HomeMy WebLinkAbout23B - PROJ - PARTON ST SEWER IMPROVEMENTS REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: APRIL 1, 2013 TITLE: APPROVED CONTRACT AWARD FOR PARTON ? As Recommended STREET SEWER MAIN ? As Amended IMPROVEMENTS PROJECT NO. El Ordinance on Reading ( El Ordinance on 2 2"d Reading 126418) ? Implementing Resolution ? Set Public Hearing For CONTINUED TO FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Award a contract to the lowest responsible bidder, Atlas-Allied, Inc., in accordance with the Base Bid in the amount of $258,760 for the construction of Parton Street sewer main improvements. 2. Approve the Cost Analysis for a total estimated project delivery cost of $323,400 as shown in Exhibit 1. DISCUSSION This project consists of replacing the old, deteriorated, and undersized sewer main located under Parton Street between 10th Street and Washington Avenue as shown in Exhibit 2. The improvements include installing a new sewer main, sewer laterals, manholes, and appurtenances. Once completed, the sewer main breaks and blockages associated with older and deteriorated systems will be eliminated, and the flow capacity will be increased, which would significantly reduce the chance of future sewer overflows. A Notice Inviting Bids was advertised on January 11 and 14, 2013, and bids were opened on January 29, 2013. The following is a summary of the bid invitations mailed, bids received, and bid results: CONTRACTOR PARTICIPATION DATA Santa Ana contractors receiving notices: 12 Contractors requesting bidding documents: 21 Bids received: 7 Bids received from Santa Ana contractors: 0 23B-1 Contract Award for Parton Street Sewer Main Improvements April 1, 2013 Page 2 BID RESULTS SUMMARY RANK BIDDER'S NAME LOCATION BASE BID 1 Atlas-Allied, Inc. Anaheim $258,760 2 GRFO, Inc. Moreno Valley $274,170 3 SND Construction, Inc. Arcadia $287,070 4 Palp, Inc. dba Excel Paving Company Long Beach $323,991 5 G. Hurtado Construction, Inc. Riverside $339,930 6 Bali Construction El Monte $341,644 7 SRD Engineering, Inc. Anaheim $368,066 A total of 7 bids were received and all were deemed responsive. The bid results and the lowest responsive bid by Atlas-Allied, Inc., in the amount of $258,760 is significantly lower than the Engineer's Estimate of $339,500. Therefore staff recommends awarding the contract and proceeding with construction. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project is exempt from further review. Categorical Exemption Environmental Review No. 2012-56 has been filed for this project. FISCAL IMPACT A project cost analysis shown in Exhibit 1 determines that the total funds needed to deliver the project, which includes construction administration, inspection, testing, and contingencies, is approximately $323,400. Funding is available to cover those costs in the Sewer Services Capital Project account (No. 05617640-66220), Project No. 126418. APPROVED AS TO FUNDS AND ACCOUNTS: Raul Godinez 11 Francisco Gutierrez Executive Director' Executive Director Public Works Agency Finance & Management Services Agency RG/TC Exhibit 1: Cost Analysis 2: Project Location Map 23B-2 COST ANALYSIS PROJECT NO. 126418 PARTON STREET SEWER MAIN IMPROVEMENTS Construction Contract $258,760 Contract Administration $14,300 Inspection and Testing $19,100 Survey Staking $5,364 Contingencies $25,876 TOTAL ESTIMATED CONSTRUCTION COSTS 323 400 Exhibit 1 23B-3 23B-4 WASHUGTO,V STREET E, L9 PROJECT LIME STREET LOCATION w Q LOTH STREET w ~ ~ w W cc Go C4 0 E0.4. z ~o; O z O z a > O a CIVIC CEATTER DRIVE STREET' EXH13T 2 VICINITY MAP NOT TO SCALE SANTA DNA ray, , Tltkp `sir PARTON STREET Agenda Date SEWER MAIN IMPROVEMENTS (REBID) W . 4-1-13 PROJECT NO, 12-6418 23B-5 23B-6