)
AIKt
THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN (10)DAYS AFTER COMPLETION
REQUEST FOR :::, -. -. ,
���
- -�
COUNCIL ACTION �. -
CITY COUNCIL MEETING DATE:
MARCH 21, 2011
TITLE
CONTRACT AWARD FOR THE FIRST
STREET BRIDGE REPLACEMENT
OVER THE SANTA ANA RIVER
(PROJECT NO. 061723)
C�
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED 3 � `��— ��� �3 �
As Recommended
� As Amended
� Ordinance on � °` Reading
(] Ordinance on 2 ^d Reading
� Implementing Resolution
� Set Public Hearing For
CONTINUED TO
FILE NUMBER
Award a contract to Powell Constructors, Inc., the lowest responsible bidder, in accordance
with unit bid prices in the estimated amount of $6,010,329 for construction of the First
Street bridge replacement over the Santa Ana River effective Monday, March 28, 201 1 ,
subject to compliance with all City rules and regulations.
2. Approve a funding analysis with a total estimated construction cost of $8,113,900.
DISCUSSION
Currently, the First Street Bridge over the Santa Ana River consists of two travel lanes in each
direction (Exhibit 1). This project will widen the bridge and the approaches to three lanes in each
direction, along with bike lanes and with pedestrian sidewalks on both sides to make this segment
of First Street consistent with the Orange County Master Plan of Arterial Highways and the City's
Circulation Element.
The proposed work includes demolishing the existing bridge and construction of a new, wider
bridge. Other improvements include medians, trail connections to the Santa Ana River and
landscaping along the approaches to the bridge.
The work will be conducted in two phases. In the first phase, traffic will be directed to the south
half of the bridge while the north half will be demolished and rebuilt. The second phase of the
project will start immediately following completion of the first phase. Traffic in this phase will be
directed to the newly completed north half of the bridge during construction of the south half.
Once completed, these improvements will enhance flow of traffic, pedestrian safety and ride
quality of the bridge.
Contract Award for the First Street Bridge
Replacement Over the Santa Ana River
March 21 , 201 1
Page 2
The Notice Inviting Bids was advertised on February 18 and 19, 201 1 , and bids were opened on
March 17, 2011. A summary of the bid invitations mailed, the bids received, and the bid results
follows:
Santa Ana contractors receiving notices:
Contractors requesting bidding documents:
Bids received:
Bids received from Santa Ana contractors:
The bids received are as follows:
NAME OF RESPONSIVE BIDDER
1. Powell Constructors, Inc.
2. C.C. Myers, Inc.
3. Riverside Construction Company, Inc.
4. Griffith Company
5. Ortiz Enterprises Inc.
6. MCM Construction, Inc.
7. Steve P. Rados, Inc.
8. SEMA Construction, Inc.
9. FTR International, Inc.
10. Reyes Construction, Inc.
47
64
10
1
CITY
Fontana
Rancho Cordova
Riverside
Brea
Irvine
North Highlands
Santa Ana
Lake Forest
Irvine
Pomona
� .u• ► �
$6,010,329.00
$6,256,823.30
$6,353,994.50
$6,503,674.94
$6,587,060.40
$6,598,994.05
$6,918,010.90
$7,171 ,938.86
$7,522,176.00
$7,646,199.40
While the City made outreach efforts to Santa Ana contractors regarding the Notice Inviting Bids,
only one Santa Ana contractor submitted a bid as a prime contractor. Also, Hardy and Harper, a
Santa Ana -based contractor is a sub to the low bidder. The other 45 Santa Ana contractors did
not submit a bid either because they are not capable of performing this type of work, unable to
obtain insurance because the project is too large, or they work as a subcontractor to certain prime
contractors.
A total of 1 O bids were received and all were responsive. The lowest bid was submitted by Powell
Constructors, Inc. for $6,010,329, which is below the Engineer's estimate of $10,400,000. The
downturn of the economy and the competitive market contributes to the low bids received.
The project is partially funded with Highway Bridge Replacement and Rehabilitation funds and
Measure M funds. The project must be awarded by March 31 , 201 1 as required by Orange County
Transportation Authority. According to the bidding documents, bidders may protest the bidding
results within five business day following bid opening and are entitled to an administrative hearing
to be conducted by the Executive Director of Public Works. Therefore, this award is valid only if
the City does not receive any legitimate bid protests.
Contract Award for the First Street Bridge
Replacement Over the Santa Ana River
March 21 , 201 1
Page 3
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended action is exempt
from further review. Notice of Determination ER No. 201 0 -108 was filed for this project.
FISCAL IMPACT
The funding analysis shows a total estimated construction cost of $8,113,900 for the project
(Exhibit 2). Funds are available in the Measure M Street Construction Fund (accounting unit
03217660 - 66220, project no.061723) and the Select Street Construction Fund (accounting unit
05917660 - 66220, project no. 061723).
Rau odinez II
Executive Directo
Public Works Agency
RG /ET
Exhibit 1: Project Location Map
2: Funding Analysis
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez F$
Executive Director
Finance &Management Services Agency
LEGEND
® PROJECT LIMITS
EXHIBIT 1
SANTA ANA cllY couNC�L TITLE= CONTRACT AWARD FOR THE FIRST
`` p� AGENDA DATE STREET BRIDGE REPLACEMENT OVER
I VVVV� MARCH 21, 2ot1 THE SANTA ANA RIVER
���-�_ ��_ ��� (PROJECT NO. 061723)
GPT 10 /y �,
4i�J �sA
� ;;� 1
FUNDING ANALYSIS
PROJECT NO. 06 -1723
CONTRACT AWARD FOR THE FIRST STREET BRIDGE REPLACEMENT OVER THE
SANTA ANA RIVER
Construction Contract $6,010,329
Contract Administration $240,400
Inspection and Testing $661 ,105
Contingencies $1,202,066
TOTAL ESTIMATED CONSTRUCTION COSTS 8.113.900
EXHIBIT 2
THE REGISTER Thla space for filing stamp only
625 N GRAND AYE, SANTA ANA, CA 92701
Telephone (714) 796 -7000 /Fax (714) 796 -6059
PROOF OF PUBLICATION
(2015.5 C.C.P.)
State of California )
County of ORANGE ) ss
Notice Type: BID - NOTICE INVITING BIDS
Ad Description: First St Bridge Replacement
I am a citizen of the United States and a resident of the State of California; I am
over the age of eighteen years, and not a party to or interested in the above
entitled matter. I am the principal clerk of the printer and publisher of the THE
REGISTER, anewspaper published in the English language in the city of
SANTA ANA, county of ORANGE, and adjudged a newspaper of general
circulation as defined by the Taws of the State of California by the Superior
Court of the County of ORANGE, State of Califomie, under date 11/19/1905,
Case No. A21046. That the notice, of which [he annexed is a printed copy, has
been published in each regular and entire issue of said newspaper and not in
any supplement thereof on the following dates, to -wit:
a Y7 f[ :7 f �i a i f R a Y7 i B 7L r� � 7 i f
Executed on: 02/19/2011
Ac SANTA ANA, California
I certify (or declare) under penalty of perjury that [he foregoing is true and
correct.
Signature
I IIIIIII IIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII IIII IIII
* A 0 0 0 0 0 2 0 6 1 6 1 0
CNS #: 2046719
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN
that the Ci[y of Santa Ana,
California well receive et the
City Hall -Ross Annex, (M-
43), 20 Civic Genler Pleie,
Senla Ane, Califomie 92]01,
the P Ile Works AgeneV
Fount F r t t,
on or a ore a our o
p. m. on Thurstlay, March 17,
2011 sealed bids end /or
proposals for
PROJECT NO. 116 -1]23;
Flret Sheet Bridge
Repleeement Protect
Notice is hereby given
BIDDERS Na[ this pre act Is
fundetl�wiN [Source of 7undsl
money, and Nat [ha rate o
wages for each craft or type
of won% or mechan�C
employyed under Nis contract
shall ba as apedfietl under
the current determinations of
the DaD rtment oT L�bon es
reau�er the
��eo� •t —Where e
lanced' panty exists Delween
Federal end Stale prevetiing
wage rate, Ne higher of Ne
two preveilkng wage rates
shall apply.
Each bid shall be
accompanied by cash, a
cashiers or certifiatl check
payable b the Ciry of Santa
Ana. or bitl bontl issued by e
corporate surety, for en
amount no[ less Wen [en
percent (10 %) of Ne
aggregate of Ne bid, es e
guarantee that Na BIDDER
will enter Into Ne proposed
contract if Ne same is
ewartletl to him. THE
SIGNATURE OF THE
BIDDER ON THE BID
BOND MUST BE
NOTARIZED.
The City Council reserves
the dgh[ to reJect any or ell
bitla.
The successful BIDDER
must possess or obtain a
valid Califomie Class A
ContracloYS prior to the
schetluletl award dale of Nis
contract.
There will be a PRE -BID
JOB WALK e[ 20 GMc
Center Plaza – Roas Annex
3 Floor Conference Room
3004, on Montley, February
26, 2011 at 10:00 a.m. The
focus of the meeting will be
addressing gllBat10n8 and
concams related [o the
contract dowmants of the
proposed pro]ecL The
Contractor shall acquire
contract documents antl
faMliadze Nemselves with
Ne protect prior to this
rtlea[ing.
The Disadvantage BUSinass
Enterpdae (DBE) ggoat for this
protect Is 1.6] %. The
Underutilized Disadvantagge
Business Enfar rise (VOBE)
goat for this pro�eet is 2.22 %.
These percentages shell
apply to the cost of Na enure
ppro]ect. This information may
be submitted with your bid
proposal. If i[ is not, and you
ere the apparent low bidder
or the eawntl or the third Ipw
bidder, it must be submitetl
end received by .the
atlminielering agency no later
[hen the time epacified In the
Federal Requirement
Appendix E.
The time for completion of
Nis contract is 510 working
days, Ne first 450 working
days of which is for
construction, and Ne lest 60
working days for Ne
lentlsrape antl irrigation
maintenance period.
Liquitlatetl damages of
$8,300 par working day shall
begin following Na
completion of the first 460
working tlayye after Nonce [o
Proceetl is issued.
Substilufion of securities for
any monies withheltl by Ne
CI[y of Santa Ana to ensure
performance is allowed In
accortlance wIN Ne Public
Contract Code.
I
i n
i
e Pans end
peciflwtions ere available
in portable document format
(PDF) on compact disk (CD)
antl in paper forme[. Thera Is
no charge for these Plans
antl Specifications on CD.
Thera Ise $24.53 [plus $1.66
per sheet over ten sheets]
charge (non - refundable) for
these Plana end
Specifications in paper
/orma[, plus a $14.42
etltlilional fee if mailed. Make
checks payable to the City of
Sane Ane.
DO NOT CALL
PURCHASING DIVISION
REGARDING
AVAILABILITY OF PLANS
AND SPECIFICATIONS.
2/1 B, 2/19/11
CNS - 2046]19#
THE REGISTER
Addendum No. 2 (March 8, 2011)
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL 8c CONTRACT AGREEMENT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Powell Constructors. Inc.
REQUIREMENT:
The undersigned declares that he /she has carefully examined the location of the proposed work, that
he /she has examined the Plans and Specifications and read the accompanying
instruction
to BIDDERS,
and hereby proposes to furnish all material and do all the work required
to complete the said work in
accordance with said plans (if any), specifications and special provisions,
for the unit
prices) or lump
sums)
set forth in the following schedule:
Item #
Bid Item
Unit
Quantity
Unit Price
Amount
1.
Clearing and Grubbing
LS
1
$ 1__..°
$ It>CCb .-
2.
Unclassified Excavation
CY
1,495
$ 30. -
$ 'a'- t$527. -
3.
Unclassified Fill
CY
2,050
$ t1� -
$ �t a 15'0. -
4
Cold Mill AC Pavement
SF
21,087
$ D :�
$ 1051* -4 --
5.
Pavement Fabric
SY
2,343
$ 3 -'�
$ 9s'�ao -
6.
AC Pavement
TON
3,895
$ �•
$ 3-eoo�.-
7.
Adjust Water Valve Frame and Cover
EA
4
$ 300: -
$ 12o0"
to Grade
8.
Adjust Water Meter Valve to Grade
EA
1
$ '1 �_
$ '100 =
9.
Adjust Metal Frame and Cover to
EA
2
� $ 2�� -
$ '-Eoo -
Grade
10.
PCC Curb, Type B -1
LF
1,961
$ 30: '
$ S"�?'g3o _
11.
PCC Curb Ba Gutter, Type A -2 -8
LF
1,482
$ 20 .!
$ 99 to'-l0 -
12.
PCC Sidewalk, 4" Thick
SF
10,214
$ '-i-
$ *+o85to.-
13.
PCC Driveway Approach
SF
1,296
$ � --
$ 9 0� � _-
14.
PCC Cross Gutter
SF
507
$ � —
$ 'tDSCo .^
BP 1 OF 29
Addendum No..2 (March 8, 201 1)
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL 8z CONTRACT AGREEMENT
BID PROPOSAL. continued
Item #
Bid Item
Unit
Quantity
Unit Price
Amount
15.
PCC Curb Ramp, Case C
EA
1
$
�ioD '
$ 4�
16.
PCC Channel Lining
CY
1 O
$
loGn �
$ loL�d -
17.
Chain Link Fence, H =6'
LF
172
$
'-kO _
$ loSgo• -
18.
Chain Link Drive Gate
EA
1
$ a �0O:
$ 22c� -
19.
Striping, Markings, and RPMs
LS
1
$
LS
$ toan_-
20.
16" Steel Water Pipe
LF
278
$
'-lam _
$ 1 t� 300 .-
21.
16" Fusion - Bonded Epoxy Coated
LF
345
$
`lam'
$ 13g0�•_
Steel Water Pipe
22.
16" Ductile Iron Gate Valve
EA
2
$
I3�.-
$ 3yco�.-
23.
6" Ductile Iron Gate Valve
EA
1
$
15'oc� -
$ tsod _
24.
1" Air and Vacuum Release Valve
EA
1
$
gym-
$ �1oC0•-
Assembly
25.
1" Copper Water Service and Meter
EA
2
$
3�•-
$ CooLV -
26.
Mechanical Coupling
EA
2
$
13Sao.-
$ a- 1000.-
27.
Fire Hydrant Assembly
EA
1
$
1 l0cio- �
$ t�cbo. -
28.
6" Reclaimed Water Relocation
LS
1
$
�
$ 3v�.-"
29.
PCC Curb Ramp, Case D Type 1
EA
1
$
� 1cb -"'
$ ltoo '"
30.
Masonry Retaining Wall, Type B
SF
220
$
3S -
$ - 1 -7oG1-
31.
Metal Hand Railing, Type C
LF
47
$
5C� -
$ a35a. "'
32.
Picket Fence and Gate
LS
1
$
t--S
$ '-lam —
33.
Removable Bollard
EA
7
$
Zap.-
$ ��•
BP 2 OF 29
Addendum No. 2 (March 8, 2011)
CITY OF` SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL 8c CONTRACT AGREEMENT
BID PROPOSAL. continued
Item #
Bid Item
Unit
Quantity
Unit Price
Amount
34.
Stamped Concrete Brick Pattern
SF
1,925
$
S -
$ 9loaS --
35.
24" Box Tree
EA
14
$
3a� -
$ � -tiro --
36.
Irrigation System
LS
1
$
t_s
$ ��.-
37.
Landscaping
LS
1
$
+-s
$ ��.-
38.
Landscape Maintenance Period
LS
1
$
�-S
$ S'GY.b •�
39.
(F) Bridge Removal
LS
1
$
+�
$ 3�{0,�.�
40.
(F) Structure Excavation (Bridge)
CY
939
$
toc�.-
$ a1'�'ioo
41.
(F) Structure Backfill (Bridge)
CY
202
$ a-QO -'
$ '- 1��eao -
42.
Earth Retaining Structure (MSE Wall)
SF
5,229
$
go�`
$ '- t►ZS3�o.-
43.
Retaining Wall Type SSWB
SF
321
$
��to.-
$ '- t�k9+to -
44.
Furnish Piling (Class 90)
LF
868
$
a5.-
$ 9- t'�cn --
45.
Drive Pile (Class 90)
EA
16
$
3�0 -
$ '��r�o
46.
Furnish Piling (Class 140)
LF
8,169
$
�•-
$ ao�4,a2S.-
47.
Drive Pile (Class 140)
EA
120
$
30� -
$ 3��D _
48.
Prestressing Steel (Post- Tensioned)
LS
1
$
t-g
$ �� -�
49.
(F) Structural Concrete, Bridge
CY
287
$
Ste•-
$ t5Z8�'77.-
Footing
50.
