NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
a construction of Residential Street Repair Phase 16 & Santiago Park Roadwa Improvement.
o under contract entered into on March 5, 2012 with R.J. Noble Company, on which contract
w Travelers Casualty and Surety Company of America is surety. The property on which such work
Wo improvement was placed is in the City of Santa Ana, County of Orange, State of California, and
o described as Project Nos. 12 -6753, 12 -7531, and I1 -2618 located at VARIOUS LOCATIONS.
aThe work improvement on said property was accepted as completed on July 9, 2013.
�a
0
x O CITi!�TTA A A UNICIPAL CORPORATION
w o by
Dated: � /d 2d�� City Engineer
q ] TITLE
O
VERIFICATION
I, the undersigned, say: I am the City Engineer of
the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on
behalf of the owner of the property therein described; I make this verification on behalf of said
corporation by authorization of the City Council of the City of Santa Ana; I have read said notice
and know the contents thereof; and I declare under penalty of perjury that the facts therein stated
are true. �7
Executed on v (.,/ 6 at Santa Ana, Calif'
c °J 7C,
(Signature of individual swearing that the
contents of Notice of Completion are true.)
THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN (10) DAYS AFTER COMPLETION
sY'
C
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
MARCH 5, 2012
TITLE:
CONTRACT AWARD FOR CITYWIDE
RESIDENTIAL STREET REPAIR —
PHASE 16 AND SANTIAGO PARK
ROADWAY IMPROVEMENT (PROJECT
NOS. 126753, 112618 AND 127531)
r
r I,.z -CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED (5-6-12
ZAs Recommended) cZSC.'
❑ As Amended
❑ Ordinance on 1st Reading
❑ Ordinance on 2nd Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
1. Award a contract to R.J. Noble Company, the lowest responsible bidder, in accordance with
unit bid prices in the estimated amount of $2,394,149.70 for construction of Citywide
Residential Street Repair — Phase 16, Santiago Park and Memorial Park Neighborhood
Roadway Improvements.
2. Approve a funding analysis with a total estimated construction cost of $2,992,500.
DISCUSSION
This phase of the City's Residential Street Repair Program consists of the remaining asphalt
residential streets that are in need of repair. These segments of local streets have been identified
as a high priority for rehabilitation in the City's pavement management system (Exhibit 1). The
pavement is deteriorating due to weather, age, and heavy usage. The project provides for grinding
asphalt, asphalt pavement overlay, reconstruction, and replacement of damaged concrete curbs,
gutters, sidewalks, cross gutters, and curb ramps.
Additionally, the Santiago Park roadway off of Memory Lane has been deteriorated due to age and
use. The asphalt roadway serves the wildlife and watershed center, nature reserve, and archery
range in Santiago Park. The project includes roadway improvements, decomposed granite, a
retaining wall, and a wrought iron fence and gate.
The project utilizes the most cost - effective, innovative, and environmentally sound technologies,
including recycling of existing asphalt pavement. The project also provides for grinding asphalt,
asphalt pavement overlay, and replacement of damaged concrete curbs, gutters, sidewalks, cross
gutters, and curb ramps. Once completed, these improvements will enhance the ride quality,
surface drainage, and appearance of the neighborhoods and park.
Contract Award for
Residential Street Repair — Phase 16
& Santiago Park Roadway Improvements
March 5, 2012
Page 2
The Notice Inviting Bids was advertised on January 18 and 19, 2012, with outreach efforts made to
12 Santa Ana contractors. Bids were opened on February 14, 2012. A summary of the bid notices
and the bid results follows:
Santa Ana Contractors receiving notices: 12
Contractors requesting bidding documents: 25
Bids received: 6
Bids received from Santa Ana Contractors: 1
NAME OF RESPONSIVE BIDDER
1. R.J. Noble Company
2. Excel Paving Company
3. Sequel Contractors
4. All American Asphalt
5. Elite Bobcat Service, Inc.
6. Hardy & Harper, Inc.
CITY BID AMOUNT
Orange
$2,394,149.70
Long Beach
$2,520,380.00
Santa Fe Springs
$2,537,826.00
Corona
$2,559,559.00
Corona
$2,598,953.00
Santa Ana
$2,696,000.00
The Engineer's estimate was $2,259,020. A total of six bids were received and all were
responsive. The lowest bid was submitted by R.J. Noble Company in the amount of $2,394,149.70.
Therefore, staff recommends awarding the contract to R.J. Noble Company.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended action is exempt
from further review. Categorical Exemption Environmental Reviews Nos. 2012 -01 and 2012 -11 will
be filed for this project. In addition, a Certification of Categorical Exemption and a Statutory
Worksheet have been prepared in accordance with the National Environment Policy Act.
FISCAL IMPACT
The funding analysis shows a total estimated construction cost of $2,992,500 for the project
(Exhibit 2). Funds are available in the Community Development Block Grant Fund (accounting unit
13518783 - 66220), Public Works Account for Residential Street Repair Fund (accounting unit
05817661- 66220), District 2 A &D /In -Lieu Fund (accounting unit 31213261- 66220), Deferred
Maintenance Fund (01113260- 66220), Water Production and Supply Fund (accounting unit
06017640- 66220) and Capital Outlay /Park Improvements Fund (accounting unit 05113263- 66220).
Contract Award for
Residential Street Repair — Phase 16
& Santiago Park Roadway Improvements
March 5, 2012
Page 3
Raul'G'odinez II
Executive Director
Public Works Agency
Nancy T. Edivards
Interim xe64ve Director
Community Development Agency
RG /ET
Exhibits: 1. Project Location Map
2. Funding Analysis
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
u
Gerardo Mouet
Executive Director
Parks, Recreation, & Community Services Agency
�•
,,t �� ;(_
FUNDING ANALYSIS
PROJECT NOS. 126753, 127531 AND 112618
CITYWIDE RESIDENTIAL STREET REPAIR — PHASE 16 AND
SANTIAGO PARK ROADWAY IMPROVEMENT
Construction Contract
$2,394,149.70
Contract Administration
$143,640.00
Inspection and Testing
$167,495.30
Survey Staking
$47,800.00
Contingencies
$239,415.00
TOTAL ESTIMATED CONSTRUCTION COSTS $2.992.500.00
Exhibit 2
. . . .
THE REGISTER This space for filing stamp only
625 N GRAND AVE, SANTA ANA, CA 92701
Telephone (714) 796 -7000 / Fax (714) 796 -6059
PROOF OF PUBLICATION
(2015.5 C.C.P.)
State of California )
County of ORANGE ) ss
Notice Type: BID - NOTICE INVITING BIDS
Ad Description:
Residential St Repair Ph16 & Santiago Park
I am a citizen of the United States and a resident of the State of California; I am
over the age of eighteen years, and not a party to or interested in the above
entitled matter. I am the principal clerk of the printer and publisher of the THE
REGISTER, a newspaper published in the English language in the city of
SANTA ANA, county of ORANGE, and adjudged a newspaper of general
circulation as defined by the laws of the State of California by the Superior
Court of the County of ORANGE, State of California, under date 11/19/1905,
Case No. A21046. That the notice, of which the annexed is a printed copy, has
been published in each regular and entire issue of said newspaper and not in
any supplement thereof on the following dates, to -wit:
01/18/2012, 01/19/2012
Executed on: 01/19/2012
At SANTA ANA, California
I certify (or declare) under
correct.
that the
and
MIIV�IVIV �IVIIVNYAI�III�I , IIVM�VIIV
CNS #: 2243667
NOTICE INVITING BID,
NOTICE IS HEREBY GIVEN
that the City of Santa Ana,
California will receive at the
City Hall -Ross Annex, (M-
43) , 20 Civic Center Plaza,
Santa Ana, California 92701,
the P blic Works A enc
FouR oor eo ton st,
on or before the hour o 2:00
p.m. on February 8, 2012
sealed bids and/or proposals
for
PROJECT 12 -6753
and 12 -7531
RESIDENTIAL STREET
REPAIR PHASE 16
AND
PROJECT 11 -2618
SANTIAGO PARK
ROADWAY IMPROVEMENT
Notice is hereby given
BIDDERS that this project is
funded with [Source of funds]
money, and that the rate of
wages for each craft or type
of work or mechanic
employed under this contract
shall be as specified under
the current determinations of
the De artment f Labor a
reau re under the av s-
Bacon & _t. Where a
discrepancy exists between
Federal and State prevailing
wage rate, the higher of the
two prevailing wage rates
shall apply.
Each bid shall be
accompanied by cash, a
cashiers or certified check
payable to the City of Santa
Ana, or bid bond issued by a
corporate surety, for an
amount not less than ten
percent (10 %) of the
aggregate of the bid, as a
guarantee that the BIDDER
will enter into the proposed
contract if the same is
awarded to him. The
signature of the BIDDER
on the bid bond must be
notarized.
The City Council reserves
the right to reject any or all
bids.
The successful BIDDER
must possess or obtain a
valid California Class A
Contractors prior to the
scheduled award date of this
contract.
The City of Santa Ana has
established an Annual
Anticipated DBE Participation
Level (AADPL) of 15.91
(7.14/ Race Neutral and
8.77% Race Conscious) for
projects constructed this
fiscal year. This project has
a specific ntr
9081 of 8. °/a is
percentage shall apply only
to the cost of the COB G fund
in the amount of $729,938.
