HomeMy WebLinkAbout20120123_2012-01_1301EWarner•RESOLUTION NO. 2012-01 ROH - 01/23/12
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA APPROVING CONDITIONAL
USE PERMIT NO. 2011-25 TO ALLOW A 60 -FOOT HIGH
WIRELESS FACILITY ON THE PROPERTY LOCATED AT
1301 EAST WARNER AVENUE
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA
AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Conditional Use Permit No. 2011-25 came before the Planning
Commission of the City of Santa Ana for a duly noticed public hearing on
January 23, 2012.
B. Conditional Use Permit No. 2011-25 has been filed with the City of Santa
Ana seeking to allow a 60 -foot high wireless facility disguised as a
eucalyptus tree on the property located at 1301 East Warner Avenue.
•
C. Pursuant to Santa Ana Municipal Code Section 41-198.10, a Conditional
Use Permit is required for major wireless communication facilities
established in the City of Santa Ana.
D. Santa Ana Municipal Code Section 41-638 authorizes the Planning
Commission to grant a conditional use permit upon making certain
findings.
1. Will the proposed use provide a service or facility which will
contribute to the general well being of the neighborhood or the
community?
The proposed 60 -foot tall eucalyptus -disguised cellular
monopole will provide a service to Santa Ana residents,
businesses and motorists who subscribe to AT&T's services
by reducing the gaps in digital cellular service and providing
additional calling capacity for its users, especially for those
users traveling within the south central sector of Santa Ana.
2. Will the proposed use under the circumstances of the particular case
be detrimental to the health, safety, or general welfare of persons
residing or working in the vicinity?
Federal law exempts local jurisdictions from regulating health
. related issues as these issues are covered under Federal
laws. However, the proposed facility will be in compliance
Resolution No. 2012-01
Page 1 of 6
• with both the Federal Communications Commission (FCC)
and Federal Aviation Administration (FAA) safety regulations.
3. Will the proposed use adversely affect the present economic stability
or future economic development of properties surrounding the area?
The proposed facility, in conjunction with the new eucalyptus
trees and required site improvements, will be compatible with
the surrounding area and will not adversely affect the
economic viability in the area. The stealth appearance and
site upgrades will be the major solution to maintaining and
increasing the economic stability for this commercial corridor.
4. Will the proposed use comply with the regulations and conditions
specified in Chapter 41 for such use?
The cellular facility has been designed to comply with the
regulations and conditions identified in Chapter 41 of the
Santa Ana Municipal Code for a major wireless facility.
5. Will the proposed use adversely affect the General Plan or any
specific plan of the City?
The proposed facility will not adversely affect the General
Plan as cellular facilities that are designed to be compatible
with the surrounding environment are consistent with the
• goals and objectives of the Industrial (IND) General Plan land
use designation. Policy 2.2 of the Land Use Element
encourages land uses that accommodate the City's needs for
services.
is
E. This project was reviewed in accordance with the Guidelines for the
California Environmental Quality Act. The recommendation is exempt
from further review pursuant to Section 15303. This Class 3 exemption
allows in -fill developments for the construction and location of limited
numbers of new, small facilities or structures. Categorical Exemption
Environmental Review No. 2012-2 will be filed for this project.
Section 2. The Planning Commission, after conducting the public hearing,
hereby approves Conditional Use Permit No. 2011-25 as conditioned in Exhibit "A"
attached hereto and incorporated herein. This decision is based upon the evidence
submitted at the above said hearing, which includes but is not limited to: the Request for
Planning Commission Action dated January 23, 2012, and exhibits attached thereto;
and the public testimony, all of which are incorporated herein by this reference.
ADOPTED this 23rd day of Janua , 2012 by the following vote:
Resolution No. 2012-01
Paqe 2 of 6
• AYES:
NOES:
ABSENT:
ABSTENTIONS
•
•
Commissioners:
Commissioners:
Acosta, Alderete,
Yrarrazaval(6)
None /AN
Commissioners: Turn(
Commissioners: None
APPROVED AS TO FORM:
Joseph A. Straka, City Attorney
Gartner, Mill, Nalle,
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Martha Ramirez, Planning Commission Secretary, do hereby attest to and certify the
attached Resolution No. 2012-01 to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on January 23, 2012.