(F) Structural Concrete, Bridge
CY
2;398
$
SSD -
$ 1 .?��g qoo. -
51.
(F) Structural Concrete, Approach
CY
204
$
to � •`
$ 13� .�. J
Slab (Type N30S)
52.
Furnish Precast Prestressed Concrete
EA
30
$ �•�iocsD.�
$ "I�o,czxa�
Bulb -Tee Girder (100' -120')
BP3OF29
Addendum No. 2 (March 8, 201 1)
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL 8z CONTRACT AGREEMENT
BID PROPOSAL. continued
Item # Bid Item
Unit
Quantity
Unit Price Amount
53. Erect Precast Prestressed Bulb -Tee
EA
30
$ $
Girder (100'-120')
(100' -120')
54. Joint Seal Assembly (MR =2 '/2 ")
LF
149
$ as D _ $ ag6Gb.
55. (F) Bar Reinforcing Steel (Bridget
LB
484,691
$ I-- $ 1A8q kill. -
56. Welded Steel Pipe Casing (Bridge)
LF
70
$ 140.- $ 98Co -
57. Tubular Hand Railing
LF
760
$ -7c $ 53aco.-
58. (F) Concrete Barrier (Type 26
LF
760
$ $ -
Modified)
59. (F) Sound Wall (Masonry Block)
SF
2,233
$ aS.- $ SS`a3bo.-
60. (F) Minor Concrete (Minor Structure)
CY
3
$ 18Gio.-
Co016��aq —N�
Project 06 -1723 Total Bid-------- ---_ --
*Note: (F) - Final Pay Item as defined in Caltrans Standard Specifications Dated May 2006
PROJECT 06 -1723
BIDDER
FIRST STREET BRIDGE REPLACEMENT
PROJECT
Firm
Powell Constructors, Inc.
Address
8555 Banana Avenue
Fontana, Ca 92335
Phone
(909) 356 -8880
Fax
(909) 356 -1299
Email
-Paul@powellconszriigr-ors.com
BIDDER
Sigma
Michael B. Powell
BP 4 OF
29
s ,
r
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB - CONTRACTORS
Section 4100 et. seq_ of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; ' /z% of the bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: '' /z% ofthe bid
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
'.�l
NAME /(.�.- /-:c�h �r:�;ii- '(ors-- ,.,.�.tl -e" NAME <JL,_ <'.s,•� -2. - �= ��r- ,�= .�T�c.<-- �i, -'r�
LOCATION 7.c�•r,.., -r�_? 1�,�,- l'f� LOCATION ,�'.�,_�,,,,.,,.� >/ -r >n, csA
PHONE ___ PHONE
TYPE OF WORK Lcr,. -c/ � rr : w- Y�TT�- w',C:= TYPE OF WORK ;�..:i� /r< / � ..- $<:%�1? 5Z� /.
/-3=s. ����cr =
NAME ����( �` �'_!��, -� - -
LOCATION 1: .,zr -,.. -1 cs (i.- - �:> i�. c-�rr_�"_ '6%
PHONE �
TYPE OF WORK �-- Cl -�a +- $ c /.!/ � _,,./ _.
NAME L - -J�i1n = -'n
LOCATION � czrz a�'.0 -�-, C "��" t
P[ -[ONE
TYPE OF WORK %(moo.:. -., -, s �! $ ' - /,� /t1 7 `
i�
NAME �_ >r ,' -� -�,�:/ / � l�' r�F,: � ��
�<;
LOCATION �` / r�r';,._,:
(�f!
PHONE
TYPE OF WORKS "�.�1� �; -�, ,'jrr $ � % -I l?
�_ - • -f�
NAME /- /i_Z,- �lc.r" �,� ,,�.��-�,�: % •=
LOCATION `fit rti. F.�rr•�;ri ,_J. ,t: -�
G %y
PHONE
TYPE OF WORK f 1�,; -;_�. $.- _�1= _;.
--ra_� --
Powell Constructor
Name ofFin�_Str mitt" a �d icy
Sigitat- are�BIDDER Michael B. Powell
NAME i_�� /
LOCATION Lc�,. a F�� =c: � -�i. [ ?�F
PHONE '
TYPE OF WORK
NAME /�,.t �- ._�"2¢�i. - -.a �, /�.. � rS
LOCATION r =,,, -; y.�r.�r'�� �4�,���� ,'
PHONE - --
TYPE OF WORK /....,o, $ =i5 �% ? ='i -3.
� (; j
NAME '�! � '_1;,1_ -- =
LOCATION -� � � - _ �: /� � -'
PHONE
TYPE OF WORK ��, l?, ✓< $ " ; r �.'r
NAME r "fir , /L�f� /_._ � -, = ii..<_ .
LOCATION / -:� � c .-�r� !- � I cw�' L'C
PHONE
TYPE OF WORK /`..e.- r- .�� %.,. 1 $ "7 �, /S "� --
BP 5 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB - CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; ' /z% ofthe bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: '' /z% ofthe bid
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
NAME � (�<> :��/ �' l �ca.�/_i<f
LOCATION
'mac; ,,,,JEk !'Ti��<
L'!�
PHONE
TYPE OF WORK ;'l;�,«�
$ � /v`J:7� =r3 -
TYPE OF WORK
f �' /�_ � �
$ 3 =� `� �S''7` /.
NAME
PHONE
LOCATION
$
NAME
PHONE
LOCATION
TYPE OF WORK
$
NAME
NAME
LOCATION
PHONE
PHONE
TYPE OF WORK
$
TYPE OF WORK
$
NAME
PHONE
LOCATION
$
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
Powell Constructors
Name of Firm S�u
E�=rit mg_Bid�—
_ ��
Signa�e- of-I3TDDER Michael S. Powell
NAME GCi�sj � «�: -/ ��7 %r'�c�
LOCATION f�eee =; «.,. /
Ff � l! , Cl�1
PHONE
TYPE OF WORK ;'l;�,«�
$ � /v`J:7� =r3 -
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
BP 5 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB - CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; '' /z% ofthe bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: '' /z% ofthe bid
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
NAME
$
LOCATION
PHONE
TYPE OF WORK
$
NAME
$
LOCATION
PHONE
TYPE OF WORK
$
NAME
$
LOCATION
PHONE
TYPE OF WORK
$
NAME
$
LOCATION
PHONE
TYPE OF WORK
$
NAME
R
LOCATION
PHONE
TYPE OF WORK
$
Powell Constructors In .
Name of Finn S_ubyii�t�iri �
r�
��1���
e-
Signa DER Michael
B. Powell
NAM E
LOCATION
PHONE
TYPE OF WORK
$
NAM E
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
R
BP 5 of29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL 8c CONTRACT AGREEMENT
BIDDER'S STATEMENT
BIDDER understands and agrees that this written proposal (or any part thereof specifically designated
and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement
between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by
the Clerk of the Council with her signature and official seal noting hereon the action of approval of the
Council, signed by the Public Works Agency Executive Director or his duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its execution, and
when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivet-y (as defined above) of the accepted agreement he /she will
furnish AGENCY all required bonds and certificate of liability insurance within ten (10) days (excluding
Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or BIDDERS bond
substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and
shall be considered as payment of damages due to the delay and other causes suffered by AGENCY
because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafis, ot• BIDDER'S
bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in
the bid schedule are solely for the purpose of comparing bids, and that final compensation under the
contract will be based upon the actual quantities of work satisfactorily completed.
All teens contained in the Specifications, the Certification of Non - Discrimination by Contractors, and
the Workers' Compensation Insurance Certificate are to be incorporated by reference into this
Agreement and are made specifically as part of this bid.
Name of Firm
Signatut•e of
BIDDER
Title President
(if an individual, so state)
BP 6 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT continued
(If a firm or co- partnership, state the firm name and give the names of all individual co- partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
Powell Constructors, Inc.
President /CEO /RMO - Michael B. Powell
Awarded toy � �;�'. }. ,,,t, t 'G ] i' ,n , �� /.. � � , �s, ", �, . / / ,�
on the basis of lowest responsible and responsive T
bidder in the amount of
��
ATTEST:
�: � /;�- -
. - - .-
CLERK OF THE C�7TJNCIL._,
ACTION OF COUNCIL:
Date i �, � � ��i�''ln,.� , x�, l 20
APPROVED AS TO FORM: ACCEPS�D FOR THE CITY OF SANTA ANA:
''� � `
w
� ��
�f ,Y ATTORNEY -------- _________ _ EXECUTIVE DIRE T
-� PUBLIC WORKS A CY
BP 7 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
(T'HE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS
PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND
EXECUTION OF THOSE CERTIFICATIONS WHICHARE A PART OF THIS
PROPOSAL)
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The BIDDER Powell Constructors, Inc. ,
proposed subcontractor ,hereby certifies
that he has ,has not X ,participated in a previous contract or subcontract subject to the equal
opportunity clauses, as required by Executive Orders 10925, 111 14, or l 1246, and that, where required,
he has filed with the Joint Reporting Coininittee, the Director of the Office of Federal Contract
Compliance, a Federal Government contracting or administering agency, or the former President's
Committee on Equal Employment Oppommity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the
Secretary of Labor (4l CFR 60- 1.7(b) (1)), and must be submitted by BIDDERS and proposed
subcontractors only in connection with contracts and subcontracts which are subject to the equal
opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity
clause are set forth in 41 CFR 60 -1.5. (Generally only contracts or subcontracts of $10,000 or
under are exempt.)
Currently, Standard Form 100 (EEO -1) is the only report required by the Executive Orders or
their implementing regulations.
Proposed Prime Contractors and Subcontractors who have participated in a previous contract or
subcontract subject to the Executive Orders and have not filed the required reports should note that 4l
CFR 60 -1 .7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a
report covering the delinquent period or such other period specified by the Federal Highway
Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.
BP S of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR
The undersigned contractor or corporate officer, during the performance of this contract, certifies as
follows:
l . The Contractor shall not discriminate against any employee or applicant for employment because
of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to their
race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions ofthis nondiscrimination
clause.
2. The Contractor shall, in all solicitations or advertisements fior employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he /she has
a collective bargaining agreement or other contract or understanding, a notice to be provided advising
the said labor union or workers' representatives of the Contractor's commitments under this section, and
shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Contractor shall comply with all provisions of Executive Order 1 1246 of September 24,
1965, and of the rules, regulations, and relevant orders ofthe Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 1 1246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,
and will permit access to his /her books, records, and accounts by the administering agency and the
Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations,
and orders.
6. In the event of the ConL-actor's non- compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or
suspended in whole or in part and the Contractor may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
Execution Order 1 1246 of September 24, 1965, and such other sanctions may be imposed and remedies
invoked as provided in Executive Order 1 1246 of September 24, 1965, or by rule, regulations, or order
of the Secretary of Labor, or as otherwise provided by law.
BP 9 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR continued
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 1 1246 of September 24, 1965, so that such provisions will be binding upon each subcontract or
purchase order as the administering agency tnay direct as means of enforcing such provisions, including
sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in,
or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency, the Contractor may request that the United States enter into such litigation to
protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any contractor of public works violating
this Section is subject to all the pen ip.e�d for a violation ofthe Chapter.
Signed � C �J/ �O /�
Mic4i- ae- 1 -"1�. Powe
Title President
Firtn Powell Constructors, Inc.
Date 03/17/11
BP 1 O of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
WORKERS' COMPENSATION INSURANCE CERTIFICATION
As required by California Labor Code Section 1860 and 1861, the Contractor certifies as follows:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for worker's compensation or to undertake self - insurance in accordance with the
provisions of the Code, and I will comply with such provisions before co�ninencing the performance of
the work ofthis contract.
If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer
under California Labor Code Section 3300, unless the hired employees) is (are) persons excluded by
said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers'
compensation insurance carrier certifying that I carry such insurance and that the policy shall not be
canceled nor the coverage reduced except upon thirty (30) days prior written notice to the City of Santa
Ana.
Signed �
Michae�3- Powell
Title President
Firm Powell Constructors, Inc
Date 03 / 17 / 1 1
BP 11 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which
BIDDER has performed similar work within the past two years.
1. 'tSee Attacl -ied Job History
Name and Address of Owner.
3.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
i�ame ana Haaress of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Wo
Name and Address of owner_
Name and Telephone Number of person familiar with project.
Date Completed
�- ��wuc� .v mount Type of Work
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom
BIDDER intends to procure insurance and bonds.
Broker: BB &T Insurance Services - 714 578 -7000
P.O. Box 34009, Fullerton Ca 92834 -9409
Surety: Fidelity & Deposit GOmDany of Maryland - (818) 409 2808
801 Brand Blvd., Penthouse Suite, Glendale, Ca 91203
BP 12 of 29
1
N
�o
'y�6'
N
a
3
0
1
d0
0
0
N
C7
v
��
O�
O
�°
0
0
0
0
0
0
o
o
�
o
o
p
v
�„�
_
�`
�
N
O
m
No
M
o
c^�n
�
rn
�
ca
'T
��
N
�
n
�
�
NEIi
G�3
G�3
VA
(}�
(ss
O
O
LL7
N
�
O
V
(O
O
�
O
�
O
�
E
U
�
�
4'l
�
N
N
A
O
N
d
�
t
y
y
>
>
�
�
c
p
r
U
�
�
�'
V' C
Y
p
� a
i UJ
��
��
a aci
�
as O
C O
rn Tc
m m
�
� °J
E
rnC
in w
� is
rn
° m
v� U
m` °v
O aU
O <n
m`
� p
�
�
O
�
N
M
V
�
�
�
N
ti
(O
C�'�J
O
r
CO
N
O
O
t[")
CV'J
N
�
v
�
O
.y
v
°
�
N
�
o
f6
r �
�
N
fO
N
_
�N
N
O
_
v
aEi
c
U
N�
c
.-
�i
C
.n
[n
c
I—
N
N
�
y
O
t
�
c
Q
W
2
Y
�
'mil
4
o
c
O
c
o
c
o
c
O
TO`
C
�
C
O
'�C
�
iO"
V
h
O
Q
O
f0/l
Val
�
O
N
N
N
C
t`
C
t0
c
N
C
N
O
O
O
O
O
O
O
�
C
C
E
C
E
C
E
��
�
r
�
�
�
F.�
m
d
�
a
�-
a
�
a¢i
�
a°i
�
�
�
�
�
�v
�o
is
��
ca
so
�u
c
c
c
c
c
O
V
O
U
O
O
O
p
O`
U
U
U
U
U
ti
y
o
0
0
0
0
0
�
'u
is
m
w
�o
'_TI
U
N
N
U
N
U
��
O
��
O
r
O
M
O�
N
O
O�
�
�
�
1
N
�o
'y�6'
N
a
3
0
1
d0
as
0
o
0
�
o
s
N
N
N
I
0
O
�
M
O
O
0 0 0 0 0 0 0 0 o a o o a o 0
0
C
.�
nl
1
Y
C
b
y
b
�
�
o
o
�
�
o
0
0
��
V
r
u')
I�
a7
0
o
0
0
0
0
_O
fi
o
rn
o
ti
°Jm
�
ti
(O
tD
N
CO
6J
N
m
aTO
.rn
rn
�
"'
W
M
O)
N
�
a0
M
O)
_
N
(D
(D
O)
c0
O)
(D
eD
O)
(f�
.�-
N
�
�
�
O
O
�
O
07
V
N
(�fT
af>
M•
N
H)
�
�
fiT
(ff
('7
M•
V
H9
EA
c��
�
�
�
O
O
Ol
�
O
`
C.
E
m_
o
m
a�
a`�
'C
m
�
��
O_
E
qj LLj
H N
_
C
�
�
0)
N a
�
Ui
r
UJ O
�
� �
�
C_
�.'u
a
�.