The UDBE commitment form
Exhibit 15 -G1 may be
submitted with the bid
proposal. If the UDBE form is
not submitted with the bid,
the apparent low bidder, the
second low bidder, and the
third low bidder must
complete and submit the
form to the City. The Form
must be received by the City
no later than the time
specified in the Federal
Reauirement of Appendix F
of the Special Provisions.
Substitution of securities for
any monies withheld by the
City of Santa Ana to ensure
performance is allowed in
accordance with the Public
Contract Code.
Complete A I ac ronic eta Of
th a PI ns and Specifications
will be furnished upon
application to the Public
W rk A n unter First
FI r 2 ivi nt r Plaza,
S nta Ana li rnia 9 2701.
phone (714) 647.564 The
Plans and Specifications are
now available in portable
document format (PDF) on a
compact disk (CD) only.
There is no charge for the
Plans and Specifications on
Co. To request a CD by mail,
the Contractor must submit
an email request to
sarmourOsanta- ana.org and
provide the following
information: Company name,
mailing address, phone
number, Fed Ex account, and
email Subject heading: CD
Request for PROJECT 12-
6753 & 12 -7531
RESIDENTIAL STREET
REPAIR PHASE 16 AND
PROJECT 11 -2618
SANTIAGO PARK
ROADWAY
IMPROVEMENT. Checks are
no longer accepted. Any
addenda will be issued by
email to those who received
CDs directly from the Public
Works Agency.
DO NOT CALL
PURCHASING DIVISION
REGARDING
AVAILABILITY OF PLANS
AND SPECIFICATIONS.
1/18, 1119/12
CNS - 2243667#
THE REGISTER
LU w
520
:;c
-u
Z
ul
0
>
0
4
D
G)
m
m
m m
m
0
00
M
QO
M
>
>
O
C)
Z < >
0
>
>
r7l 0 6
p--iG)
C) r7l > —49
> z ro Z
- >
o r z
x
K
--I
0
Z;
Ln
C)
Cil
z
0
0
r- m
z z
m z
z M m
C:
M;u
. z
woo
c,
71 o
�, 0
0 Z
0
N3 C)
p 8
0 X
� (n
z
0
in
0
OD
CA
(7)
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Claudia C. Alvarez
COUNCILMEMBERS
David Benavides
Carlos Bustamante
Michele Martinez
Vincent F. Sarmiento
Sal Tinajero
February 1, 2012
ADDENDUM No. ONE
CITY OF SANTA ANA
PUBLIC WORKS AGENCY M -36
P.O. Box 1988
Santa Ana, California 92702
CITY MANAGER
David N. Ream
CITY ATTORNEY
Joseph W. Fletcher
CLERK OF THE COUNCIL
Maria D. Huizar
SUBJECT: PROJECT No. 12 -6753 and 12 -7531: Residential Street Repair Phase 16
and Project No. 11 -2618: Santiago Park Roadway Improvement
The following changes have been made to specifications of the subject project:
Specifications
1. Page iv, Notice Inviting Bids; Revise the first paragraph to read:
"NOTICE IS HEREBY GIVEN that the City of Santa Ana, California will receive at the
City Hall -Ross Annex, (M -43), 20 Civic Center Plaza, Santa Ana, California 92701, the
Public Works Agency Fourth Floor Receptionist, on or before the hour of 2:00 p.m. on
February 14, 2012 sealed bids and /or proposals for..."
2. Page iv, Notice Inviting Bids; Revise the fourth paragraph to read:
"The City of Santa Ana has established an Annual Anticipated DBE Participation Level
(AADPL) of 15.91 (7.14% Race Neutral and 8.77% Race Conscious) for projects
constructed this fiscal year. This project has a specific UDBE Contract goal of 8.77 %.
This percentage shall apply only to the cost of the CDBG fund in the amount of
$1,229,938. The UDBE commitment form Exhibit 15 -G1 may be submitted with the bid
proposal. If the UDBE form is not submitted with the bid, the apparent low bidder, the
second low bidder, and the third low bidder must complete and submit the form to the
City. The Form must be received by the City no later than the time specified in the
Federal Requirement of Appendix F of the Special Provisions."
3. PB Page 22 and 23 of 31, Exhibit 15 -G1 and G2; Replace BP page 22 and 23 of
31 with the attached PB page 22 and 23 of 31.
All other terms and conditions remain the same.
FOR THE CITY OF SANTA ANA
2L ts', (Iffi� AAMA.L
Souri Amirani
City Engineer
CITY OF SANTA ANA
PROJECT 12 -6753 and 12 -7531
RESIDENTIAL STREET REPAIR PHASE 16
AND
PROJECT 11 -2618
SANTIAGO PARK ROADWAY IMPROVEMENT
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: R.J. NOBLE COMPANY
REQUIREMENT:
The undersigned declares that he /she has carefully examined the location of the proposed work, that
he /she has examined the Plans and Specifications
and read the accompanying instruction to BIDDERS,
and hereby proposes to furnish all material and do all
the work required
to complete the said work in
accordance with said plans (if any), specifications and
special provisions, for the unit price(s) or lump
sum(s) set forth in the following schedule:
Item # Bid Item
Unit
Quantity
Unit Price
Amount
1. Unclassified Excavation *
CY
7,300
$ 37, dU
$ a -70 /00. e-0
2. Clearing and Grubbing (Santiago Park)
LS
1
$20,000.00
$ 20,000.00
3. PCC Pavement Removal *
CY
4,620
$35.00
$ 161, 700.00
4. AC Pavement *
TN
20,200
$ �
$ 1 -.
5. Cold Milling *
SF
70,000
$0.19
$ 13,300.00
6. Cold Milling Base Material *
SF
86,000
$0.55
$47,300.00
7. Remove Excess Dirt *
CY
930
$32.15
$29,899.50
8. Pavement Fabric *
SY
12,000
$1.41
$ 16, 920.00
9. PCC Curb and Gutter *
LF
1,440
17 �6
$_a �. 00
10. PCC Curb (Type B -1)*
LF
720
$10.5-o
$
IL PCC Sidewalk (T =4 ") *
SF
4,370
$ 3 • a
$
12 PCC Sidewalk (T =6 ") *
SF
740
$ S. � a
a3o, 00
$ ,-'
BP I of 31
TO BE INCLUDED IN BID PACKAGE
f 1
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531 &11-2618
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL, continued
Item # Bid Item
Unit
Quantity
Unit Price
Amount
13.
PCC Curb Ramp *
SF
10,000
$..1-50
Dd
$ %�� -
14.
PCC Driveway Approach *
SF
3,300
$
gyp, DO
$ 19,09
15.
PCC Cross Gutter *
SF
5,700
$
T �?
$ 3v O. �J
16.
PCC Grinding *
LF
220
$ 32.00
$7,040.00
17.
Adjust Survey Monument to Finished
EA
3
$
289.00
$ 867.00
Grade *
18.
Adjust Manhole to Finished Grade *
EA
66
$
525.00
$ 34, 650.00
19.
Furnish and Install Water Valve Box
EA
37
$
625.00
$ 23,125.00
Frame and Cover *
20.
Adjust Misc Utility Frames and Covers
EA
4
$
755.00
$3,020.00
(Santiago Park)
21,
Root Shave *
EA
40
$
67.60
$ 2,704.06
22.
Traffic Loop Detector *
EA
30
$
195.00
$ 5,850-00
23.
Signing and Striping (Parton, Van Ness,
LS
1
$
4,450.00
$ 4,450.00
Ross, Birch, & Sycamore)
24.
Signing and Striping (all other
LS
1
$
28,000.00 $ 28,000.00
residential streets)
-
25.
Signing and Striping (Santiago Park)
LS
1
$_3,
600.00
$ 3,600.00_
26
Loop Detectors (Santiago Park) t
EA
2
$
195.00
$ 390.00
27.
Tie -out and Reestablish Survey
EA
30
$
315.00
$ 9,450.00
Monuments (Phase 16)
28.
Decomposed Granite Pavement *
TN
21
$
165.00
$ 3,465.00
29.
Aggregate Base *
TN
13
$
132.00
$ 1,716.00
30.
Crushed Rock *
TN
300
$
67.00
$ 20,100.00
BP2of31
TO BE INCLUDED IN BID PACKAGE
U
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL & CONTRACT AGREEMENT
BID PROPOSAL, continued
Item # Bid Item
Unit
Quantity
Unit Price
Amount
31.
Concrete Retaining Wall 4' -8"
LF
100
$375.00
$ 37,500.00
32.
Stone Pavers *
SF
500
$11.50
$ 5,750.00
33.
Recycle Solid Plastic Lumber Edging *
LF
4,794
$8.50
$ 40, 749.00
34.
Wrought Iron Fence 5.0'
LF
322
$73.00
$ 23, 506.00
35.
Wrought Iron Fence 6.0'
LF
50
$91.50
$ 4,575.00
36.
Wrought Iron Gate 6.0' w/ Operator
EA
1
$10,100.00
$ 10 ,100.00
37.
Precast Concrete Wheel Stop
EA
8
$79.00
$ 632.00
38.
