Loading...
HomeMy WebLinkAbout23C - SANTIAGO PARKREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: MARCH 5, 2012 TITLE: CONTRACT AWARD FOR CITYWIDE RESIDENTIAL STREET REPAIR - PHASE 16 AND SANTIAGO PARK ROADWAY IMPROVEMENT (PROJECT NOS. 126753, 112618 AND 127531) -? 1 I Zw?CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ? As Recommended ? As Amended ? Ordinance on 151 Reading ? Ordinance on 2nd Reading ? Implementing Resolution ? Set Public Hearing For_ CONTINUED TO FILE NUMBER 1. Award a contract to R.J. Noble Company, the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $2,394,149.70 for construction of Citywide Residential Street Repair - Phase 16, Santiago Park and Memorial Park Neighborhood Roadway Improvements. 2. Approve a funding analysis with a total estimated construction cost of $2,992,500. DISCUSSION This phase of the City's Residential Street Repair Program consists of the remaining asphalt residential streets that are in need of repair. These segments of local streets have been identified as a high priority for rehabilitation in the City's pavement management system (Exhibit 1). The pavement is deteriorating due to weather, age, and heavy usage. The project provides for grinding asphalt, asphalt pavement overlay, reconstruction, and replacement of damaged concrete curbs, gutters, sidewalks, cross gutters, and curb ramps. Additionally, the Santiago Park roadway off of Memory Lane has been deteriorated due to age and use. The asphalt roadway serves the wildlife and watershed center, nature reserve, and archery range in Santiago Park. The project includes roadway improvements, decomposed granite, a retaining wall, and a wrought iron fence and gate. The project utilizes the most cost-effective, innovative, and environmentally sound technologies, including recycling of existing asphalt pavement. The project also provides for grinding asphalt, asphalt pavement overlay, and replacement of damaged concrete curbs, gutters, sidewalks, cross gutters, and curb ramps. Once completed, these improvements will enhance the ride quality, surface drainage, and appearance of the neighborhoods and park. 23C-1 Contract Award for Residential Street Repair - Phase 16 & Santiago Park Roadway Improvements March 5, 2012 Page 2 The Notice Inviting Bids was advertised on January 18 and 19, 2012, with outreach efforts made to 12 Santa Ana contractors. Bids were opened on February 14, 2012. A summary of the bid notices and the bid results follows: Santa Ana Contractors receiving notices: Contractors requesting bidding documents Bids received: Bids received from Santa Ana Contractors; NAME OF RESPONSIVE BIDDER 12 25 6 1 1. R.J. Noble Company 2. Excel Paving Company 3. Sequel Contractors 4. All American Asphalt 5. Elite Bobcat Service, Inc. 6. Hardy & Harper, Inc. CITY Orange Long Beach Santa Fe Springs Corona Corona Santa Ana BID AMOUNT $2,394,149.70 $2,520,380.00 $2,537,826.00 $2,559,559.00 $2,598,953.00 $2,696,000.00 The Engineer's estimate was $2,259,020. A total of six bids were received and all were responsive. The lowest bid was submitted by R.J. Noble Company in the amount of $2,394,149.70. Therefore, staff recommends awarding the contract to R.J. Noble Company. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption Environmental Reviews Nos. 2012-01 and 2012-11 will be filed for this project. In addition, a Certification of Categorical Exemption and a Statutory Worksheet have been prepared in accordance with the National Environment Policy Act. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $2,992,500 for the project (Exhibit 2). Funds are available in the Community Development Block Grant Fund (accounting unit 13518783-66220), Public Works Account for Residential Street Repair Fund (accounting unit 05817661-66220), District 2 A&D/In-Lieu Fund (accounting unit 31213261-66220), Deferred Maintenance Fund (01113260-66220), Water Production and Supply Fund (accounting unit 06017640-66220) and Capital Outlay/Park Improvements Fund (accounting unit 05113263-66220). 23C-2 Contract Award for Residential Street Repair - Phase 16 & Santiago Park Roadway Improvements March 5, 2012 Page 3 r _ Raul odinez II Executive Director Public Works Agency Nancy T. E ards Interim Exe tive Director Community Development Agency RG/ET Exhibits: 1. Project Location Map 2. Funding Analysis APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director Finance & Management Services Agency Gerardo Mouet Executive Director Parks, Recreation, & Community Services Agency 23C-3 23C-4 ?nnnnnnr LEGEND: EXHIBIT 1 SANTA ANA TFLE: P CITY COUNCIL CONTRACT AWARD FOR Fi AGENDA DATE: CITYWIDE RESIDENTIAL ?U ?? PHASE 16 March 5, 2012 AND SANTIAGO ROADWAY IMPROVEMENTS saK rr r (PROJECT bM ]Z67W 127531 AND 112618 (CDBG)) FUNDING ANALYSIS PROJECT NOS. 126753, 127531 AND 112618 CITYWIDE RESIDENTIAL STREET REPAIR - PHASE 16 AND SANTIAGO PARK ROADWAY IMPROVEMENT Construction Contract $2,394,149.70 Contract Administration $143,640.00 Inspection and Testing $167,495.30 Survey Staking $47,800.00 Contingencies $239,415.00 TOTAL ESTIMATED CONSTRUCTION COSTS 2.992.500.00 Exhibit 2 23C-6