L
v a
l0 LC)
s o
�a �
�
rn
�
�" U
o
�. m
VJ �
�
CJ
G�
C
C=
2'
m
N
� C
j M
K
N Ol
j E
E J
�v
N N
O
V
�
,C
U�
�O
C.7 �
j�
C7 L
N y y
j O
0` .�
�
N
=�
O O
O�
w O
Z i
Y
� y
.�
? d
'C 3
m y
-OO �
�
¢
�
� y
>: T
¢ o
a� �
2 0
l j
�
V
5
K �
C
a
c H
�
-O
O a is
� `=
N o_
rn
@
N
o c
ca to
'n o_
� r
c L
_ h
�
��
�
Y
�m
tq a0 U
t0 a
� o
[O E
a> >
a
H
0
2
CO U
d' a>
N N
>>
T E
a�
Q�
o
Ul U
a w
�p N
c
Ao
C7 cn
��J
¢�
Ua
m
¢
O
<n�
00
�ers
as
�2'
��
y
�a
O
J
o
m
o
rn
MO
.n
V
ao
6J
N
M
�
af)
t�O
LL7
�f
LL�'J
l�J
�
m
�
CN'J
a00
� J
�
O
N
N
ON
['�J
CO
(O
�
(D
c0
M
m
d
O
N
O
N
O
a(7
�
�
m
(D
�
�
O
N
N
y+
N
N
67
Q
(O
y
N
O
N
r
N
N
N
.O
M
�
M
M
O
C_O
M
(O
T
��
�
(O
O)
�1
��
^V
N
v
N
(V
�
(D
(V�
(D
QJ
Qa
O�J
(D
�
6�
O)
D)
C
� `
V
m
E
�
m
.�
`�
o
�
L
o
LL
c
6'
c
c
'OO
<a
C
�
o
_
a�
m
L
�
a
m
o
U
�
�
d
c
�
o
c
�
o
�
t
m
(�
��Vjj
O
Q
�.
C
�.
N
N
N
E
O`
T
U
�
(O
d
Y_
m_
—J
^l
s
O
-o
�2
0
0
0
0
�ia
0
�
._�
a
�
.�
a
�
is
c
m
0
0
m
0
Vl
�
N
�
'O
c
c
N
c
N
(A
In
o
c
c
c
�,
�
�
�
�
o
E
o
E
o
ti
o
`0
0
0
�i
�y
�
N
c
N
E
r
m
c
aI
O
�
c
N
c
a)
c
a)
c
a>
_O
�
u°i
O
R
�
O
E
�
E
1�
m
°
.tea
�
.tea
m
O
N
O'
d
N
O-
O
O_
O_
O_
O_
N
�
UJ
O
O-
N
�
y
�
N
�
N
�
UJ
N
N
N
O)
O>
tO
�
_
OJ
rn
N
m
N
rn
N
rn
C
¢
.�
E
C
¢
E
�T.
,(O
E
_
=
fO
(O
fO
C
E
O
E
O
E
O
��i
U
O
O
tC
J
N
J
N
U
N
p
(p
A
N
r—
.�
J
J
O
J
O
J
U
O
U
O
U
d
U
D)
¢
U
U
U
��'V_1
�
�
O
O
O
O
�
�
O
T
O
-a
O
O
O
O
1`u�1�
C
N
C
y
�
O
�
.O_.
_
_
_
_
�
Q�
O
I��
�
M
O
CO
M
O
r
M
O
(O
M
O
KJ
M
O
V'
M
O
M
M
N
M
�
M
O
M
Q)
N
GO
N
r
N
(O
N
aIJ
N
O
O
O
O
O
O
O
O
O
0
C
.�
nl
1
Y
C
b
y
b
0
N
N
N
O
0
N
M
�
O
0
N
O
�--
o
0
N
O
O�
0
N
N
N
O
�
N
O�
O
�
o
ON
�
O
O
N
.r-
O
0
o
O
N
°O
O
o
O
N
O
O
N
O
O
o
O
N
at")
O
0
O
N
�
O
0
O
N
CD
O
0
N
1�
�
O
�
O
Ny
07
O
O
°
N
�
0
0
0
0
0
0
0
0
0
o
a
a
o
0
0
0
0
0
0
r
O
o
o
o
0
0
0
�
°
°
M
0
0
0
0
0
0
0
0
0
0
moo+
i
COJ
N
�
O
M
(�O
N
N
N�S'J
�
�
f"J
af>
CO
(V
A
M
O
N
M
6)
6)
Q)
t0
N
Y'J
(D
CO
m
V
(O
O>
1�
O
O
at")
OM
O>
O
V
(D
M
V
CO
(O
O
1�
N
tl'J
M
Q)
Ln
�
N
CO
M
(O
fiT
�
(f3
�
(fT
�
N
(f!
�
�
OJ
ll"J
O
N
M
N
M
EfT
C�7
V)
M
�
�
�
�
�
�
�
�
-O
Y
c
>
�
o_
a
�
�
�
A
Y
/��
V
/��
V
aO
p`
�
y
o_
�
rn
rn
�
y
a�i
� �
L!)
a o
-O
V
s
d
rn
�
a>
m
an
.0
c
a�
C
'c
�.
v
y
a
[q
0
� '�
� O
�
to u'a
a�
`o
�
�
K
—
a
�
d
j
o
o
KS
�
�
w
�
Q
�
�
-o
�
N
N
O
O
a
�
�
C
� �
�
� �
J
�
� _�
N
O
y
y
^'
�]
U O
U O
O d
U
U U
`�
Y
y �
a
' c
N
J O
N w
��
��
�]
.�
y J
N J
E
d J
N
_N
m�
U
O
> v
�`a
[a �
> u'i
O G
�
c
C7 0
� �
N
V
N O)
� �
� >
> U
� �
�
U
(/J N
� j .C)
y �
CQ
O
y O
�� fO
y
_
` O
(O
� N
_ c
rn o
_rn o
c f°
rn o
m
d
— 2
°
°
� -
o
°
c
p -
o o
>
>
` >
>
�
(�
K cn
m �
m fO
>
� aai
> �
�° <`o
d '�u
o
h '�
??
v�j
v
�
� °'
a�i °'
�
c E
c E
t
CO >
VJ K
Z
� J
d' �
C7 ui
�
VJ
C7 °
d' �
Z
U �
N �
U �'
O
O)
M
4S
M
M
af>
M
O
V
O)
�
N
N
I�
M
M
N
M
N
�
M
Q)
�
�
a!'J
M
O
_
�
O
�
��
N
Q
f7
M
N
�
�
N
�
�
�
M
O
tl"J
N
O
�
O
y
N
�O
M
O
�-
N
�
N
O
.�
�J
V
Vu's
V
t`�')
COO
a0
N
W
aM0
r
V
�
L�
a0
oD
�
�
O)
N
N
-�
CO
Cn
�
6)
V
V
V
u')
CO
O
O
(y
O>
O>
vJ
�
af>
CO
O)
6J
`_
N
O
�
(D
V
V
_M
��
C
�
C
�
L
p
Y
y
�
t
y
Ol
N
N
L
E
o
c
li
c
�
o
c
v
tO
m
3
U
O
y
tV
-O
V
�
L
[O
N
C
�
-O
W
J
fO
�
�
t6
w
LL
c
m
m
N
a�
O
c
=
c
�
�
C
N
H
a�i
>.
C
t0
N
E
0
U
O
C
L
�
O
�
0
-O
p)
�
_�
'j
m
O
'C
O
V
Q
Y
K
I—
H
m
�
Y
t%J
�
O
�
H
Y
E
C7
�
?j
rn
c
O
c
O
O
O
O
O
_O
O
c
y
O
O
�
LO.
C
�
[O
�
N
�
i6
�
!O
�
J
!O
_O
i6
'C
_O
!U
i6
O
�
O
H
O
O
p_
Q
Q
Q
OQ
O
�
O
O
�
O
�
O
C
C
N
C
y
y
y
y
y
y
y
U-
Q
[D
H
N
f-'
A
�
N
H
N
N
�
N
,�
U
`
N
N
A
O
y
H'
f H
H
V
H
�--'
H
f-'
C
O
C
O
O
O
O
O
O
O
y
O
O
O
O
N
d
C
d
UJ
d
d
N
d
¢
O
d
d
N
�
�a
�
<a
.0
N
.�
a
�
E
C
E
'C
E
�
E
�
c
d
E
r
E
�
E
E
a°i
m
a
O
°-
a
a
a
a
�
a
a
�
m
r
w
�
a�i
O
D
`o
p
�
�
�
�
0
a>
a¢i
aai
�
d
0
D
�
�
co
<a
�a
�c
�
°
��
�c
�c
�c
0
0
oc`
�
D
0
o
�
`o
0
0`
�
o
'c
ayi
�
c
'c
�
?
�
o`
o
_
c
U
U
U
3
U
�
m
U
U
U
U
-�
U
U
o
U
U
�
0
0
0
0
0
0
0
�
U
a`�
>
N
N
N
O
N
�
�
d
N
N
N
�
m
N
o
0
0
`o
Q
Q
m
va..
�
m
m
is
o
�a
�a
�
a�
is
a�
m
T
�
�
(i1
!/�
U
U
(n
VJ
UJ
VJ
O
VJ
VJ
U
In
(n
U
N
N
N
N
N
O
�
�
O
�
V
M
N
O
O
pp
�
-o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
°o
°o
o°
N
b
'-.
v
��
0
C
��
d
i
O
C
ti
u
r
ao
ti
ti
�
� co
0
0
0
�
(`7
M
N
�
O
O
O
O O
V
N
N
N_
N_
N N
O
O
O
�
O
�
�
O
N
r_
O
O M
N
N
N
at)
H
H
O
O
O
O
O O
0 0 o a o 0 0
O
O
O
O
O
O
O
O
O
O
N
c7
O
O
V
�
�
(`7
M
1�
O)
O
fD
O
O
V
N
N
O
(D
O_
(O
O
O
O
CJ_
N
CO
N
r_
�
V
N
N
N
at)
H
H
C
—
O
O
(n
C
�
�
N
O
O
�
�
O
N
�
O
L.L
O
_
��
m
m
_
rn
d
f/J
I-
C
�
v
O
L
U
�
O
U
CO
L
� C
U
¢
d
3
O
O
°
d
O
fO
O
d
N
O fO
w
� �
C
�
_
°
U
O)
U
d 'C
�°
0
O
r
d
(J
� N
�� N
U
�
� Q
j
h
O
H °�
.O 'O
H �'
(O ¢
d LrJ
O �
VJ
d' K
�'
�
N m
O_
ap
1�
�
N
oa
�
O �
M
N
O
O O
O
O
O
O
0 0
0
0
0
a00
(�D
C07
IOCJ
CrO
N
N
O
ail
O�
N
1�
N
M
�
u0'I
�
�
�
�
rn
'�
as
co
rn
v
N
O
at)
f?
Qa
07
�
(O
�
1�
f0
Y
O
7
y
C
O
C
N
�
�
y
]+
fA
N
C
L
U
O
O
Y
U
�
�_
�
�
U
a�
tO
rn
°
m
�
0
0
m
cn
a
w
�
S
m
�
<o
x
�
F�
d Q
� �
Z _
O o
ti
M
0
e rf
d9
^�
ti
N
�o
u
v
�S
C
c
0
0
�
�
0
0
o_
N
a
N
C
C
N
N
H
H
O
O
C
C
N
d
�
�
N
[O
d
d
UJ
�
d
�
N
t0
�
N
C
C
C
C
O
o
w a�
�
�
@
m
=
U
U
�
R
io
N
0
0
o
j
0
0
°
0
0
U U
N
N
Y
U
O �
M
N
O
O O
O
O
O
O
0 0
0
0
0
0
M
0
e rf
d9
^�
ti
N
�o
u
v
�S
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING APPRENTICESHIP RE UIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code
regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000
or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area ofthe site ofthe public work for a certificate approving the contractor under the
apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or fiords in each craft or trade in which he /she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same manner as
the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to
the California Apprenticeship Council. _
Signed '!�
Micl- iae�well
Title President
Firm Powell Constructors, Inc.
Date 03/17/11
BP 13 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
NON - COLLUSION AFFIDAVIT
(Title 23 United States Code Section 1 12 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner,
directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price
of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element ofthe bid price, or ofthat of
any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further, that the
BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, bid depository, or to any member or agent
thereofto effectuate a collusive or sham bid.
Note: The above Non - collusion Affidavit is part of the Proposal. Signing this Proposal on the
signature portion thereof shall also constitute signature of this Non - collusion Affidavit. BIDDERS
are cautioned that making a false ce n may subj� the certifier to criminal prosecution.
Signed
owe
State ofCalifornia
County of San Bernardino
Subscribed and sworn to (or affirmed) before me on this 17th day of March 2011, by
Michael B. Powell ,proved to me on the basis of satisfactory evidence to be the persons) who
appeared before Lne.
'- `- SHERRI EVANS �
��//�� � 4 COMM. # 1843286 ,^
V/ • � NOTARY PUBLIC- CALIFORNIA N
- ' \w ^_5 —AN BERNARUINO COUNTY
;'� � _ ,. +7f- .+- �+re. -'e btr Cornea. ExP. APR. 70, 20t3 �
� � _. ,.
Notary Public Signature Notary Public Seal
Sherri Evans
SP ]4 of29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING "ANTI- KICKBACK" RE UIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the Copeland "Anti- Kickback" Act (18 USC 74) as supplemented in
the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or
subcontractor shall be prohibited from inducing, by any means, any person employed in the construction
or repair of public work, to give up any par mpensation to which he /she is otherwise entitled.
Signed
Michael ell
Title President
Firm Powell Constru
Date 03 / 1 7
BP 15 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
CONTRACTOR'S LICENSING STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is
true and correct.
Contractor's Name: Powell Constructors, Inc.
Business Address: 8555 Banana Avenue, Fontana, Ca 92335
Telephone: (909) 356 -8880
State Contractor's License No. and
Class:
Expiration
Date: 12 / 3 1 / 1 1
Signed: �� ���1��
�r`ic`hael B. Powell
Title: President
i • . • i
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
FEDERAL REQUIREMENTS FOR FEDERAL -AID CONSTRUCTION PROTECTS
GENERAL —Tlte wodc hersrt propped vvll be firratoad yr while a ut pat with
Federal fiords, and thi-eftxe all ofthe shffiIles Hiles and rEgtlations promulgated by
the Feda-al Go�emmart and applicable to work fnti -mced in whole or in part with
Federal finds will apply to strcl-r work. Tlie "Required Cmtraci Provisions, Ferlaal-
Aid Conshi�on Contr-aet� "Form FI -iWA 1273, aceutclu3edm this Section 14.
Whenever in said regtilred oonttacf, provi9a-ts refastees are made to "SHA
CorVracting o$ioer," "SHA reside-rt itginea-," or •�mahaizPd repcsatlalive ofthe
SHA," sudt n °faatces shall be ocnstrued h� n�i `£ngo�ea" as defu�ted in Satirn
I -1.18 oftl�eStandatd Specifications
PERFORMANCE OF PREVIOUS CONTRACT - in addition to the
provisiors in Section 1[, "Nrndiscrimu-ratiorr," and Section V[I, "Subletmtg or
Assigning the Cmtrac�" ofthe r-egrur>� mrbact provisions, the COnttaC7'Q shall
canply witittlte fdlowing -.
The BIDDER shall exeade the CERTIFICATION WITH REGARD TO
THE PERFORMANCE OF PREVIOUS CONTRACTS OR
SUBCONIRAC'1 -S Si_JBJE.CT TAD 71-{E EQUAL OPPORTUNITY
CLAUSE AND THE FILING OF REQUIRED REPORTS located in the
propos<il. No r-egrrest fa- strblettirig or assigning any portion ofthe caihact i-r
exc¢s of$10,000 will be oonside-e� tinder the povisirns ofSemat VII ofthe
n�c}ri� oorttiad provision unless strdi request is accompanied by the
CERTIFfCAT10N r-efaral m above, ex� by the prop�ecl stlxarhacxa.
NONLtOLLUSION PROVISIONS -The ptovisiats in ttris section are
applicable m all eathats except ern tracts fer Feclaal Aid Secaxlazy projee�
Title 23, Lh-ri[ed States Code, Section 112, rogrrirs as a condition pcecedirt m
approval by the Federal Highway Adrnvrisi�IIar- ofthe centred far tltis vtoric tliat
each BIDDER file a swan stati-r-rirt exect.¢ed by, or on behalfof, the person, f¢�n,
assotiavat, or aapiation to whom suds orntract is m be awarded, citifying tl,irt
such pasa-y fi-tn, associatirn, or ca'paation has not, eitlier d'veNy or in�iec9y,
i-r�ed irrN any ac�-einert, partidpa�d in any cdlusion or otherwise taker any
acUOn in reshaict offiee mrnpetiWe bidding in oa�rredion wit}t the submitted bid A
fa-rn to make the narcollusion affidavit statanait r-apwed by Section 1 12 as a
oatifidaon wider penahy of}xrjtuy rather tlti-n� as a swam statirrirt as pirnitted by
?8, USC, Sec- 1746, is included it the P�tl-
PARTICIPATION BY DLSADVANTAGED BUSINESS
ENTERPRISES IN SUBCOIYI'RACTi1VG - Part 26, Title 49, Code ofFedial
Regtrlarbu�s supplies to tltis Fedialaid project Pitn�rart sections ofsaid Code ate
inmpaated it pat or in i� errlidy within otlii- secUats oftliese special provisiorts
Sdredtde B - Infun><�on for Detantining Joirt Viritrze Eli�bility-
Atrirdtnient
Exlribft A -FRI
s� m
BP 17 of 29
(This form need not be filled in ifall joint venture firms are minority
owned.)