Date: :; —`/-�L-
i
Planning Commission
City of Santa Ana
Resolution No. 2012-01
Page 3 of 6
• Conditions for Approval for Conditional Use Permit No. 2011-25
Conditional Use Permit No. 2011-25 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with all applicable sections of the Santa Ana
Municipal Code, the California Administrative Code, the California Building Standards
Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed belowrip or to
exercising the rights conferred by this conditional use permit.
The applicant must remain in compliance with all conditions listed below throughout the
life of the conditional use permit. Failure to comply with each and every condition may
result in the revocation of the conditional use permit.
A. Planning Division
1. The applicant must comply with all conditions and requirements of the
Resolution No. 2012-01
Pape 4 of 6
Development Review Committee for the development project (DP No.
2011-8).
2. Any amendment to this conditional use permit must be submitted to the
Planning Division for review. At that time, staff will determine if
administrative relief is available or the conditional use permit must be
•
amended.
3. The proposed monopole shall be constructed as per approved plans and
any existing landscaping shall be protected in place during the construction
period for the 60 -foot tower facility.
4. The proposed monopole shall be constructed per the following
specifications:
a. The monopine should have 3.1 branches per foot for full density
coverage with limited spacing between the branches; 70 percent of
the branches should be eight feet or longer.
b. Branch disbursement should be random so that longer branches and
shorter branches are intermingled to give a natural appearance.
C. Branches should exceed all antennas by a minimum of 12 inches.
d. Branches should start at 15 feet above the ground.
e. There should be a minimum space of seven feet between the top of
the antenna and the top of the branches.
f. Branches should have a sweep similar to that of an actual
Eucalyptus Tree.
g. Branch foliage color should be an olive green with some other
appropriate coloring to match an actual Eucalyptus Tree. A sample
•
shall be submitted for approval prior to fabrication.
Resolution No. 2012-01
Pape 4 of 6
• h. Full bark cladding with a custom color should be submitted for
approval prior to fabrication.
i. All antennas shall be covered with "antenna socks" that match the
approved foliage color.
j. All "stand-off mounts" and support pipe mounts shall be concealed
behind antennas and painted a darker shade or green (or black) with
a "flat" paint finish to reduce reflection and visibility of the mounting.
k. Include the tree specifications (selected manufacturers and models)
with photo simulations (also a site plan review requirement).
I. Show the location of the GPS antenna on all elevations.
M. Provide a "unistrut" detail for the utility cabinet; an "H -frame" is not
acceptable.
n. Provide a note on the plans stating "install underground utilities
sleeving for two carriers during construction of the structure".
Shrouds on the outside of the pole are not acceptable.
o. All exterior conduit and electrical meters shall be installed and
screened in one metal enclosure painted to match the structure.
5. The permit applicant shall provide a 24-hour phone number to which
interference problems may be reported. This condition will also apply to all
• existing facilities in the City of Santa Ana.
6. The permit applicant will provide a "single point of contact" in its
Engineering and Maintenance Departments to insure continuity on all
interference issues. The name, telephone number, fax number and e-mail
address of that person shall be provided to the City's designated
representative upon activation of the facility.
•
7. The permit applicant shall insure that lessee or other user(s) shall comply
with the terms and conditions of this permit, and shall be responsible for the
failure of any lessee or other users under the control of permit applicant to
comply.
8. The permit applicant shall provide a coverage and cell site location map for
each existing and proposed facility in Santa Ana.
9. Locate all equipment and related appurtenances (appleton plug and electric
meter) on the inside of the existing equipment enclosure or inside the
building and underground all electrical power from the utility source shown
on the approved site plan.
10. Locate all proposed ladders on the interior of the building or inside the lease
area within the building.
Resolution No. 2012-01
Page 5 of 6
• 11. The existing building shall be repainted. The applicant shall submit paint
color samples for the repainting to the Planning Division.
12. Conditional Use Permit No. 2011-25 expires 10 years from the date of City
Council approval.
•
Resolution No. 2012-01
Paqe 6 of 6