Loading...
HomeMy WebLinkAbout23B - PROJ - MACARTHUR BLVD REHABREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: FEBRUARY 19, 2013 TITLE: APPROVED CONTRACT AWARD TO HARDY AND ? As Recommended HARPER, INC., FOR MACARTHUR ? As Amended 5 BOULEVARD REHABILITATION - ? Ordinance on 1 Reading ? Ordinance on 2"d Reading BRISTOL STREET TO FLOWER STREET ? Implementing Resolution (PROJECT NO. 136786) ? Set Public Hearing For_ 6? iGkL --- CITY MANAG R CONTINUED TO FILE NUMBER RECOMMENDED ACTION 1. Award a contract to the lowest responsible bidder, Hardy and Harper, Inc., in accordance with the Base Bid, totaling $911,000, for MacArthur Boulevard Rehabilitation from Bristol Street to Flower Street. 2. Approve the Cost Analysis as shown in Exhibit 1 for a total estimated project delivery cost of $1,138,750. DISCUSSION The City's Pavement Management System has identified MacArthur Boulevard from Bristol Street to Flower Street (Exhibit 2) as a high priority for rehabilitation. The pavement has deteriorated due to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require replacement. Improvements include reconstruction of pavement and replacement of damaged concrete curb and gutter, driveway approaches, sidewalk, and construction of new cross gutters. Once completed, these improvements will extend the life of the pavement and enhance the ride quality, surface drainage, and appearance of the street. A Notice Inviting Bids was advertised on January 7, 2013, and January 8, 2013, and bids were opened on January 23, 2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: Contractor Participation Data Santa Ana contractors receiving notices: 12 Contractors requesting bidding documents: 18 Bids received: 4 Bids received from Santa Ana contractors: 1 23B-1 Contract Award to Hardy and Harper, Inc., for MacArthur Boulevard Rehabilitation - Bristol Street to Flower Street February 19, 2013 Page 2 Bid Results Summary RANK BIDDERS NAME LOCATION BASE BID 1 Hardy and Harper, Inc. Santa Ana $911,000.00 2 R.J. Noble Company Orange $928,309.00 3 Excel Paving Company Long Beach $1,018,011.60 4 All American Asphalt Corona $1,080,000.00 A total of four bids were received and all were deemed responsive. The lowest bidder was a Santa Ana contractor, Hardy and Harper, Inc., for $911,000. Their bid is in line with the Engineer's estimate of $907,875. ENVIRONMENTAL IMPACT Environmental Review No. 2013-6 has been completed, and Categorical Exception was filed for this project, pursuant to the California Environmental Quality Act. FISCAL IMPACT A project cost analysis determined that $1,138,750 is needed to deliver the project, which includes construction administration, inspection, testing, and contingencies. Funding is available to cover costs in the Proposition 1 B Fund (Account 03017660-66220), Project No. 136786. Raul Godinez II Executive Director Public Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director , Finance & Management Services Agency RG/ET Exhibit 1: Cost Analysis 2: Project Location Map 23B-2 COST ANALYSIS PROJECT NO. 136786 CONTRACT AWARD FOR MACARTHUR BOULEVARD REHABILITATION - BRISTOL STREET TO FLOWER STREET Cost Analysis Construction Contract $911,000 Contract Administration $45,550 Inspection and Testing $91,100 Contingencies $91,100 TOTAL ESTIMATED CONSTRUCTION COSTS $1,138,750 Exhibit 1 23B-3 23B-4 23B-5 23B-6