1. Name ofjoint ventw-e
2. Address ofjoin venture
3. Phone number ofjoint venture
4. Identify the fim�s which comprise the joint verthrre- (The DBE
partner must complete Schedule A)
a Describe the role ofthe DBE firm in this joint vitture.
b. Desa-ibe very briefly the experience and business qualifications of
each non -MBE joint venture:
5. Nature ofthe joint venture's business
6. Provide a copy ofthe joint venture agreement.
7. What is the claimed percent<�tge of DBE ownership?
8- Ownership ofjoint venture: (This need not be filled in ifdescribed
in the join[ venture agr-eemiit, provided by question (G)-
a Profit and loss sharing
b. Capital conri-ibutions,
including equipment.
c. Other applicable
owna-ship interests
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
9. Control ofand participation in this ornh -act Ida�tify byname, r�
sex, and `YuTn" theme individuals (and their titles) who are te5por>.sible
for day -today rnanaganent and policy decision making, irrdudmg,
brn nct limited tq those with prune responsibility fie:
a Financial decisions
b. Managanent decisions, such as:
1. FsUmaiomg
2. Markemmg and sales
3. Hiring and firing oflnanaa�anait
4. Purdmasurg ofmajor sterns or supplies
c. Strpavision offield operaiirns
Nde: li; afia filing this Schedule B and befu-e the axrmpleUon ofthe
joint verrtw -e's wa-k m the ca�act covered by U-ris re�nil��or>, il•ra -e is
any significant change in the information suUnitted, the joust venture
must inform the gratnee, eiUra� dirm3cTly or Uuvuglm the (rime
conhac[or ifthe joint vemtwE is a suboontntctor.
1-1 f%idcmi/
`Tlme undersigned swear that the fo,>':going st<ttanamts a,E
oon-ed armd include all materiel infannaUon necessary to idam[ify and
explain Ume terms and opa �IIion of our joint vamtw-e and Ute unaided
participation iry ardor joint vamhua- in the tmda�rldng- FuAha -, the
undasis�med covamant atmd agree to provide to grantee cun>'nt,
oanplcxe and aocr.rrate umfonnatiorm rez>ar-ding aches -rl joint ventrue
v\�aic and the anent tha>:fore and atry proposed dmange; in any of
the joint vc�rmuu�e anangenmans and to permit time audit and
exarnirmtttion of the books, records, and files of the jour vamture, by
arNmorved representatives of Use grantee or the Federal fiurding
a�>ency. Any material mis'e)aasamtatigm will be g -aumds for
tam u><-t>amg airy contrail whidm nmay be awarded and fa initiating
action under Federal or State laws concern ing false statanermts „
AtUrchmart
Ealribit A- FRZ
8 -07 -97
Name ofFirm
Name ofFinn
Sigtrahrre
Sigmarrn>r
Name
Name
Tide
Title
Stave of
Qn this day of 20 before me appeared (Warne)
to me perscerally (mown, w1ro, being duly swonm, did execute the
foregoing affidavit and did state than he or slte was properly autlmarizad by (Name of fimm)
to execute the affidavit and did so as his or-her free act and deod-
Ndary Public
Camnission c
��1
a�
State of
Cauny of
On Umis _ day of 20 lx:fore me appeared
(Name) to me persamally lamown, wlmo being swan, did execute the
fiTegoing afficL3vit and did state that he or she was prgxrly arNmorizcxf by (Name of fine)
to execrrte the affidavit and did so as his a� ha- flee act anddeed-
No�vy Public
Camunission e+q�ires
��l
BP 1 8 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
DEBARMENT AND SUSPENSION CERTIFICATION
The BIDDER under penalty of perjury, certifies that except as noted below, he /she or any person
associated therewith in the capacity ofowner, partner, director, officer, manager:
is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility
by any federal agency;
has not suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency
within past three years;
has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent
jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
Ifthere are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining
BIDDERS responsibility. For any exception noted above, indicate below to whom it applies, initialing
agency, and dates ofaction.
Note: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal Signing this Proposal on the signature portion thereof shall
also constitute signature ofthis Certification.
Michael B. Powell
Name of B[DDER Pow�l - Goi�st�c_rrca�rs , Inc _
Signature ofBIDDE �i��
Da� 03/17/11
FED.8 -22 -88
BP 19 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
NONLOBBYING
CERTIFICATION FOR FEDERAL AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best
of his or her knowledge and belief, that_
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influence or attempting to influence an officer or employee of
Congress, or an employee ofa Member of Congress in connection with the awarding of any
Federal contract, the making of any Federal grant, the making of any Federal loan, the
entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriate funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any Federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative
agreement, the undersigned shall complete and submit Standard Form -LLL, "Disclosure of
Lobbying Activities," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making or
entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to
file the required certification shall be subject to a civil penalty of not less than $10,000 and not more
than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she
shall require that the language of this certification be included in all lower tier subcontracts, which
exceed $ 100,000 and that all such sub - recipients shall certify and disclose accordingly.
BID s Signatilre Michael B. Powell, Presdient
Powell Constructors, Inc.
Firm
03/17/11
Date
Standard Form LLL may be obtained from Caltrans and FHWA offices.
BP 22 of 29
CITY OF SANTA ANA
06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
DISCLOSiJRE OF LOBBYING ACTIVITIES
- �.....� �. -�.�.� .- ucs wsumu tv J l U.J.L.. l3JL
lO. TType of Federal Action 2. Status of Federal Action 3. Report T e:
a Contract Q a Bid/ofFer /application � .initial
b. Grant b. initial award b. material change
c. Corporate Agreerrtent c, post -award
d. Ban F Material Change only:
e. Loan Guarantee Year quarter
f. Loan Insurance date of last report
4. Name and Address of Reporting Entity 5. if Reporting Entity in o. 4 is Subawardee, Enter Name and
Q Prime Address of Prime:
� Subwardee
Tier /fknou•n
Con essional District, ifknrn vrr Con Tonal District, ifknoirn
6. Federal DeparhnenVAgency: 7. Federa rogram Name/Description
CFDA Number, Ifap livable
8. Federal Action Number, ifknouvr "Award Amount, ifknrnvrx
1 O. a. Name and Address of Lobbying Entity b. Individual Performing Services (ixh,dirrg crck/rass ijdifferzrr<,/fa�rr No
C4a���1kv,�r���na0 �
,xv,r�fu sl,xn,r� n-9!)
(a ch Continuation Sheets) i ecessary)
1 1. Amount of Payment (check all that apply):
13. Type oB ayment (check all that apply)
$ 0 Actual Q Plann
�. retainer
� b�ene -time fee
12. Form of Pa merit check all that a 1
Y ( pP Y)�
Q c" cO�nmission
� a cash
� d" contingent fee
� b. in -kind; specify: nature
� e. deferred
value
� f other, s \ -ci
14. Brief Description of Services Pert ed or to be performed and Dates) of Service, including offic �"(s), employee(s), or members) contacted, for
Payment indicated in item 1 1 : \
\
(altnch Continua /ion .Sheet(s) ifnc cessai )
15. Continuation Sheets) a ached: Yes No �
]6. Lifaniatim regt�d Utisfrnnis at.rthaixdbyTitle3l USC Section
\
1352 "'Ibis disclosu-e ofl 'ig activities isatnata"ial represe�,lation offact opal
Signature_
�+d�idi reliance wasp by thetia� above whaithe haisamrn was made Lratla�d
�'�
into" Tltis disdostn�e" lured pttrstatrt toil U.S.C.1352 This infamamat will be
Print Name `\
reputed to Ure Con< sani �uinually and will be avalable fo- public insl�Ugt
\�
Anypasatwho ..' Istofiletl�et�uueddisclostreshallbest .,bjacttoaciv�lpaialtyof
Title ___
no[ Icy U�vt $1 ,000 and rid moretltan $100,000 fa- ®d� srFt failtna
Telephone No.
FedetsU U Qliy:
_Date
Authorized for Loud Reproduction
Standard Form — LLL
BP 23 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING RE UIRED FEDERAL CONTRACT PROVISIONS Form
FHWA -1273)
The undersigned, is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the required Federal Contract Provision (Form FHWA -1273) as
shown in the Appendix F ofthe special pr��ipns ofthis project.
Signed
. Powel
Title Pres
Firth Powell Constructors, Inc.
Date 03 / 1 7 / 1 1
BP 24 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION FOR FEDERAL AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or
her knowledge and belief; that:
(I) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,
to any person for influencing or attempting to influence an officer or employee of any Federal
Agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member
of Congress in connection with the awarding of any Federal contract, the making of any Federal
grant, the making of any Federal loan, the entering into of any cooperative agreement, and the
extension, continuation, renewal, amendment, or modification of an Federal contract, grant, loan,
or cooperative agreement.
(2) If any funds other Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with Federal contract, grant, loan, or cooperative agreement, the undersigned shall
complete and submit Standard Form -LLL *, "Disclosure of Lobbying Activities" in accordance
with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into this
transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification
shall be subject to a civil penalty of not less than $10,000 and not more than $]00,000 for each such failure.
The prospective participant also agrees by submitting his or her proposal that he or she shal] require that
the language of this certification be it in all lower tier subcontracts, which exceed $100,000 and that all
such sub - recipients shall ce�-tj�y� d' ose accordingly.
BIDDERS a ure Michael B. Powell, President
Powell Constructors
Firm
03/17/11
*Standard 1'omi LLL may Ue oUtained from Caltrnns or PH WA ofll ces.
BP 25 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S CERTIFICATE OF COMPLIANCE REGARDING "BUY AMERICA" RE UIREMENTS
FOR STEEL OR MANUFACTURED PRODUCTS
The undersigned, is submitting this proposal for performing by contract the work required by these bid
documents, certify to comply with the "Buy America" requirements of Section 165 of the Surface
Transportation Assistance Act of 1982 and n in the special provisions of this project.
Signed ��
. rowett
Title Presid
Firn1 Powell Constructors Inc.
Date 03/17/11
BP 26 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985, the BIDDER
hereby declares
under penalty of perjury under the laws ofthe State of California that the BIDDER has ®,has not X
been convicted
within the preceding three years of any offenses referred to in that section, including any charge of
fraud, bribery, collusion, conspiracy, or any other act in violation ofany state or Federal antitrust law in
connection with the bidding upon, award of, or performance of, any public works contract, as defined in
Public Contract Code Section 1 1 O1, with any public entity, as det7ned in Public Contract Code Section
1 100, including the Regents of the University of California or the Trustees of the California State
University. The tens "BIDDER" is understood to include any partner, member, officer, director,
responsible managing officer, or responsible managing employee thereof, as referred to in Section
10285.1.
Note: The BIDDER must place a check mark after "has" or "has not" in one of the blank spaces
provided. The above Statement is part of the Proposal. Signing this Proposal on the signature
portion thereof shall also constitute signature of this Statement. BIDDERS are cautioned that
making a false certification may sub's the certifies- to criminal prosecution.
Signed
Powell
Title President
Firm Powell Constructors Inc_
Date 03 / 1 7 / 1 1
BP 27 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10162 UESTIONAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of
perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary
interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or
completing a federal, state, or local government project because of a violation of law or a safety
regulation?
Yes No X
Ifthe answer is yes, explain the circumstances in the following space.
BP 28 of 29
CITY OF SANTA ANA
PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of
perjury, that no more than one final unappealable finding of contempt of court by a federal court has
been issued against the Contractor within the immediately preceding two year period because of the
Contractor's failure to comply with an order of a federal court which orders the Contractor to comply
with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal
on the signature portion thereof shall also constitute signature of this Statement and
Questionnaire.
BIDDERS are cautioned that making a false certification nay subject the certifier to
criminal prosecution.
Signed ��
Mic B
Title President
owed
Firin Powell Constructor
Date 03/17/11
BP 29 of 29
THE AMERICAN INSTITUTE OF ARCHITECTS
A/A Document A3 >O
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, TH� Powell Constructors. Inc.
�I3LX�59X�AXlS'% 8555 Banana Avenue Fontana Ca 92335
as Principal, hereinafter called the Principal, and Fidelity and Deposit Comoanv of Maryland
80'1 N. Brand Blvd. Penthouse Suite Glendale CA 9'1203
a corporation duly organized under the laws of the State of MD
as Surety, hereinafter called the Surety, are held and firmly bound unto City of Santa Ana; Public Works Agency
20 Civic Center Plaza; Citv Hall -Ross Annex Santa Ana CA 9270'1
as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of the Total Amount of the Bid
Dollars ($ �0% �
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Project No. 06 -1723: First Street Bridge Replacement Project;
BH LS- 5063(0891
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful pertormance of such Contract and for the prompt
payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to pertorm the Work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this 4th
day of March 20'1 �
Susan Ponsell
Fideli and Depos' Compan of Ma land
F,� �- � �- - � (su ry��
� (seem
la
AIA DOCUMENT A310 � BID BOND � AIA � FEBRUARY 1970 ED. � THE AMERIC
INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006
ACKNOWLEDGMENT
State of California
County of San Bernardino
On March 17, 2011
before me, Sherri Evans, Notary Public
(insert name and title of the officer)
personally appeared Michael B. Powell
who proved to me on the basis of satisfactory evidence to be the persons) whose names) is�re
subscribed to the within instrument and acknowledged to me that he/sMeLtJ3ey executed the same in
his /he?/tt►efr authorized capacity(�,ae), and that by his/- Frer /tk�ir signature(sj on the instrument the
person(.sj, or the entity upon behalf of which the person(ej acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal
.l SHERRI EVANS
N Coma+. # 1843286 (n
NOTARY PUBLIC -CALIFORNIA
SAN BERNARDINO COUNTY
Signature (Seal) MY Comm. Exp. APR. BO, 2013
ACKNOWLEDGMENT
State of California
County of Orange )
on March 4, 2011 before me, Susan Ponsell, Notary Public
(insert name and title of the officer
personally appeared Adriana Valenzuela
who proved to me on the basis of satisfactory evidence to be the person�s� whose named is /�
subscribed to the within instrument and acknowledged to me that�ae? "she /tbe�i executed the same in
Jh'siher /t Ir authorized capacity(ie�), and that by�ner /their signatures) on the instrument the
persor-xksr, or the entity upon behalf of which the person { -s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. SUSAN PONSELL
COMM.* 1734814 G)
� NOTARY PUBLIC - CALIFORNIA Z
_ C7 ORANGE COUNTY
My Commlaa�Dn E,4—
Me1'h 2]. 2011
Signature (Seal)
Power of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a
corporation of the State of Maryland, by THEODORE G. MARTINEZ, Vice President, and GREGORY E. MURRAY,
Assistant Secretary, in pursuance of authority granted by Article Vl, Section 2, of the By -Law �1�d Company, which are
set forth on the reverse side hereof and are hereby certified to be in full force and efF t r� � treof, does hereby
nominate, constitute and appoint Adriana VALENZUELA, of Fullerto tE t � ful agent and
Attorney -in -Fact, to make, execute, seal and deliver, for, and g�-t�� � is �eed: any and all
bonds and undertakings, and the execution of such -bozY��� �ii}i�Brti�cings � -these presents, shall be as
binding upon said Company, as fully and , ¢���terfts ands i twit e`y had been duly executed and
acknowledged by the reg�����f {- �t�e�'�"��6�v��,�t it -d ice in Baltimore, Md_, in their own proper persons.
The said Assistant, r s- herelZ rltti3�'ktib- �ttr�\'a�ct� set forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By- ski C;�i��pdCis�ii- ow in force.
IN WITNESS a said Vice - President and Assistant Secretary have hereunto subscribed their names and
affixed the Corporat eal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 6th day of August,
A.D. 2008.
ATTEST: FIDELITY AND DEPOSIT COMPANY OF MARYLAND
'r ^DEP p.!
1 �� «4 <+
S ..
^a �,
w �� ~.�
By:
Gregory E. Murray Assistant Secretary Theodore G_ Martinez
State of Maryland 1 ss:
City of Baltimore f
On this 6th day of August, A.D. 2008, before the subscriber, a Notary Public of the State of Maryland, duly
commissioned and qualified, came THEODORE G_ MARTINEZ, Vice President, and GREGORY E. MURRAY, Assistant
Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals
and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same,
and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company
aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said
Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority
and direction of the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above
written.
`r•�
'.
/' � ;'_.