Concrete Filled Steel Pipe Bollard
EA
12
$700.00
$ 8,400.00
TOTAL BID-------------------------------------------------------------------- - - - - -- $ A 3 0 3 10#7 q v
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to
the "25 %" limit as stated in Section 3 -2 of the Standard Specifications. The actual amount for this
item will be dictated by the actual quantity used, and the Agency reserves the right to increase or
decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 2 -3.2 of the Standard Specifications.
PROJECT 12 -6753 and 12 -7531 Firm
RESIDENTIAL STREET REPAIR PHASE
16
AND
PROJECT l 1 -2618 Address
SANTIAGO PARK ROADWAY
IMPROVEMENT Phone
Fax
BIDDER
R.J. NOBLE COMPANY
15505 E. LINCOLN AVE.
ORANGE, CA 92865
(714) 637 -1550
(714) 637 -6321
Email JENNIFERDEIONGH @RJNOBLECOMPANY.COM
BIDDER
Signature X
HAEL I CARVER, PRESIDENT
TO BE INCLUDED IN BID PACKAGE
BP 3 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB - CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; %z% of the bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: ' /2% of the bid
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
NAME (3S
C6nLr i�-
LOCATION
(pro n L, C /A
PHONE q 5(
0124- r2g6�
TYPE OF WORK
$Jy Do
NAME (f_6f/I
f eACP,
LOCATION
(9
PHONE I (W
?yLI- y
TYPE OF WORK
erg $ da
_
NAME S� i'i"►150
C�P,'Fr i�L.
LOCATION
PHONE
TYPE OF WORK
Lv,q� $ i
NAME ( n �0,A f
LOCATION
PHONE 310
117-6L Sd
TYPE OF WORK
NAME OL
S+r,\p 1nq
LOCATION
PHONE
TYPE OF WORK
S ( i $ O , 0-i
R.J. NOBLE COMPANY
Name o Fi Su
fitting Bid
X
fig ure of BIDDER
MICHAEL I CARVER,
PRESIDENT
NAME _ Cq Ae Lai ply U
LOCATION
PHONE 11V
TYPE OF WORK U $ Q 49
NAME t( C.01 ff--42-
LOCATION p-A
PHONE 'j 1 q 8W . q [&—s
TYPE OF WORK _$—
n1
NAME
LOCATION
PHONE
TYPE OF WORK $
NAME _
LOCATION
PHONE
TYPE OF WORK $
NAME
LOCATION
PHONE
TYPE OF WORK
TO BE INCLUDED IN BID PACKAGE
BP4of31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 1.2 -7531, & 11 -261.8
PROPOSAL & CONTRACT AGREEMENT
BIDDER'S STATEMENT
BIDDER understands and agrees that this written proposal (or any part thereof specifically designated
and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement
between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by
the Clerk of the Council with her signature and official seal noting hereon the action of approval of the
Council, signed by the Public Works Agency Executive Director or his duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its execution, and
when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he /she will
furnish AGENCY all required bonds and certificate of liability insurance within-ten (10) days (excluding
Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or-BIDDERS bond
substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and
shall be considered as payment of damages due to the delay and other causes suffered by AGENCY
because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S
bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in
the bid schedule are solely for the purpose of comparing bids, and that final compensation under the
contract will be based upon the actual quantities of work satisfactorily completed.
All terms contained in the Specifications, the Certification of Non - Discrimination by Contractors, and
the Workers' Compensation Insurance Certificate are to be incorporated by reference into this
Agreement and are made specifically as part of this bid.
Name of Firm R.J. NOBLE COMPANY
Signature of
BIDDER x �iil�T
Title MICHAEL J. CARVER, PRESIDENT
(if an individual, so state)
TO BE INCLUDED IN BID PACKAGE
BP 5 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT continued
(If a firm or co- partnership, state the firm name and give the names of all individual co- partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
R.J. NOBLE COMPANY, A CALIFORNIA CORPORATION
MICHAEL J. CARVER, PRESIDENT; CRAIG PORTER, VICE PRESIDENT;
STEVE MENDOZA, SECRETARY; JAMES N. DUCOTE, TREASURER
Awarded t .
on the basis of iov4t responsible and responsive
bidder in the amount of
$
ATTEST:
CLERK OF THE COUNCIL
APPROVED AS TO FORM:
'CITY ATTORNEY
ACTION OF COUNCIL:
Date _fj �, 20 �OC�
ACCEPTED FOR THE CITY OF SANTA ANA:
o �
TIVE DI C OR
EXE U
PUBLIC WORKS AYSENCY
BP 6 of 31
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
(THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS
PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND
EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS
PROPOSAL)
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The BIDDER R.J. NOBLE COMPANY
proposed subcontractor
, hereby certifies
that he has X , has not , participated in a previous contract or subcontract subject to the equal
opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required,
he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract
Compliance, a Federal Government contracting or administering agency, or the former President's
Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the
Secretary of Labor (41 CFR 60- 1.7(b) (1)), and must be submitted by BIDDERS and proposed
subcontractors only in connection with contracts and subcontracts which are subject to the equal
opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity
clause are set forth in 41 CFR 60 -1.5. (Generally only contracts or subcontracts of $10,000 or
under are exempt.)
Currently, Standard Form 100 (EEO -1) is the only report required by the Executive Orders or
their implementing regulations.
Proposed Prime Contractors and Subcontractors who have participated in a previous contract or
subcontract subject to the Executive Orders and have not filed the required reports should note that 41
CFR 60- 1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a
report covering the delinquent period or such other period specified by the Federal Highway
Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.
TO BE INCLUDED IN BID PACKAGE
BP7of31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR
The undersigned contractor or corporate officer, during the performance of this contract, certifies as
follows:
1. The Contractor shall not discriminate against any employee or applicant for employment because
of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to their
race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination
clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he /she has
a collective bargaining agreement or other contract or understanding, a notice to be provided advising
the said labor union or workers' representatives of the Contractor's commitments under this section, and
shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,
and will permit access to his /her books, records, and accounts by the administering agency and the
Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations,
and orders.
6. In the event of the Contractor's non - compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or
suspended in whole or in part and the Contractor may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies
invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order
of the Secretary of Labor, or as otherwise provided by law.
TO BE INCLUDED IN BID PACKAGE
BP8of31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR (continued
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or
purchase order as the administering agency may direct as means of enforcing such provisions, including
sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in,
or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency, the Contractor may request that the United States enter into such litigation to
protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any contractor of public works violating
this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8. 2012
TO BE INCLUDED IN BID PACKAGE
BP9of31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
WORKERS' COMPENSATION INSURANCE CERTIFICATION
As required by California Labor Code Section 1860 and 1861, the Contractor certifies as follows:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for worker's compensation or to undertake self - insurance in accordance with the
provisions of the Code, and I will comply with such provisions before commencing the performance of
the work of this contract.
If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer
under California Labor Code Section 3300, unless the hired employee(s) is (are) persons excluded by
said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers'
compensation insurance carrier certifying that I carry such insurance and that the policy shall not be
canceled nor the coverage reduced except upon thirty (30) days prior written notice to the City of Santa
Ana. i
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 10 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which
BIDDER has performed similar work within the past two years.
1. CITY OF DANA POINT, 33282 GOLDEN LANTERN, DANA POINT, CA 92629
Name and Address of Owner.
ARCHIE REMPHER (949) 248 -3558
Name and Telephone Number of person familiar with project.
$1,287,888.15 ANNUAL ROADWAY RESURFACING 09/10 - 05111
Contract Amount Type of Work Date Completed
2, CITY OF NORWALK, 12700 NORWALK BLVD., NORWALK, CA 90650
Name and Address of owner.
RANDY HILLMAN (562) 929 -5719
Name and Telephone Number of person familiar with project.
$1,174,215.00 STUDEBAKER RD. REHAB.
Contract Amount Type of Work
3. CITY OF TUSTIN, 300 CENTENNIAL WAY, TUSTIN, CA 92780
Name and Address of owner.
THOMAS MURPHY (714) 573 -3167
Name and Telephone Number of person familiar with project.
$1,726,554.92
Contract Amount
JAMBOREE RD. REHAB
Type of Work
05110 - 04/11
Date Completed
04/10 - 09/10
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom
BIDDER intends to procure insurance and bonds.
STONG SURETY INSURANC SERVICES, MIKE STONG (951) 343 -0382
4850 ARLINGTON AVE., STE B, RIVERSIDE, CA 92504
TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA. (909) 612 -3000
TO BE INCLUDED IN BID PACKAGE
BP 11 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code
regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000
or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor under the
apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he /she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same manner as
the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to
the California Apprentice Council.
Signed
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 12 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
NON - COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner,
directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price
of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of
any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further, that the
BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non - collusion Affidavit is part of the Proposal. Signing this Proposal on the
signature portion thereof shall also constitute signature of this Non - collusion Affidavit. BIDDERS
are cautioned that mgt false certification may subject the certifier to criminal prosecution.
Signed X
MICR J. CARVER, PRESIDENT
State of Califorffia
County of ORANGE
Subscribed and sworn to (or affirmed) before me on this 8 day of FEB. , 2012, by
MICHAEL J. CARVER_, proved to me on the basis of satisfactory evidence to be the person(s) who
appeared before me.
