Loading...
HomeMy WebLinkAbout23A - PROJ - HAZARD AVE REHABREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: APRIL 16, 2012 TITLE: CONTRACT AWARD WITH ALL AMERICAN ASPHALT FOR HAZARD AVENUE REHABILITATION (PROJECT NO.116749) AND ALTON- GREENVILLE INTERSECTION IMPROVEMENTS (PROJECT NO. 116750) CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ? As Recommended ? As Amended ? Ordinance on IstReading ? Ordinance on 2ndReading ? Implementing Resolution ? Set Public Hearing For CONTINUED TO FILE NUMBER 1. Award a contract toAll American Asphalt, Inc., the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $984,984 for construction ofthe Hazard Avenue Rehabilitation from Euclid to Harbor Project and the Alton- Greenville Intersection Improvements Project. 2. Approve a funding analysis with a total estimated construction cost of $1,280,749. DISCUSSION The City's Pavement Management System has identified Hazard Avenue from Euclid Avenue to Harbor Boulevard (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated due to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require replacement. Improvements includereconstruction of pavement and replacement of damaged concrete curb and gutter, driveway approaches, and sidewalk. In addition, there is an unimproved section of Hazard between La Vergn Way and Morse Drive that will be widened with new pavement, curb and gutter, sidewalk, and curb ramps. A storm drain will also be constructed between Harbor and La Vergn Way to improve drainage. Once completed, these improvements will extend the life of the pavement by 20 years, and enhance the ride quality, surface drainage and appearance of the street as well as provide a safer route to school for students along the south side of Hazard. Included in the proposed contract are improvements to the Greenville Street and Alton Avenue intersection. Construction in this intersection includes installation of new curb ramps, sidewalk, and curb and gutteron the northwest and northeast corners of the intersection. On the east side of Greenville, new sidewalk is proposed to close the gap from the existing intersection to just north of the railroad crossing. These improvements will provide safe ADA access across the railroad tracks, and complete an unimproved section of sidewalk that is used heavily by students. 23A-1 Contract Award For Hazard Avenue Rehabilitation andAlton-Greenville Intersection April 16, 2012 Page 2 The Notice Inviting Bids was advertised onFebruary 29 and March 1, 2012, and bids were opened on March 21, 2012. A summary of the bid invitations mailed, the bids received, and the bid results are as follows: Santa Ana Contractors receiving notices: 11 Contractors requesting bidding documents: 19 Bids received: Bids received from Santa Ana Contractors: NAME OF RESPONSIVE BIDDER 1. All American Asphalt, Inc. 2. Elite Bobcat Service, Inc. 3. R.J. Noble Company, Inc. 4. Excel Paving Company, Inc. 5. Hardy & Harper, Inc. 6. Hillcrest Contracting, Inc. 7. Sequel Contractors, Inc. 7 CITY Corona Corona Orange Long Beach Santa Ana Corona Sante Fe Springs BID AMOUNT $984,984.00 $1,006,119.50 $1,017,293.55 $1,038,942.00 $1,046,000.00 $1,294,685.40 $ 1,343,563.00 The Engineer's estimate was $978,016. A total ofsevenbids were received and all were responsive. The lowest bid was submitted by All American Asphalt, Inc., for $984,984.00. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption ER No. 2012-20 was filed for this project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $1,280,479for the project (Exhibit 2). Funds are available in the Proposition 1B Fund (accounting unit 03017660-66220), Measure M Street Construction Fund (accounting unit 03217660-66220), Federal Clean Water Protection Enterprise (accounting unit 05717640-66220), Select Street Construction Fund (accounting unit 05917663-66220), and Traffic System Management (accounting unit 14817611- 66220). Raul Godinezill Executive Director Public Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director Finance &Management Services Agency RG/ET Exhibit: 1. Project Location Map 2. Funding Analysis 23A-2 GREENVILLE-ALTON INTERSECTION IMPROVEMENT (PROJECT NO. 116750) ® PROJECT LIMIT (SCALE Nis) LL W J 0 O O m W W s W Z J U H Q SANTA ANA TITLE: CITY COUNCIL HAZARD AVENUE REHABILITATION WwAi, PWA AGENDA DATE: FROM EUCLID ST TO HARBOR BLVD l April 16, 2012 (PROJECT 116749) po" FUNDING ANALYSIS PROJECT NOS. 116749 AND 116750 HAZARD AVENUE REHABILITATION FROM EUCLID TO HARBOR & ALTON - GREENVILLE INTERSECTION IMPROVEMENTS Construction Contract $984,984 Contract Administration $25,117 Inspection and Testing $73,874 Survey Staking $48,757 Contingencies $147,748 TOTAL ESTIMATED CONSTRUCTION COSTS $1,280,479 Exhibit 2 23A-4