�,
Constance A. Dunn Notary Public
My Commission Expires: July 14, 201 1
POA -F Ott- 4'152G
EXTRACT FROM BY -LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND
"Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice - President, or any of the Senior
Vice - Presidents or Vice - Presidents specially authorized so to do by the. Board
of Directors or by the Executive Committee,
shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident
Vice - Presidents, Assistant Vice - Presidents and Attorneys -in -Fact as the business of the Company may require, or to
authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations,
policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in
the nature of mortgages,...and to affix the seal of the Company thereto."
CERTIFICATE
I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify
that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that
the Vice - President who executed the said Power of Attorney was one of the additional Vice - Presidents specially authorized
by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the foilow-i:ig resolution of the
Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on
the 1 Oth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and fscF��nile ar mechanically
reproduced signature of any Vice - President, Secretary, or Assistant Secretary of the Company, whethe- made heretofore or
hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shad be valid and
binding upon the Company with the same force and effect as though manually affixed."
IN TESTIMONY WHEREOF,
I have hereunto subscribed my name and affixed the corporate seal of the said Company
this day of MAR 0 4 2011
Assis[ art! Secretary
A X F
.��.. D
-�� ..: CITY OF SANTA ANA
`. ;J;, �„ PUBLIC WORKS AGENCY
-,� � _ `� ', � � 20 CIVIC CENTER PLAZA (M -36)
` �. `' SANTA ANA, CA 92701
� � � � �� ��
DATE: March 3, 2011
$OBJECT: ADDENDUM NO.:
REMARKS: PAGES ATTACHED:
7
17
PROJECT
NO.: 06 -'1723
MAIL
STATION:
PLEASE FAX THIS PAGE ONLY TO:
� FAX NO.: 1714) 647- 5635 '�'
M -36
Carlos Castellanos
PHONE NO.: 1 -(714) 647 -5642
NOTE- UPON RECE /PT OF ADDENDUM, PLEASE S /GN TH/S SHEET AND Fi4X
/T BACK TO THE CRY OF SANTA ANA
ATTENT/ON: Car /os Caste / /anos FAX NO : 1 -(714) 647 -5635
1 HEREBY ACKNOWLEDGE RECEIPT OF ADDENDUM NUMBER: 1
NO: 06 -1723
COMPANY: Powell Constructors, Inc. SIGNATURE: c 1/�a -c.-«^ T�i�t -
PRINT NAME: Sherri Evans
DATE: 03/04/11 TITLE: Administrative Assistant
�- CITY OF SANTA ANA
�" ,��� , , ,� � �� PUBLIC WORKS AGENCY
_ ; ' 20 CIVIC CENTER PLAZA (M -36)
!!� SANTA ANA, CA 92701
DATE: March 8, 20'17
SUBJECT: ADDENDUM NO.:
REMARKS: PAGES ATTACHED:
2
18
PROJECT
NO : 06 -1723
MAIL
STATION:
M -36
PLEASE FAX THIS PAGE ONLY TO: Carlos Castellanos
� FAX NO.: 1{714) 647- 5635 �
PHONE NO.: 1 -(714) 647 -5642
NOTE: UPON RECE /PT OF ADDENDUM, PLEASE S /GN TH/S SHEET AND FAX
/T BACK TO THE C /TY OF SANTA ANA
ATTENTION: Carlos Casteuanos FAX NO : 1 -(7Y4) 64 7 -5635
1 HEREBY ACKNOWLEDGE RECEIPT OF ADDENDUM NUMBER: 2
PROJECT NO.: 06 -1723
COMPANY: Powell Constructors, =nc. SIGNATURE: � ��ift�� -�� Yom,. -
PRINT NAME: Sherri Evans
DATE: 03/08/11 TITLE: Administrative Assistant
� -� x � -- �
Q
���� C1TY OF SANTA ANA
,�. .
ry��., „�' ., � PUBLIC WORKS AGENCY
&� _ , ” 20 CIVIC CENTER PLAZA (M -361
`� SANTA ANA, CA 92701
DATE: March 14. 2011
PROJECT
SUBJECT: ADDENDUM NO.: 3 NO.: os -� 723
MAIL
REMARKS: PAGES ATTACHED: 4 STATION: M -3s
PLEASE FAX THIS PAGE ONLY TO: Carlos Castellanos
� FAX NO.: 1{714) 647- 5635 �
PHONE NO.: 1 {714) 647 -5642
NOTE- UPON RECE /PT OF ADDENDUM, PLEASE S /GN TH /S SHEET AND FAX
' /T BACK TO THE C /TY OF SANTA ANA
ATTENTION: Carlos Castellanos FAX NO.: 1 -(714) 647 -5635
1 HEREBY ACKNOWLEDGE RECEIPT OF ADDENDUM NUMBER: 3
PJO.: 06 -1723
COMPANY: Powell Constructors, Inc. SIGNATURE- i� C�iU -tom �l
PRINT NAME: Sherri Evans
DATE: 03/15/11 TITLE: Administrative Assist n
TOc (� Office of PiannalG and FieSF:arOh FfJC7tv1: tarty c5f Santa Ana
1404 Tenth Street. Room 121 20 Ci-c Center Ylazra
Sacramento, CA 95814 Saalta Ana CA 927(,]2
Orange County Clerk Recorder
P O. Box 238
Santa Ana CA 92702 -0
2313
Subject: Filing of Notice of Determination in compliance with Section 21108 or 21152 or the Public
Resources Code
Project Title; First Street Bridge Replacement Project
State Clearinghouse Number N/A ER Number. 2010 -1013
Lead Agency Contact Person: Jason Gabriel Telephone Number: {714} 647 -5664
Applicant (Name and Address) City of Santa Ana Public Works Department
20 Clvic C;e rater Plaza (M36)
Santa .Ana CA 92701
Project Location: First Street Bridge over The Santa Ana River, between Harbor Blvd_ and Fairview St.
C:ity.. Santa Ana G!rtn Hy, C"a"ge
Project Description: The proposed project consists of the replacement of the existing bridge at First Street
over the Santa Ana River and widening of First Street from 4 lanes to 6 lanes.
This is to advise that the City of Santa Ana (Lead Agency) has approved the above described project on and
has made the following determination regarding the above described project:
� She Frojc -ct will nv7 have a siynificarlt eftect on the environment.
An Environmantal Impact Fleport was prepared for 1h;5 proles( pur5 uant to tt provisions of CE_.OA
A Negative Declaration was prepared for this project pursuant to the provision.- of GE(-JA.
4 NlititlaiiGl rl measures were made a ccndrhon of isle approval for this prajc +rt_
A Statc,:mcn[ of Overriding fcnsrderahons was adopfed for Phis prb)eCP.
ins.rn9=, uvr�ra made ilu rsaant to the pro4isions of CEOA
Phic is C� certify thaC iirr- final FIR wlth C:Urnrncnts ""Cl rrashora— rind icrcord �i p,<71ert approval
7f: pram ;l p,srbin ;� (arty of Slnia A—, PlnnrRlrng [iiVit re.rr 20 C fviC S er'dR Ana i:.;A
<18' 1 i Sc nwr C.:rvd
tiigna e D.tr: 3rcic
Gouniy Clerk: Please post iC)r 5tj days in accords race: wiCh Ser_LOn 21 „?lc) of the GaliTexnra £_nvironrnr -_ntal . }utxfit✓ Aia
A i'uL;7o r
rf1 lRa niAt !-F -:
.�u�. A
� •
�^ � Ui1 ''s {t�F f F e*R "
"�' �
� •. � y A C i C14't 3 t'{
iau�5li AR�xr >T �
� �
CITY OF SANTA ANA
FIE ANNING & BUILDING AGENCY
e dC�Y 3E +c3 .� ;nlA .9rt 1 C:, =rl�ty nAr z 9 - 7. ._
7 .' "X3 1 1t;}
aJiN -« snnt,r Ete 49 c,ryt
NOTICE OF DETERMINATION
2313
Subject: Filing of Notice of Determination in compliance with Section 21108 or 21152 or the Public
Resources Code
Project Title; First Street Bridge Replacement Project
State Clearinghouse Number N/A ER Number. 2010 -1013
Lead Agency Contact Person: Jason Gabriel Telephone Number: {714} 647 -5664
Applicant (Name and Address) City of Santa Ana Public Works Department
20 Clvic C;e rater Plaza (M36)
Santa .Ana CA 92701
Project Location: First Street Bridge over The Santa Ana River, between Harbor Blvd_ and Fairview St.
C:ity.. Santa Ana G!rtn Hy, C"a"ge
Project Description: The proposed project consists of the replacement of the existing bridge at First Street
over the Santa Ana River and widening of First Street from 4 lanes to 6 lanes.
This is to advise that the City of Santa Ana (Lead Agency) has approved the above described project on and
has made the following determination regarding the above described project:
� She Frojc -ct will nv7 have a siynificarlt eftect on the environment.
An Environmantal Impact Fleport was prepared for 1h;5 proles( pur5 uant to tt provisions of CE_.OA
A Negative Declaration was prepared for this project pursuant to the provision.- of GE(-JA.
4 NlititlaiiGl rl measures were made a ccndrhon of isle approval for this prajc +rt_
A Statc,:mcn[ of Overriding fcnsrderahons was adopfed for Phis prb)eCP.
ins.rn9=, uvr�ra made ilu rsaant to the pro4isions of CEOA
Phic is C� certify thaC iirr- final FIR wlth C:Urnrncnts ""Cl rrashora— rind icrcord �i p,<71ert approval
7f: pram ;l p,srbin ;� (arty of Slnia A—, PlnnrRlrng [iiVit re.rr 20 C fviC S er'dR Ana i:.;A
<18' 1 i Sc nwr C.:rvd
tiigna e D.tr: 3rcic
Gouniy Clerk: Please post iC)r 5tj days in accords race: wiCh Ser_LOn 21 „?lc) of the GaliTexnra £_nvironrnr -_ntal . }utxfit✓ Aia
MEMORANDUM .,
Paul Walters
To: Interim City Manage '/ Date: August 1, 2911
Raul Godinez II, Executive Director
b'rom; Public Works Agency
REQUEST FOR APPROVAL OF CHANGE ORDER N0.1;
Subject: PROJECT N0.06.1723' FEDERAL PROJECT 68RL5•5063 (989)
Contractor: Powell Conshucfors
8555BarlanaAvenue
Fontana, CA 92335
Project Description: First Street Bridge Replacement over the Santa Ana River
Change Order Number: 1 Amount: $468,882
Account Unit 03217660 Ar�ount 66220 AdMty: 06172302028
Original Confrad Cost. $6,010,329
Wo of Original
Amcunt of The
ChangeOrtler $4fi8,882 1.6%
Previously Approved •D• .a
Change Orders:
TofalChangeOrdem: $468,882 7.8%
REASON FOR CHANGE
A. high voltage power line, about 60 feet above the riverbed along the nodh side of the
bridge, would have been interfered with the foundation pile driving opera8ons which need a
safety clearance of a least 90 feet for the driving machine to drive the 70 feet long
reinforced concrete piles To take advantage of the dry season and not to delay the project
Wnile waiting for the Edison Company to relocate the power line, the design engineer has
revised the plan to change the concrete piles to steel I•beam piles that were driven In
shorfersedions and then ezlended bywelding.
This change order providea for deleting bid hems for fumiahing reinforced rAnaete piles,
providing and weld'mg steel piles and compensation to the coacrele pile subcontractor to
demolish and dispose 20 concete piles that have been fabdration already.
MI -1(40
RFAChange Order No, 1
August 1, 2011
Paget
In order to operate the driving machine adjacent to the high voltage power line, the line has
been tle•energaetl during working hours every day by Edison. To expedite payment fo
Etlison for tle-energizing the line, the contractor was requested to make payment to Etlison
on behalf of the City. Therefore, this change order also provides compensation to the
contractor for payment made to Edison Prior approval for this change order was granted
on May 11 W4
TOTALCOST = MIN 1
B. The contractor installed traffic sUiping, signs and barricades according to the conUact
documents. Staff had monitored the traffic bow in the project vicinity and found that Uaifc
contol setup needed to be revised to prouftle safer mouements for the motorist through the
construction zone. This change order provides for the changes according to the revised
Uaifc control plans. Prior approval for this change order was granted on May 24, 2011.
AGREED PRICE =$1,669
C, Field condifion reveals that an e>9sting irrigaton controller cabinet that controls the
irrigation line abng the west embankment of the river was in conflict with abuMenf number
one of the new bridge. This change order provides for relocation of the controler and
cabinet including new footing and insfallaflon of conduits and wiring. Prior approval for Phis
change order was granted on July 13, 2011.
AGREED PRICE _ $10,232
Ua
Raul Godi ez, II
Ezecupve Director
Pu611cWorksAgency
cor
APPROVED AS TO FUNDS AND ACCOUNTS:
FranpscoGudenez F
Ezecutive Director
Finance and Management SeNices Agency
m CITY OF SANTA ANA
PUBLIC WORKS AGENCY
,I CONTPACTCHANGEORDER
PmKINAF PROJECT NO. 06-1723; FIRST STREET BRIDGE Chaop8O*Numher 1
REPACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS•5063 (089)
to Powell Constructors Com�allo�
DELETE THE FOLLOWING CONTRACT BID ITEMS AS FOLLOWS:
Item Bid Unit
No. Item Unit Quantity Price
44 Furnish piling (class 90) lF 868 $25
46 Furnish pg (class 140) LF 8,168 $25
EXTRAWORKATAGREED PRICE
A. Furnish and dove 10,235 linear feel of steel I • beams to constmct 136 foundation piles per
PCO #1. The agreed price includes;
➢ Full compensation for procurement, (rucking and delivery.
➢ Fullcompensationforcuffing, splicingandweldingshorlersectionsasneeded.
➢ Full compensation (or cutoff and disposal of all piling sections, inslallaticn of pile anchor
hors and submission of WQCP.
➢ Full compensation to drive all piles necessary to meet design demands as indicated on the
drawings and install each pile to avoid the Edison Company's overhead power lines.
➢ Compensation of $13,390 to demolish and dispose of twenty (20) conaete piles already
fabocaGon.
➢ Compensation of $82,500 paid by the contractor to Edison Company to de•energite
overhead lines during piles driving, as needed.
B. Revise traffic control setup per PCO #2.
AGREED PRICE =$676,881
AGREED PRICE =$1,669
C. RelocateimigalioncontrollercahinetperPCO #6.
AGREED PRICE = $10,232
Page 1 of 2
. M 0 CQr OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 1
REPACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063
To Powell Constructors
Contractor
The compensation both time and cost set forth in this final change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged work. By signing this final change order, the
Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers,
that the stipulated compensation includes payment for all work contained in this final change order,
plus all payment for interruption of schedules, extended field overhead, home office overhead,
profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract.
The signing of this final change order constitutes full mutual accord and satisfaction for all changes
and work performed on this project, and that the time and cost paid per this final change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all
Suppliers for all work performed on this project. The Contractor on behalf of himself, all
Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ INCREASE $ 468,882
By reason of this order the contract time completion will be adjusted as follows: None.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above.
Accepted, Date l 12 $ it! Contractor Powell Constructors
Title
AIproval recommended by �
// PUBLI
Approved by
Page 2 of 2
v Date y — /— &
Date S 1
Paul Walters
fo: IntedmCityManager Dale; September 13, 2011
Raul Gotlinez II, Ezecudve Director
Rrom:
WayxsAgency
REQUEST FOR APPROVAL OF CHANGE ORDER N0.2;
Subject: PROJECT N0.08.1723; FEDERAL PROJECTgBRIS•5083 (099)
Cantracton ParrellConstmctors
65558ananaAvullue
Fontana, CA 92335
Project Description: First Sheet Bdtlge Replacement over the Sant Ana River
Change Order Number 2 Amount, $151,666
Public
Aaaunt Unit 03217880 AccamC 66220 Actvlty; 08172302028
OdginelContractCosC $6,010,329
%of Odginal
Amount of The
Change0rder: $157,866 2.890
PrevioustyApprovad 488,882 7,8
Change Orders,
TotalChaoge0�ere: $826,588 104�
REASON FOR CHANGE
A. When ddving steel piles at abuhnent no. one on the west side of �e bddge, if was
discovered that the remaining footing of the pier at south side of the old bddge was
interfered vaiU the new piles. The tlesipn engineer has revised the plan by adding hvo
more piles and extending the pile cap to cover them. This change order provides for
extending the pile cap, adtli9onal excavafron, fo�minp, rebers and steel piles. It also
includes compensation to the contractor for downtime of the pile driving machine during
d�a re•design, Pdor approval for this change oNer was grenfed on Ruguat 22, 2011.