J. O IONSH
Commission # 1954610
Notary Public - California
Orange County
MY li Signature Notary Public Seal Comm. es Oct 28 2015
TO BE INCLUDED IN BID PACKAGE
BP 13 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12- 7531,& 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING "ANTI- KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the Copeland "Anti- Kickback" Act (18 USC 74) as supplemented in
the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or
subcontractor shall be prohibited from inducing, by any means, any person employed in the construction
or repair of public work, to giv p any part of the compensation to which he /she is otherwise entitled.
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 14 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
CONTRACTOR'S LICENSING STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is
true and correct.
Contractor's Name: R.J. NOBLE. COMPANY
Business Address: 15505 E. LINCOLN AVE., ORANGE, CA 92865
Telephone: (714) 637 -1550
State Contractor's License No. and
Class: 782908; A & C -12
Expiration
Date: AUGUST 31. 2012
Signed: X
Title: MICHAEL J. CARVER, PRESIDENT
TO BE INCLUDED IN BID PACKAGE
BP 15 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT CLAUSES
SECTION 3 - CONTRACT CLAUSES
A. The work to be performed under this contract is subject to the requirements of Section 3 of the
Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 170lu (Section 3). The
purpose of Section 3 is to ensure that employment and other economic opportunities generated
by HUD assistance or HUD - assisted projects covered by Section 3, shall, to the greatest extent
feasible, be directed to low- and very low- income persons, particularly persons who are
recipients of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135, which
implement Section 3. As evidenced by their execution of this contract, the parties to this contract
certify that they are under no contractual or other impediment that would prevent them from
complying with the part 135 regulations.
C. The contractor agrees to send to each labor organization or representative of workers with which
the contractor has a collective bargaining agreement or other understanding, if any, a notice
advising the labor organization or workers' representative of the contractor's commitments under
this Section 3 clause, and will post copies of the notice in conspicuous places at the work site
where both employees and applicants for training and employment positions can see the notice.
The notice shall describe the Section 3 preference, shall set forth minimum number and job titles
subject to hire, availability of apprenticeship and training positions, the qualifications for each;
and the name and location of the person(s) taking applications for each of the positions; and the
anticipated date the work shall begin.
D. The contractor agrees to include the Section 3 clause in every subcontract subject to compliance
with regulations in 24 CFR Part 135, and agrees to take appropriate action, as provided in an
applicable provision of the subcontract or in this Section 3 clause, upon a finding that the
subcontractor is in violation of the regulations in 24 CFR Part 135. The contractor will not
subcontract with any subcontractor where the contractor has notice or knowledge of that the
subcontractor has been found in violation of the regulations in 24 CFR Part 135.
TO BE INCLUDED IN BID PACKAGE
BP 16 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
SECTION 3 - CONTRACT CLAUSE continued
E. The Contractor will certify that any vacant employment positions, including training positions,
that are filled (1) after the contractor is selected, but before the contract is executed, and (2) with
persons other than those to whom the regulations of 24 CFR Part 135 require employment
opportunities to be directed, were not filled to circumvent the contractor's obligations under 24
CFR Part 135.
F. Noncompliance with HUD's regulations in 24 CFR part 35 may result in sanctions, termination
of this contract for default, and debarment or suspension from future HUD assisted contracts.
G. With respect to work performed in connection with Section 3 covered Indian housing assistance,
Section (7) b of the Indian Self- Determination and Education Assistance Act (25 U.S.C. 450e)
also applies to the work to be performed under this contract. Section 7(b) requires that to the
greatest extent feasible (I) preference and opportunities for training and employment
subcontracts shall be given to Indians, and (ii) preference in the award of contracts and
subcontracts shall be given to Indian organizations and Indian -owned Economic Enterprises.
Parties to this contract that are subject to the provisions of Section 3 and Section 7 (b) agree to
comply with Section 3 to the maximum extent feasible, but not in derogation of compliance with
Section 7(b).
For the purpose of training and employment the primaLy Section 3 covered project area is the
area in closest proximity to the actual construction work site within the U.S. Census Tract in
which the project is located. It is understood that priority for employment opportunity is to be
given to residents residing within the primary Section 3 area as defined.
A Section 3 area resident is any lower income individual residing within the Section 3 area,
whose total family income does not exceed 80% of the median income of the metropolitan
statistical area in which the project is located (Orange County). A public housing resident is
defined by regulations as Section 3 resident, regardless of income.
The contractor and each subcontractor certifies that they will provide, to the greatest extent
feasible, opportunities for employment to lower income residents (local residents) and job
opportunities in connection with projects in their neighborhoods. For fiscal year 1996 -97,
minimum goal for each project is 30 %.
TO BE INCLUDED IN BID PACKAGE
BP 17 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
SECTION 3 - CONTRACT CLAUSE continued
The Contractor /Sub- contractor /Service Provider by the signature affixed hereto declares under
penalty of perjury: Contractor /Sub- contractor /Service Provider has read Section 3 requirements
and accepts all its requirements contained therein for all of his /her operations within the City of
Santa Ana.
X ., / —
Signature
MICHAEL J. CARVER, PRESIDENT
Print Name and Title
CRAIG PORTER, VICE PRESIDENT
Print Name and Title
STEVE MENDOZA, SECRETARY
Print Name and Title
FEBRUARY 8, 2012
Date
TO BE INCLUDED IN BID PACKAGE
BP 18 of 31
CITY OF SANTA ANA
PROJECTNOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
FEDERAL REQUIREMENTS FOR FEDERAL -AID CONSTRUCTION PROJECTS
GENERAL —The work herein proposed will be financed in whole or in part wish
Federal funds, and thetefae all ofthe daft t Hiles and nuWons promulgated by
the Federal Gove mhent and applicable to work finanoed in whole or in pat with
Federal finds will apply to such work. The "Regt � Contrract Provisions, Federal -
Aid Ccnshuc ion Cormads, "Form FHWA 1273, am included in this Section 14.
Wherever in said required oartract provisions refaenoes are made to ' SHA
Cortacting officer," "SHA resident enganea," or "arthofi2ed representative of the
SF ' such references shall be oorshied tb mean "Engine°' as defined in Section
1 -1.18 ofthe Standard Specifications
PERFORMANCE OF PREVIOUS CONTRACT - In addition b the
provisions in Section Il, 'Nondisaiminatioq" and Section VII, "Subletting or
Assig mig the Contract" of the required contact provisions, the Contiacbr shall
amply with the following:
The BIDDER shall o=ute the CERTIFICATION WITH REGARD TO
THE PERFORMANCE OF PREVIOUS CONTRACTS OR
SUBCONTRACTS SUBJECT TO THE EQUAL OPPORTUNITY
CLAUSE AND THE FILING OF REQUIRED REPORTS located in the
proposal. No request br subletting or assigi ng any portion of the oonW in
eco of$ 1Q000 will be considered under the provisions ofSectionVIIofthe
required eormact provisions unless such request is a000rnpanied by the
CERTIFICATIONreferredbabove, executed bytheproposeda bmtactor.
NON - COLLUSION PROVISIONS - The prwisiors in this section are
applicable to all contracts o=pt contracts for Federal Aid Seeohday projects.
Tide 23, United Staffs Code, Section l I2, requires as a condition preoedart to
approval by the Fedetal Hem-ay Administr" of the contract for this work that
each BIDDER file a sworn statement ea=ubd by, or on behalf of; the person, firm,
association, or corporation to whom such oared is to be awarded, oertifying that
srxih person, firm, association, or eorporim has nch eidxr directly or indirectly,
eked inlo any agreement, paticipamed in any collusion or otherwise taken any
action in resiraintoffiee competitive bidding in eo viabon with the submitted bid A
form to make the non-collusion aflidavit suiernert required by Section 112 as a
oertifration underpenalty ofpejury ra6wthan as a sworn smeme t as pemitim1 by
28, USC, Sec.1746, is included in the proposal.
PARTICIPATION BY DISADVANTAGED BUSINESS
ENIERPRLSES IN SUBCONfRAcnNG - Pat 26, Trde 49, Code ofFederal
Regulations supplies b this Federakrid project Pertinent sections of said Code are
moaporated in partorin its ehtiretywidnnmodwsections ofthesespecial provmors.
Sdhedule B- Iribmation forDebminingJoint Verdml ligrbrlity.
Attaduneht
Exl"A -FRI
8-07-97
BP 19 of 31
(This form need not be filled in if all joint venture firms are minority
owned.)
I. Name of joint venture y'A
2. Address of join venture
3. Phone number of joint venture
4. Identify the firms which comprise thejoint venture. (The DBE
partner must complete Schedule A)
a. Describe the role of the DBE firm in this joint venture.
b. Describe very briefly the experience and business qualifications of
each non -MBE joint venture:
5. Nature of thejoint venture's business
6. Provide a copy of thejoint venture agreement.
7. What is the claimed percentage of DBE ownership?
8. Ownership of joint venture: (This need not be filled in if described
in thejoint venture agreement, provided by question (6).
a. Profit and loss sharing
b. Capital contributions,
including equipment.
c. Other applicable
ownership interests
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -753 1, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
9. Control of" participation in this contract. Identify by name, race,
sex, and "fine" those mclividuals (and their lilies) who am responsible
for day-to-,day aranagement and policy decision rnaWng, including,
Nameof rm
NameofFirm
but not limited to, those with prime responsibility fix-
a Financial decisions
Signature
Signature - —
Name
Name
b. Management decisions, such as:
1. Fstirhhamng
Tide
Title
Date
Date
2. Marketing and sales
Date
3. Nuing and firing of managerne t
State Of
County of
4. Purchasing of major items or supplies
On this
_ day of 20� before me appeared (name)
ID me personally known, who, being duly swan, did execute the
c. Supervision offield operations
foregoing affidavit and did state that he or she was }roperfy authonzed by (Name of firm)
to execubethe affidavit and did so as his or her fire act and deed.
