CONTRACT AWARD FOR FAIRVIEW ? As Recommended
TRIANGLE HABITAT RESTORATION o ?rAmended
? Ordinance on 15f Reading
(GRANT FUNDED) (PROJECT NO. ? Ordinance on 2"d Reading
086028) E] Implementing Resolution
? Set Public Hearing For
CONTINUED TO
- t FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
Award a contract to ACE CD, Inc., the lowest responsible bidder, in accordance with unit bid
prices for the base bid in the estimated amount of $93,207.50 for construction of the Fairview
Triangle Habitat Restoration.
2. Approve a funding analysis with a total estimated construction cost of $123,780.
DISCUSSION
The Fairview Triangle is a triangular-shaped undeveloped dirt lot along the Santa Ana River
Recreational Trail and Fairview Avenue, south of 17th Street (Exhibit 1). The Santa Ana River
Vision Plan, which was adopted by City Council on August 7, 2006, identified this property as an
area of opportunity in that it could be developed into a trail-side rest area for pedestrians and
cyclists. The proposed project includes decomposed granite paths, benches, a bike rack, drought-
tolerant landscaping, and an irrigation system using reclaimed water. The improvements will
provide a space for trail users to rest as well as view the existing habitat area.
The Notice Inviting Bids was advertised on August 17 and 18, 2011, and bids were opened on
September 7, 2011. A summary of the bid invitations mailed, the bids received, and the bid results
follows.
Santa Ana Contractors receiving notices: 19
Contractors requesting bidding documents: 26
Bids received: 10
Bids received from Santa Ana Contractors: 0
23A-1
Contract Award For
Fairview Triangle Habitat Restoration
October 3, 2011
Page 2
While the City made outreach efforts to Santa Ana contractors regarding the notice inviting bids, no
contractors from Santa Ana submitted bids. A survey was taken from randomly selected Santa
Ana contractors who chose not to bid. The results indicated that they either were not capable of
performing this type of work, were unable to obtain insurance because the project was too large, or
they worked as a subcontractor to certain prime contractors.
The bids received are as follows.
NAME OF RESPONSIVE BIDDER CITY
BASE BID AMOUNT
1. ACE CD, Inc. Glendora $93,207.50
2. Moalej Builders Sherman Oaks $101,752.60
3. Fleming Environmental, Inc. Fullerton $104,065.55
4. Native Landscaping, Inc. Escondido $109,365.00
5. STL Landscape, Inc. Los Angeles $116,000.00
6. HYM Engineering, Inc. Buena Park $125,860.00
7. Ted Enterprises, Inc. San Clemente $139,750.00
8. Aramexx Const. Chino $148,295.00
9. Unique Performance Const. Inc. Costa Mesa $166,645.00
10. Atom Engineering Const. Hemet $177,398.00
A total of 10 bids were received and all were responsive. The lowest bid was submitted by ACE
CD, Inc., for $93,207.50, which is below the Engineer's estimate of $105,500.
ENVIRONMENTAL IMPACT
Environmental Review #ER-2006-166 has been completed and a Notice of Exemption has been
filed pursuant to the California Environmental Quality Act. In addition, a Certificate of Categorical
Exclusion has been prepared in accordance with the National Environmental Quality Act.
23A-2
Contract Award For
Fairview Triangle Habitat Restoration
October 3, 2011
Page 3
FISCAL IMPACT
The funding analysis shows a total estimated construction cost of $123,780 for the project
(Exhibit 2). Funds are available in the National Recreation Trails Fund Act (accounting unit
17213240-66220) and the Park Acquisition and Development Fund (accounting unit 31113260-
66220).
F
Raul Godinez gIll
Executive Director
Public Works Agency
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
Gerardo Mouet
Executive Direct r
Parks, Recreation, and Community
Services Agency
RGMA
Exhibits: 1. Project Location Map
2. Funding Analysis
23A-3
23A-4
B ? LA VE TP
G???E FP?y .. - :2 GaEEK -
GpPO?N - ? I ? ? r-
- - - SPNTPGO ??
22 w?? Ir1
!J
vp n YESTN INSTE EVENTEENT
SEV TEENT
X00 \ n??D?DDooo gtiq
c CIV CENTE Da, U?O??00?00 .rui=
??I ? ANTP ? o
?? FIRST a III ???O?000?
I O LL ..??llu r FIRST
nCFAODEN L EE=
I-'
oa
??
ncFaooEN
EOI NGER r - E
I n ? o.,,.o o a X
Y ?a
EOINGER
E
e
?E
WARNER (II ?u
V u L_J YPRNER u ? ?i
??n a Q?a
P=P cer. g s (?P
$E RSTR IIr OYER
2 c 5 a ¢ ? ? ?+'
hp c¢uelrt ?
NR[RRTRUH = ? o a ??? ? rt ??.
NP ARTR R '??
$UNFLOWE
?S P
\\9N ?? SUNFLOWER S Q>
DI
T
\Rti'Y
FAIRVIEW
TRIANGLE
EXHIBIT 1
SANTA ANA
CITY
AGENDAOUNCII
p PROJECT 0&-am
¦ H ¦
VVu DATE: FAHVEW TIPIMCtiE HABITAT FESI )RATIM
PUBLIC KRKS AOENCI SEPTEMBER 7, 2011 0%ok A MM
NTS
\Rwy
r1?N oRANC
3 ?
o z
o ,
1
23A-6
FUNDING ANALYSIS
PROJECT NO. 08-6028
FAIRVIEW TRIANGLE HABITAT RESTORATION
Construction Contract $93,207
Contract Administration $2,432
Inspection and Testing $6,000
Survey Staking $3,500
Contingencies $18,641
TOTAL ESTIMATED CONSTRUCTION COSTS 123 780