TOTAL COST =$88,693
B, Before erecting the girders far the new bddge, tr�ree overhead communication lines were
found to be in con6id with canes used to lift and set fire girders. The antrectar hired a
subcontractor wh�h is approved by the communication campaDies to temporary remove
qte Imes daily tludng selling the girders. This change order pmvides for temporary
removing end placirM back the lines daily and markup to the pdme contractor.
RGREED PRICE= $66,993
Projed061723
RFAChangeOrderNa.2
September 13, 2011
Page 2
Rau inet, II
Executive erector
PublicWaksAgency
APPROVEDASTO FUNDSANDACCOUNrfS:
FrdndscoGutiertea
Executive Director ��
Finance and Maoagemeot Services Agency
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
�
CONTRACT CHANGE ORDER
P�ojecfNumnm PROJECTNO .O6- 1723;FRSTSTREETBRIDGE CharlgeGde�Num6e� 2
REPACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS - 5063100
io Powell Coostmdors coatrauo�
EXTRAWORKATAGREED PRICE
A. Ezteodirtg pile cap of abutment No. one on tlae west side of the bridge per PCO #10.
AGREED PRICE _ $88,693
B. Temporary rebate commuoicafioo lines for Ne><i G, XO and Time Wamer Calve to aaommodate
cranes deeded for setlirlg new bridge's PCO #11.
AGREED PRICE _ $66,993
Page 1 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE CflDEfl
PtojedNumher PROJECT NO. O6- 1123, FIRST STREET BRIDGE ChangeQdatNumber 2
REPACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS - 5063(089)
To Powell Constructors GonhaNet
The compensation both Time and cost set forth in this foal change order comprises the total
compensation due the Congactor, all Subconlrailors, and all Suppliers for all wotic performed per
this change order, including impact on unchanged work. By signing this final change order, the
Coabactor acknowledges and agrees on beharf of himself, all Subcongailors, and all Suppliers,
that the sfipulafed compensation includes payment for all work contained in this foal change order,
plus all payment for interruption of schedules, extended Feld overhead, home office overhead,
pmfl, delay, and all impact, fipple effect or cumulative impact on all other work under this Contrail.
The signing of this goal change order consgtules full mutual accord and satisfaction for all changes
and work performed on this project, and that the time and cost paid per this final change order
consfitules the total equitable adjustments owed the Contractor, all Subcorrtrailors, and all
Suppliers for all work performed on this project The Contractor on behalf of himself, all
Subcontrailors, and all Suppliers agrees to waive all rights, vnthout exception or reservation of any
whalsoeuer to gle any further claim related to this project,
TOTALCOSTiNfSCHPNGEOMEn: CECFFASE $ INCflFASE $ 161,686
Byre asmofNlsa�da �Ne mmredfmaoomplalloowillG ¢adjusl¢Gasfdlmrs. None.
Wa Ihewdelslgn¢d o>ntrador have gNm ea�elul o>11sNeradoo to @e ahao�pe9os� and hemby ag��, h Nis propaatla appmu�, Nat we will provide NI
equipneltl,fumiah NI mNa�ls,eacepf � may oNamisa b¢oot¢d afire, aod palam alt aeNiceo la Iha u�k �OVes�d�d, �dwdl acceplas fNl
Ao�pl�,oale /o / % /// �i1iau °` PoweConstmilors
ilda ��En/r
Appmed by
Page 2 of 2
Paul Wakere
To: Interim City Manager Die; Nouember30,2011
Raul Godine:ll, EzeaNve Director
From; Public Works Agency
REQUEST FOR APPROVAL OF CHANGE ORDER NO, 3;
Subjau PROJECT N0.081723; FEDERAL PROJECT #BRbS•6063 (089)
Cordractor. PowellConsfmctors
8555 BananaAvanue
Fontana, CA 92335
Project Oescnption: First Sheet Bridge Replacement over the Santa Ana River
Change Oder Number: 3 Amount: $120,165
Aaaml Una 03217880 Aorount: 88220 A�urfy 08172302026
OriginalCanUactCost: $8,010,329
%of Original
Amount of The
Chanpe0rder: $120,185 2.0°k
PrevicuslyApprovad 628,568 10.4
Change Orders,
ToWChange0rders: $746,153 12.4%
REASON FOR CHANGE
A. The conhactor is required to deaign and build a Mechanically Stabilized Embankment
jMSE) wall on the noMaast quadrant of tha bridge by d�oosing one type of wall from a Ilst
of wall systems shown 'm the conhacl documents. While designing fhe wall, k became
apparent tha(the loads from two Edison Company's poles panehagng the wall footing
were not considered In fhe original deaign specified in fhe conhacl documents. In addition,
the Edison Company was required to relocate dreir power pales and overhead line on the
nodh side of tl�e bridge to dear the new bridge. This change order provides [or reinforang
tl�e wall by installing steel angles and eddi8oral chap to accommodate tl�e addlfional
loads from Edison's poles and compensation to die conhador far working on a weekend
to grade the areas of new pale IoceGons before die Edisoha poles could be relocated.
Priarapproval Mrlhis change orderwas granted on Sepfember29, 2011.
AGREED PRICE =$23,800
ProjedO &1723
RFAChange Oder No. 3
Novembar30, 2011
Paget
To aaommoda(e Level 3 Communicetlon Compan}�s conduits that will be hung from the
bridge deck, two utility openings were created of each end of the bridge structure to allow
the conduits to go through the bridge. This change order provides compensation to the
conUactorforadtlitional fortningand rehar
RGREED PRICE =$7,952
C. While demolishing the north side of the badge, two enclosed spaces vnih doors were
found behind stem walls above the east and wed abutments After removing the stem
walls, field condition revealed that piles of hash were found. This change order provides
for handling and disposing the trash. Pea approval for This change order was granted on
June 15, 2011.
TOTALCOST =$8,705
D. The contractor installed traffic sUiping,
documents. Staff had monitored
signs and barricades according to the conhact
the traffic flaw in the project vidnity and atldNanal
delineators and crash cushions ware placed for the mofoad safety and add�onal
directional signs were installed on the bike trail far the cyclists' safely. This change order
provides for placing addNanal delineators, crash cushions and directional signs.
TOTALCOST =$10,847
E. Field condition reveals that an epsfmg &inch redaim¢d inigaflon line on the west
embankment of tl�e aver eras in conflict with abutment number one of the new badge and
an imgation conduit would be damaged duang the demolition of the badge. This change
order provides for relocation of hre imgatian line and protection for the condutl by
temporary plating a wrood enclosure around d,
TOTAL COST =$13,282
E>asting Edison Companys high vdtage and disfa6ution power lines and communication
lines along the nodh side of the bridge have slaved down the pile driving opereflon. In
addlflon, the duragon of dewateang of ground wafer for the opereflon was estendetl. This
change order provides compensation to the contractor far additional labor and equipment
during piles driving operation and dewateang.
TOTALCOST =$55,599
r
Raul Godir�z II '
Ex¢cutive Direcdar
PuNicWo�SAgertiy
APPROVED AS TO FUNDS AND ACCOUNTS:
FranclscoGudemez ��
Executive Director
Finance and Management SerNces Rgency
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Pm(sr(Numbsr PROJECT W. DB•1723; FIRST STREET BRIDGE ChargaOrdeNur* 3
REPACEMENT OVERTHE SANTAANA RIVER;
FEDERAL PROJECT #BRLS•5083(089)
To PowellConshuLfors DooVar(a
EXTRA WORKAT AGREED PRICE
A. ReAesign and revise MSE wall #2 to acoommodate load from Edison Compan�s poles per
PCOs #12 & 15.
AGREED PRICE =$23,800
B. Provide opening in the bridge to accommodate conduits; from Level 3 Communication Company
per PCO #9.
AGREED PRICE =$7,952
EXTRA WORKAT TIME AND MATERIALS
C. Remove, handle and dispose trash found behind stem walls above the east and west e»sting abutments
per PCO #4.
TOTAL COST = $8,705
D. Install additional delineators on hie xrest aide of the bodge, replace aesh wshions on tl�e east aide of
the bridge and install addNional kmporary dgns on Ne bike hails. In addNan, install temporsry power
pole for cammunkat'an overhead Imes per PCO #4A.
TOTAL COST = $10,841
E. Relocate existing 5 redaimed imgation line on the west side of the bridge and prded existing
irrigation conduitfor conshuction phases 1 and 2 per PCO #7.
TOTAL COST = $13,282
F. Compensation for eddtiional labor and equipment far piles driving operation and dewatedng
required while vrorking around �e Edison Company's overhead lines per PCO #8.
TOTAL COST = $55,599
Page 1 of 2
CITY OF SANTA ANA
PUBLICWGRKS AP:
NCY
CONTRACT CHANGE ORDER
PqaaNumbe� PROJECT NO. O6.1723; FIRST STREET BRIDGE chwgaorda�Num6er
REPACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT gBRLS -6063 (089)
To Powell Constructors caaUadot
The compensation both time and cost set fodh in this final change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged woric. By signing this final change order, the
Contractor acknowledges and agrees on behalf o( BIM
seM, all Subcontractors, and all Suppliers,
that the stipulated compensatom inctudes payment for all work centained in this final change order,
Flus all payment for interuption of schedules, extended field overhead, home office overiieatl,
profd, delay, and all impact, ripple effect or cumulative impact on all other work under this Compact.
The signing of Phis foal change order consttlufes full mutual accord and satisfaction for all changes
and work performed on Phis project, and Thai the Time and cost paid per Phis foal change order
comsiitutes the total equitable adjusimenls owed the Contractor, all Subcontractors, and all
Suppliers for all work performed on this project. The Contractor on behalf of himsefi, all
Subcontactors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsceverlofile amy furfherclaim related to this project,
ictarcasrrHisoHANSEOanEn. oE�iasE $ iNCnEASE $ 120,185
Byieas000( misad¢ rtl�anlradllma mm� afioowillDea�jusl¢Sasfdlowrs. NOne.
We Na Mdarsgoei r�oVadar hatre glum �raNl �ma�amlloo to Iha �ar�a proposal and �V' ai�¢a, II N� proposal � appouad, malwa will p� all
¢gNpmam,Nmishallm�¢ des, ax�plasmayolhareise6¢ oot�da�ua, andpn( amall�vicerwcess�yfamawoMabouespec� ¢d,ardwilla�pf�Wf
p�ym�fiharefomNapticesphor�pahoua,
amap�,oeia / / /� /// Ca�fmdor PowellComsfmctors
� r
Aproual��mmardad6y _ Daf¢ ��� �� �jj
Fppourd by
Page 2 of 2
mafa 2,�'L
I..fr
MEMORANDUM
Paul Walters
'ro: Interim City Manager Date:
January 23, 2012
Raul Godinez II, Executive rDir cto
From: Public Works Agency I ;
REQUEST FOR APPROVAL OF CHA E ORDER NO. 4;
Subject: PROJECT NO. 06 -1723; FEDERAL PROJECT #BRLS -5063 (089)
Contractor: Powell Constructors
8555 Banana Avenue
Fontana, CA 92335
Project Description: First Street Bridge Replacement over the Santa Ana River
Change Order Number: 4 Amount: $138,774
Account Unit: 03217660 Account: 66220 Activity: 06172302028
Original Contract Cost: $6,010,329
% of Original
Amount of The
Change Order: $138,774 2.31%
Previously Approved $746,753 12.42%
Change Orders:
Total Change Orders: $885,527 14.73%
REASON FOR CHANGE
A. In order to accommodate the project schedule, Southern California Edison (SCE)
requested the contractor to install inserts attached to the deck in order to support the new
conduits underneath the bridge deck. To expedite payment to contractor for installing
these inserts, the city will make payment to the contractor as a change order and SCE will
reimburse the City for the cost. Prior approval for this change order was granted on
October 31, 2011.
AGREED PRICE = $24,858
B. To improve the esthetics of the bridge, the barrier rails were re- designed to include arches,
reveals and pilaster instead of the plain panels. The new design requires the use of
special forms and additional reinforcement, which require substantially more time for the
installation. This change order provides for the bridge barrier rails re- design. Prior approval
for this change order was granted on November 15, 2011.
AGREED PRICE = $82,263
Project 06 -1723
RFA Change Order No. 1
January 23, 2012
Page 2
C. To construct the bridge deck, forms are placed adjacent to the girders; girder elevations
need to be uniform. After the girders were post- tensioned, each girder's curvature was
different. Therefore, it was recommended to weld two steel angle iron on top of the
girders, to adjust for the elevation difference. The situation is expected to be the same for
the next half of the bride and the cost of this order includes that future work. Prior
approval for this change order was granted on October 24, 2011.
TOTAL COST = $21,664
D. A girder for the bridge deck is a continuous structural element, it was pre- fabricated into
three segments with the connection at the top of the piers. The connection was made by
overlapping the rebars at each pier. The contract piers are not wide enough to allow for
sufficient overlapping of the rebar. As a result, the structural engineer recommended
joining the rebars by slide -in couplings. This change order provides for cutting the rebars
to fit the space and install slide -in. Prior approval for this change order was granted on
November 15, 2011.
TOTAL COST = $4,595
E. Field condition reveals that area between the new retaining wall at the easterly
embankment and the adjacent property would need to be graded to allow the property
owner to use this area. However, the grading in this area was not included in the contract.
This change order provides additional grading, landscaping and modifications of the
irrigation system. Prior approval for this change order was granted on November 15,
2011.
TOTAL COST = $5,394
APPROVED AS TO FUNDS AND ACCOUNTS:
�' c�tycc�r aZ!Isc A
Raul Godinez, II U Francisco Gutierrez �Q
Executive Director Executive Director
Public Works Agency Finance and Management Services Agency
PROJECTS /06- 1723/CO/06 -1723 RFA CO 4
Inc"'
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 4
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063 (089)
To Powell
EXTRA WORK AT AGREED PRICE
A. Install inserts in bridge deck to hang Edison Company's conduits per PCO #17.
AGREED PRICE = $24,858
B. Construct barrier rails for construction phases 1 & 2, as modified per PCO #21.
AGREED PRICE = $ 82,263
EXTRA WORK AT TIME AND MATERIALS
Contractor
C. Install iron angles on girders and concrete for construction phases 1 & 2 to correct negative 1%
camber per PCOs #16 and 22.
D. Install Mechanical couplers for girders per PCO #18.
TOTAL COST = $21,664
TOTAL COST = $4,595
E. Grade the area between the new retaining wall at easterly embankment and the adjacent
property per PCO #19.
Page 1 of 2
TOTAL COST = $5,394
rte',
CITY OF SANTA ANA
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063
To Powell Constructors
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Change Order Number 4
Contractor
The compensation for both time and cost set forth in this final change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged work. By signing this final change order, the
Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers,
that the stipulated compensation includes payment for all work contained in this final change order,
plus all payment for interruption of schedules, extended field overhead, home office overhead,
profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract.
The signing of this final change order constitutes full mutual accord and satisfaction for all changes
and work performed on this project, and that the time and cost paid per this final change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all
Suppliers for all work performed on this project. The Contractor on behalf of himself, all
Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ INCREASE $ 138,774
By reason of this order the contract time completion will be adjusted as follows: None.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above,
Accepted, Date 07 e- Contractor Powell Constructors
Approval recommended by
Approved by
Title E�LOE�l�
FQ
Page 2 of 2
Date I �115' 4 12
Date Z L
MEMORANDUM
Paul Walters
To: Interim City Manager
From:
Subject:
Raul Godinez II, Executive Director
Public Works Agency
-_�_
Date: March 26, 2012
REQUEST FOR APPROVAL OF CHANGE ORDER NO. 5;
PROJECT NO. 06 -1723; FIRST STREET BRIDGE REPLACEMENT OVER THE SANTA ANA
RIVER; FEDERAL PROJECT #BRCS -5063 (089)
Contractor:
Project Description:
Account Unit: 03217660
Original Contract Cost:
Amount of The
Change Order:
Previously Approved
Change Orders:
Total Change Orders:
REASON FOR CHANGE
Powell Constructors
8555 Banana Avenue
Fontana, CA 92335
First Street Bridge Replacement over the Santa Ana River
Account: 66220 Activity: 06172302028
$6,010,329
of Original
$175,000 2.91
$885,527 14.73%
$1 ,060,527 17.64%
The coordination effort between the City and Southern California Edison's (SCE) to de- energize
nigh voltage transmission and distribution lines above the north side of the bridge was critical for
the contractor to install the new concrete girders. Due to the size of the cranes and the location of
the lines it was not possible to install the fifteen girders, for the north half of the bridge, without de-
energizing SCE's lines.