Note: If, after filing this Schedule B and before the completion of the
Notary Public
joint venom's vwrk on the coritract covered by this regulation, there is
Commission expires
any significant change in the information submitted, the joint venture
must inform the grantee, either directly or through the prime
contractorifthejoint venture isasubcontractor.
Date
i -M..
"The undersigned swear that the foregoing statements am
correct and include all material infonh>ation necessary to idr* and
explain the term and operation of our joint venture and the intended
participation by each joint vent m in the trndriaking Further, the
undersigned covenant and agree to provide to grantee current;
complete and accurate infomnation regarding actual joint venture
work and the payrrnent therefore and arty proposed changes in arty of
the joint vendee anangerrnerls and to permit the audit and
examination of the books, recoils, and files of the joint venture, by
authorized representatives of the gmtee or the Federal funding
agency. Any material misepresantation will be grounds for
teminating arty contract which may be awarded and for initiating
action urxlerFedral or State laws mrnorning firlse sla rrerls."
Attachment
Exhibit A FR2
8 -07 -97
Stateof
County of
On this _ day of 20_, before me appeared
( Name) to me personally known, who being sworn, did execute the
foregoing affidavit and did state that he or she was properly authorized by (Name of fin n)
to execautethe affidavit and did so as his or her free act and deed
Notary Public_
Cornmissionexpires
[Seal]
BP 20 of 31
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROPOSAL AND CONTRACT AGREEMENT
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
DEBARMENT AND SUSPENSION CERTIFICATION
The BIDDER under penalty of perjury, certifies that except as noted below, he /she or any person
associated therewith in the capacity of owner, partner, director, officer, manager:
is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility
by any federal agency;
has not suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency
within past three years;
Does not have a proposed debarment pending: and
has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent
jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
NONE
Exceptions will not necessarily result in denial of award, but will be considered in determining
BIDDERS responsibility. For any exception noted above, indicate below to whom it applies, initialing
agency, and dates of action.
N/A
Note: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall
also constitute signature of this Certification.
Name of BIDDER R.J. NOBJ,,tr1QPMPANY
Signature of BIDDER V
Date FEB ARY 8. 2012
FED.8 -22 -88 MICHAEL J. CARVER, PRESIDENT
TO BE INCLUDED IN BID PACKAGE
BP 21 of 31
Exhibit 15 -G Local Agency Bidder UDBE Commitment (Construction Contracts)
NOTE: PLEASE REFER TO INSTRUCTIONS ON APPENDIX F
City of Santa Ana Santa Ana
AGENCY_ LOCATION
PROJECT DESCRIPTION PROJECT NO. Residential Street Repair PH 16 Project No 12-6753, 12 -7531, 11 -2618
TOTAL FEDERAL CONTRACT AMOUNT $1 229,93
BID DATE: Feb uary 14 2012
BIDDER'S NAME: R . NOBLE COMPANY
,ONTRACI UDBE GOAL: $107,865.63
'ONTRACT 1-1 FM OF WORK AND DESCRIPTION 'ert. No. of UDBF.
NAME OF t,DBF.s
DOLLAR AMOUNT
ITEM NO, OR SERVICES TO BE AND EXPIRATION
KNIust be certified on the date bids
UDBE:
SUBCONTRACTED OR MATERIALS DATE
are opened - include ODBF. address
TO BE PROVIDED
rid phone number)
#4 Portion of Asphalt Oil CT -10447
E.M. Oil Transport Inc.
250 liquid tons
08/02/2012
1145 S. Taylor Avenue
x $750.00 =
Montebello, Ca 90640
S187,500.00
323- 722 -9088
x 60%
$112,500.00
For Local Agency to Complete:
Local Agency Contract Number
Total Claimed
Participation
112,500.00
Federal Aid Project Number.
Federal Share
ontract Award Data.
Local Agency certifies that all information is complete and accurate.
- - --
-- — --
STEVE ME OZA, 4CRETARY
Print Name Signature Date
Signature oC idder
Local Agency Representative
02/14/2012
714- 637 -1550
Area Code 'Fele hone Number.
Datc (Area
- —
Code) Tel- No
For Caltrans Review:
Print Name Signature Date
Caltrans District Local Assistance Engineer
Local Agency bidder- UDRF Commim,ont(Rev , 09)
Distribution: (I) Copy -Fax or scan a copy to the Caltrans District Local Assistance Engineer (DL AE) within IS days of award. Failure to
send a copy to the DLAF. within 15 days of award may result in de- obligation of !ands Im this project
(2) Copy -- liiclude in award package to Caltrans District Local Assistance
(3) Original - Local agency filcs
TO BE INCLUDED IN BID PACKAGE
BP22of31
Exhibit 15 -G2 Local Agency Bidder DBE Information (Construction Contracts)
(Inclusive of all DBEs including the UDBEs listed at bid proposal)
NOTE: PLEASE REFER TO INSTRUCTIONS ON APPENDIX F
AGENCY: City of Santa Ana _ LOCATION. Santa Ana
PROJECT DESCRIP'l ION. PROJECT No Residential Street Repair PH 16, Project No. 12 -6753, 12 -7531, 11 -2618
OTAL FEDERAL CON'I -RACT AMOUNT SL _222-9-938 _
BID DA'I L{ 02/14/2012
BIDDERS NAME- R.J. NOBLE COMPANY
CONTRACT
ITEM N0,
ITEM OF WORK AND DESCRIPTION
OR SERVICES TO BE
SUBCONTRACTED OR MATERIALS
O BE PROVIDED
Cert. No. cfDBE
AND EXPIRATION
DA H
NAME OF DBEs
Must be certified on the date bids
are opened - include DBE address
and hone nuntbei) __ _
#4
_
Portion of sp a t I
CT -10447
E.M. Oil Transport
08/02/2012
1145 S. Taylor Ave
Montebello, Avenue, Ca
- - - --
-
- - - - --
- -- -
90640 -- - - - - --
— -
323 - 722 -9088
For Local Agency to Complete:
Local Agency Contract Number.
Federal Aid Prolec( Number.
Federal Share:
Contract Award Date.
Local Agency certifies that all information is complete and accurate
Print Name
Local Agency Representative
Area Code Telephone Number:
For Caltrans Review:
Signature
Total Claimed
Participation
AR AMOUNT —1
250 Liquid tons
x $750.00 =
$187,500.00
x 60% _
$112,500.00
S 112.500.00
100 %
Steve Men za, Sigretary
Date Signetureol'Bidder
02/14/2012 714- 637 -1550
Date (Area Code) "I -el No
Pi iut Name Signature Date
Caltrans District Local Assistance Engineer Local Agency Bidder - DBF Information (Rev 1;091
Distribution: (1) Conv— Fax or scan a coov to the Caltrans District Local Assistance Engineer ( DLAE) within 15 days of award Failure to
send a copy to the DLAE: within 15 days of award may result in de obligation of funds for this project
(2) Copy -- Include in award package to Caltrans District Local Assistance
(3) Original — Local agency files
TO BE INCLUDED IN BID PACKAGE
BP 23 of 31
CITY OF SANTA ANA
PROJECTNOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
NONLOBBYING
CERTIFICATION FOR FEDERAL AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best
of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influence or attempting to influence an officer or employee of
Congress, or an employee of a Member of Congress in connection with the awarding of any
Federal contract, the making of any Federal grant, the making of any Federal loan, the
entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriate funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any Federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative
agreement, the undersigned shall complete and submit Standard Form -LLL, "Disclosure of
Lobbying Activities," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making or
entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to
file the required certification shall be subject to a civil penalty of not less than $10,000 and not more
than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she
shall require that the language of this certification be included in all lower tier subcontracts, which
exceed $100,000 and that all such sub - recipients shall certify and disclose accordingly.
X
BM s Signature MICHAEL J. CARVER, PRESIDENT
R.J. NOBLE COMPANY
Firm
FEBRUARY 8, 2012
Date
• Standard Form LLL may be obtained from Caltrans and FHWA offices.
TO BE INCLUDED IN BID PACKAGE
BP 24 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
DISCLOSURE OF LOBBYING ACTIVITIES
Cmm�lete chic f o r m to licnlner Inht 6 rt o, «;.A *; T f e r 1
1. Type of Federal Action
2. Status of Federal Action
3. Report Type:
❑ a. Contract
❑ a. Bid/offer /application
❑ a. initial
b. Grant
b. initial award
b. material change'
c. Corporate Agreement
c, post -award
d. Ban
For Material Change only:
e. Loan Guarantee
year quarter
f. Loan Insurance
date of W ort
4. Name and Address of Reporting Entity
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and
Address of Prime:
❑ Prime ❑ Subwardee
Tier If known
Congressional District, i known
Congressional DL*ict, i known
6. Federal Department/Agency:
7. Federal Prograrn,,Mme/Description
CFDA Number, If applicable
8. Federal Action Number, fknown
9. Award'Amount, ifknown
-'s
10. a. Name and Address of Lobbying Entity
b. Individual Performing Services (erg aaEtr~csifdrf/ardfrornNo.