Following several coordination meetings with SCE, they agreed to a three -day window from Sam to
3pm to de- energize the lines contingent on the energy demand on the grid. The transmission lines
over the bridge are a critical component to the southwest grid. Consequently, when the energy
demand is high it is not possible for SCE to de- energize these lines without interrupting service on
the grid. Therefore, SCE advised that the de- energizing window may fluctuate with the energy
demand on the grid.
The first day, due to weather forecast, SCE was not able to de- energize the lines until lam, which
caused a two hour delay to the contractor. The second day went well and SCE was able to de-
energize the lines as planned. However, the third was eventually cancelled due to the extreme hot
weather. The contractor was on standby for approximately four hours before it was confirmed that
SCE was not able to de- energize the lines; which caused the rescheduling of the work.
Project 06 -1723
RFA Change Order No. 5
March 26, 2012
Page 2
Coordinating the rescheduling with SCE and the contractor proved difficult due to the weather
forecast and the availability of the special transport trucks for the remaining girders.
Due to the size and weight of the girders leaving them on site was not a viable option. After
weighing the options and reviewing the weather forecast it was decided to demobilize the cranes
and return the girders to the manufacturer since it looked like it would be at least a week before the
work could be rescheduled.
This change order is to compensate the contractor for all labor and equipment standby time; two
hours on September 6, 2011 and four hours on September 8, 2011 and the demobilizing and
remobilizing of all labor, equipment, and material, which included a 500 and a 250 ton cranes and
transport
ing the five girders to and from the manufacturer's yard.
TOTAL COST = $175,000
APPROVED AS TO FUNDS AND ACCOUNTS:
Raul Godinez, II Francisco Gutierrez
Executive Director Executive Director
Public Works Agency Finance and Management Services Agency
PROJECTS /06 -� 723/CO/06 -'1723 RFA CO 5
`\ , � /
�.._�;_
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 5
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS -5063 (089)
To Powell Constructors
EXTRA WORK AT AGREED PRICE
Contractor
Compensation for all labor and equipment standby time; two hours on September 6, 2011 and four
hours on September 8, 2011 and demobilizing and remobilizing of all labor, equipment, and
material, which includes a 500 and a 250 ton cranes and transporting the five girders to and from
the manufacture's yard per PCO #13.
Page 1 of 2
AGREED PRICE _ $175,000
CITY OF SANTA ANA
- -� °•-� `- PUBLIC WORKS AGENCY
— CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -� 723; FIRST STREET BRIDGE Change Order Number 5
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS -5063 (089)
To Powell COnStrUCtOfS Contractor
The compensation both time and cost set forth in this final change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged work. By signing this final change order, the
Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers,
that the stipulated compensation includes payment for all work contained in this final change order,
plus all payment for interruption of schedules, extended field overhead, home office overhead,
profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract_
The signing of this final change order constitutes full mutual accord and satisfaction for all changes
and work performed on this project, and that the time and cost paid per this final change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all
Suppliers for all work performed on this project_ The Contractor on behalf of himself, all
Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE � INCREASE $ � 75,000
By reason of this order the contract time completion will be adjusted as follows: None.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above.
Accepted, Date
By
Approval recommend y
Approved by
Contractor Powell Constructors
Title
��
Page 2 of 2
Date � � v � �/�
Date �l '-
MEMORANDUM
Paul Walters
To: City Manager
Raul Godinez II
From: Executive Director Public Works A ency
�C
r �' !'SiH
�Il �.Y:.:�. _.._
Date: June 22, 2012
Subject: PROJECT NO. 06 -1723; FIRST STREET BRIDGE REPLACEMENT OVER THE SANTA ANA
RIVER; FEDERAL PROJECT #BRCS -5063 (089)
REQUEST FOR APPROVAL OF CHANGE ORDER 6
Contractor:
Powell Constructors
8555 Banana Avenue
Fontana, CA 92335
Project Description:
First Street Bridge Replacement over the Santa Ana River
Account Unit: 05917760
Account: 66220
Activity: 06172302028
Original Contract Cost:
$6,010,329
of Original
Amount of The
Change Order:
$190,682
3.2%
Previously Approved
$1,060,527
17.6%
Change Orders:
Total Change Orders: $1 ,251 ,209 20.8 %"`
Contingency was increased to 30% by RFCA dated January 17, 2012.
REASON FOR CHANGE
While constructing the northern half of the bridge, the coordination to relocate and work
around the overhead utilities between SCE, the communication companies and the
contractor caused the contractor to work in the Santa Ana River after September 30,
2011. The costs are to compensate the contractor for removing his equipment daily
from the river bed, as required by the County. (PCO 14).
AGREED COST = $2,158
2. While installing the northern half of the bridge deck reinforcement, it was determined
that the required lap length could not be installed as designed for the closure pour. The
existing southern half of the bridge was in the way, so the deck steel was cut short and
prepped to receive couplers when the southern half of the bridge is built. The costs are
to compensate the contractor to install 1000 couplers to extend the reinforcement for
the closure pour's required lap length. (PCO 20).
AGREED COST = $77,700
Project 06 -1723
RFA Change Order No. 6
June 22, 2012
Page 2
3. After installing Stage 2 traffic control for the construction of the southern half of the
bridge it was determined by Traffic Engineering that the traffic control needed some
adjustments to provide safer movements for the side street traffic. The costs are to
compensate the contractor to sandblast, restripe, and install additional delineators per
the revised traffic control plan. (PCO 23).
AGREED COST = $19,601
4. While forming the MSE wall cap located at the northeast corner of the bridge it was
determined that the designed planters within the wall cap would not fit. The
concentrated amount of reinforcement within in the cap could not be moved or cut_ The
costs are to compensate the contractor to form and pour a new planter on top of the
wall cap. (PCO 24).
AGREED COST = $49,476
5. While laying out the new sidewalk, curb and gutter and asphalt where the street joins
the existing mobile home park, located at the northeast corner of the bridge, it was
discovered that there was a bust in the elevation. In order to effectively join the new
street with the private property the existing curb needed to be realigned. The costs are
to compensate the contractor to remove and replace a section of asphalt and curb and
gutter at the join between the street and private property_ (PCO 25).
AGREED COST = $1 ,942
6. During a preconstruction meeting with the City's Water Department it was determined
before the contractor ties the new water line into the existing a thrust block would be
needed around the existing valve, if one did not exist. The costs are to compensate the
contractor to pothole and verify that there is an existing thrust block_ (PCO 26).
AGREED COST = $1,156
7. After making the modifications to Phase 2 traffic control plans in PCO 23, the mobile
home park located at the northeast corner of the bridge advised the City that traffic
control modification restricted its residents from entering and exiting the mobile home
park. This restriction was causing some motorists to make unsafe movements. It was
determined that the contractor's work area could be adjusted to accommodate the
installation of a turning pocket at the mobile home park. The costs are to compensate
the contractor to revise its construction area by relocating the K -rail, removing some
curb, patching the area with asphalt and restriping the street. (PCO 27).
AGREED COST = $24,157
8. In order to accommodate the new planter, per PCO24, the irrigation needed to be
relocated out of the MSE wall cap_ The costs are to compensate the contractor to
relocate the irrigation line to the new planter. (PCO 29).
AGREED COST = $1,357
Project 06 -1723
RFA Change Order No. 6
June 22, 2012
Page 3
9. While reviewing the layout for the abutment drainage it was determined that the
abutments were not permitted to drain directly into the river and the new access road
bollards needed to be sleeved. The costs are to compensate the contractor to relocate
the abutment drainage to a sump and install sleeves for the bollards. (PCO 30).
AGREED COST = $1 ,913
10. While laying out the MSE wall, the new SCE pole location needed to be established so
the MSE wall straps could be designed to miss these locations. The costs are to
compensate the contractor to provide survey for the pole locations. (PCO 31).
AGREED COST = $1,400
11. While demolishing the existing southern half of the bridge various debris, rip rap, and
bio hazardous material was discover under the bridge. The costs are to compensate
the contractor to remove and safely dispose of the material. (PCO 32).
Godine II
Executive Di for
Public Work gency
PROJECTS /06- '1723/CO/06 -'1723 RFA CO 6
AGREED COST = $9,822
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Guti `��
Executive Director
Finance and Management Services Agency
_ CITY OF SANTA ANA
�� ''`'� �' PUBLIC WORKS AGENCY
�� I CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number g
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS -5063 (089)
To Powell Constructors, Inc_ contractor
EXTRA WORK AT AGREED PRICE
1. Compensate to mobilize in the channel after September 30, 201 1(PCO 14).
AGREED PRICE _ $2,158
2. Provide and install couplers at the closure pour as directed per City of Santa Ana letter dated June
1 1 , 2012 (PCO 20).
AGREED PRICE _ $77,700
3. Revise stage 2 construction traffic control as directed per City of Santa Ana letter dated February 22,
2012 (PCO 23).
AGREED PRICE _ $19,601
4. Revise the planter located at the northeast side of the bridge as directed per City of Santa Ana letter
dated January 10, 2012 (PCO 24).
AGREED PRICE _ $49,476
5. Modify the curb located at the mobile home park located at the northeast corner of the bridge as
directed per City of Santa Ana (PCO 25).
AGREED PRICE _ $1,942
6. Modify the existing water line located east of the bridge as directed per City of Santa Ana (PCO 26).
AGREED PRICE _ $1,156
7. Revise stage 2 construction traffic control as directed per City of Santa Ana (PCO 27).
AGREED PRICE _ $24,157
8. Revise the irrigation at the planter located at the northeast side of the bridge as directed per City of
Santa Ana letter dated December 9, 2011 and January 5, 2012 (PCO 29).
AGREED PRICE _ $1 ,357
9. Modify the abutment drainage and the bollards as directed per City of Santa Ana letter dated March
5, 2012 (PCO 30).
AGREED PRICE _ $1,913
Page 1 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 6
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRCS -5063 (089)
To Powell Constructors, Inc. Contractor
10. Survey location of SCE power poles as directed per City of Santa Ana letter dated September 29,
2011 (PCO 31).
AGREED PRICE _ $1,400
11. Remove and dispose of the trash under the abutments as directed per City of Santa Ana letter dated
May 1 , 2012(PCO 32).
AGREED PRICE _ $9,822
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work. performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption of schedules,
extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE � _�_ INCREASE $ 1 90,682.00
By reason of this order the contract time completion will be adjusted as follows: None.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above.
Accepted, Date �o�2b�Z Contractor Powell Constructors, Inc.
By
Approval recommended by
Approved by
Title
Page 2 of 2
Date • � � � ���
Date � — � 7 / 2.
MEMORANDUM
Paul Walters
To: City Manager Date: January 25, 2013 '
Raul Godinez II
From: Executive Director Public Works Agency
Subject: PROJECT NO. 06 -1723; FIRST STREET BRIDGE REPLACEMENT OVER THE SANTA ANA
RIVER; FEDERAL PROJECT #BRLS -5063 (089)
REQUEST FOR APPROVAL OF CHANGE ORDER 7
Contractor: Powell Constructors
8555 Banana Avenue
Fontana, CA 92335
Project Description: First Street Bridge Replacement over the Santa Ana River
Account Unit: 05917760 Account: 66220 Activity: 06172302028
Original Contract Cost: $6,010,329
% of Original
Amount of The
Change Order: $ 107,703 1.8%
Previously Approved $1,251,209 20.8%
Change Orders:
Total Change Orders: $1,358,912 22.6 %*
* Contingency was increased to 30% by RFCA dated January 17, 2012.
REASON FOR CHANGE
1. The contract documents show artificial turf as the median landscaping on both sides of
the bridge; ETAC has reviewed the artificial turf as a landscaping treatment and has
recommended switching to drought tolerant plants. In order to establish the drought
tolerant plants an irrigation system is required. The additional costs compensate the
contractor to delete the artificial turf system and to provide and install a new irrigation,
including new valves and appurtenances, and new drought tolerant landscaping. (PCO
33)
AGREED COST = $4,180
2.
City Council has requested that a new bronze plaque be added to the southwest corner
of the new bridge. The plaque is to be inset into a pilaster at the beginning of the
decorative bridge barrier rail. Due to the size of the plaque the pilaster's size needed to
be increased. The additional costs compensate the contractor for all labor and
equipment to fabricate and install a new bronze plaque and increase the size of the
pillar. (PCO 34)
AGREED COST = $2,550
Project 06 -1723
RFA Change Order No. 7
January 25, 2013
Page 2
3. During an inspection of the PCC channel pavement (liner) in the river bed by Orange
County Public Works, it was determined that the portions of the PCC liner needed to be
replaced adjacent to the new pier walls. Additionally, O.C.P.W. requested to increase
the size of the aggregate for the PCC liner from 3/a inch rock to 1'/2 inch rock. The
additional costs compensate the contractor for all labor and equipment to saw cut and
remove portions of the PCC liner, the additional PCC for the replacement, and costs
incurred to increase the size of the aggregate. (PCO 35)
AGREED COST = $9,720
4. Due to the project's two year duration the northern half of the bridge was constructed
the first year and the final irrigation and landscaping on the north side could not be
completed until the end of the second year when the southern half of the bridge was
built. Therefore the condition of the planters and areas located on the north half of the
bridge needed to be addressed in advance of the final irrigation and landscape. The
additional costs compensate the contractor to remove the weeds from the planter at the
northeast corner of the bridge, and to grade and install sod in the areas back of walk.
(PCO 36).
AGREED COST = $961
5. Due to the widening of the bridge, the new drive approach installed to the property
located at the northeast corner was approximately six inches higher than the existing
adjacent pavement. Therefore the adjacent pavement needed to be lowered to meet
the elevation of the new drive approach. The additional costs compensate the
contractor for all labor and equipment to remove approximate eight feet of pavement
behind the drive approach, grade and place AC pavement to the new drive approach
elevation. (PCO 36)
AGREED COST= $992
6. Adjacent to the west side abutment, there is a 60 -inch Orange County Sanitation
District (O.C.S.D.) reclaimed waterline that is shown on the plans. During construction
it was discovered to be eight feet closer to the abutment than as shown on the plans.
Due to the vibration while installing the piles for the new abutments, O.C.S.D.
requested that the pipe be surveyed to verify that it did not move during the pile driving
operations. The additional costs compensate the contractor for all labor and equipment
to excavate and expose the line for the survey, then backfill and compact once the
surveying is complete. (PCO 36)
AGREED COST = $789
7. Due to several rain events, a significant amount of sand and debris was deposited by
the storm runoff onto the construction area in the river bed. To facilitate OC Flood's
inspection of the PCC liner they required the City to have the Contractor remove the
sand and debris. The additional costs compensate the contractor for all labor and
equipment to remove and dispose of the sand and debris. (PCO 36)
i
AGREED COST = $1,211
Project 06 -1723
RFA Change Order No. 7
January 25, 2013
Page 3
8. In order to accommodate the new planter, per PCO 24, the irrigation needed to be
relocated out of the MSE wall cap. The additional costs are to compensate the
contractor for all labor and equipment to relocate the irrigation line to the new planter.
(PCO 29) /
AGREED COST = $1,357 /
9. During the course of the bridge construction, excessive graffiti was continually
encountered on adjacent property walls and buildings. In order to mitigate the graffiti it
was recommended to remove the graffiti regularly. Graffiti removal is outside the scope
of the contract therefore, the additional costs compensate the contractor for all labor
and equipment to remove the graffiti. (PCO 36)
AGREED COST = $2,750
10. After the new sound wall was installed at the northeast corner of the bridge, the
adjacent property owner informed the City that the sound wall restricted motorist's
vision of oncoming pedestrians and bicyclists when exiting the property. The City's
Traffic Engineering Section reviewed the situation and recommended 15 -feet of the
wall be removed to improve sight distance. The additional costs compensate the
contractor for all labor and equipment to saw cut, remove, and dispose of the 15 foot
section of wall. (PCO 37) %
AGREED COST = $2,406
11. After completion of the bridge, at the southwest corner, the property owner informed
the City that the new barrier rail was to close to their home's roof which sacrificed the
security of their property. After a careful review, it was recommended to increase the
barrier rail height to seven feet by adding a 48" high CMU wall to the top of the barrier
rail. The additional costs compensate the contractor for all labor and equipment to
install a 148 foot long CMU wall on top of the barrier rail adjacent to the property. (PCO
38)
AGREED COST = $25,887 V
12. In advance of building the MSE wall located at the southwest corner of the bridge it was
determined that the excavation for the new footing would undermine the adjacent
property wall. After reviewing the issue with the property owner it was determined that it
would be more cost effective to remove the existing wall and extend the adjacent
property fences two feet to abut the new MSE wall. The additional costs compensate
the contractor for all labor and equipment to extend two block walls, two chain link
fences, one wood fence, one wrought iron fence and the parking lot pavement two feet.