(�frrh lWn7nq,fislAlp '
Ilkr)
(kd namftgnww M9
attar Continuation
Shee s ) if necessary)
11. Amount of Payment (check all that apply): 13. Type of Payment (check all that apply)
$ ❑ Actual ❑ Planned' ❑ a. retainer
❑ b. one -time fee
12. Form of Payment (check all that apply): ❑ c. commission
❑ a. cash ❑ d. contingent fee
❑ b. in -kind; specify: nature _ ❑ e, deferred
value ❑ f. other, specify
14. Brief Description of Services PWrmed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for
Payment indicated in item 11:
attach Continuation Sheets i necess
15. Continuation Sh attached: Yes Ll No
16. Infonw6on reque�l�nough this form is a>Ihoria d by Tide 31 USC Secpon
1352. This disclosuar,6fobbyingactivitiesisamabia lrgx onoffactupon
Signature X -
which reliance plaoad by thetierabove when thetransaction was madeorentem 1
into. This ' istequiredpursuantto31 U.S.C. 1352 This infom26onwiilbe
Print Name ICHAEL J. CARVER
repottedtb Congressserniannually and will be available forpublic ¢specbm
Any whofasbfilethe► equireddiscloaueshallbesubjecttoaavilpamllyof
Title PRESIDENT
not than $10,000and not more than$100,000foreachsuchfa ue.
Tele hone No. 714) 637 -1550 Date FEBRUARY 8, 2012
Federal Use Only:
Authorized for Local Reproduction
Standard Form — LLL
TO BE INCLUDED IN BID PACKAGE
BP 25 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING REQUIRED FEDERAL CONTRACT PROVISIONS (Form
FHWA -1273)
The undersigned, is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the required Federal Contract Provision (Form FHWA -1273) as
shown in the appendix of the spSpial provisions of this project.
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8. 2012
TO BE INCLUDED IN BID PACKAGE
BP 26 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION FOR FEDERAL AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or
her knowledge and belief; that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,
to any person for influencing or attempting to influence an officer or employee of any Federal
Agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member
of Congress in connection with the awarding of any Federal contract, the making of any Federal
grant, the making of any Federal loan, the entering into of any cooperative agreement, and the
extension, continuation, renewal, amendment, or modification of an Federal contract, grant, loan,
or cooperative agreement.
(2) If any funds other Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with Federal contract, grant, Ioan, or cooperative agreement, the undersigned shall
complete and submit Standard Form -LLL *, "Disclosure of Lobbying Activities" in accordance
with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into this
transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification
shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her proposal that he or she shall require that
the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all
such sub - recipients sh certify and disclose accordingly.
X
BIDDE gnature MICHAEL J. CARVER, PRESIDENT
R.J. NOBLE COMPANY
Firm
FEBRUARY 8, 2012
Date
i Z;, N 3s,. r °auisK ,. p '. -:'I
TO BE INCLUDED IN BID PACKAGE
BP 27 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12- 7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S CERTIFICATE OF COMPLIANCE REGARDING "BUY AMERICA" REQUIREMENTS
FOR STEEL OR MANUFACTURED PRODUCTS
The undersigned, is submitting this proposal for performing by contract the work required by these bid
documents, certify to comply with the " Buy America" requirements of Section 165 of the Surface
Transportation Assistance AcIX 1982 and as shown in the special provisions of this project.
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 28 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the BIDDER
hereby declares
under penalty of perjury under the laws of the State of California that the BIDDER has _ , has not X
been convicted
within the preceding three years of any offenses referred to in that section, including any charge of
fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in
connection with the bidding upon, award of, or performance of, any public works contract, as defined in
Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section
1 100, including the Regents of the University of California or the Trustees of the California State
University. The term "BIDDER" is understood to include any partner, member, officer, director,
responsible managing officer, or responsible managing employee thereof, as referred to in Section
10285.1.
Note: The BIDDER must place a check mark after "has" or "has not" in one of the blank spaces
provided. The above Statement is part of the Proposal. Signing this Proposal on the signature
portion thereof shall also constitute signature of this Statement. BIDDERS are cautioned that
making a false certification may subject the certifier to criminal prosecution.
Signed X
Title
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 29 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12 -7531, & 1 ] -2618
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10162 OUESTIONAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of
perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary
interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or
completing a federal, state, or local government project because of a violation of law or a safety
regulation?
Yes No X
If the answer is yes, explain the circumstances in the following space.
N/A
TO BE INCLUDED IN BID PACKAGE
BP 30 of 31
CITY OF SANTA ANA
PROJECT NOS. 12 -6753, 12- 7531, & 11 -2618
PROPOSAL AND CONTRACT AGREEMENT
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of
perjury, that no more than one final unappealable finding of contempt of court by a federal court has
been issued against the Contractor within the immediately preceding two year period because of the
Contractor's failure to comply with an order of a federal court which orders the Contractor to comply
with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal
on the signature portion thereof shall also constitute signature of this Statement and
Questionnaire.
BIDDERS are cautioned that making a false certification may subject the certifier to
criminal prosecution.
Signed X
Title MICHAEL J. CARVER, PRESIDENT
Firm R.J. NOBLE COMPANY
Date FEBRUARY 8, 2012
TO BE INCLUDED IN BID PACKAGE
BP 31 of 31
FEDERAL MINIMUM
WAGE RATES
Insert the Federal minimum wage rates in Appendix H. Go to Caltrans website to obtain a copy:
httj2://www.access.gpo.gov/davisbacon/ca.html
Scroll down to Orange County
Select latest highway entry
TO BE INCLUDED IN BID PACKAGE
BP 32 of 31
It
BID BOND
KNOW ALL MEN BY THESE PRESENTS,
That we, R. J. NOBLE COMPANY
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Hartford. Connecticut 06183
as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of
Hartford, Connecticut, a corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter
called the Surety, are held and firmly bound unto
CITY OF SANTA ANA
as Obi glee hereinafter Caliwj the Ohii;imp in the stem of TEN PERCENT OF THE AMOUNT OF THE BID
Dollars ($ 10% OF BID ), for the payment of which sum well and truly to be made, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid for
PROJECT 12 -6753 AND 12 -7531 RESIDENTIAL STREET REPAIR PHASE 16 AND
PROJECT 11 -2618 SANTIAGO PARK ROADWAY IMPROVEMENT
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Cofiract and give such bond or bonds, if the Piinc ipai shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Wort. covered by said bid, then !his obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this 30th day of JANUARY
(Witness)
2012
R.J. NOBLE C9KPANY
(P►imipal) (Saar)
MI EL J. CARVER, PRESIDENT (Title)
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
(Witness)
BY
MICHAEL .t STONG (Attorney-in-Fact)
Printed in cooperation with the American Institute of Architects (AIA) by Travelers Casualty and Surety
Company of America. The language in this document conforms exactly to the language used in AIA
Document A310, February 1970 edition.
S-! ?69, rm_oT
1 ,11
CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT
State of California
County of Orange
On February 01, 2012 before me, J. DeIongh, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Michael J. Carver
J. DE10NGH
Commission # 1954610
Notary Public - California
Orange County
M Comm. Expires Oct 28,201
Name(s) of Signer(s)
CIVIL CODE § 1189
who proved to me on the basis of satisfactory
evidence to be the person frs� whose namge is /afe
subscribed to the within instrument and acknowledged
to me that he /s4ell executed the same in
his /fir authorized capacity and that by
his /her /their signature() on the instrument the
personx, or the entity upon behalf of which the
personagf acted, executed the instrument.
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
hand ahld /dfficial seal.
Signatwe,.- k A I
Place Notary Seal Above OPTIONAL Signature of Notary Public
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above: —
Capacity(ies) Claimed by Signer(s)
Signer's Name:
1 Corporate Officer — Titie(s): _
C Individual
1-1 Partner — L.1 Limited Ci General Top of thumb here
1 Attorney in Fact
Ci Trustee
Cl Guardian or Conservator
CI Other:
Signer Is Representing:
Number of Pages:
Signer's Name:
Cl Corporate Officer — Title(s): _
Individual Lei 1149M
Cl Partner — O Limited f. -_I General Tot, of thumb hHre
Attorney in Fact
❑ Trustee
• Guardian or Conservator
• Other:
Signer Is Representing:
vcu o rvao , y rssoaauon • rvauonaiwiary.org - i -WU -UJ NUiAHV (7 -800 -676 -6827)
Item #5907
CALIFORNIA ALL - PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of RIVERSIDE
On
personally appeared
before me, R. NAPPI "NOTARY PUBLIC"
MICHAEL D. STONG
(Here insen name and title of the officer)
who proved to me on the basis of satisfactory evidence to be the person,Wwhose name(sfis /arc subscribed to
the within instrument and acknowledged to me that he /sheA4tey executed the same in his /heW+hetr authorized
capacityt(ie4 and that by his /ht:.d4wir signaturcKon the instrument the person 'f, or the entity upon behalf of
which the personwacted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
R. NAPPI
COMM. #1796916
NOTARY PUBLIC - CALIFORNIA
RIVERSIDE CO�2O My Comm. Expires J
(Notary Seal)
ADDITIONAL OPTIONAL INFORMATION
DESCRIPTION OF THE ATTACHED DOCUMENT
(Title or description ofattached document)
(Title or description of attached document continued)
Number of Pages Document Date
(Additional information)
CAPACITY CLAIMED BY THE SIGNER
❑
Individual (s)
❑
Corporate Officer
(Title)
❑
Partner(s)
❑
Attorney -in -Fact
❑
Trustee(s)
❑
Other
2008 Version CAPA vl2.10.07 800 - 873 -9865 www.NotarvClasses.com
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California must contain verbiage exactly as
appears abm,e in the notary section or a separate acknowledgment form must be
properly completed and attached to that document. The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be primed on such a document so long as the
verbiage does not require site notary to do something that is illegal for a notary in
California (i.e. certifying the authorl=ed capacity of the signer). Please check the
document carefulb, for proper notarial wording and attach this form tf required.