(PCO 38)
AGREED COST= $12,401
13. The contract documents show construction of new sidewalk at southwest corner of the
bridge with variable in widths from 8 to 15 feet. After careful review, the City's Design
Engineering Section revised the plans to move the curb and gutter back to create a
constant eight foot wide sidewalk. This revision requires the construction of variable
Project 06 -1723
RFA Change Order No. 7
January 25, 2013
Page 4
height curb and gutter. The additional costs compensate the contractor for all labor and
equipment to form and place 298 feet of variable curb and gutter. (PCO 39)
AGREED COST= $2,644
14. During an inspection of the existing street section on the west side of the bridge, it was
determined that there are two bus stop locations where the curb & gutter and pavement
had deteriorated; therefore, it is recommended to construct new PCC bus pads at
these locations. The additional costs compensate the contractor for all labor and
equipment to remove the pavement and curb & gutter, grade, compact and place two
PCC bus pads. (PCO 39)
AGREED COST= $38,685
I APPROVED AS TO FUNDS AND ACCOUNTS:
Raul odinez, II V Francisco Gutierrez
Execu 've Director Executive Director
Public Works Agency Finance and Management Services Agency
PROJECTS /06- 1723/CO/06 -1723 RFA CO 7
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 7
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063 (089)
To Powell Constructors. Inc. Contractor
EXTRA WORK AT AGREED PRICE
1. Delete the artificial turf and provide and install new irrigation and landscape as directed per City of
Santa Ana letter dated October 9, 2012 (PCO 33).
AGREED PRICE = $4,180
2. Provide and install a bronze plaque as directed per City of Santa Ana letter dated September 12,
2012 (PCO 34).
AGREED PRICE = $2,550
3. Increase the PCC channel liner removal and replacement and increase the size of the aggregate as
directed per City of Santa Ana (PCO 35).
AGREED PRICE = $9,720
4. Remove the weeds, grade, and sod the adjacent property located at the northeast corner of the
bridge as directed per City of Santa Ana (PCO 36).
AGREED PRICE = $961
5. Grade and pave the existing drive approach located at the northeast corner of the bridge as directed
per City of Santa Ana (PCO 36).
AGREED PRICE = $992
6. Excavate the existing 60" water line located along the west bank of the bridge as directed per City of
Santa Ana (PCO 36).
AGREED PRICE = $789
7. Remove and dispose of sand and debris from the lined channel as directed per City of Santa Ana
(PCO 36).
8. Remove the graffiti as directed per City of Santa Ana (PCO 36).
AGREED PRICE = $1,211
AGREED PRICE = $2,750
9. Repair the existing wrought iron fence located at the northeast corner of the bridge as directed per
City of Santa Ana (PCO 37).
AGREED PRICE = $2,527
Page 1 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 7
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063 (089)
To Powell Constructors. Inc.
Contractor
10. Saw cut and remove a section of the sound wall located at the northeast corner of the bridge as
directed per City of Santa Ana (PCO 37).
AGREED PRICE = $2,406
11. Provide and install 148 linear feet of CMU wall at the southwest corner of the bridge as directed per
City of Santa Ana (PCO 38).
AGREED PRICE = $25,887
12. Extend the existing fences along the new MSE wall located at the southwest corner of the bridge as
directed per City of Santa Ana (PCO 38).
AGREED PRICE = $12,401
13. Realign the 298 If of new curb and gutter located at the southwest corner of the bridge as directed
per City of Santa Ana (PCO 39).
AGREED PRICE = $2,644
14. Install two new bus pads located at the southwest and northwest corners of Susan and 1St Street as
directed per City of Santa Ana (PCO 39).
Page 2 of 3
AGREED PRICE = $38,685
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 7
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS -5063 (089)
To Powell Constructors, Inc. Contractor
The compensation both time and cost set forth in this change order comprises the total
compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per
this change order, including impact on unchanged work. By signing this change order, the
Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers,
that the stipulated compensation includes payment for all work contained in this change order, plus
all payment for interruption of schedules, extended field overhead, home office overhead, profit,
delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The
signing of final change order constitutes full mutual accord and satisfaction for all changes and
work performed on this project, and that the time and cost paid per this change order constitutes
the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all
work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all
Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any
further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ -0- INCREASE $ 107,703.00
By reason of this order the contract time completion will be adjusted as follows: None.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above.
Accepted, Date / Z3'4 j3 Contractor Powell Constructors, Inc.
Title
recommended byL( ` / 1—' Date
Approved by
Page 3 of 3
Date
i • •
CITY COUNCIL MEETING DATE:
JUNE 3, 2013
TITLE:
CONTRACT INCREASE TO ADD
STREETLIGHTS TO FIRST STREET
BRIDGE REPLACEMENT OVER THE
SANTA ANA RIVER (PROJECT NO.
061723) , „/ °)
*Ii] IT, Iin14n�7��7s�i��[�7�1
CLERK OF COUNCIL USE ONLY:
APPROVED 3i 02013
�✓j As Recommended
❑ As Amended
❑ Ordinance on 1s' Reading
❑ Ordinance on 2nd Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Increase the contract with Powell Constructors, Inc., for the construction of the First Street
bridge replacement over the Santa Ana River by $250,000 for a total estimated contract amount
of $8,065,000, and authorize the City Manager to execute change orders in an amount not to
exceed the authorized contingency.
DISCUSSION
On March 21, 2011, the City Council awarded a construction contract for the First Street bridge
replacement over the Santa Ana River to Powell Constructors, Inc., in the amount of $6,010,329
plus a contingency amount of $1,202,066, totaling $7,212,395. On January 17, 2012, the City
Council approved an increase of $602,605 which raised the contract total to $7,815,000.
The additional costs were related to a significant redesign of the bridge foundations that
eliminated conflicts with interfering power lines, resulting from the inability of the utility company
to de- energize and relocate its lines. The restriction of constructing the bridge one -half at a time
and only during the dry season (six months), as determined by the Orange County Flood
Control District, caused scheduling delays that also affected contract costs. Other extra costs
were attributed to added enhancements to the bridge, including architectural details to the
railings, erecting sound walls, and for general unforeseen underground conditions.
Fortunately, due to unpredictability of the highly competitive construction market, the original
construction bids were significantly lower than the engineer's cost estimate. That resulted in
making additional grant funds available to the project for eligible scope expenditures. Even with
major redesign efforts and cost increases to the project, approximately $500,000 in grant
funding is still available for this bridge construction project.
Contract Increase for First Street Bridge Replacement
June 3, 2013
Page 2
Staff is recommending using these grant funds to complete two additional improvements: (1)
Install streetlights and required appurtenances, including upgrading the lamps to energy
efficient LED lamps, which will provide significant annual savings to the City; and (2) install a
planter with vines along the concrete masonry wall located at the southwest corner of the
bridge, which will help suppress graffiti.
At the time the bridge was under design, streetlights were not part of the scope due to funding
constraints and, therefore, the construction contract did not include streetlights. However, the
positive financial position of the project would allow completing the streetlight installation, since
this project has designated grant funds still available. Staff has designed structural
reinforcements for each streetlight location on the bridge, and the cost of those structural
retrofits can be covered within the existing contract. However, the cost to install the 20
streetlight standards, conduit and wiring, lamps, controller, and the site improvements will
exceed the current Council- approved contract. Since these improvements are eligible for grant
reimbursement, it is recommended that the contract be increased by $250,000 to complete
these project enhancements and close out the project.
ENVIRONMENTAL IMPACT
This is no environmental impact associated with this action.
FISCAL IMPACT
Funds for the contract increase of $250,000 are available in the Measure M Street
Construction Fund (Account 03217660- 66220) and the Select Construction Fund (Account
05917660 - 66220).
Rau Godinez II
Executive Director
Public Works Agency
RG:WG
APPROVED AS TO FUNDS AND ACCOUNTS:
Am'�IN-M A 0 �4 rc
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
MEMORANDUM
To:
From:
David Cavazos
City Manager
William Galvez, Interim Executive Director
Public Works Aaencv
Project No. 06 -1723; First Street Bridge
Replacement over the Santa Ana River;
Federal Project #BRLS -5063 (089)
Subject: Change Order No. 8
Date: Jan
2. 2014
Contractor: Powell Constructors
8555 Banana Avenue ; v,
Fontana, CA 92335 "
Project Description: First Street Bridge Replacement over the Santa Ana River
Change Order Number: 8 Change Order Amount: $ 232,237.00
Accounting Unit- Account - Activity Number: 0591776 66220 06172302028
JUSTIFICATION
1. Increase limits of asphalt removal and replacement including the cost of traffic control.
Relocate an existing water meter to behind the new curb and gutter to meet City
Standards. At the request of Orange County Public Works Department, install redwood
headers adjacent to new pavement on access ramp to Santa Ana River Bike Trail to
prevent future damage to the pavement. (PCO 40)
AGREED PRICE = $17,258
2. After Southern California Edison poles and streetlights were relocated as part of the bridge
widening, it was determined that there were not enough streetlights adjacent to the bridge
to provide adequate lighting on the bridge for pedestrian and motorist safety. In keeping
with the Council's request to maintain the historical integrity of the bridge, 20 vintage style
streetlight posts will be installed along both sides of the street on the bridge and the
approach to the bridge. The pilasters on the barrier rail along the bridge need to be
enlarged and reinforced to accommodate the new streetlight poles.
On the southwest approach to the bridge there is a 6' high block wall that is prone to
graffiti. It has been determined that to best mitigate the graffiti, a planter should be
constructed, irrigation lines installed and vines planted along the wall. (PCOs 41 & 42)
AGREED PRICE = $208,564
Project 06 -1723
Request for Approval of Change Order No. 8
October 15, 2013
Page 2 of 2
3. Prior to the completion of the installation of the electrical service pedestal intended for the
point of connection for the irrigation controller, Southern California Edison revised the
installation requirements for electrical service pedestals and conduits. The pedestal had to
be removed, the conduits modified and the cabinet reinstalled. (PCO 43).
AGREED PRICE _ $6,415
CONTRACT COST SUMMARY
* Contingency was increased to 30% by RFCA dated January 17, 2012
* Contingency was increased to 35% by RFCA dated June 3, 2013
SCHEDULEIMPACT
Increase contract time by 250 working days.
William Galvez, Inte"r4mIxecutive Director
Public Works Agency
APPROVED AS TO FUNDS AND
ACCOUNTS:
A SkM'l .A 1�&ct Francisco Gutierr e, or
Finance & Management Services Agency
Amount
% of Contract
Original Contract Total
$
6,010,329.00
Previous Change Orders
$
1,358,912.00
Increase* 22.61%
Change Order #8
$
232,237.00
Increase ** 3.86%
Total Change Orders to Date
$
1,591,149.00
Increase 26.47%
Adjusted Contract Total
$
7,601,478.00
* Contingency was increased to 30% by RFCA dated January 17, 2012
* Contingency was increased to 35% by RFCA dated June 3, 2013
SCHEDULEIMPACT
Increase contract time by 250 working days.
William Galvez, Inte"r4mIxecutive Director
Public Works Agency
APPROVED AS TO FUNDS AND
ACCOUNTS:
A SkM'l .A 1�&ct Francisco Gutierr e, or
Finance & Management Services Agency
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
PROJECT NO. 06 -1723; FIRST STREET BRIDGE
REPLACEMENT OVER THE SANTA ANA RIVER;
Project Number FEDERAL PROJECT #BRLS -5063 (089)
To Powell
Inc.
EXTRA WORK AT AGREED PRICE
Change Order Number 8
Contractor
1. Provide additional traffic control, removal and replace asphalt, relocate water meter, and install
redwood headers as directed per City of Santa Ana (PCO 40).
AGREED PRICE = $17,258
2. Provide and install new 20 streetlights and construct a new planter at the southwest corner of the
bridge as directed per City of Santa Ana (PCOs 41 and 42).
AGREED PRICE = $208,564
3. Modify SCEs meter and point of connection as directed per City of Santa Ana (PCO 43).
Page 1 of 2
AGREED PRICE = $6,415
PROJECT NO. 06 -1723; FIRST STREET BRIDGE
REPLACEMENT OVER THE SANTA ANA RIVER;
Project Number FEDERAL PROJECT #BRLS -5063 (089)
To Powell
Inc.
0 1. . , .G
CONTRACT CHANGE ORDER
Change Order Number 8
Contractor
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption of schedules,
extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ _0_ INCREASE $ 232,237.00
By reason of this order the contract time completion will be adjusted as follows: Add 250 working days.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above.
Accepted, Date e19 //3 Contractor Powell Constructors, Inc.
Title
Approval recommended by
Approved by
Page 2 of 2
Date W//
Date��1 /
MORANDUM
To
From:
David Cavazos
City Manager
William Galvez, Interim Executive Director
Public Works Agency
Date: June 26, 2014
Project No. 06 -1723; First Street Bridge Replacement over the Santa Ana River;
Federal Project #BRLS -5063 (089)
Sul ject: Change Order No. 9
Contractor: Powell Constructors
8555 Banana Avenue
Fontana, CA 92335
Project Description: First Street Bridge Replacement over the Santa Ana River
Change Order Number: 9 Change Order Amount: $12,311.00
Accounting Unit - Account - Activity Number: 05917660 -6620 06172302028
JUSTIFICATION
While laying out the new planter located at the southwest corner of the bridge it was
determined that the design did not have sufficient reinforcement for the loads. Therefore
the reinforcement was modified for the existing conditions. Additionally while installing the
new streetlight it was determined that embedment depth for the streetlights needed to be
increased to accommodate code requirements. (PCO 44)
AGREED PRICE _ $5,729
2. After completing the improvements in front of the mobile home park located at the
northwest corner of the bridge, the owners of the property informed the City that there may
be a conflict with the bike traffic and the motor vehicles exiting their property. The City
Traffic Engineering Section reviewed the situation and requested additional striping and
signage at that location. (PCO 45)
AGREED PRICE _ $6,213
3. While performing a preliminary final job inspection it was determined that several areas
required additional landscaping to complete the intent of the design. (PCO 46).
AGREED PRICE _ $369
Project 06 -1723
Request for Approval of Change Order No. 8
October 15, 2013
Page 2 of 2
CONTRACT COST SUMMARY
Amount % of Contract
Original Contract Total $ 6,010,329.00
Previous Change Orders $ 1,591,149.00 Increase* 26.47%
Change Order #9 $ 12,311.00 Increase" 0.2%
Total Change Orders to Date $ 1,603,460.00 Increase
Adjusted Contract Total $ 7,601,478.00
" Contingency was increased to 30% by RFCA dated January 17, 2012
Contingency was increased to 35% by RFCA dated June 3, 2013
SCHEDULEIMPACT
Increase contract time by 80 working days.
26.67%
APPROVED AS TO FUNDS AND
ACCOUNTS:
William Galvez, Interi xecutive Director Francisco Gutierrez, Execu ive ector PO
Public Works Agency Finance & Management Services Agency
Ch Y OF SANTA ANA
PUBLIC WORKS AGENCY-
CONTRACT CHANGE ORDER
PROJECT NO. 06- 1723; FIRST STREET BRIDGE
REPLACEMENT OVER THE SANTA ANA `RIVER; -
FEDERAL PROJECT #BRLS -5063 (089)
Project Number Change Order Number 9
To Powell Constructors, Inca Contractor
EXTRA WORK AT AGREED PRICE
1. Modify the streetlights as directed per City of Santa Ana; (PCO 44).
AGREED PRICE = $5,729
2. Provide and install' new striping at the northwest corner of the bridge as directed per City of Santa
Ana (PCO 45).
AGREED PRICE = $6,213
3. Replace landscape as directed per City of Santa Ana (PCO 46).
i
AGREED PRICE _ $369
/
/
/
/
/
/
Page 1 of 2
C OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
9
PROJECT NO. 06 -1723; FIRST STREET BRIDGE
REPLACEMENT OVER THE SANTA ANA RIVER;
FEDERAL PROJECT #BRLS- 5063 (089)
Project Number Change Order Number 9
To Powell Constructors, Inc. Contractor
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption.of schedules,
extended field'' overhead, home office overhead, profit, delay, and all impact, ripple effector cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL. COST THIS CHANGE ORDER DECREASE $ -0- INCREASE $ 12,311.00
By reason of this order the contract time completion will be adjusted as follows: Add 80 Working days.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above and perform all service necessary for the work above specified, and will accept as full
payment therefore the prices shown above
Accepted,. Date �p �� �� Contractor Powell Constructors, Inc.
?2.eSO�.v /—
Approval recommended by
lc WORKSA E
Approved by
CITY MANAGER
/ Date
UTIV RECTOR
/age 2 of 2