• State and County information must be the State and County where the document
signer(s) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e
tae /she/dwy, is /ere ) or circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
r Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
POWER OF ATTORNEY
TRAVELERS, Farmington Casualty Company St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 222079 Certificate No. 004084066
KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance
Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and
Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty
Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under
the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin
(herein collectively called the "Companies "), and that the Companies do hereby make, constitute and appoint
Michael D. Stong, Rosemary Nappi, and Jeremy Pendergast
of the City of Riverside , State of California , their true and lawful Attomey(s) -in -Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Compap0j have caused this instrument to be signed and their corporate seals to be hereto affixed, this
day of February LL
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
16th
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
G�SU.�� q�}�•�'y F \0.E 4 \�N 1//S` 'pl•� rygUq '4 JP�tY Apo NWwAAr Y'�
0—o 9m ^o' N. S81LL d'•.. 'Cf o•.'*... .:'�dD 66 Dt '4 �p
State of Connecticut
City of Hartford ss.
By:
Georg Thompson, nior ice President
16th February 2011
On this the day of , before me personally appeared George W. Thompson, who acknowledged
himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters,
Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety
Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,
executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
In Witness Whereof, I hereunto set my hand and official seal. ' G• A W Anr 4
My Commission expires the 30th day of June, 2011. �OUQL�G * Marie C. Tetreault, Notary Public
Cam'$
58440 -4 -09 Printed in U.S.A.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER , ."
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice
President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking
shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 3 day of t /C�YLf.'� i' 201 �-
Kori M. Johans Assistant Secretary
Gh54q�� Jy°fl0.E 6 4 ` ^N �ysG ''+"rNSU,e P tV A/yD _��jiY
02 �y�P�pp� "r 6 /� �, � .gyp QO: % ^....... 91 4JP: ..........,'9'`",�,`st 4J � yG 1y4�• 4W' 'w0
'h+tc++' e � 1951 �`'• S E A L i " � � o ' �, �� N 1896
' W
i n �• o o:S82f.L:•'a ' � ��
iy ��i ,� SL �G y..........i Lr d.•.... " >� ec0
To verify the authenticity of this Power of Attorney, call 1- 800 - 421 -3880 or contact us at www.travelersbond.com. Please refer to the Attomey -In -Fact number, the
above -named individuals and the details of the bond to which the power is attached.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
E.M. Oil Transport Inc.
MBE /WBE/DBE/UDBE Certified
Caltrans # 10447
State License # 838893, C -12
1145 S. Taylor Ave.
Montebello, Ca 90640
TEL ( 323)722 -9088 FAX (323)722 -5459
E -MAIL: EMOILTRANSPORT @SBCGLOBAL.NET
Date 2/15/12
Steve Mendoza
C/o R.J. Noble Company
From: Cristina Rodriguez
Proposal Re: City of Santa Ana project 12 -6753 and 12 -7531
Bid Date: 2/15/12
Est. Liquid Tons Item Price per ton
250 -300 PG64 -10 or PG6416 Market or Rack price ( Paramount Refinery)
All transportation not included in per ton price.
Haul quote to $ 15.50 per ton to R.J . Noble — Orange - Asphalt Plant
If any questions please give me a call.
PUBLICATION
AFFIDAVIT PILE COPY
DECLARATION � OF PUBLICATION
STATE OF CALIFORNIA,
[ � f D = 7c� DD
Suzie Davidson /Art director
15.505 c, lincoln avenue
ue, box 620
R .J. NOBLE
nran�e ca 92856
714- 637.1550
company fax 71,4. 637 -6321
RA, NOBLE COMPANY IS REQUESTING PARTICIPATION
FROM ALL QUALIFTED & CERTIFIED UDBE & DBE
SUBCONTRACTORS AND /OR SUPPLIERS FOR THE I~OLLOWING'
RESIDENTIAL STREET REPAIR PHASE 16 & SANTIAGO PART,
ROADWAY IMPROVEMENTS
PROTECT NO. 12-6753,12,7531 & 11 -2618
SANTA ANA, CA
BIA DATE /TIME: FEBRUARY 08, 201.2 AT 2:00 PM
Please respond by, February 08, 2012 before 2:00 pm
SEEKING QUALIFIED & CF.,RTIFIED UDEE & DBE SUBCONTRACTORS FORT
CONCRETE; STRIPING; MILT,,ING; FABRIC; UTILITIES; LOOPS; SURVEY:
TRES SERVICE; RET. WALL; PAVERS; FTNCE.
Please call if you have any duesttons.
R.J. NOBLE COMPANY
CONTACT. STEVE MENDOZA
711- 637 -1.550 • Fax 714 -637 -6321
0PP0RTU N I T Y 6MF1,0yfilt
The undersigned declares:
I am over the age of 18 years and a citizen of the United States, i am not a party to and have no interest in this
matter. I urn principal clerk o,f the publisher of the Construction Up -Date, Inc, and Minority Bidders Bulletin, a trade/
Focus publication in the City of San Diego, the County of San Diego, and the State of California. This notice, a true
copy hereon, was published on the below date(s): / .
I declare under penality of perjury that the foregoing is true and correct. Aga &IW1M
Executed at San Diego, California signature
DATES PUBLISHED
Q�; v�>
aAaAll
TR4.DF, PUBLICATION
�� ►� oc�i��P�U�
FOCUS PUB.LrCAT10N
ALSO DISPLAYED ON WEB SITE C http: / /Www.goo4 aithcffOrt.corn 00
Phone Number (858) X4$7 -26
16885 W, Bernardo Dr., Suite 335, San Diego, CA 92127 Fax Number (858) 487 -3500
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JULY 2, 2012
TITLE:
CONTINGENCY INCREASE WITH R.J.
NOBLE COMPANY FOR
RESIDENTIAL STREET REPAIR —
PHASE 16 (PROJECT NO. 126753)
NON GENERAL FUND
�����I _
t
CLERK OF COUNCIL USE ONLY:
APPROVED "� � ��/ 2
®mss Recommended oi38
0 As Amended
0 Ordinance on use Reading
0 Ordinance on 2ntl Reading
(] Implementing Resolution
� Set Public Hearing For_
CONTINUED TO
FILE NUMBER
RECOMMENDED ACTION
Increase the contingency for the contract with R.J. Noble Company for Residential Street Repair,
Phase 16, by $500,000, and authorize the City Manager to execute change orders in an amount
not to exceed the authorized contingency_
DISCUSSION
On March 5, 2012, the City Council awarded a contract to R.J. Noble Company in the estimated
amount of $2,633,564 for Residential Street Repair, Phase 16. During construction and while
removing the existing pavement, the contractor encountered areas where the street sections
were thicker than expected as well as a wet and unstable sub - grade. To ensure the integrity of
the new pavement, the excess water needs to be removed from the sub - grade. This process
requires additional excavation, which is greater than the amount specified in the contract, and
also strengthening the sub -grade with acement- treated soil. Since the additional work was not
included in the original contract amount, staff is requesting an additional contingency amount of
$500,000 to pay for the work.
FISCAL IMPACT
The contingency increase is $500,000 for the project. Funds are available in the Community
Development Block Grant Fund (accounting unit 13518783 - 66220).
APPROVED AS TO FUNDS AND ACCOUNTS:
��
.�, Ra odinez Francisco Jerre ,. /�,c�
Executive Dire for Executive Director "__�
Public Works Agency Finance &Management Services Agency
Nancy E ards
Interim E cutive Director
Community Development Agency
MEMORANDUM
Paul Walters
To: City Manager
Raul Godinez II
From: Executive Director Public Works Agency
�f_; �'
`•�e�' �
Date: October 16, 2012
Subject: PROJECT NOS. 12 -6753 & 12 -7531; RESIDENTIAL STREET REPAIR PHASE 16; 11 -2618;
SANTIAGO PARK ROADWAY IMPROVEMENT
REQUEST FOR APPROVAL OF CHANGE ORDER 1
Contractor:
Project Description
Account Unit:
05817661
Original Contract Cost:
Amount of The
Change Order:
Previously Approved
Change Orders:
Total Change Orders:
R.J. Noble Company
15505 E. Lincoln Avenue
Orange, CA 92865
Residential Street Repair and Park roadway improvements
Account:
66220
$2,394,149.70
$185,154.87
$ -0-
$185,1 54.87
Activity:
12675301028
of Original
7.73%
O%
7.73 %"
Contingency was increased to 30% by RFCA dated July 2, 2012.
REASON FOR CHANGE
1. While constructing the pavement, the contractor encountered areas where the
pavement section was thicker than expected with a wet and unstable sub - grade. It
was recommended to remove the thicker sections and cement treat and re -grade the
sub grade. Council approved the additional funds on July 2, 2012. The costs are to
compensate the contractor for additional excavation and cement - treating the sub
grade. (PCO 7).
AGREED COST = $109,200
2. To protect the new asphalt street, Portland cement concrete bus and landing pads
were recommended to be placed along Greenville from Warner to Edinger. The costs
are to compensate the contractor to install nine new bus and landing pads. (PCO 4).
Project Nos. 12 -6753, 12 -7531 & 11 -2618
RFA Change Order No. 1
October 16, 2012
Page 2
aul Godinez, II
Executive Director
Public Works Agency
"12- 6753 /CO /l2 -6753 RFA CO 1.1 Rev.
AGREED COST = $75,954.87
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance and Management Services Agency
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 12 -6753 & 12 -7531 ; RESIDENTIAL STREET REPAIR PHASE Change Order Number 1
16; 11 -2618; SANTIAGO PARK ROADWAY IMPROVEMENT
To R.J. Noble Company contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
spec cations on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT AGREED PRICE
1. Provide additional excavation and cement treat the sub -grade per direction given on June 7,
2012. (PCO #7).
AGREED COST = $109,200.00
2. Install bus and landing pads along Greenville per PCO #4 issued on April 19, 2012.
AGREED COST = $ 75,954.87
Page 1 of 2
CITY OF SANTA ANA
_„ - PUBLIC WORKS AGENCY
� CONTRACT CHANGE ORDER
Project Number 12 -6753 & 12 -7531 ; RESIDENTIAL STREET REPAIR PHASE Change Order Number 1
16; 11 -2618; SANTIAGO PARK ROADWAY IMPROVEMENT
To R.J. Noble Company Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifcations on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption of schedules,
extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ _ _ _ _ _ INCREASE � 1 $5,154.87
By reason of this order the CONTRACT TIME completion will be adjusted as follows: TBD.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specked, and will accept as full
payment therefor the prices shown above.
Accepted, Date 9 /?�+ /�-i_ Contractor R.J_ Noble COmpany
�BY AA Title G/ /7G` -/G �-$ ij�/�'-
�proval recomffiende .,.�
.-� Date � � � 24- � 2 ��Z
PUBLIC WORKS AGENCY E UTIVE DIRECTOR
Approved by `� 1' � Date � l � � ( 2�
CITY MANAGER
Page 2 of 2
MEMORANDUM
,�ducauon jst
Kevin O'Rourke
To: Interim City Manager Date: May 23, 2013
_a
Raul Godinez II, Executive Director
From: Public Works Agency
Subject: Project Nos.: 12 -6753, 12 -7531 & 11 -2618
Residential Street Repair Phase 16 and Santiago Park Roadway Imp
rovemeri4s
Change Order No. 2 ::e.'
Contractor: R.J. Noble Company
15505 E. Lincoln Avenue
Orange, CA 92865
Project Description: Residential Street Repair Phase 16 and Santiago Park Roadway
Improvements
Change Order Number: 2
Accounting Unit - Account - Activity Numbers:
31213261- 66220 - 11261801028 District 2
JUSTIFICATION
Total This Change Order: $40,512.88
The contract documents required the installation of approximately 330 linear feet of
5 -foot high wrought iron fence at Santiago Park along the service road which serves
the wildlife and watershed center, nature reserve and archery range. The fence is
intended to protect the natural habitat near the creek while inhibiting parking along
the road. Upon potholing the existing underground Navy jet -fuel pipeline, it was
determined that the proposed location of the new fence was within three feet of the
pipeline. Navy regulations required a minimum three foot offset from their pipeline
for any proximate improvements. Since the new wrought iron fence needed to be
relocated, Parks, Recreation and Community Services Agency took this opportunity
to enhance the park by realigning the fence and adding a pedestrian walking trail
adjacent to the fence.
FINAL COST = $40,512.88
Request for Approval of Change Order No. 2
May 23, 2013
Project Nos. 12 -6753, 12 -7531 & 11 -2618
Page 2
CONTRACT COST SUMMARY
Original Contract Total $2,383,107.90
Amount
% of
Contract
Previously Approved Change Order
$185,154.87
Increase
7.77%
This Change Order
$40,512.88
Increase
1.70%
Total Change Order to date
$225,667.75
Increase
9.47%
Adjusted Contract Total
$2,608,775.65
SCHE®ULEIMPACT
The re- alignment and design of the walking path involved additional modification to
fence panels which caused an eight week gate fabrication impact to the contract
schedule. The contract time is extended by 65 working days for the material
procurement and the revised work included in this change order.
APPROVED AS TO FUNDS AND ACCOUNTS:
t
Raul Go&nez II, Exe utive Director Francisco Gutierrez, Executive Director
Public Works Agency Finance and Management Services Agency
Gerardo Mouet, Exec Wive Director
Parks; Recreation and Community Services Agency
Projects \126753\MEM RFA CO N2
Request for Approval
May 23, 2013
Project Nos. 12 -6753,
Page 2
of Change Order No. 2
12 -7531 & 11 -2618
CHANGE ANALYSIS
DETAILED JUSTIFICATION
This project is split into two stages; Phase 16 of the City's Residential Street Repair
and the Santiago Park Roadway Improvements.
Phase 16 City Residential Street Repair Project addresses the remaining asphalt
streets that were identified as part of the Residential Street Repair Program. These
segments of local streets were identified as a high priority for rehabilitation in the
City's pavement management system.
Santiago Park Roadway Improvements addresses the service and access roads in
and around Santiago Park. These roads provide access to the wildlife and
watershed center, nature reserve, the archery range and access for City staff to
water production facilities.
This Change Order is entirely within the Santiago Roadway Improvements phase of
the project and encompasses modifications to the wrought iron fence, addition of a
decomposed granite walkway and pressure treated wood parking stops in Santiago
Park. A prior approval was granted for this work on December 10, 2012. This work
was done partially under contract bid items and partially on a time - and - material
basis.
The work included clearing and grubbing, relocation of existing irrigation heads,
construction of a decomposed granite trail, and installation of pressure treated
beams to create a barrier between pedestrians and vehicular traffic. A small portion
of this extra work was done using contract bid items; the majority of the extra work
was done on a time - and - materials basis.
REVISED DETAILS
Contract Section
Revised Section
6 0"
H I MODIFIED DETAIL W /WALK
Request for Approval of Change Order No. 2
May 23, 2013
Project Nos. 12 -6753, 12 -7531 & 11 -2618
Page 2
COST ANALYSIS
This Change Order accounts for only the time and material work not covered by
contract line items. Detailed breakdowns of all the costs involved in the changes are
as follows:
Contract Unit Costs:
Line Item
Preliminary City
Unit Price
Preliminary Cost
34 Furnish And Install 5.0' Wrought Iron Fence ILF
322
$73.00
$23,506.00
Time & Material Daily Report# 37
Final Quantity
Unit Price
Final Cost
34
Furnish And Install 5.0' Wrought Iron Fence
ILF
334
$73.00
$24,382.00
Time and materials costs:
Time & Material Daily Report # 33A/33B
$5,206.28
Time & Material Daily Report# 34
$2,005.06
Time & Material Daily Report# 35
$4,261.00
Time & Material Daily Report# 36
$4,331.44
Time & Material Daily Report# 37
$4,018.76
Time & Material Daily Report# 38
$671.98
Time & Material Daily Report # 39A/39B
$3,119.75
Time & Material Daily Report# 40
$1,949.46
Time & Material Daily Report # 41A/41B
$5,115.46
Time & Material Daily Report # 42
$7,841.59
Time & Material Daily Report # 43
$837.36
Time & Material Daily Report # 44
$1,154.75
TOTAL
$40,512.88
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 12 -6753 & 12 -7531; RESIDENTIAL STREET REPAIR PHASE Change Order Number 2
16; 11 -2618; SANTIAGO PARK ROADWAY IMPROVEMENT
To R.J. Noble Company
Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
EXTRA WORK AT TIME -AND MATERIALS
PUBLIC WORKS AGENCY
1. Construct a pedestrian walking trail to include redwood headers, pressure treated
beams with footings, clearing and grubbing, modification of fence panels, and relocation
of existing signage and irrigation heads per City of Santa Ana PCO #10 dated December
10, 2012.
Page 1 of 2
FINAL COST = $ 40,512.88
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 12 -6753 & 12 -7531; RESIDENTIAL STREET REPAIR PHASE Change Order Number 2
16; 11 -2618; SANTIAGO PARK ROADWAY IMPROVEMENT
To R.J. Noble Comoanv Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time,
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption of schedules,
extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 40,512.88
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Sixty five (65) Working Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the prices shown above.
Accepted, Dale 1,4 1'2_x' 13 Contractor R.J. Noble Comoanv
Gr1aIME %09711r /�—M11111111011
Approval recommended
Approved by
CITYMANAGER
iJ
rwx ✓s Date f
1IVE DIRECTOR //
Dale 6 —c,?6 -13